CIAP – Construction Industry Authority of the

Philippines
Composed of representatives from
PCA – Philippines Constructors Association Inc
UAP – United Architects of the Philippines
PICE – Philippine Institute of Civil Engineers
PCCI – Philippine Chamber of Commerce and Industry
COFILCO – Confederation of Filipino Consulting
Organizations
CREBA – Chamber of Real Estate and Builders Association
PICA – Philippine Institute of Construction Arbitrators
SPAC – Society of Philippine Accredited Consultants
SECTION 1 – Definitions and Documents
Article 1 – Definitions
Article 2 – Execution, Correlation, Meaning of
Terms and Intent of Documents
Article 3 – Drawings and Specifications
Article 4 – Detail Drawings and Instructions
Article 5 – Shop Drawings
SECTION 2 – Laws, Regulations, Site Conditions,
Permits and Taxes
Article 6 – Laws and Site Conditions
Article 7 – Permits, Taxes and Surveys
SECTION 3 – Equipment and Materials
Article 8 – General
Article 9 – Equipment
Article 10 – Materials, Fixtures, Appliances, and
Fittings Furnished by the Contractor
Article 11 – Materials, Equipment, fixtures,
Appliances and Fittings Furnished by the Owner
Article 12 – Royalties and Patents
Article 13 – Manufacturer’s Directions
SECTION 4 – Premises and Temporary Structures
Article 14 – Use of Premise
Article 15 – Temporary Structures and Facilities
SECTION 5 – Protection of Work and Property
Article 16 – Protection of Work and Owner’s
Property
Article 17 – Protection of Adjacent Property and
Existing Utilities
Article 18 – Protection of Life, Work and Property
During and Emergency
SECTION 6 – Labor, Work and Payments
Article 19 – Labor
Article 20 – Work
Article 21 – Time of Completion of Work
Article 22 – Payments
SECTION 7 – Contractor-Separate Contractor-
Subcontractors Relationship
Article 23 – Separate Contracts with other
Contractors
Article 24 – Contractor-Separate Contractors
Relations
Article 25 – Sub-Contracts
SECTION 8 – Suspension of Work and Termination of
Contract
Article 26 – Contractor’s Right to suspend work or
terminate contract
Article 27 – Owner’s Right to suspend work
Article 28 – Owner’s Right to terminate contract
Article 29 – Owner’s Right to proceed with the
work after reduction in contractor’s scope of
work; partial takeover from contractor
SECTION 9 – Responsibilities and Liabilities of
Contractor and of Owner
Article 30 – Contractor’s Responsibility for
Accidents and Damages
Article 31 – Contractor’s Insurance and Bonds
Article 32 – Owner’s Responsibilities and Liabilities
Article 33 – Liens, Disputes and Arbitration
SECTION 10 – Owner’s Representative
Article 34 – Owner’s Representative
SECTION 11 – Schedule of Time Limits