This toolbox talk discusses safety topics for workers on the RIYAD CITY SOUTH - PHASE 05 N6 & 7 INFRASTRUCTURE & STREETSCAPE WORKS project. It outlines 10 safety points related to operating equipment, including maintaining distance from moving equipment, using banksman to guide plant movement, and designating parking areas. It also lists general safety discussions including prohibiting sleeping and eating at the site, and communicating daily activity briefings.
This toolbox talk discusses safety topics for workers on the RIYAD CITY SOUTH - PHASE 05 N6 & 7 INFRASTRUCTURE & STREETSCAPE WORKS project. It outlines 10 safety points related to operating equipment, including maintaining distance from moving equipment, using banksman to guide plant movement, and designating parking areas. It also lists general safety discussions including prohibiting sleeping and eating at the site, and communicating daily activity briefings.
This toolbox talk discusses safety topics for workers on the RIYAD CITY SOUTH - PHASE 05 N6 & 7 INFRASTRUCTURE & STREETSCAPE WORKS project. It outlines 10 safety points related to operating equipment, including maintaining distance from moving equipment, using banksman to guide plant movement, and designating parking areas. It also lists general safety discussions including prohibiting sleeping and eating at the site, and communicating daily activity briefings.
2. Follow Site speed limit 30 & 20 KMPH 3. Maintain minimum 10-meter distance away from any equipment 4. Do not stand or give direction while standing very close to the moving equipment’s 5. Banksman shall be provided to guide the plant movement in a congested area. 6. Reversing of equipment/vehicle controlled by Banksman. 7. Separate routes for pedestrian and machines wherever required. 8. Never use a mobile phone when driving or operating. 9. Never operate mobile plant or vehicles use equipment unless trained and authorised to do so. 10. Designated Parking (reverse parking).
General Discussion 11. No sleeping /eating at site 12. Daily activity briefing shall be communicated and recorded to all employees