PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II

PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER SERVICES


CIVIL WORKS

TOTAL PRICE
NO. DESCRIPTION
(IDR)
1 2 3
PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II

1 Bill No 1 : Switchyard 11,957,715,959

2 Bill No 2 : GIS Building 150 kV 7,704,535,318

3 Bill No 3 : Miscellaneous

4 Bill No 4 : Security Post 258,253,582

Total Price Schedule 1 for Civil work 19,920,504,859

Date :

Name of Bidder :
GIS 150 KV SENAYAN BARU II
Signature of Bidder :
PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II
PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER SERVICES
CIVIL WORKS
BILL NO 1 : SWITCHYARD FOR CIVIL WORKS

PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II


UNIT PRICE TOTAL PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY LOCAL
PORTION
(RUPIAH) (RUPIAH)
1 2 3 4 5 6=4x5

I PREPARATORY WORK
1 Mobilization & Demobilization ls 1.00 64,000,000 64,000,000
2 Plank name project unit 1.00 1,439,097 1,439,097
3 Bouwplank m' 440.20 123,270 54,263,519
4 Fence security of project 2 m high m' 296.27 511,680 151,595,412
5 Site office ( 4m x 6 m ) m2 24.00 2,767,249 66,413,978
6 Site storage ( 4 m x 15 m ) m 2
60.00 2,767,249 166,034,945
7 Soil and Geotechnical Investigation :
a. DCPT (Sondir) unit 3.00 2,560,000 7,680,000
b. Boring unit 2.00 25,600,000 51,200,000
c. Test Lab and Report Sets 5.00 640,000 3,200,000

TOTAL I 565,826,950

II GENERAL EARTHWORKS AND SITE WORKS

1 Earthworks:
a. Site Clearing m2
b. Common Excavation m3 -
c. Soil Disposal m 3
-
d. Backfill filling with selected material m3 -

2 Embankment Construction :
a. Construction of common fill embankment with selected m3 2,500.00 163,555 408,886,883
material from import fill (compaction in layer of 20 cm) -
b. Test Sand Cone (per-layer of 20 cm) ttk 15.00 640,000 9,600,000
-
3 Concrete works (slope stability): -
a. Retaining wall (stone masonry) m 3
350.00 1,337,509 468,128,178
b. Gabion m3 - -
c. Sodding (gebalan rumput) m3 - -
d. Concrete frame (concrete f'c = 14,5 MPa (K 175), m 3
- -
Fe: 150 kg/m3; BJTD-35, formwork) -
-
4 Road works (new): -
a. Prepare compacted subgrade m2 1,400.00 64,351 90,091,255
b. Base structure m 2
1,400.00 106,363 148,907,950
c. 50 mm Asphalt hot mix m2 1,400.00 72,644 101,701,383
d. 50 mm Asphalt penetration m2 1,400.00 156,578 219,209,679
-
5 Kerbing & Edging (Concrete f'c = 14,5 MPa (K 175)): -
a. Precast Concrete Kerbs for switchyard (10 x 20 x 60 cm) m' 151.00 94,675 14,295,945
b. Precast Concrete Kerbs for road (25 x 30 x 50 cm) m' 300.00 124,005 37,201,568
-

Date :
GIS 150 KV SENAYAN BARU II
PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II
PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER SERVICES
CIVIL WORKS
BILL NO 1 : SWITCHYARD FOR CIVIL WORKS

PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II


UNIT PRICE TOTAL PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY LOCAL
PORTION
(RUPIAH) (RUPIAH)
1 2 3 4 5 6=4x5
6 Fence complete with barbed wire,accessories and foundation -
a. BRC Fence 1.50 m height m' - -
b. BRC Fence 1.90 m height m' 56.00 1,484,163 83,113,127
c. Fence brick wall 2.40 m height (lower part) & barbed wire
m' 670.00 4,772,813
0.60 m height (upper part) 3,197,784,560
-
7 Gate complete with pole, accessories and foundation -
a. Single gate BRC 1.90 m height, 1.1 m width unit 5.00 3,158,876 15,794,382
b. Sliding gate BRC 1.50 m height, 6.3 m width (include column
unit 1.00 5,719,304
brick) 5,719,304
c. Double gate BRC 1.90 m height, 3,30 m width unit - -
-
8 Landscaping m2 - -
9 Gravelling : -
a. Gravel (dia 3 - 5 cm); thickness = 20 cm m2 500.00 46,708 23,354,241
3
b. Sand layer below gravel (compacted sand); thickness = 5 cm m - -
-
U- Ditch cable trench for 150 kV (f'c = 31,2 MPa (K 350)) include
10
cover, galvanized L 50.50.5 and PVC pipe) -
a. Type 1 (large, 100 x 100 x 120 cm ) m' 106.00 1,234,569 130,864,317
b. Type 2 (medium, 60 x 60 x 120 cm ) m' 35.00 842,011 29,470,386
c. Type 3 (small, 40 x 40 x 120 cm ) m' 30.00 412,791 12,383,727
d. Type 4 Box Culvert (crossing road, 100 x 100 x 100 cm LD) m' 20.00 1,461,112 29,222,237
-
11 Drainage switchyard : -
a. Open Drainage (stone masonry)= 40 x 70 cm2 m' 300.00 1,050,299 315,089,635
b. Open Drainage (brick) 30 x 40 cm 2
m' 90.00 540,401 48,636,109
c. Sub soil Drainage dia 30 cm including gravel & Palm fibre m' 112.00 477,800 53,513,596
d. Control Box (Brick 60x60 cm2 ) height = 70 cm with cover unit 30.00 1,065,574 31,967,234
-
12 Station earthing system: -
a. Excavation and backfill m3 30.00 203,633 6,109,002
b. 100 mm diameter asbestos cement pipe ducts m -
c. PVC flexible pipe m -
-
TOTAL II 5,481,044,699
III FOUNDATION FOR 150 kV -
-
1 Surge Arrester Unit -
2 Carrent Transformer Unit -
3 Line Trap Unit -
4 Post For Gantries TW1 Unit -
5 Power Transformer 60 MVA Set 4.00 73,107,710 292,430,838
6 Fire Wall Unit 5.00 - -
7 Marshalling Kiosk Unit -
8 Neutral Grounding Resistors (NGR) Unit 4.00 - -
9 Support 20 kV Unit 4.00 6,097,850 24,391,399
10 Outdoor Cable Sealing end Unit -
11 Oil Pit ( Cap 30 m3 ) Unit 1.00 - -
12 Service transformers (include roofing and fence BRC 1.2 m) Set 2.00 - -
-
TOTAL III 316,822,237

