Entrance of VIP: Service Path Tarmac

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

Entrance of VIP

General Notes

1. All dimensions are in millimetres unless


A B C E F G H I J otherwise stated

service path tarmac 2. All Water pipes to be PPRC PN 20


Conforming to the current European
Standards for PPRC installations.

3. PPRC pipe joints to be by polyfussion


or electrical coupling.
Ø150
ic ic ic

ic
100Ø vent F/A
Ø100 Ø100 Ø100
4. All valves to be of brass/bronze
01 heavy duty pattern construction
50Ø as 'peglar'

Re
Ø150
50Ø

Trapless
Gents Re
Ø200 to
5. Water Pipes under floor slab, drive
Ladies gulley
Ø100 Ø150 Ø150 Ø150
sewer line ways, walkways, car parks,to be sleeved
ic ic ic ic ic
FT
Ø100
in heavy duty C or GMS as instructed
Re Re Gt Ø100 Ø100 Ø150
40Ø Ø100 Ø100 Ø100 Ø100
40Ø 40Ø 40Ø
Ø50
6. Exposed hot water pipes to be lagged

ic
FT Gt Gt Gt Gt Gt

main01building
Ø50

Disabled 100Ø
SVP F/A
Ø50
FT
100Ø 40Ø
Ø50
FT
40Ø
FT
40Ø
FT
100Ø SVP F/A rear entrance with minimum 50mm thick fibre glass
Ø50 DUCT PROPOSAL
Ø50 SVP F/A
Cashier Re
Re Re Re
Ø200
7. All drainage pipes above ground to be
FT
40Ø
Consultation Consultation Consultation Consultation
ProcedureFT 40Ø u C 'grey' while those below to be
u C golden brown
Re room Re room
room room room
ic 8. All drainage pipes below floor slab,
driveways, walkways, carparks to be
WAITING
02 encased in 150mm concrete sorround
Passage well cured

Riser
Security 9. All pipework to run in wall chase,
03 Re
40Ø
FT
03 under floor slab,under worktops
in ceiling etc. Exposed pipes shall
Consultation emergency
Ø200
not be acceptable
shower Lab
room SPECIMEN LAB FT
Triage 50Ø (ac) Store 10. Overflow pipes to discharge at
Entry porch 100Ø SVP F/A Reception COLLECTION
Customer Records Re DUCT PROPOSAL Re 40Ø Vulcathene
50Ø
Lift 150mm beyond the wall
ROOM under worktable
40Ø 40Ø
care Re
DT Re
FT 40Ø
04 FT 40Ø
04 11. Stack pipes to rise 600mm above
Gt Gt Gt Gt
100Ø SVP F/A
the roof.
DUCT PROPOSAL
stair Ø100 Ø100 Ø100 Ø100
LAB OFFICE
STAIR
05 05
1.
Ø150 Ø150
ic ic ic

ic
one bed Ø100 150Ø PVC No. Revision/Issue Date
sleeve
06 06

2F
doctor duty Wall cleanout FLOOR
CLEANOUT100Ø
75Ø VENT SVP F/A
THROUGH ROOF
room Ø100
DUCT PROPOSAL

Ø100
Female staff
PROJECT
FT
100Ø 40Ø 40Ø
Re STAFF LOUNGE PROPOSED ONCOLOGY EXTENSION
FLOOR
SVP F/A CLEANOUT
Trapless
Re
AT KUTRRH
private room Ø100
Male staff gulley
Ø200

Ø100
one bed 100Ø
SVP F/A Ø100 Re
07 50Ø
07
Ø100 TITLE
Ø100
ic

ic
GROUND FLOOR DRAINAGE
nurse office
Ø150 kitchenette
Ø100
LAYOUT

ic
txt Gt
Re 40Ø

six bed six bed Ø200


100Ø
Doctors room 100Ø
SVP F/A SVP F/A
Nurse 0ffice
Ø100 Ø200

ARCHITECTS

ic
08 therapeuatical Re
40Ø 40Ø 08 ARCH .K. MWANGI

ic
FT Gt
room
MALE CHANGING ROOM
Ø200
Doctor's 0ffice Ø50
Ø100
observation change Ø200

