Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Lakeside

The presented map depicts how comparison of Lakeside’s map structure chaned/ altered over 9 years
between 2000 and 2009

Overall, Lakeside buildings underwent major changes in 9 years

The Industrial complex and residential are on the right bank of the river, came to an end over the years.
The Residential area was demolished and replaced by an Industrial complex, and it covered a large area in
2009. The right bank of the river did notn’t change much. anymore

OBut over the years, the left side of the river has takentook on a completely new shape, some places were
destroyed and new ones were built. Although there were two Residential areas, only one’s operatedone
left there for 9 years.The other one along the north of the river it was replaced by a shopping center. The
art center was changed by a multi-screen cinema between 2000 and 2009. Another change is that new
schools were built , being relocated. Although the school still remained stable, while a new university was
built in the northern-east in 2009in later years. Finally, the Derelict warehouses were overturned and built
instead of parkingreplaced by a car park

Finally, turning to the main border, river stayed unchangeable, except lake. Because The lake, which is
the mouth of the river, was shruink and taken on its final form, that is, a pond. But Woodland stayed
sameAs for the woodland, it was almost halved in size.

TA 6.0 CC 6.0 LR 6.5 GRA 6.0 Overall 6.0

You might also like