Date :
GIS 150 KV SENAYAN BARU II
PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II
PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER SERVICES
CIVIL WORKS
BILL NO 1 : SWITCHYARD FOR CIVIL WORKS

PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II


UNIT PRICE TOTAL PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY LOCAL
PORTION
(RUPIAH) (RUPIAH)
1 2 3 4 5 6=4x5
V SITE AND ROAD LIGHTING -
--
1 Mercury Vapour Flouresent light 1 x 250 W complete with lighting
column 9 m high, fuse box, grounding system and installation of
cable conduit and wiring and all accessories and foundation of NO 5.00
column (each 15 m length) 9,908,244.00 49,541,220-
2 Mercury Vapour Flouresent light 1 x 250 W complete with support,
fuse box, grounding system and installation of cable conduit and NO 3.00
wiring and all accessories for Switchyard 4,229,932.00 12,689,796-
3 Mercury Vapour Flouresent light 1 x 80 W complete with lighting
column 2 m high, fuse box, grounding system and installation of
cable conduit and wiring and all accessories and foundation of NO 5.00
column 7,686,068.00 38,430,340-
4 Lighting panel outdoor complete with foto cell switch fuse, mcb,
grounding system indicator wiring and all accessories (foto cell) and Set 2.00
foundation of panel 6,158,009.00 12,316,018
TOTAL V 112,977,374
11,957,715,959
TOTAL PRICE SIPIL SWITCHYARD (I+II+III+IV+V)

Date :
GIS 150 KV SENAYAN BARU II
PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II
PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER SERVICES
CIVIL WORKS
BILL NO 2 : CONTROL BUILDING 150 KV

PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II


UNIT PRICE TOTAL PRICE
LOCAL CURRENCY LOCAL
NO DESCRIPTION UNIT QTY
PORTION
(RUPIAH) (RUPIAH)
1 2 3 4 5 6=4X5
CONTROL BUILDING FOR 150 KV

I EARTHWORKS
1 Excavation work m3 1,495.50 127,659 190,913,941.18
2 Backfill filling with selected material m3 279.29 163,555 45,678,879.90
3 Soil Disposal m3 1,216.21 45,495 55,331,006.46
4 Sand layer ( compacted sand ) m3 10.56 363,941 3,843,213.50
5 Import Filling with selected Material m3 - -
-
II CONCRETE REINFORCEMENT AND INSTALATION WORK -

1 Lean concrete f'c = 7.4 MPa (K-100) (for foundation and plain thickness 5 cm) m3 5.28 932,934
4,925,889.61

2 Foundation work (concrete f'c = 26.4 MPa (K 300), Fe : 150 kg/m3, Formwork) m 3
55.44 4,521,232
250,657,079.69

3 Sloof work ( concrete f'c = 26.4 MPa (K 300), Fe : 250 kg/m3, Formwork) m3 25.04 6,540,916
163,784,536.95

4 Column work ( concrete f'c = 26.4 MPa (K 300), Fe : 350 kg/m3, Formwork ) m3 125.49 8,560,600
1,074,252,626.53

5 Beam work (concrete f'c = 26.4 MPa (K 300), Fe : 300 kg/m3, Formwork) m3 74.10 7,550,758
559,496,082.60

6 Basement wall work (concrete f'c = 26.4 MPa (K 300), Fe : 200 kg/m3, Formwork) m3 52.80 5,531,074
292,040,696.86

7 Roof work (concrete f'c = 26.4 MPa (K 300), Fe : 150 kg/m3, Formwork ) m3 66.88 4,521,232
302,389,011.62

8 Cannopy work ( concrete f'c = 26.4 MPa (K 300), Fe : 125 kg/m3, Formwork ) m3 5.60 4,016,310
22,491,338.76

9 Slab floor work (concrete f'c = 26.4 MPa (K 300), Fe : 150 kg/m3, Formwork) m3 273.47 4,521,232
1,236,398,598.46

10 Stair work ( concrete f'c = 26.4 MPa (K 300), Fe : 125 kg/m3, Formwork ) m3 11.70 4,016,310
46,990,832.76
Column, sloof and beam practical work (concrete f'c = 14,5 MPa (K 175), Fe :120
11 m3 7.87 3,811,602
kg/m3, Formwork) 30,004,933.71
12 Stone masonry ad 1 pc : 3 sand m 3
- -
13 A half brick wall ad 1 pc : 4 sand m2 1,856.51 147,776 274,347,752.46
14 A half brick wall ad 1 pc : 2 sand m2 72.00 156,698 11,282,232.27
15 Plaster ad 1 pc : 4 sand m2 3,713.02 84,825 314,955,941.26
16 Plaster ad 1 pc : 2 sand m2 190.00 89,180 16,944,163.52
17 Acian m2 3,903.02 50,251 196,130,439.45
18 Concrete f'c = 7.4 MPa (K-100), slump (12±2) (rabat) m3 121.60 1,039,640 126,420,201.01
-
III ROOF AND CELLING WORK -
1 Steel trusses complete with welding or bolting and steel painting kg - -
2 Purlin complete with plat simpul and steel painting kg - -
3 Wind bracing and tie rod kg - -
4 Klip-lock Hi-Ten metal sheet complete with accessories m2 - -
5 Nok standard Hi-Ten m' - -
Thermal Insulation Glasswool t=10 cm, aluminium foil (single sided) with 2 (two)
6 m2 -
layer and roof-mesh -
7 Ceilling Gypsum board 1200 x 2400 x 9 mm m 2
481.44 66,162 31,852,973.20
8 Ceilling Frame (Hollow steel 40x40x2 mm) m2 481.44 204,654 98,528,699.10

Date :

Name of Bidder :
GIS 150 KV SENAYAN BARU II
Signature of Bidder :
PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II
PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER SERVICES
CIVIL WORKS
BILL NO 2 : CONTROL BUILDING 150 KV

PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II


UNIT PRICE TOTAL PRICE
LOCAL CURRENCY LOCAL
NO DESCRIPTION UNIT QTY
PORTION
(RUPIAH) (RUPIAH)
1 2 3 4 5 6=4X5
9 List profil gypsum m' 529.00 44,816 23,707,907.09
10 Listplank super sheet (GRC) m' - -

