Hole Cleaning
Hole Cleaning
DOSHI 1
TWO PRIMARY ACTIVITIES ASSOCIATED
WITH DRILLING A WELL
1. PENETRATING SUBTERRANEAN
FORMATIONS WITH THE DRILL BIT.
2. REMOVING THE DRILLED
MATERIAL FROM THE HOLE THUS
DRILLED
INCREASING DRAG
INCREASING TORQUE
STUCK PIPE
HOLE ANGLE
ROP
FLOW RATE
PIPE ROTATION
15
THE VECTOR OF THE DOWNWARD MOTION IS
CONTROLLED BY THE FORCE OF GRAVITY AND
IS INFLUENCED BY:
• BUOYANCY
• VISCOSITY OF THE DRILLING FLUID
• SIZE OF THE PARTICLE
17 1/2 120
12 1/4 120
9 7/8 120
8 1/2 80
HIGH HIGH
DILUTION
VOLUMES COSTS
FLOW RATE
PIPE ROTATION
HI DENSITY SWEEPS
EXTENDED CIRCULATION
GUIDELINES TO EFFECTIVE HOLE CLEANING - DR. S. V. DOSHI 60