Schematic 

Diagram showing the lead for Quarry locations from different points of proposed work Location

Package.28  PBC Canal
KM. 110.000
KM.119.965 KM.134.279 P.14 Lift 137.075 KM.142.425/150.000
KM.114.983

39.245 Km. 71.7 Km. 46.15 51.5

Common Lead for Metal     208.579
4
= 52.14475 or Say 52 Km

T‐Sadum