11 PVC pipe vertical dia 3 inc (include bends, tees, albows, reducers, adaptors, roof m' 512.00 184,842
drain) 94,639,256.37
12 Aluminium flashing t=0.50 mm including filler in both side m' - -
13 Steel angle include welding or bolting kg - -
14 Water proofing membran type t= 3 mm and mortar screed m2 590.00 50,813 29,979,931.49
-
IV DOOR AND WINDOWS WORK -
1 Glass door complete with aluminium frame and accessories: -
- Type P1 (double door) 2100 x 2700 mm unit 2.00 1,511,597 3,023,194.83
- Type P4 (double door) 1775 x 2100 mm unit 1.00 1,360,438 1,360,437.67
- Type P6 (Single door) 800 x 2100 mm unit 4.00 879,787 3,519,146.55
- Type P2 (Single door) 1000 x 2100 mm unit 8.00 1,231,701 9,853,610.33
- Type P5 (Single door) 800 x 2100 mm unit 2.00 1,143,723 2,287,445.25
- Type P7 (Single door & 12 fixed windows) 2100 x 9900 mm unit 1.00 6,158,506 6,158,506.45
-
2 Glass windows & ventilation complete with aluminium frame and accessories: -
- Type V1 (4 fixed ) 3650 x 1500 mm unit 20.00 1,052,042 21,040,841.32
- Type V2 (5 fixed ) 4800 x 1500 mm unit 10.00 1,262,450 12,624,504.79
- Type V3 (19 fixed ) 9500 x 1000 mm unit 1.00 1,578,063 1,578,063.10
- Type V4 (2 fixed ) 1775 x 700 mm unit 1.00 946,838 946,837.86
- Type V5 (1 fixed) 475 x 700 mm unit 1.00 999,440 999,439.96
- Type V6 (1 fixed) dia 1500 mm unit 2.00 1,073,083 2,146,165.81
- Type J1 (3 fixed) 3300 x 1300 mm unit 2.00 1,209,848 2,419,696.75
-
3 Steel folding door (P7) complete with frame, accessories and steel painting unit 1.00 1,149,878 1,149,878.12
-
V SANITARY AND PLUMBING WORK -

Supply and fix the following including all jointing, materials for fixing and plugging
and making good on competion sanitary appliances are to be of high quality -
-
1 Bath basin complete No 2.00 1,999,879 3,999,757.47
2 Close-coupled with eco washer equal to merk TOTO complete No 2.00 4,081,358 8,162,715.39
3 Wash basin stainless steel equal to merk TOTO complete No 1.00 3,955,000 3,955,000.14
4 Lavatory basin equal to merk TOTO complete with spectacle No 2.00 932,337 1,864,673.18
5 Ceramic bowl urinal equal to merk TOTO complete No 2.00 3,906,253 7,812,506.75
6 Chromium plate toiled roll holder No 2.00 522,366 1,044,731.03
7 Chromium plate soap dish No 2.00 254,238 508,475.03
8 Chromium plated hat and coat hook No 2.00 251,012 502,023.83
Installation of water supply GIP medium pipe class SNI (include for all pipes,
9 bends, tees, albows, reducers, adaptors, taps and connections to fittings, appliances, ls 1.00 13,891,140
etc.) 13,891,140.00
Installation of water waste pipe PVC dia 3 inc AW (include for all pipes, bends,
10 tees, albows, reducers, adaptors, metal grill and connections to fittings, appliances, ls 1.00 18,568,547
etc.) 18,568,546.56

Water tank stainless steel 2 x1000 liter and pressure tank 100 liter and steel
11 unit 1.00 58,026,105
structures tower ( cap : 2 m3 ) and installation of pipe
58,026,104.55

Date :

Name of Bidder :
GIS 150 KV SENAYAN BARU II
Signature of Bidder :
PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II
PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER SERVICES
CIVIL WORKS
BILL NO 2 : CONTROL BUILDING 150 KV

PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II


UNIT PRICE TOTAL PRICE
LOCAL CURRENCY LOCAL
NO DESCRIPTION UNIT QTY
PORTION
(RUPIAH) (RUPIAH)
1 2 3 4 5 6=4X5
12 Deepwell including submersible water pump 150 lt/m capacity and accessories set 1.00 229,120,000 229,120,000.00
Septictank cap 3 m3 included infiltrate cap 2 m3 complete with PVC, palm fibre and
13 unit 1.00 15,350,888
sand stone 15,350,887.68
14 Open Drainage (brick) 30/40 cm2 for GIS building m' 130.00 540,401 70,252,157.16
-
VI FLOOR AND WALL TILING -
All material floor and wall tiling must be of high quality -
1 Granite floor tiles 600 x 600 mm (meeting, hall, terace room) m2 161.75 315,636 51,053,138.87
2 Non glazed ceramic floor tiles 400 x 400 mm (battery, AC/DC room) m2 77.45 188,640 14,610,915.79
3 Granite floor tiles 300 x 300 mm (toilet, kitchen) - anti-slip m2 16.00 297,127 4,754,038.51
4 Granite floor tiles 300 x 600 mm (stairs)- anti-slip m2 76.72 316,974 24,318,243.75
5 Granite wall tiles 400 x 400 mm (toilet, kitchen) m2 36.75 238,507 8,765,116.79
6 Glazed plint tiles 100 x 400 mm m' 38.94 204,905 7,979,018.03
7 Granite plint tile 100 x 600 mm m' 86.00 669,453 57,572,917.79
8 Stepnosing 100 x 400 mm (stairs, terrace) m' 159.00 191,222 30,404,336.97
9 Natural stone (terace) m2 - -
10 Metal raised floor 50 mm thick, including vinil finishing (control, SAS) m2 195.27 1,009,372 197,101,116.05
11 Floor hardener finished m2 409.60 121,629 49,819,010.73
12 Expansion joint and sealing m - -
-
VII PAINTING WORK -
Apply two coasts red lead primer, one coat alkyd based undercoat and one coats
1 m2 143.10 88,141
alkyd gloss paint on metal works 12,612,989.02
Prepare and apply one coat alkali resistant primer and three coats vinyl acrylic
2 m 2
3,406.86 35,570
emulsion (interior & celling) 121,181,489.96
Prepared and apply two coats alkali resistant primer and three coats exterior grade
3 m2 1,122.00 35,703
weathershield 40,058,729.31
4 Prepare as speciffied and apply two coats epoxy based coloured floor paint m 2
-
-
VIII FINISHING WORK -
All material finishing work must be of high quality -
1 Door closer No 21.00 552,093 11,593,955.39
2 Hinge for window (1 set= 2 pcs) set - -
3 Hinge for door (1 set= 3 pcs) set 21.00 187,987 3,947,735.79
4 Grendel for window (1 set= 2 pcs) No - -
5 Grendel for door double swing No 3.00 162,335 487,005.93
6 Wind hook of window (1 set = 2 pcs) set - -
7 Door lock No 18.00 740,253 13,324,556.04
8 Door Holder (1 set= 2 pcs) No 21.00 740,253 15,545,315.39
-
IX METAL WORKS -
Rates for steel and metal works to included for all neccesary, bolts, welded,
connections , apliances, etc. -
1 Handrail of stainless steel pipe ø 2" m' 70.00 1,350,542 94,537,965.94
2 Plat bordes/ checker plate t= 6 mm complete with steel painting kg 1,080.00 28,775 31,076,534.48
3 Cable Rack thickness 2 mm m' 500.00 797,417 398,708,508.16
4 Emergency spiral staircase of stainless steel include foundation set 1.00 9,150,174 9,150,173.97
5 Stainless steel of fence m' 30.00 1,235,342 37,060,271.12
6 Steel angle include welding or bolting kg 500.00 49,262 24,631,185.28
-

