Strap Footing Design

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

Strap Footing

Project Name :
Location of Project :

Input
Column A Column B
Pu 335 kN Pu 516 kN
Mu 56 kNm Mu 21.603 kNm
c/c distance b/w Columns 4.57
SBC 180 kN/m2
Projection of Footing A 0.225 m
Dimensions of Column A 0.23 0.45 m
Dimensions of Column B 0.45 0.23 m
Concrete Grade 25
Grade of Steel 500
Assume length of Footing A 1.4 m

R1 392.809
R2 458.191

Width of Footing A ### 1.55 m


Width of Footing B ### 1.6 m

q1 420.86682

q2 429.55403

SFD
At face of footing A ###

BMD
At face of footing A ###
At face of footing B ###
At face of column B ###

Thickness of Footing A
Assume Pt 0.2 %
Tau C 0.32 MPa 320 kN/m2
Width, b 1m
Projection 0.66 m
Thickness ### 0.4

Thickness of Footing B
Projection 0.685 m
Thickness ### 0.4

Area of Steel for Footing A


Ast 680 mm2
Dia of Bars 12 mm
No. of Bars per 1m 6.0155697
Spacing rquired 166.23529 per 1m
Spacing provided 150 mm

Area of Steel for Footing B


Ast 417.00594 mm2
Dia of Bars 12 mm
No. of Bars per 1m 3.6890122
Spacing rquired 271.07528 per 1m
Spacing provided 150 mm

Area of Steel for Beam


b 0.35 m
d required ###
d provided 450 mm
D 500 mm
Ast 1710.6438 mm2
Dia of Bars 20 mm Dia of Bars 16 mm
No. of bars required 2 No. of bars required 2
Ast attained 628 Ast attained 401.92
Total Ast attained 1029.92
Pt 0.6539174603
Tau C 0.36 MPa Dia of bar 8 mm
Tau V ###
Spacing required ###
Spacing Provided 300 mm
Asv 96.551724138 mm2
No. of leg req. ###
No. of leg provided 2
8 mm
10 mm
12 mm
16 mm

0.025
400000
0.958299 0.081662
0.041701
417.0059

0.025
157500
0.565551 0.680152
0.434449
1710.644

0 mm
12 mm
16 mm
20 mm
25 mm

You might also like