Professional Documents
Culture Documents
Entrance of VIP: Service Path Tarmac
Entrance of VIP: Service Path Tarmac
Entrance of VIP: Service Path Tarmac
General Notes
ic
100Ø vent F/A
Ø100 Ø100 Ø100
4. All valves to be of brass/bronze
01 heavy duty pattern construction
50Ø as 'peglar'
Re
Ø150
50Ø
Trapless
Gents Re
Ø200 to
5. Water Pipes under floor slab, drive
Ladies gulley
Ø100 Ø150 Ø150 Ø150
sewer line ways, walkways, car parks,to be sleeved
ic ic ic ic ic
FT
Ø100
in heavy duty C or GMS as instructed
Re Re Gt Ø100 Ø100 Ø150
40Ø Ø100 Ø100 Ø100 Ø100
40Ø 40Ø 40Ø
Ø50
6. Exposed hot water pipes to be lagged
ic
FT Gt Gt Gt Gt Gt
main01building
Ø50
Disabled 100Ø
SVP F/A
Ø50
FT
100Ø 40Ø
Ø50
FT
40Ø
FT
40Ø
FT
100Ø SVP F/A rear entrance with minimum 50mm thick fibre glass
Ø50 DUCT PROPOSAL
Ø50 SVP F/A
Cashier Re
Re Re Re
Ø200
7. All drainage pipes above ground to be
FT
40Ø
Consultation Consultation Consultation Consultation
ProcedureFT 40Ø u C 'grey' while those below to be
u C golden brown
Re room Re room
room room room
ic 8. All drainage pipes below floor slab,
driveways, walkways, carparks to be
WAITING
02 encased in 150mm concrete sorround
Passage well cured
Riser
Security 9. All pipework to run in wall chase,
03 Re
40Ø
FT
03 under floor slab,under worktops
in ceiling etc. Exposed pipes shall
Consultation emergency
Ø200
not be acceptable
shower Lab
room SPECIMEN LAB FT
Triage 50Ø (ac) Store 10. Overflow pipes to discharge at
Entry porch 100Ø SVP F/A Reception COLLECTION
Customer Records Re DUCT PROPOSAL Re 40Ø Vulcathene
50Ø
Lift 150mm beyond the wall
ROOM under worktable
40Ø 40Ø
care Re
DT Re
FT 40Ø
04 FT 40Ø
04 11. Stack pipes to rise 600mm above
Gt Gt Gt Gt
100Ø SVP F/A
the roof.
DUCT PROPOSAL
stair Ø100 Ø100 Ø100 Ø100
LAB OFFICE
STAIR
05 05
1.
Ø150 Ø150
ic ic ic
ic
one bed Ø100 150Ø PVC No. Revision/Issue Date
sleeve
06 06
2F
doctor duty Wall cleanout FLOOR
CLEANOUT100Ø
75Ø VENT SVP F/A
THROUGH ROOF
room Ø100
DUCT PROPOSAL
Ø100
Female staff
PROJECT
FT
100Ø 40Ø 40Ø
Re STAFF LOUNGE PROPOSED ONCOLOGY EXTENSION
FLOOR
SVP F/A CLEANOUT
Trapless
Re
AT KUTRRH
private room Ø100
Male staff gulley
Ø200
Ø100
one bed 100Ø
SVP F/A Ø100 Re
07 50Ø
07
Ø100 TITLE
Ø100
ic
ic
GROUND FLOOR DRAINAGE
nurse office
Ø150 kitchenette
Ø100
LAYOUT
ic
txt Gt
Re 40Ø
ARCHITECTS
ic
08 therapeuatical Re
40Ø 40Ø 08 ARCH .K. MWANGI
ic
FT Gt
room
MALE CHANGING ROOM
Ø200
Doctor's 0ffice Ø50
Ø100
observation change Ø200
ic
room room
FT FT Ø200
100Ø
LINEN STORE SVP F/A
Ø100
ic
100Ø FT FT
SVP F/A
Ø100
six bed six bed
Ø100 Ø50
MECHANICAL AND ELECTRICAL ENGINEERS LTD
ic
nurse station Gt
Dunstone Consulting Engineers
TBA P.O. Box 23167-00100
FEMALE CHANGING ROOM Ø50 Ø200
Ø200 Nairobi, Kenya.
FT Tel. 0203573922,0722724508
Re
09 40Ø 40Ø 09 email: info@dunstonengineers.com
ic Ø200 Ø200
ic
store
CLIENT
2F
electricity KENYATTA UNIVERSITY
well STAIR REFERRAL HOSPITAL
six bed
six bed
elevator
Drg. No.DCEL/21/01/201
office
A B C E F G H I J
General Notes
CHEMO
CHANGING DUCT PROPOSAL 3. PPRC pipe joints to be by polyfussion
MIXING 40Ø
01 or electrical coupling.
