Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

WHAT'S NEW / VULCAN

What's New in Maptek Vulcan 10.1


Vulcan 10.1 continues Maptek's mission to deliver multiple applications on the Maptek
Workbench. Eureka 4.0 is included in the release, with I-Site Studio and BlastLogic joining as
integrated Workbench applications later in 2017.

• Automated pit designer • Mining block generation • Other enhancements


• Statistical analysis • Stope optimiser • Workbench
• Drill & blast upgrades • Underground scheduling • Eureka 4.0
• Dragline module • Decline optimiser

Overview
Vulcan 10.1 features new functionality to
streamline design and planning, optimise
drill & blast and improve reporting and
analysis of data.
Updated workflow in Automated Pit
Designer makes it easier to use, with
greater flexibility for engineering design
impact studies.
Vulcan Data Analyser is enhanced with Integrated dynamic model display is an Drafting Sheet Editor allows users to
new statistical analysis, graphing and intuitive tool for interpreting block models. add corporate logos, set up page sizes
display options for better understanding and apply new scale bar and north arrow
Create, assign and view attributes has styles across all plot utilities.
technical data.
been enhanced and reserving attributes
Open cut drill & blast upgrades enhance can be automatically made available to The Maptek Workbench is the interface
manual drill design and significantly reduce the scheduler. within which all Maptek applications will
the time to create or update a design. ultimately be available. The Workbench
CAD polygon manipulation is faster and platform enhances interaction with data
Updated dragline tools enable automatic more accurate, and live preview allows and access to applications that support
creation of maximum dragline spoil users to select data and preview results design and modelling.
topography. while changing parameters.
Eureka now shares the Maptek
A new mining block generation tool Python scripting language provides an Workbench environment with Vulcan,
combines design and reserving tools efficient method for working with large offering improved workflows, data
for improved productivity. arrays of data for customising solutions sharing and access to additional
for block models, databases, mapfiles, applications on a single platfor
New features in Stope Optimiser help
grids and triangulations.
create more accurate final stope shapes for
mine planning and scheduling. New command line utilities allow users
Vulcan 10.1, Eureka 4 and the
to manipulate block models to speed
Enhanced integration sees the Vulcan Maptek Workbench are available for
up workflow for lengthy computations.
Gantt Scheduler directly reading Vulcan download in a single installer from a
block models for underground scheduling. Increased grade estimation speed is secure link in the Maptek Users Area.
made possible by estimating groups of Visit users.maptek.com to login or
Decline Optimiser is integrated with
IDs together and making better use of register with your corporate email for
Vulcan Level Designer to generate multiple
multiple core processing. access. Current maintenance is a
underground development scenarios.
A new transformation option allows users prerequisite.
Graphics driver updates to the interactive
to transform multivariate geostatistics Download file size is approximately
interface more efficiently support large
data forwards and backwards via the 2.0 GB. USB keys can be mailed if you
datasets. New transparency display
log-ratio method. have difficulty downloading files.
algorithm and keyboard mode selection
options speed up editing of designs.
>
WHAT'S NEW / VULCAN

Automated pit design


Automated Pit Designer allows high level,
long term mine planning analysis and
integrates with other pit design options.

Major enhancements in Maptek


Vulcan 10.1 deliver additional output
triangulations, reserves run directly from
the panel and faster iteration. An external
executable facilitates scripting and
sensitivity studies.

New features improve workflow.