Date :

Name of Bidder :
GIS 150 KV SENAYAN BARU II
Signature of Bidder :
PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II
PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER SERVICES
CIVIL WORKS
BILL NO 2 : CONTROL BUILDING 150 KV

PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II


UNIT PRICE TOTAL PRICE
LOCAL CURRENCY LOCAL
NO DESCRIPTION UNIT QTY
PORTION
(RUPIAH) (RUPIAH)
1 2 3 4 5 6=4X5
X CABLE DUCT -
1 Concrete cable duct ( f'c = 14,5 MPa (K 175); Fe : 100 kg /m3 ) -
included galvanized cable tray steel anggle 50.50.5 and plate bordes 6 mm m - -
for type cable duct I --
2 Concrete cable duct ( f'c = 14,5 MPa (K 175); Fe : 100 kg /m3 ) -
included galvanized cable tray steel anggle 50.50.5 and plate bordes 6 mm m - -
for type cable duct II --
3 Concrete cable duct ( f'c = 14,5 MPa (K 175); Fe : 100 kg /m3 ) -
included galvanized cable tray steel anggle 50.50.5 and plate bordes 6 mm m - -
for type cable duct III --
4 Concrete cable duct ( f'c = 14,5 MPa (K 175); Fe : 100 kg /m3 ) -
included galvanized cable tray steel anggle 50.50.5 and plate bordes 6 mm m - -
for type cable duct IV --
5 Concrete cable duct ( f'c = 14,5 MPa (K 175); Fe : 100 kg /m3 ) -
included galvanized cable tray steel anggle 50.50.5 and plate bordes 6 mm m - -
for type cable duct V -
-
XI INSTALATION OF ELECTRICAL AND MECANICAL WORK -
Installation of electric lighting to included for all neccesary (cabling plugs, fittings,
lights, exhaust fans, air conditioning, etc.) -
1 AC split 2PK No 6.00 12,620,571 75,723,424.82
2 AC split 1 PK No 2.00 7,294,881 14,589,762.41
3 Exhaus fan wall 60 W/220 Volt (16") industrial No 5.00 693,379 3,466,892.86
4 Exhaus fan ceiling 40 W/220 Volt (10") very low noice No 4.00 573,699 2,294,794.29
5 Panel Box MCB complete with R.S.T lamp indicator and contactor grounding No 2.00 3,072,000 6,144,000.00
6 Price for capacity electrical ls 1.00 6,400,000 6,400,000.00
7 Downlight inculding fitting spotlight installation wiring and switch No 180.00 594,354 106,983,717.12
8 Lampu LED 9 Watt No 180.00 78,720 14,169,600.00
9 Lighting hanger including fitting spotlight installation wiring , switch and Led 2x10 No 56.00 594,354 33,283,823.10
10 Emergency lighting including wiring and lamp 30 Watt No 72.00 179,200 12,902,400.00
11 Spotlight including installation wiring, switch and LED 30 Watt No 24.00 448,000 10,752,000.00
12 Stop contact No 26.00 253,369 6,587,581.31
320,000 -
XII LIGHTNING PROTECTION -

1 Arder/ground rod included pipa and cable BC 25 mm2 and all accessories clamps Lot 1.00 15,542,695
steel plate, material support and pole, grounding system for controle building 15,542,694.57
-
XIII FIRE ALARM -
Rates for fire alarm works to included for all neccesary - cable enclosed in steel
conduit above ceiling level, including junction boxes, bends, clamps and the like
and complete with all fittings and accessories -
1 Alarm bell 6'' ( 150 mm ) diameter to approval surface mounted in Lobby No 3.00 179,200 537,600.00
2 Smoke detector No 42.00 448,000 18,816,000.00
3 Fixed and rate of rice temperature detector No 20.00 1,408,000 28,160,000.00
MCFA ( Master control fire alarm ) included indication lamp, battery rectifier and
4 No 1.00 2,304,000
all accessories 2,304,000.00
-
XIV FIRE FIGHTING EQUIPMENT -

Date :

Name of Bidder :
GIS 150 KV SENAYAN BARU II
Signature of Bidder :
PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II
PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER SERVICES
CIVIL WORKS
BILL NO 2 : CONTROL BUILDING 150 KV

PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II


UNIT PRICE TOTAL PRICE
LOCAL CURRENCY LOCAL
NO DESCRIPTION UNIT QTY
PORTION
(RUPIAH) (RUPIAH)
1 2 3 4 5 6=4X5
1 Portable fire extinghuister type dry chemical ( 5 kg hallon ) No 4.00 640,000 2,560,000.00
2 Mobile unit powder fire extinghuister ( 50 kg hallon ) No 2.00 29,440,000 58,880,000.00
3 Portable type 6 kg CO2 c/w wall bracket No 5.00 1,920,000 9,600,000.00
4 Hydrant and accessories included installation of pipe Lot 1.00 4,262,298 4,262,297.93
- Fortable Pump for Fire Hidrant complete = 1 unit -
- Hydrant Box Type C (Out Door) = 3 unit -
- Gate valve dia 2 1/2" kitz + Control box ( for Pipa Distribusi Hidrant ) = 3 pieces -