Re
Riser
CHEMO
100Ø
Female staff
50Ø FT Re
under floor slab,under worktops
STAFF LOUNGE
private 50Ø
40Ø 40Ø
Re
in ceiling etc. Exposed pipes shall
FT
100Ø 100Ø
room 100Ø SVP not be acceptable
F/A-T/B
one bed Male staff
PHARMACY
1.
08 Re
40Ø 40Ø 08
FT No. Revision/Issue Date
MALE CHANGING ROOM
50Ø
NURSE NURSE
50Ø 50Ø
OFFICE OFFICE MDT room FT FT PROJECT
Re 100Ø
100Ø SVP
Re 100Ø 100Ø
SVP T/B PROPOSED ONCOLOGY EXTENSION
FT FT
F/A-T/B 50Ø
six bed six bed
50Ø
AT KUTRRH
nurse station
50Ø
FEMALE CHANGING ROOM
FT
Re
09 40Ø 40Ø 09
TITLE
elevator ARCHITECTS
ARCH .K. MWANGI
Doctors office
office
MECHANICAL AND ELECTRICAL ENGINEERS LTD
Dunstone Consulting Engineers
P.O. Box 23167-00100
Nairobi, Kenya.
Tel. 0203573922,0722724508
email: info@dunstonengineers.com
CLIENT
KENYATTA UNIVERSITY
REFERRAL HOSPITAL
A B C E F G H I J
Drg. No.DCEL/21/01/202
General Notes
40Ø
Nine bed DUCT PROPOSAL
3. PPRC pipe joints to be by polyfussion
100Ø Below
Re Re slab 50Ø 50Ø 01 or electrical coupling.
40Ø 40Ø
100Ø Below 100Ø Below
40Ø slab slab 40Ø
Five bed 4. All valves to be of brass/bronze
Waiting
Re 100Ø Below
slab
100Ø Below
slab
Re
heavy duty pattern construction
Re Re Re as 'peglar'
Linen Re 40Ø
100Ø Below
Nurse station
slab FT
02 5. Water Pipes under floor slab, drive
ways, walkways, car parks,to be sleeved
Re
Security in heavy duty C or GMS as instructed
03 Re
Nine bed
FT 100Ø Below
slab
50Ø FT 03
40Ø 40Ø
100Ø Below Re 100Ø Below
40Ø
6. Exposed hot water pipes to be lagged
FT slab slab Re
with minimum 50mm thick fibre glass
Six bed 100Ø Below
slab Five bed
Lift 7. All drainage pipes above ground to be
u C 'grey' while those below to be
04 40Ø 40Ø
Re
04 u C golden brown
100Ø SVP F/A-T/B 100Ø SVP F/A-T/B
DUCT PROPOSAL DUCT PROPOSAL FT
100Ø
Female staff 9. All pipework to run in wall chase,
50Ø FT
Re Sluice FAMILY CONFERENCE under floor slab,under worktops
100Ø SVP
in ceiling etc. Exposed pipes shall
40Ø 40Ø
F/A-T/B 50Ø Re
FT
100Ø
Male staff not be acceptable
100Ø
Re
50Ø 50Ø 10. Overflow pipes to discharge at
07 Re Staff lounge 07
100Ø SVP
F/A-T/B
150mm beyond the wall
1.
08 Re
40Ø 40Ø 08
FT
No. Revision/Issue Date
MALE CHANGING ROOM
50Ø
LINEN STORE
50Ø 50Ø
FT FT
Re 100Ø
PROJECT
100Ø 100Ø
Re
ROOF BELOW
100Ø SVP
F/A-T/B
FT FT
50Ø 50Ø
SVP T/B
PROPOSED ONCOLOGY EXTENSION
ON CALL
100Ø Below
AT KUTRRH
slab 50Ø
ROOF BELOW
40Ø 100Ø B/s FEMALE CHANGING ROOM
Re
FT FT FT
Re
09 40Ø 40Ø 09
TITLE
ARCHITECTS
ARCH .K. MWANGI
CLIENT
KENYATTA UNIVERSITY
REFERRAL HOSPITAL
A B C E F G H I J
Drg. No.DCEL/21/01/203
General Notes
Waiting
Re 100Ø Below
slab
100Ø Below
slab
Re
as 'peglar'
Re Re Re
Re
Security
6. Exposed hot water pipes to be lagged
03 Re Nine bed
FT 100Ø Below FT 03 with minimum 50mm thick fibre glass
slab
40Ø 40Ø 40Ø
100Ø Below Re 100Ø Below
FT slab slab Re
7. All drainage pipes above ground to be
100Ø Below u C 'grey' while those below to be
Six bed slab Five bed
Lift u C golden brown
04 40Ø 40Ø
Re
04 8. All drainage pipes below floor slab,
100Ø SVP F/A-T/B 100Ø SVP F/A-T/B
DUCT PROPOSAL DUCT PROPOSAL FT
driveways, walkways, carparks to be
encased in 150mm concrete sorround
05 05 well cured
100Ø SVP F/A-T/B
DUCT PROPOSAL 50Ø 50Ø
FT FT 9. All pipework to run in wall chase,
06 Re 100Ø Re
06 under floor slab,under worktops
100Ø in ceiling etc. Exposed pipes shall
100Ø
Female staff not be acceptable
50Ø FT
Re FAMILY CONFERENCE
100Ø SVP
F/A-T/B 50Ø FT
40Ø 40Ø
1.