ic
room room
FT FT Ø200
100Ø
LINEN STORE SVP F/A
Ø100

ic
100Ø FT FT
SVP F/A
Ø100
six bed six bed
Ø100 Ø50
MECHANICAL AND ELECTRICAL ENGINEERS LTD
ic

nurse station Gt
Dunstone Consulting Engineers
TBA P.O. Box 23167-00100
FEMALE CHANGING ROOM Ø50 Ø200
Ø200 Nairobi, Kenya.
FT Tel. 0203573922,0722724508
Re
09 40Ø 40Ø 09 email: info@dunstonengineers.com
ic Ø200 Ø200

ic
store
CLIENT

2F
electricity KENYATTA UNIVERSITY
well STAIR REFERRAL HOSPITAL
six bed
six bed

elevator
Drg. No.DCEL/21/01/201

Date: MARCH 2021 Designed:F.J.K

Scale: NTS Approved by:G.K.R

office
A B C E F G H I J

General Notes

1. All dimensions are in millimetres unless


otherwise stated
01
2. All Water pipes to be PPRC PN 20
airlock
Conforming to the current European
Standards for PPRC installations.
CLEAN 100Ø SVP 100Ø SVP
F/A-T/B F/A-T/B
100Ø SVP F/A-T/B

CHEMO
CHANGING DUCT PROPOSAL 3. PPRC pipe joints to be by polyfussion
MIXING 40Ø
01 or electrical coupling.
Re

NON CHEMO Store


4. All valves to be of brass/bronze
COLD ROOM
MIXING inpatient Oncology
Pharmacy
heavy duty pattern construction
PASS BOX as 'peglar'
PASS BOX
02 5. Water Pipes under floor slab, drive
ways, walkways, car parks,to be sleeved

Riser
CHEMO

MIXING Security in heavy duty C or GMS as instructed


03 03
PASS BOX
6. Exposed hot water pipes to be lagged
Consultation
MTM
Consultation
Consultation
with minimum 50mm thick fibre glass
office
linen store conference Re
100Ø Below 100Ø Below 100Ø Below
Re slab Re slab Re slab Lift 7. All drainage pipes above ground to be
Dirty bin 50Ø 50Ø 50Ø
40Ø 40Ø 40Ø 100Ø
u C 'grey' while those below to be
04 FT FT FT 04 u C golden brown
100Ø SVP F/A-T/B 100Ø SVP F/A-T/B
DUCT PROPOSAL DUCT PROPOSAL
stair STAIR
8. All drainage pipes below floor slab,
05 FAMILY 05
CONFERENCE
driveways, walkways, carparks to be
doctor duty
100Ø SVP F/A-T/B encased in 150mm concrete sorround
one bed room DUCT PROPOSAL
06 Re 06 well cured

9. All pipework to run in wall chase,

100Ø
Female staff

50Ø FT Re
under floor slab,under worktops
STAFF LOUNGE
private 50Ø
40Ø 40Ø

Re
in ceiling etc. Exposed pipes shall
FT

100Ø 100Ø
room 100Ø SVP not be acceptable
F/A-T/B
one bed Male staff

Re 10. Overflow pipes to discharge at


07 50Ø
50Ø Re 07 150mm beyond the wall
100Ø SVP
F/A-T/B
triage
Doctor's 0ffice
11. Stack pipes to rise 600mm above
txt kitchenette
the roof.
Re
40Ø
six bed 100Ø SVP 100Ø SVP
six bed F/A-T/B F/A-T/B
Nurse 0ffice TBA

PHARMACY
1.
08 Re
40Ø 40Ø 08
FT No. Revision/Issue Date
MALE CHANGING ROOM
50Ø

NURSE NURSE
50Ø 50Ø
OFFICE OFFICE MDT room FT FT PROJECT
Re 100Ø

100Ø SVP
Re 100Ø 100Ø
SVP T/B PROPOSED ONCOLOGY EXTENSION
FT FT
F/A-T/B 50Ø
six bed six bed
50Ø
AT KUTRRH
nurse station
50Ø
FEMALE CHANGING ROOM

