Outreach (Meters) 0.5 0.75 0.9 # of 30kg Weights Required 7 11 14

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

5 4 3 2 1

4.27m
4.02m Tie back to structure
3.87m capable of holding
4,000lbs (1815kg)
in any direction

A A
16ft beam assembly with (2) 8ft 5x5
1,000lb H-Beams with splice tube assembly
(450kg)
Maximum
Load (2) Header Beams (520101) with
Capacity (2) Header Beam Clamps (921104)

0.50m
0.75m
0.90m

B B

3.05m

Counterweights
as required (see
mudsills chart below)

3/4" plywood
Working Fulcrum Load = 1,250lbs (567kg)
(625lbs per leg) (284kg per leg)
Plus self weight of scaffold
C distributed on scaffold leg C

Outreach (meters) 0.5 0.75 0.9


# of 30kg weights required 7 11 14

1 Released for project BJA 09-27-11


REV Revision Description By Date
DEBUR AND BREAK SHARP EDGES
Material: ASSEMBLY Weight:

Treatment: N/A 1959.7 LBS


Raw material part number: Dimensions in [ ] are in mm The information contained in this drawing is the sole
Tol. ISO 2768-m property of Bee Access Products. Any reproduction
ASSEMBLY > 0,5 6 30 120 400 in part or whole without the written permission of
Bee Access Products is strictly prohibited.
D < 6 30 120 400 D
Scale Size TOL. +0.1 +0.2 +0.3 +0.5 +0.8 16ft Beam Assembly w/ 0.9m
1:30 B/A3 Machined surfaces 12.5
outreach on scaffolding
CAD generated drawing. ISO 1302
Do not manually update. Unless otherwise stated
Do not scale drawing. tolerances in inches Product Line/Project: REV.
Approvals By:
Drawn BJA 09-27-11
Date: Fractions Decimals Angles
X .060 ALL .5 Beam Assembly 1
XX .015 Part No.
Approved . XX-XX-XX XXX .005 L1001-292 Sheet 1 of 1