Additional triangulation modes
remove the manual Boolean step of
topography and pit design triangulations.
Open cut drill & blast Mining blocks
Visualisation and analysis is improved. Open cut drill & blast upgrades in Vulcan Mining block generation is now handled by
10.1 enhance manual drill design and a single tool that allows users to segment
New live reserving functionality allows
significantly reduce the time to create information contained in block models
faster iteration when evaluating different
or update a design. (polygons, solids, surfaces) to prepare
parameters. Change a design parameter
mining blocks for short term scheduling.
and new tonnage and contained metal One new option creates rows which The new option combines design and
can be updated in a single click. merge from a straight back row to fit reserving tools, improving productivity.
a curved free face. Sequential row/
The new executable facilitates scripting
echelon joining and continuous naming Users can now interrogate mining blocks
and sensitivity analysis, allowing more
streamlines workflow when combining for defined attributes as well as reserves
elaborate engineering studies on the
separate blasts. calculations through dynamic link to the
impact of different design considerations.
block model.
Instead of only a few manual pit designs, A new option enables minimum burden
multiple pits can be generated for checks, calculations and adjustments, Mining block generation is easy to set up
multiple different parameter sets. providing face triangulations which reflect and run and multiple pits are supported.
the actual rather than the designed face.
Statistical analysis Viewing options for triangulations and
Vulcan Data Analyser allows resource blast rows have been updated, as have
geologists and engineers to make tools for selecting and adjusting holes.
informed decisions about the holistic Vulcan 10.1 also includes new graph
mine planning process. options for profiles and minimum burdens.

In Vulcan 10.1 new functionality sees


general statistics, histogram, cumulative
Dragline
frequency, scatter, P-P and Q-Q charts New dragline functions automate
available with a single click. creation of a maximum dragline spoil
topography and spreadsheet
Users can superimpose statistics on
template setup to compare
graphical representations. Support for
available spoil room to actual
block models allows analysis of mine
sectional spoil volumes.
planning data. The new caching system
makes analysing datasets with different Another new option allows the
charts almost instantaneous. creation of a level bench of specified
width or RL in one step. New options in
Users can find outliers, compare
Dragline preferences allow users to tailor
distributions and perform other tasks by
prompting and defaults for rehandle.
simply picking the data and the analysis
to perform.

>
WHAT'S NEW / VULCAN

Decline optimiser Block model manipulation


New block command line utilities allow
Decline Optimiser is integrated with users to manipulate block models
Vulcan Level Designer to generate by splitting and joining regular block
multiple underground development models on parent boundaries. Benefits
scenarios for consideration in the mine include chopping a model, running
planning process. This new tool creates lengthy computations on separate
cost optimised single or complex decline computers, and then joining the models
networks in seconds. for the combined result. This speeds up
workflow and benefits users working with
Other enhancements large datasets and block models.
Graphics
Multi-id grade estimation
Stope optimiser Graphics driver updates improve
the interactive interface for efficiently
Increased speed for grade estimation
arises from estimating groups of IDs
New features in Stope Optimiser give supporting large datasets. New
together and making better use of
greater flexibility and control in defining transparency display algorithm and
multiple core processing. Estimation runs
stope shapes, helping to create more keyboard mode selection options
that took 5 hours have been reduced to
accurate final stope shapes for mine enhance speed and convenience when
less than an hour.
planning and scheduling. editing designs. Dynamic model display
is integrated with the Property Editor for
The resultant shape can now be defined Multivariate geostatistics
intuitive block model interpretation.
by 6 or 8 points on section. Users can A new transformation option allows users
specify true dip and width, work better Attributes to transform multivariate geostatistics
with narrow ore regions, handle variable Vulcan 10.1 updates make it easier data forwards and backwards via the
dilution and use the prism method for users to create, assign and view log-ratio method.
for defining stope shapes. Simulation attributes which pass important
data can now be incorporated in the information to downstream processes. Drafting sheet improvements
optimisation using risk options. Reserving attributes can be assigned Fast creation and modification of custom
to design data and triangulations can drafting sheets greatly improves plotting.
Underground scheduling be automatically made available to the Users can create better looking and
more standardised plots regardless of
scheduler. Users can now visualise the
Enhanced integration in Vulcan 10.1 attributes of a group of triangulations plotting method.
allows the Vulcan Gantt Scheduler (VGS) and apply bulk changes.
to directly read a Vulcan block model, Vulcan 10.1 Drafting Sheet Editor allows
removing the need to run templated Changes to Templated Attributes give users to add images to drafting sheets,
attributes and advanced reserves more control over updating and viewing set up page sizes and apply new scale
to populate designs with reserve attributes, with guidance for creating bars and north arrow styles. Users can
information. The process for updating the expression type attributes. save and import title blocks between
schedule with changes made in Envisage drafting sheets, and move and resize title
has been streamlined. CAD polygon tools blocks and all associated data.
Enhanced CAD polygon tools in Vulcan
Multiple vgantt files can be imported 10.1 improve performance and results
and exported for scheduling shorter in day to day drafting work.
range plans from LOM. Multiple users can
schedule different zones and schedules Speed and accuracy allow many edge
can be imported for a comprehensive cases previously ignored to be correctly
view of the entire mine schedule. handled. Live preview allows users to
select data up front, and preview results
Schedule optimisation while changing parameters.
Schedule Optimisation Tool is an add-on
to VGS for creating long term schedules
Python scripting
that optimise NPV while adhering to Vulcan 10.1 includes an interface to the
operational resource constraints. Multiple Python scripting language, providing
scenarios can be run for analysis and an efficient method for working with
built-in reporting improves user experience. large data arrays. Users can customise
solutions for block models, databases,
mapfiles, grids and triangulations.
>
WHAT'S NEW / VULCAN

