Denah Plafond Lantai 1: SKALA 1: 100

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

13 13 131 30 150 485 30 130 275

8 50 100

40

40
25
170
130

70 VOID

200
40
30

46,7 78,3 181,1 35 92 96,4

,2

40
40

40

25
98,5
30 100 84,4

140
390

40

90,5

80
110
25
25
50,7

25
30

30
115,6

55
NK
60

40,5 224,6 80
42,4

= PLAFOND TERTINGGI GYPSUM


DROOP KANTONG 8 + 8 CM
40
155

= PLAFOND ELEVASI TENGAH

50
DROOP KANTONG 8 + 8 CM

= PLAFOND TERTINGGI
60

95
126 235,5 126
SUNDA PLAFOND COKLAT DOFF

= PLAFOND TERTINGGI
MULTIPLAKS LAPIS HPL
30 60 87,5 60 87,5 60 30 290 165,6
485

DENAH PLAFOND LANTAI 1


SKALA 1 : 100

ARCHITECT PROJECT OWNER TITLE APPROVED PROJECT NUMBER NOTE SHEET


ARSITEK PROYEK PEMBERI TUGAS JUDUL GAMBAR DISETUJUI NOMOR PROYEK KETERANGAN LEMBAR

PROJECT MANAGER
SUPPLIER IS RESPONSIBLE FOR CHECKING WORKING DRAWINGS BEFORE PLATE ARE MADE FOR ACCURACY
DENAH ARCHITECT/DESIGNER 473 IN MEASUREMENTS, PLATE TOLERANCE REQUIREMENT, REGISTRATION AND CONSTRUCTION DETAILING.
ARS
ENGINEER IN CHARGE
ANY CHANGES MADE TO SUIT PRODUCTION REQUIREMENT SHOULD BE APPROVED BY BOTH THE CLIENT
AND DESIGNER. COLOR PROOFS SHOULD BE SUBMITTED TO CLIENT AND DESIGNER. ALL COPY SHOULD BE
SCALE
JOB CAPTAIN PROOFREARED BY CLIENT AND LEGAL REQUIREMENT CHECKED BY CLIENT'S LEGAL DEPARTMENT.

1 : 200 0 200 DRAWN BY

You might also like