Download as pdf or txt
Download as pdf or txt
You are on page 1of 33

PROSES PRODUKSI BANGUNAN

KAPAL BARU
DESIGN ENGINEERING
1. PRA – DESIGN
2. PEMBUATAN MODEL (UJI LAB HYDRO)

AREA LHI
MODEL KAYU

MANUVERING

TOWING TANK
BALING-BALING

3. BASIC DESIGN
4. KEY PLAN
5. YARD PLAN
6. PRODUCTION DRAWING
HULL

MODELLING

PRODUCTION
INFORMATION

AUTOMATIC PART
GENERATION
OUTFITTING

Components

Specification

Production
Information

Diagram

Modelling
PENGADAAN MATERIAL
1. PROSES PENGADAAN MATERIAL
PERMINTAAN EVALUASI TEKNIS
MATERIAL ATAS QUOTATION UNDANGAN
USER INQUIRY COMMENT
LIST YANG MASUK NEGOSIASI
(M 01)

MINTA
PERSETUJUAN KE VENDOR
KADIV

MINTA
PEMBUATAN INFO KE
SETUJU PERSETUJUAN NILAI > NEGOSIASI
DRAFT KONTRAK VENDOR Rp.200 JT
DIR.BANGKAP

DRAFT DRAFT KONTRAK SIGN : PEMBUATAN


KONTRAK SIGN KADIV ( < Rp.200 JT ) DRAFT KONTRAK
VENDOR DIR. BU ( Rp.200 JT < X < Rp.200 JT )
DIRUT ( > Rp.500 JT )
2. KEDATANGAN MATERIAL
PROSES PRODUKSI
1. HULL CONSTRUCTION
INDIKASI MATERIAL DISTEEL STOCK HOUSE
STEEL PLATE

PROFILE
SHOOT BLASTING STEEL PLATE

FASILITAS FABRIKASI
FASILITAS FABRIKASI
SUB ASSEMBLY
ASSEMBLY

- BLOCK 150 TON


- FULL OUTFITTING BLOCK SYSTEM
BLOCK BLASTING
ERECTION

- TRANSPORTER
- DOCK SEMARANG
- SIDE LAUNCHING
LAUNCHING: DKP DI SHIPLIFT
2. OUTFITTING

- FABRIKASI OUTFITING
a. Bk. Pipa

b. Bk. Plat Tipis


c. Bk. Joiner

d. Bk. Permesinan
e. Bk. Palletizing
- INSTALASI OUTFITTING

a. FULL OUTFITTING BLOCK SYSTEM


b. ONBOARD

- LOKASI DI KAPAL
a. AFTER PART & ENGINE ROOM
b. CARGO

c. AKOMODASI
- KELOMPOK PEKERJAAN
a. MACHINERY OUTFITTING
b. HULL OUTFITTING
c. ELECTRIC OUTFITTING
3. TESTING EQUIPMENT
4. SEA TRIAL

You might also like