100Ø SVP 100Ø SVP
F/A-T/B F/A-T/B
No. Revision/Issue Date
Nurse 0ffice
40Ø
txt
kitchenette
08 Re
40Ø
Re
40Ø 40Ø 08
FT PROJECT
MALE CHANGING ROOM PROPOSED ONCOLOGY EXTENSION
50Ø
TBA AT KUTRRH
50Ø 50Ø
FT FT
Re 100Ø
100Ø 100Ø
Re SVP T/B
100Ø SVP FT FT
F/A-T/B 50Ø 50Ø
TITLE
TBA 50Ø
FEMALE CHANGING ROOM THIRD FLOOR DRAINAGE
Re
FT LAYOUT
09 40Ø 40Ø 09
ARCHITECTS
ARCH .K. MWANGI
CLIENT
KENYATTA UNIVERSITY
REFERRAL HOSPITAL
Drg. No.DCEL/21/01/204
A B C E F G H I J
THIRD FLOOR
A B C E F G H I J
General Notes
OPERATING ROOM
Apparatus and
Dressing Preparation
or electrical coupling.
01 Re
100Ø
Re
100Ø
Re
40Ø
100Ø Re Re
01
40Ø
100Ø Below 4. All valves to be of brass/bronze
slab
Re
100Ø Below Kitchenette heavy duty pattern construction
100Ø Below
slab
100Ø Below
slab
slab as 'peglar'
Sluice Room 01 Room 02 Room 03 Room 04
Disposal FT 50Ø
FT FT
50Ø
FT 5. Water Pipes under floor slab, drive
50Ø Re
nurse station
Re
ways, walkways, car parks,to be sleeved
02 02
Setup ANAESTHETIC Bed 100Ø Below in heavy duty C or GMS as instructed
AREA change slab
Clean corridor Patients entry
Security 6. Exposed hot water pipes to be lagged
03 100Ø Below
slab Re
03 with minimum 50mm thick fibre glass
40Ø Passage
FT FT
Re 50Ø
Room 06 Room 05 Re
7. All drainage pipes above ground to be
Conference
Scrub up 100Ø Below
Call
40Ø u C 'grey' while those below to be
slab Drug store Incharge
Passage
room WC/SHR Lift u C golden brown
Re Re
Re Re FT
04 100Ø 100Ø 100Ø 100Ø
04 8. All drainage pipes below floor slab,
100Ø SVP F/A-T/B 100Ø SVP F/A-T/B
driveways, walkways, carparks to be
DUCT PROPOSAL
Bone marrow DUCT PROPOSAL
Passage
Re
100Ø
in ceiling etc. Exposed pipes shall
Female staff not be acceptable
100Ø
FT
50Ø FT
Re
100Ø
SVP T/B 50Ø
40Ø 40Ø
Re
Staff entry Nurse station 10. Overflow pipes to discharge at
FT
100Ø
FT
Male staff
150mm beyond the wall
100Ø
Re
11. Stack pipes to rise 600mm above
07 07 the roof.
FT
50Ø
FT
50Ø
1.
50Ø FT FT 50Ø
Re Re
100Ø 100Ø Re 40Ø Re 100Ø 100Ø
No. Revision/Issue Date
40Ø
Private wards
08 08
PROJECT
FT FT
50Ø 50Ø
50Ø FT FT 50Ø
Re Re
100Ø 100Ø Re 40Ø 40Ø Re 100Ø 100Ø
SVP T/B Re Re SVP T/B
50Ø FT FT 50Ø
50Ø 50Ø
FT FT TITLE
ARCHITECTS
ARCH .K. MWANGI
CLIENT
KENYATTA UNIVERSITY
REFERRAL HOSPITAL
Drg. No.DCEL/21/01/205
A B C E F G H I J
FOURTH FLOOR