Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

AN

TSI W DA
DR
TSI-AO504-25290

-CA
E
TR # 7847
BERNADITA BISWEK

R-8 IWA
75
1336.88
CP

AREA=309 SQ.M.

97
G
BENCHMARK COORDINATES
CONCRETE NAIL ON THE GROUND 76
1335.41

ALLE NORTHING = 1816776.242


CP

Y(3.
00-5 EASTING = 466648.443
EX
.00M ELEVATION = 997.27 IST
.) 77 ING
.
1334.11
CP

RO
42 N JR E) AD
-32 ZO ID E) (10.00M. WIDE)
AR UI
ID
.W .W
I-C O Q
M
4-6
0M
72
73

TS ENI Y(
1333.67
1333.85 74
CP 1333.26
CP

E
.0
CP

ALL
G ( 5 G
EU

JANET ANCHETA
IN
Y IST
M LE
71
21
997.27
EX
CA
1334.06 bm
2
CP

AL

JOSE SU
53
1334.16
CP/RR

128 HE
1340.96
F ALT
127
129
1340.61 HC
1340.77
RR
EH/EAVES EN
TE
126
R
25
1341.81
F

-26 AN
55
1334.58

NGA
54

AR AG
BM 1335.26
CP
130
123
1340.91

I-C EW
1340.96
124 2 122 EAVES
RR 52
125
1341.95 1340.97 1335.12
1344.00
)
TOPO PT

S
F 117 WT CP

D
1341.41 EX
. WIDE

T N 30
1004.24
TOPO PT IS
WAT TIN
TA ER G
1340.98
WT 121
3

FRAN
131

LA
SS NK
116 1338.77
114 1341.02 EAVES
115
1341.25 TOPO PT 120

RO
1 1341.10
32 TOPO PT 119
1340.96 51
TOPO PT
1006.26 WT 1340.91 1335.13
118
CP

TSI-C O COPES
top 1341.24 TOPO PT

OPO
28
TOPO PT 4
1006.06

PROJECT LOCATION ridge end

JOVIT TO
113

E
1341.33
TOPO PT
0M

BUIL URPOS

CISC
GEOGRAPHIC COORDINATES 34
112
1341.52

M. WIDE)
G
1011.67 50
TOPO PT

LIN
top 1335.12

LATITUDE = 16°24'47" N
110

DIN
CP

AR-25
1341.15
EY (5.0

TOPO PT

HEIR
111 25
1341.10 1004.60

TI-P
LONGITUDE = 120°33'31" E

O
TOPO PT SS
33 109
1011.71 29 1340.80
top TOPO PT 133
1004.97
1340.06
ridge end

MUL
TOPO PT
27
1006.44
31 ridge
49
1011.85
1335.59

S OF
37
top
108 CP
26

EN
1006.96 1340.20
NG ALL

ridge TOPO PT 132


1339.56
EAVES

EXISTING ALLEY (5.00


ITIZ
106
1341.35 107
24 TOPO PT 1340.18

RC
TOPO PT

E)
1006.79 4243
ridge 101 1337.09

TEC
1342.26 134 1337.07
1338.97 EAVES

. WID
BASE ER
102

TSI-A.O.504-11337
TOPO PT

NIO
1342.98
STR 6 45
20
23 1001.16
48
1335.93
105
1002.18 44
bm
1341.38 BM1335.96
SS 1335.98
CP
TOPO PT

SE
ER

GERARDO TAMAYO JR.


EXISTI

.00M
103

LA C
1341.28
STR
5
104 35
1339.20

Y (5
1341.40
STR TOPO PT

39

LLE

HIL-A
1340.07
TOPO PT

GA
TSI-AO504-20122 38
36
1338.94
TOPO PT
56
57 46

TIN
1339.72

TR # 7849 TOPO PT 1336.72


ER
1336.60
BM 47

NG
37 1336.75
22
1340.95 CHB

EXIS
1000.31

DEBORAH MAY S. BUTING 41


1341.56
TOPO PT t4

58
1336.64

AREA=411 SQ.M.
CHB/AL ER

EXISTING 40
1339.97
CHB

STAIR
59
1336.81
ER
60
1336.76
ER

BENCHMARK COORDINATES
2
1003.84
70
61 1337.16
CONCRETE NAIL ON THE GROUND
gi EAVES
1336.84
ER
NORTHING = 1816742.754
EASTING = 466633.093
62
1336.84
ER ELEVATION = 1000.31
66
1336.86
ER

TSI-AO-504-299
63
1336.90
64
ER

. WIDE)
1336.73

EXISTING ALLEY (3.00M


EAVES

VICTORINO J. AFALLA 67
19
17 1336.79

AREA=270 SQ.M. 1000.40


cp
ER 69
1000.59
18 t3
1336.87
65 1000.57
FENCE
gi/f
1336.92
EAVES
FOR PARK

14
999.50
cp
68
OPEN SPAC T

16
1336.62
1000.40
FENCE
ROMULO LIB

gi
TSI-CAR-16

8
1003.37 15
align 999.53
4
1000.07 ps
rr 3
E 10

. WID
1002.47 11 999.76
999.23 13

M
ING LO

gi t2
EXISTING ALLEY (6.00M. cp 999.71
TECHNICAL DESCRIPTION
4.00
gi

WIDE) 7

ROBERT
1000.39
chb
LINE BEARING DISTANCE
EXISTING ALLEY
E

5
999.66
chb
1
1000.00
12
999.28
BOUNDARY
ATIQUE

gate

TSI-CAR-2
t1

9
1-2 N.42°52'E. 4.39 M.
59

6 1001.07
2-3 S.64°19'E. 4.71 M.
1001.46
chb
oh
RFPA-CB-000361 3-4 S.24°35'W. 2.91 M.
NAS

MARLYN M. AMISTAD
PAL 4-7948

4-5 S.13°00'W. 14.45 M.


GAN
OLIVA R-001713
IN

5-6 N.71°38'W. 7.96 M.


AREA=165 SQ.M.

GUMAFIAY
6-1 N.20°10'E. 13.89 M.
SAT 42
SAT

ADAM 5
AGA

S
1
E

TIE LINE FROM TRIA. STA. "LIMESTONE",


GADIN
3M WID
DAN I-CAR-3

AR-23

B.T.S. TO CORNER 1:

444
0
MAR I-A.O.5

LOT NO. BEARING DISTANCE


ALLEY

TSI-C E
A

BDRY S.70°33'W. 1627.56


ING

HOUS
ILO

TSI-C
EXIST
IEL

LILIA

RFPA-CB-000298
TS

TS

RODRIGO F. MASLANG
AREA=145 SQ.M.

MYRAFE SALIBA

1 MASTER SITE DEVELOPMENT PLAN


A 3 SCALE NTS

PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED & SUBMITTED: RECOMMENDED: SET NO. SHEET NO.
FOUNDATION PLAN
SECOND FLOOR FRAMING PLAN
HILLSTONE BUILDERS THIRD FLOOR FRAMING PLAN
A-A 3
ALAPANG LA TRINIDAD, BENGUET HUDSON W. DEPOLIO LOCAL INFRASTRUCTURE PROGRAM- CONSTRUCTION OF ERNESTO V. EGUILOS ALFREDO O. BANNAGAO, JR. GLENN V. REYES RENE F. ZARATE
MULTI-PURPOSE BUILDING FOR SENIOR CITIZENS, BRGY. IRISAN, CHIEF, CONSTRUCTION SECTION
CONTRACTOR PROJECT ENGINEER ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 3 7
DATE
BAGUIO CITY, BENGUET
DATE DATE DATE
16
DATE

You might also like