FT
Re
09 40Ø 40Ø 09
TITLE

FIRST FLOOR DRAINAGE


store
LAYOUT
electricity
well
STAIR six bed
six bed

elevator ARCHITECTS
ARCH .K. MWANGI

Doctors office

office
MECHANICAL AND ELECTRICAL ENGINEERS LTD
Dunstone Consulting Engineers
P.O. Box 23167-00100
Nairobi, Kenya.
Tel. 0203573922,0722724508
email: info@dunstonengineers.com

CLIENT
KENYATTA UNIVERSITY
REFERRAL HOSPITAL

A B C E F G H I J
Drg. No.DCEL/21/01/202

Date: MARCH 2021 Designed:F.J.K

Scale: NTS Approved by:G.K.R


FIRST FLOOR
A B C E F G H I J

General Notes

1. All dimensions are in millimetres unless


otherwise stated
01
2. All Water pipes to be PPRC PN 20
Conforming to the current European
Standards for PPRC installations.
100Ø SVP 100Ø SVP
F/A-T/B F/A-T/B
100Ø SVP F/A-T/B
FT

40Ø
Nine bed DUCT PROPOSAL
3. PPRC pipe joints to be by polyfussion
100Ø Below
Re Re slab 50Ø 50Ø 01 or electrical coupling.
40Ø 40Ø
100Ø Below 100Ø Below
40Ø slab slab 40Ø
Five bed 4. All valves to be of brass/bronze

Waiting
Re 100Ø Below
slab
100Ø Below
slab
Re
heavy duty pattern construction
Re Re Re as 'peglar'
Linen Re 40Ø
100Ø Below

Nurse station
slab FT
02 5. Water Pipes under floor slab, drive
ways, walkways, car parks,to be sleeved
Re
Security in heavy duty C or GMS as instructed
03 Re
Nine bed
FT 100Ø Below
slab
50Ø FT 03
40Ø 40Ø
100Ø Below Re 100Ø Below
40Ø
6. Exposed hot water pipes to be lagged
FT slab slab Re
with minimum 50mm thick fibre glass
Six bed 100Ø Below
slab Five bed
Lift 7. All drainage pipes above ground to be
u C 'grey' while those below to be
04 40Ø 40Ø
Re
04 u C golden brown
100Ø SVP F/A-T/B 100Ø SVP F/A-T/B
DUCT PROPOSAL DUCT PROPOSAL FT

05 05 8. All drainage pipes below floor slab,


driveways, walkways, carparks to be
100Ø SVP F/A-T/B
DUCT PROPOSAL 50Ø 50Ø encased in 150mm concrete sorround
FT FT
06 Re 100Ø
Re
06 well cured
100Ø

100Ø
Female staff 9. All pipework to run in wall chase,
50Ø FT
Re Sluice FAMILY CONFERENCE under floor slab,under worktops
100Ø SVP
in ceiling etc. Exposed pipes shall
40Ø 40Ø

F/A-T/B 50Ø Re
FT
100Ø
Male staff not be acceptable
100Ø

Re
50Ø 50Ø 10. Overflow pipes to discharge at
07 Re Staff lounge 07
100Ø SVP
F/A-T/B
150mm beyond the wall

Doctor's 0ffice 11. Stack pipes to rise 600mm above


txt kitchenette the roof.
Re
40Ø
100Ø SVP 100Ø SVP
F/A-T/B F/A-T/B
Nurse 0ffice
TBA

1.
08 Re
40Ø 40Ø 08
FT
No. Revision/Issue Date
MALE CHANGING ROOM
50Ø
LINEN STORE

50Ø 50Ø
FT FT
Re 100Ø
PROJECT
100Ø 100Ø
Re
ROOF BELOW
100Ø SVP
F/A-T/B
FT FT
50Ø 50Ø
SVP T/B
PROPOSED ONCOLOGY EXTENSION
ON CALL
100Ø Below
AT KUTRRH
slab 50Ø
ROOF BELOW
40Ø 100Ø B/s FEMALE CHANGING ROOM
Re
FT FT FT
Re
09 40Ø 40Ø 09
TITLE