5 Lot 1.00 10,064,367


Underground Water tank (cap : 100 m3) and jet pump included installation of pipe 10,064,367.48
-
XV SUNDRIES -
-
1 Flagpole Stainless Steel ø 3" with acc + Foundation No - -

2 Name plate "GIS 150 kV XXX" work complete with stainless steel pipe ø 2", No -
stainless steel plate 1.2 mm, PLN's logo & block letter and foundation of column -
3 Key box No 1.00 61,440 61,440.00

TOTAL PRICE GIS BUILDING FOR 150 KV 7,704,535,318

Date :

Name of Bidder :
GIS 150 KV SENAYAN BARU II
Signature of Bidder :
PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II
PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER SERVICES
CIVIL WORKS
BILL NO 3 : MISCELLANEOUS WORKS

PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II


UNIT PRICE TOTAL PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY LOCAL
PORTION
(RUPIAH) (RUPIAH)
1 2 3 4 5 6=4x5

1 Concrete Work
1.1 Concrete f'c = 14,5 MPa (K 175) m3 -
1.2 Concrete f'c = 26.4 MPa (K 300) m 3

1.3 Concrete f'c = 19,3 MPa (K 225) m3

2 Reinforcement Work
2.1 Reinforcement steel U 24/ BJTP - 24 kg -
2.2 Reinforcement steel U 32/ BJTD - 40 kg

3 Excavation Work
3.1 Excavation of Soil m3 -
3.2 Excavation of Rock m 3

4 Filling Work
4.1 Back Filling m3 -
4.2 Import Filling m 3

5 Steel Work
5.1 Steel trusses comply with connection kg
5.2 Wind Bracing and Tic Rod kg
5.3 Steel Structure for Gantry ton

6 Piling
6.1 Driven Pile 20 x 20 cm m'
6.2 Driven Pile 30 x 30 cm m'
6.3 Wooden Pile dia 8- 10 cm m'

TOTAL MISCELLANEOUS -

Date :
GIS 150 KV SENAYAN BARU II
Name of Bidder :
PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II
PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER SERVICES
CIVIL WORKS
BILL NO. 4 : SECURITY POST

UNIT PRICE TOTAL PRICE


NO. DESCRIPTION UNIT QTY LOCAL CURRENCY LOCAL
PORTION
(RUPIAH) (RUPIAH)

A. EARTHWORK
1 Excavation work m3 19.20 127,659 2,451,051.60
2 Backfill filling with selected material m3 14.70 75,974 1,116,824.62
3 Sand layer ( compacted sand ) m3 52.00 363,941 18,924,914.94
4 Import Filling with selected Material m3 3.60 163,555 588,797.11
-
B. CONCRETE REINFORCEMENT AND INSTALATION WORK -
1 Stone masonry ad 1 : 3 m3 9.60 1,337,509 12,840,087.16
2 A half brick wall ad 1 pc : 4 sand m2 84.00 147,776 12,413,189.91
3 Plaster ad 1 pc : 4 sand m2 168.00 84,825 14,250,555.65
4 Plaster ad 1 pc : 2 sand m2 32.00 89,180 2,853,753.86
5 Acian m2 200.00 50,251 10,050,188.80
6 Sloof work f'c = 14,5 MPa (K 175) 15/20 m3 0.90 1,403,981 1,263,582.95
7 Column work f'c = 14,5 MPa (K 175) 15/15 m3 0.63 1,590,569 1,002,058.65
8 Ring balk work f'c = 14,5 MPa (K 175) 15/20 m3 0.90 1,403,981 1,263,582.95
9 Concrete for Table f'c = 14,5 MPa (K 175) (Meja Jaga) m3 0.32 1,403,981 449,273.94
10 Steel work 120 kg /m3 concrete kg 330.00 20,197 6,664,958.57
11 Concrete f'c = 7.4 MPa (K-100), slump (12±2) (selasar, carport, terrace) t=7cm m3 2.40 1,039,640 2,495,135.55
-
C. FLOOR AND WALL TILING -
1 Glazed ceramic floor tiles 400 x 400 mm m2 21.00 350,667 7,363,998.16
2 Non glazed ceramic floor tiles 200 x 200 mm (toilet) m2 3.00 239,307 717,919.74
3 Glazed ceramic wall tiles 200 x 250 mm (toilet, table) m2 18.50 267,467 4,948,131.72
4 Glazed ceramic plint tiles 100 x 400 mm m' 30.00 204,905 6,147,163.35
-
D. SANITARY AND PLUMBING WORK -

Supply and fix the following including all jointing, materials for fixing and plugging and
making good on competion sanitary appliances are to be of high quality
-
1 Wash basin complete unit 1.00 3,955,000 3,955,000.14
2 Bath basin complete unit 1.00 1,999,879 1,999,878.73
3 Squatting water closed complete unit 1.00 4,081,358 4,081,357.70
Installation of water supply pipe PVC dia 1/2 inc and fittings (include for all pipes,
4 bends, tees, albows, reducers, adaptors, taps and connections to fittings, appliances, ls 1.00 6,945,570
etc.) 6,945,570.00
Installation of water waste pipe PVC dia 3 inc and fittings (include for all pipes,
5 bends, tees, albows, reducers, adaptors, metal grill and connections to fittings, ls 1.00 9,284,273
appliances, etc.) 9,284,273.28
6 Septictank cap 1.5 m3 included infiltrate cap 2 m3 complete with ls 1.00 7,675,444 7,675,443.84
palm fibre and sand stone -
7 Control Box include cover unit 2.00 1,065,574 2,131,148.97
-
E. DOOR AND WINDOWS WORK -
1 Glass door complete with aluminium frame and accessories: -
- Type P2 (Single door) 800 x 2100 mm unit 1.00 879,787 879,786.64
- Type P1 (Single door) 1000 x 2100 mm unit 2.00 1,143,723 2,287,445.25
-
2 Glass windows & ventilation complete with aluminium frame and accessories: -
- Type J1 (2 hole ) 1250 x 1150 mm unit 1.00 876,702 876,701.72
- Type V1 (1 fixed) 550 x 500 mm unit 2.00 613,691 1,227,382.41
-

Name of Bidder :
GIS 150 KV SENAYAN BARU II

Signature :
PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II
PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER SERVICES
CIVIL WORKS
BILL NO. 4 : SECURITY POST