Eureka 4.0
Eureka now shares the Maptek
Workbench environment with Vulcan,
offering improved workflows, data
sharing and access to additional
applications on a single platform.

Eureka provides an interactive 3D


environment for visualisation and
modelling of exploration and project data
including drilling, geophysics, seismic,
GIS data, maps and other imagery.

Vulcan and Eureka maintain their own


Workbench The Workbench Explorer knows which
files can be edited and will make the
file explorer and menus. Tied views
allow viewing of Eureka data on one
The Maptek Workbench is the interface edit option available in the context screen and the same or different data
within which all Maptek applications menu. A new tab lists file changes in Vulcan on another. Rotate or zoom
will ultimately be available. This release in the current working folder. This actions in one window are replicated in
incorporates Vulcan 10.1 and Eureka 4.0. chronological log records creation, the other. Drilling data edited in Vulcan is
modification, renaming and deletion dynamically updated in Eureka boreholes.
The Workbench platform enhances of file types shown in the data tab. An implicit model created in Eureka is
interaction with data and access to instantly available for use in Envisage as
applications that support design and Working space can be increased by a triangulation file.
modelling. auto-hiding docked windows, such
as the Explorer, Logs and Properties.
Users can create their own toolbars,
menus, command lists and shortcut
Windows can be pulled out and docked
together on another monitor to create
Eureka timed trial
keys, to suit their own work patterns. a richer working environment. The Core drillhole viewing and exploration
All of these customisation points may Envisage window can be undocked and tools in Maptek Eureka 4.0 are
include both Vulcan and Eureka. maximised on another monitor. Attached available on a timed trial expiring on
An integrated text editor includes toolbars move with the windows. 30 June 2017.
advanced features such as syntax Toolbars can be resized into any Eureka provides an interactive 3D
highlighting and region folding. An rectangular shape. Docked toolbar environment for visualisation and
integrated spreadsheet application windows can be set to auto-hide and modelling of exploration and project data
provides efficient editing functionality. only appear when needed. including drilling, geophysics, seismic,
Enhanced tooltips now show summary GIS data, maps and other imagery.
Users can dynamically switch between
and status information for all items. Files supported languages. Simply click on the Eureka icon on the
and file components are colour coded to Workbench to get started.
reflect their state as changed, loaded or Command lines and scripts can be
edited by a Workbench application. edited in panels that recognise the types
of required values. Editing a command
Items capable of rendering to an image line automatically takes users to the
include a preview thumbnail. Groups of correct panel for that executable.
items can be displayed as icons or details,
scaled and dragged into other windows. The Workbench can constantly monitor
memory usage of client and server
Thumbnail views can be docked to processes, as well as overall system
the side or base and used as a palette. memory. A dashboard displays memory
The dynamic filter can be used to quickly usage in easy-to-read scrolling charts.
search for assets. This information can be used to help
identify performance issues in the
software or platform.

© 2017 Maptek www.maptek.com

You might also like