SECOND FLOOR DRAINAGE


LAYOUT

ARCHITECTS
ARCH .K. MWANGI

MECHANICAL AND ELECTRICAL ENGINEERS LTD


Dunstone Consulting Engineers
P.O. Box 23167-00100
Nairobi, Kenya.
Tel. 0203573922,0722724508
ROOF BELOW
email: info@dunstonengineers.com

CLIENT
KENYATTA UNIVERSITY
REFERRAL HOSPITAL

A B C E F G H I J

Drg. No.DCEL/21/01/203

Date: MARCH 2021 Designed:F.J.K


SECOND FLOOR
Scale: NTS Approved by:G.K.R
A B C E F G H I J

General Notes

1. All dimensions are in millimetres unless


otherwise stated
01 2. All Water pipes to be PPRC PN 20
Conforming to the current European
Standards for PPRC installations.
100Ø SVP 100Ø SVP
F/A-T/B
Re
F/A-T/B
100Ø SVP F/A-T/B
DUCT PROPOSAL
3. PPRC pipe joints to be by polyfussion
Nine bed
40Ø
100Ø Below
or electrical coupling.
FT slab 50Ø 50Ø 01
40Ø
100Ø Below 100Ø Below
40Ø 4. All valves to be of brass/bronze
40Ø slab slab 40Ø
Five bed heavy duty pattern construction

Waiting
Re 100Ø Below
slab
100Ø Below
slab
Re
as 'peglar'
Re Re Re

Linen Re 40Ø 5. Water Pipes under floor slab, drive


100Ø Below
slab FT 02 ways, walkways, car parks,to be sleeved
Nurse station
in heavy duty C or GMS as instructed

Re
Security
6. Exposed hot water pipes to be lagged
03 Re Nine bed
FT 100Ø Below FT 03 with minimum 50mm thick fibre glass
slab
40Ø 40Ø 40Ø
100Ø Below Re 100Ø Below
FT slab slab Re
7. All drainage pipes above ground to be
100Ø Below u C 'grey' while those below to be
Six bed slab Five bed
Lift u C golden brown

04 40Ø 40Ø
Re
04 8. All drainage pipes below floor slab,
100Ø SVP F/A-T/B 100Ø SVP F/A-T/B
DUCT PROPOSAL DUCT PROPOSAL FT
driveways, walkways, carparks to be
encased in 150mm concrete sorround
05 05 well cured
100Ø SVP F/A-T/B
DUCT PROPOSAL 50Ø 50Ø
FT FT 9. All pipework to run in wall chase,
06 Re 100Ø Re
06 under floor slab,under worktops
100Ø in ceiling etc. Exposed pipes shall
100Ø
Female staff not be acceptable
50Ø FT
Re FAMILY CONFERENCE
100Ø SVP
F/A-T/B 50Ø FT
40Ø 40Ø

Re 10. Overflow pipes to discharge at


100Ø 150mm beyond the wall
Male staff
100Ø

Re 11. Stack pipes to rise 600mm above


07 50Ø
50Ø Re 07 the roof.
100Ø SVP
F/A-T/B
Staff lounge
Doctor's 0ffice

1.
100Ø SVP 100Ø SVP
F/A-T/B F/A-T/B
No. Revision/Issue Date
Nurse 0ffice
40Ø
txt
kitchenette
08 Re
40Ø
Re
40Ø 40Ø 08
FT PROJECT
MALE CHANGING ROOM PROPOSED ONCOLOGY EXTENSION
50Ø

TBA AT KUTRRH
50Ø 50Ø
FT FT
Re 100Ø
100Ø 100Ø
Re SVP T/B
100Ø SVP FT FT
F/A-T/B 50Ø 50Ø

TITLE
TBA 50Ø
FEMALE CHANGING ROOM THIRD FLOOR DRAINAGE
Re
FT LAYOUT
09 40Ø 40Ø 09

ARCHITECTS
ARCH .K. MWANGI

MECHANICAL AND ELECTRICAL ENGINEERS LTD


Dunstone Consulting Engineers
P.O. Box 23167-00100
Nairobi, Kenya.
Tel. 0203573922,0722724508
email: info@dunstonengineers.com