UNIT PRICE TOTAL PRICE


NO. DESCRIPTION UNIT QTY LOCAL CURRENCY LOCAL
PORTION
(RUPIAH) (RUPIAH)
F. ROOF AND CELLING WORK -
1 Atap Spandek Colorbond m2 85.80 382,434 32,812,863.94
2 Nok Atap Spandek Colorbond m' 10.00 304,524 3,045,243.01
3 Listplank super sheet (GRC) m' 26.00 78,296 2,035,690.51
4 Talang Jurai Dalam Colorbond m' 15.00 366,714 5,500,709.72
5 Rangka atap baja ringan m2 55.00 539,295 29,661,226.85
6 Ceilling Gypsum board 1200 x 2400 x 9 mm m2 44.00 66,162 2,911,122.51
7 Ceilling Frame (Hollow steel 40x40x2 mm) m2 44.00 204,654 9,004,783.07
8 List profil gypsum m' 50.00 44,816 2,240,822.98
-
G. PAINTING WORK -
Prepare and apply one coat alkali resistant primer and three coats vinyl acrylic
1 m2 165.00 35,570
emulsion (wall & celling) 5,869,024.80
Prepared and apply two coats alkali resistant primer and three coats exterior grade
2 m2 -
weathershield -
-
H. FINISHING WORK -
All material finishing work must be of high quality -
1 Hinge for door (1 set= 2 pcs) Set 3.00 187,987 563,962.26
2 Hinge for window (1 set= 2 pcs) Set 3.00 127,507 382,522.26
3 Door lock No 3.00 740,253 2,220,759.34
4 Grendel for door double swing No - -
5 Grendel for window (1 set= 2 pcs) No 3.00 162,335 487,005.93
6 Wind hook of window (1 set = 2 pcs) Set 3.00 51,455 154,365.93
-
I. INSTALATION OF ELECTRICAL AND MECANICAL WORK -
Installation of electric lighting to included for all neccesary (cabling plugs, fittings,
lights, exhaust fans, air conditioning, etc.) -
1 Indoor luminaires type flourescent fitting CDL E27 (1 x 8 W) No 4.00 594,354 2,377,415.94
2 Indoor luminaires type flourescent fitting CDL E27 (1 x 23 W) No 2.00 594,354 1,188,707.97
3 Price for capacity electrical ls 1.00 3,840,000 3,840,000.00
4 Stop contact No 2.00 294,400 588,800.00
5 Panel Box MCB No 1.00 3,072,000 3,072,000.00
6 Exhaus fan ceiling 40 W/220 Volt (10") very low noice No 2.00 573,699 1,147,397.15

TOTAL PRICE SECURITY POST 258,253,582.04

Name of Bidder :
GIS 150 KV SENAYAN BARU II

Signature :
PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II
SCHEDULE NO.2 : Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear

Foundation 150 kV: Surge Arrester / unit


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE
PORTION
(RUPIAH) (RUPIAH)

1 Excavation of Soil m3 7.78 -

2 Back Filling m 3
5.08 -

3 Compacted sand t : 0.10 m m3 0.48 -

4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m3 0.24 -

5 Concrete f'c = 26.4 MPa (K 300 ) m 3


1.97 -

6 Reinforced Concrete BJTD-35 kg 184.85 -


7 Formwork m 2
6.36 -

8 PVC Ø 2" for earthing cable m 0.67 -

9 PVC Ø 4" for cable trench m 1.33 -

10 Anchor bolt Ø 24 mm ls 4.00 -

TOTAL -

Foundation 150 kV: Current Voltage Transformer / unit


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE
PORTION
(RUPIAH) (RUPIAH)

1 Excavation of Soil m3 11.35 -


2 Back Filling m3 7.62 -

3 Compacted sand t : 0.10 m m3 0.73 -

4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m 3


0.37 -

5 Concrete f'c = 26.4 MPa (K 300 ) m3 2.64 -

6 Reinforced Concrete BJTD-35 kg 243.49 -

7 Formwork m2 6.96 -

8 PVC Ø 2" for earthing cable m 0.67 -


9 PVC Ø 4" for cable trench m 1.33 -

10 Anchor bolt Ø 24 mm ls 4.00 -

TOTAL -

Note:
1. Schedule 2 (only owner Reference)
2. Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear
3. Shall be installed in Bill No 1

NAME OF BIDDER :
GIS 150 KV SENAYAN BARU II

SIGNATURE OF BIDDER :
PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II
SCHEDULE NO.2 : Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear

Foundation 150 kV: Line Trap / Unit


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE
PORTION
(RUPIAH) (RUPIAH)

1 Excavation of Soil m3 11.35 -

2 Back Filling m 3
7.62 -

3 Compacted sand t : 0.10 m m3 0.73 -

4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m3 0.37 -

5 Concrete f'c = 26.4 MPa (K 300 ) m 3


2.64 -

6 Reinforced Concrete BJTD-35 kg 243.49 -


7 Formwork m 2
6.96 -

8 PVC Ø 2" for earthing cable m 2.00 -

9 PVC Ø 4" for cable trench m 4.00 -

10 Anchor bolt Ø 24 mm ls 4.00 -

TOTAL -

Foundation 150 kV: Disconnecting /& Earthing Switches (DS/E) / set ( 1 set = 3 unit)
UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE
PORTION
(RUPIAH) (RUPIAH)

1 Excavation of Soil m3 22.32 -

2 Back Filling m 3
15.08 -

3 Compacted sand t : 0.10 m m3 1.38 -

4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m 3


0.69 -

5 Concrete f'c = 26.4 MPa (K 300 ) m3 5.18 -

6 Reinforced Concrete BJTD-35 kg 626.12 -


7 Formwork m 2
16.56 -

8 PVC Ø 2" for earthing cable m 3.00 -

9 PVC Ø 4" for cable trench m 6.00 -

10 Anchor bolt Ø 24 mm ls 12.00 -

TOTAL -

Note:
1. Schedule 2 (only owner Reference)
2. Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear
3. Shall be installed in Bill No 1

NAME OF BIDDER :
GIS 150 KV SENAYAN BARU II

SIGNATURE OF BIDDER :
PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II
SCHEDULE NO.2 : Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear

Foundation 150 kV: Current Transformer / unit


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE
PORTION
(RUPIAH) (RUPIAH)

