Professional Documents
Culture Documents
Cable Tray Installation JSA 21-11-2017 N°0022
Cable Tray Installation JSA 21-11-2017 N°0022
Cable Tray Installation JSA 21-11-2017 N°0022
WORK TEAM MEMBERS PERSONAL PROTECTIVE PLANT, EQUIPMENT & ISOLATION, TAGGING, Environmental Controls
EQUIPMENT REQUIREMENTS TOOLS BARRICADES, SIGNS & (Bunding, Waste
LICENSES Disposal, Discharge
Prevention, etc)
NAME (print) Helmet Generator LOTO if required Cssi Will follow the
MSDS instructions
Black Safety Glasses or clear Tower light Caution taps And project
enviromenet procedure
Gloves Hand tools Relevant safety signs
Safety shoes Cad weld Equipment certified
Dust musk if necessary Clear access
Covroll and Disposable suit
1 rev 00
Mandatory PPE
PERMITS
Confined Spaces Work
Excavation Gas
Isolation Hot Work
5 rev 00
Mandatory PPE