CLIENT
KENYATTA UNIVERSITY
REFERRAL HOSPITAL

Drg. No.DCEL/21/01/204

Date: MARCH 2021 Designed:F.J.K

Scale: NTS Approved by:G.K.R

A B C E F G H I J
THIRD FLOOR
A B C E F G H I J

General Notes

1. All dimensions are in millimetres unless


otherwise stated

01 01 2. All Water pipes to be PPRC PN 20


Disinfection Conforming to the current European
Standards for PPRC installations.
100Ø
SVP T/B 100Ø
SVP T/B
100Ø SVP F/A-T/B 3. PPRC pipe joints to be by polyfussion
DUCT PROPOSAL

OPERATING ROOM
Apparatus and
Dressing Preparation
or electrical coupling.
01 Re
100Ø
Re
100Ø
Re
40Ø
100Ø Re Re
01
40Ø
100Ø Below 4. All valves to be of brass/bronze
slab
Re
100Ø Below Kitchenette heavy duty pattern construction
100Ø Below
slab
100Ø Below
slab
slab as 'peglar'
Sluice Room 01 Room 02 Room 03 Room 04
Disposal FT 50Ø
FT FT
50Ø
FT 5. Water Pipes under floor slab, drive
50Ø Re
nurse station
Re
ways, walkways, car parks,to be sleeved
02 02
Setup ANAESTHETIC Bed 100Ø Below in heavy duty C or GMS as instructed
AREA change slab
Clean corridor Patients entry
Security 6. Exposed hot water pipes to be lagged
03 100Ø Below
slab Re
03 with minimum 50mm thick fibre glass
40Ø Passage
FT FT
Re 50Ø
Room 06 Room 05 Re
7. All drainage pipes above ground to be
Conference
Scrub up 100Ø Below
Call
40Ø u C 'grey' while those below to be
slab Drug store Incharge
Passage
room WC/SHR Lift u C golden brown
Re Re
Re Re FT
04 100Ø 100Ø 100Ø 100Ø
04 8. All drainage pipes below floor slab,
100Ø SVP F/A-T/B 100Ø SVP F/A-T/B
driveways, walkways, carparks to be
DUCT PROPOSAL
Bone marrow DUCT PROPOSAL

encased in 150mm concrete sorround


Staff
05 transplant unit Lounge 05 well cured
100Ø SVP F/A-T/B
DUCT PROPOSAL kitchenette
Re
9. All pipework to run in wall chase,
06 40Ø 06 under floor slab,under worktops

Passage
Re

100Ø
in ceiling etc. Exposed pipes shall
Female staff not be acceptable
100Ø
FT
50Ø FT
Re
100Ø
SVP T/B 50Ø
40Ø 40Ø

Re
Staff entry Nurse station 10. Overflow pipes to discharge at
FT
100Ø
FT
Male staff
150mm beyond the wall
100Ø

Re
11. Stack pipes to rise 600mm above
07 07 the roof.

FT
50Ø
FT
50Ø
1.
50Ø FT FT 50Ø
Re Re
100Ø 100Ø Re 40Ø Re 100Ø 100Ø
No. Revision/Issue Date
40Ø

SVP T/B Re Re SVP T/B


50Ø FT FT 50Ø
50Ø 50Ø
FT FT

Private wards
08 08
PROJECT

PROPOSED ONCOLOGY EXTENSION


AT KUTRRH

FT FT
50Ø 50Ø
50Ø FT FT 50Ø
Re Re
100Ø 100Ø Re 40Ø 40Ø Re 100Ø 100Ø
SVP T/B Re Re SVP T/B
50Ø FT FT 50Ø
50Ø 50Ø
FT FT TITLE

FOURTH FLOOR DRAINAGE


LAYOUT
09 09

ARCHITECTS
ARCH .K. MWANGI

MECHANICAL AND ELECTRICAL ENGINEERS LTD


Dunstone Consulting Engineers
P.O. Box 23167-00100
Nairobi, Kenya.
Tel. 0203573922,0722724508
email: info@dunstonengineers.com

CLIENT
KENYATTA UNIVERSITY
REFERRAL HOSPITAL

Drg. No.DCEL/21/01/205

Date: MARCH 2021 Designed:F.J.K

Scale: NTS Approved by:G.K.R

A B C E F G H I J
FOURTH FLOOR

You might also like