1 Excavation of Soil m3 11.35 - -

2 Back Filling m 3
7.62 - -

3 Compacted sand t : 0.10 m m3 0.73 - -

4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m3 0.37 - -

5 Concrete f'c = 26.4 MPa (K 300 ) m 3


2.64 - -

6 Reinforced Concrete BJTD-35 kg 243.49 - -


7 Formwork m 2
6.96 - -

8 PVC Ø 2" for earthing cable m 0.67 - -

9 PVC Ø 4" for cable trench m 1.33 - -

10 Anchor bolt Ø 24 mm ls 4.00 - -

TOTAL -

Foundation 150 kV: Circuit Breaker / set ( 1 set = 3 unit)


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE
PORTION
(RUPIAH) (RUPIAH)

1 Excavation of Soil m3 34.06 - -


2 Back Filling m3 22.85 - -

3 Compacted sand t : 0.10 m m3 2.19 - -

4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m 3


1.10 - -

5 Concrete f'c = 26.4 MPa (K 300 ) m3 7.93 - -

6 Reinforced Concrete BJTD-35 kg 730.47 - -

7 Formwork m2 20.88 - -

8 PVC Ø 2" for earthing cable m 2.00 - -


9 PVC Ø 4" for cable trench m 4.00 - -

10 Anchor bolt Ø 36 mm ls 12.00 - -

TOTAL -

Note:
1. Schedule 2 (only owner Reference)
2. Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear
3. Shall be installed in Bill No 1

NAME OF BIDDER :
GIS 150 KV SENAYAN BARU II

SIGNATURE OF BIDDER :
PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II
SCHEDULE NO.2 : Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear

Foundation 150 kV: Post for Gantry TW1 / Unit


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE
PORTION
(RUPIAH) (RUPIAH)

1 Excavation of Soil m3 52.22 - -

2 Back Filling m3 37.28 - -

3 Compacted sand t : 0.10 m m3 2.30 - -

4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m 3


1.15 - -

5 Concrete f'c = 26.4 MPa (K 300 ) m3 11.63 - -

6 Reinforced Concrete BJTD-35 kg 1332.11 - -

7 Formwork m 2
31.20 - -

8 PVC Ø 2" for earthing cable m 2.00 - -


9 PVC Ø 4" for cable trench m 4.00 - -

10 Anchor bolt Ø 36 mm ls 16.00 - -

TOTAL -

Foundation 150 kV: Post for Gantry TW2 / Unit


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE
PORTION
(RUPIAH) (RUPIAH)

1 Excavation of Soil m3 42.11 - -

2 Back Filling m 3
29.53 - -
3 Compacted sand t : 0.10 m m3 1.76 - -

4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m3 0.88 - -

5 Concrete f'c = 26.4 MPa (K 300 ) m 3


9.93 - -

6 Reinforced Concrete BJTD-35 kg 1332.11 - -

7 Formwork m2 30.40 - -

8 PVC Ø 2" for earthing cable m 2.00 - -

9 PVC Ø 4" for cable trench m 4.00 - -


10 Anchor bolt Ø 36 mm ls 16.00 - -

TOTAL -
Note:
1. Schedule 2 (only owner Reference)
2. Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear
3. Shall be installed in Bill No 1

NAME OF BIDDER :
GIS 150 KV SENAYAN BARU II

SIGNATURE OF BIDDER :
PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II
SCHEDULE NO.2 : Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear

Foundation 150 kV: Power Transformer 60 MVA/ Set


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE
PORTION
(RUPIAH) (RUPIAH)

1 Excavation of Soil m3 103.58 - -

2 Back Filling m3 12.12 - -

3 Compacted sand t : 0.10 m m3 7.00 - -

4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m 3


3.57 - -

5 Concrete f'c = 26.4 MPa (K 300 ) m3 36.87 - -

6 Reinforced Concrete BJTP-24 kg 2755.22 19,525 53,795,710

Reinforced Concrete BJTD-35 kg 2658.49 - -

7 Formwork m2 65.36 - -
8 Grille Oil Pit kg 1207.00 16,000 19,312,000

9 Steel Painting for grille oil pit m2 27.15 -

10 Gravel (dia 3 - 5 cm); t = 10 cm m2 20.05 -

11 PVC Ø 4" for open drainage m 6.00 -

TOTAL 73,107,710

Foundation 150 kV: Fire Wall / unit


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE
PORTION
(RUPIAH) (RUPIAH)

1 Excavation of Soil m3 31.50 - -

2 Back Filling m3 22.59 - -

3 Compacted sand t : 0.10 m m 3


1.53 - -

4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m3 1.53 - -

5 Concrete f'c = 26.4 MPa (K 300 ) m 3


5.85 - -

6 Reinforced Concrete BJTD-35 kg 555.75 - -

7 Stone masonry 1 PC : 3 Sand m3 7.92 -


8 Brick 1pc : 4 ps m 2
39.00 -

9 Plaster cement 1 pc : 4 ps thickness 10 mm m2 78.00 -

TOTAL -

Note:
1. Schedule 2 (only owner Reference)
2. Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear
3. Shall be installed in Bill No 1

NAME OF BIDDER :
GIS 150 KV SENAYAN BARU II

SIGNATURE OF BIDDER :
PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II
SCHEDULE NO.2 : Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear

Foundation 150 kV: Marshalling Kiosk / Unit


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE
PORTION
(RUPIAH) (RUPIAH)

1 Excavation of Soil m3 1.00 - -

2 Back Filling m 3
0.00 - -

3 Compacted sand layer m3 0.10 - -

4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m3 0.10 - -

5 Concrete f'c = 26.4 MPa (K 300 ) m 3


0.15 - -

6 Reinforced Concrete BJTD-35 kg 17.00 - -


7 Formwork m 2
6.36 - -

8 PVC Ø 2" for earthing cable m 2.00 - -

9 PVC Ø 4" for cable trench m 4.00 - -

10 Anchor bolt Ø 24 mm ls 4.00 - -

TOTAL -

Foundation 150 kV: NGR ( NER) / Unit


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE
PORTION
(RUPIAH) (RUPIAH)

1 Excavation of Soil m3 16.95 - -

2 Back Filling m3 10.75 - -

3 Compacted sand t : 0.10 m m 3


0.83 - -

4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m3 0.83 - -

5 Concrete f'c = 26.4 MPa (K 300 ) m3 2.05 - -


6 Reinforced Concrete BJTD-35 kg 195.00 - -

7 PVC Ø 2" for earthing cable m 2.00 - -

8 PVC Ø 4" for cable trench m 4.00 - -

TOTAL -

Note:
1. Schedule 2 (only owner Reference)
2. Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear
3. Shall be installed in Bill No 1

NAME OF BIDDER :
GIS 150 KV SENAYAN BARU II

SIGNATURE OF BIDDER :
PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II
SCHEDULE NO.2 : Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear

Foundation 150 kV: Support 20 kV / Unit


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE
PORTION
(RUPIAH) (RUPIAH)

1 Excavation of Soil m3 3.52 - -

2 Back Filling m 3
1.70 - -

3 Compacted sand layer m3 0.29 - -

4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m3 0.14 - -

5 Concrete f'c = 26.4 MPa (K 300 ) m 3


1.44 - -

6 Reinforced Concrete BJTD-35 kg 136.80 - -


7 Anchor bolt Ø 24 mm ls 4.00 - -

TOTAL -

Foundation 150 kV: Post Insulator / unit


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE
PORTION
(RUPIAH) (RUPIAH)

1 Excavation of Soil m3 7.78 - -

2 Back Filling m 3
5.08 - -

3 Compacted sand t : 0.10 m m3 0.48 - -

4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m3 0.24 - -

5 Concrete f'c = 26.4 MPa (K 300 ) m 3


1.97 - -
6 Reinforced Concrete BJTD-35 kg 184.85 - -

7 Formwork m2 6.36 - -

8 PVC Ø 2" for earthing cable m 1.00 - -

9 PVC Ø 4" for cable trench m 2.00 - -

10 Anchor bolt Ø 24 mm ls 4.00 - -

TOTAL -

Note:
1. Schedule 2 (only owner Reference)
2. Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear
3. Shall be installed in Bill No 1

NAME OF BIDDER :
GIS 150 KV SENAYAN BARU II

SIGNATURE OF BIDDER :
PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II
SCHEDULE NO.2 : Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear

Foundation 150 kV: Cable Sealing End / unit


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE
PORTION
(RUPIAH) (RUPIAH)

1 Excavation of Soil m3 7.78 - -

2 Back Filling m 3
5.08 - -
3 Compacted sand t : 0.10 m m3 0.48 - -

4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m3 0.24 - -

5 Concrete f'c = 26.4 MPa (K 300 ) m 3


1.97 - -

6 Reinforced Concrete BJTD-35 kg 184.85 - -

7 Formwork m2 6.36 - -

8 PVC Ø 2" for earthing cable m 1.00 - -

9 PVC Ø 4" for cable trench m 2.00 - -


10 Anchor bolt Ø 24 mm ls 4.00 - -

TOTAL -

Foundation 150 kV: New Oil Pit / Set ( Cap 30 m3 )


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE
PORTION
(RUPIAH) (RUPIAH)

1 Excavation of Soil m3 52.80 - -

2 Back Filling m 3
19.91 - -

3 Compacted sand t : 0.10 m m3 1.93 - -

4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m3 0.96 - -

5 Concrete f'c = 26.4 MPa (K 300 ) m 3


4.98 - -

6 Reinforced Concrete BJTD-35 kg 547.80 - -

7 Stone masonry 1 PC : 3 Sand m 2


9.55 - -

8 Brick 1pc : 2 ps m3 32.00 - -

9 Plaster cement 1 pc : 2 ps thickness 15 mm m2 32.00 - -

10 PVC Ø 2" for earthing cable m 2.00 - -

11 PVC Ø 4" for cable trench m 4.00 - -

TOTAL -

Note:
1. Schedule 2 (only owner Reference)
2. Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear
3. Shall be installed in Bill No 1

NAME OF BIDDER :
GIS 150 KV SENAYAN BARU II

SIGNATURE OF BIDDER :
PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II
SCHEDULE NO.2 : Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear

Foundation 150 kV: Service Transformers / Unit


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE
PORTION
(RUPIAH) (RUPIAH)

1 Excavation of Soil m3 3.24 - -

2 Back Filling m3 0.69 - -

3 Compacted sand t : 0.10 m m3 0.29 - -

4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m 3


0.22 - -

5 Concrete f'c = 26.4 MPa (K 300 ) m3 1.68 - -

6 Reinforced Concrete BJTD-35 kg 160.00 - -

7 Formwork m 2
6.36 - -

8 PVC Ø 2" for earthing cable m 2.00 - -


9 PVC Ø 4" for cable trench m 4.00 - -

10 Roofing and Fence BRC 1.2 m height ls 1.00 -

TOTAL -

Note:
1. Schedule 2 (only owner Reference)
2. Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear
3. Shall be installed in Bill No 1

Hydrant and accessories included installation of pipe and electrical / set


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE
PORTION
(RUPIAH) (RUPIAH)

1 Electric fire pump no 1.00 -


2 Jockey fire pump no 1.00 -
3 Diesel fire pump no 1.00 -
4 Panel control hydrant set 1.00 -
5 Hydrant Pillar no 4.00 -
6 Hydrant Box Out Door complete with no 4.00 -
- Hose dia 21/2" x 30 m -
- Hose rack -
- Nozle dia 21/2 -
7 Pipe BS Sch.40 Dia 4" complete fitting m 240.00 -
8 Gate valve dia 4" kitz no 4.00 -
9 Control box no 4.00 -
10 Pump House = 3 x 4 m2 m2 12.00 -

TOTAL -

NAME OF BIDDER :
GIS 150 KV SENAYAN BARU II

SIGNATURE OF BIDDER :
PEKERJAAN PEMBANGUNAN GIS 150 kV SENAYAN BARU II
SCHEDULE NO.2 : Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear

Underground Water tank (cap : 100 m3) and jet pump included installation of pipe / set
UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE
PORTION
(RUPIAH) (RUPIAH)

Underground Water tank (cap : 100 m3)


1 Excavation of Soil m3 120.49 - -
2 Back Filling m3 56.60 - -
3 Compacted sand t : 0.10 m m3 3.44 - -
4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m3 1.72 -
5 Concrete f'c = 26.4 MPa (K 300 ) m3 47.00 -
6 Reinforced Concrete BJTD-35 kg 5169.56 - -
7 Formwork m2 182.00 - -
8 PVC Ø 2" for ventilation m 5.00 - -
9 Ladder Ø 16 mm & painted kg 20.00 -
-
Jet pump included installation of pipe -
1 Jet pump capacity 32 liter/menit H=30 m unit 1.00 -
2 Instalasi pipe & valve dia. 1" (to water tank) m' 50.00 1,198 59,920

TOTAL 59,920

NAME OF BIDDER :
GIS 150 KV SENAYAN BARU II

SIGNATURE OF BIDDER :