AED
1 Mobilization INCLUDED
PAGE NO. 1 OF 31
CONTRACT NO. 231-6
DEVELOPMENT OF ROADS, INFRASTRUCTURE AND STREETSCAPE AT KHALIFA CITY SOUTH EAST SECTORS 25, 26, 35 AND 36 (CONTRACT 231-6)
MUNICIPALITY OF ABU DHABI - U.A.E.
BILL OF QUANTITIES - VOLUME 4
Applicable
Item Description Specification Unit Quantity Rate in Words Rate in Figures Amount
Clauses or
Sections AED AED
SECTION XVI - LIGHTING
AND ELECTRICAL
DISTRIBUTION WORKS
SS/XVI-10 &
16.35 Supply Lighting Control Cabinets . No. 5 16,800 84,000.00
PS/XV1_16.03
Applicable
Item Description Specification Unit Quantity Rate in Words Rate in Figures Amount
Clauses or
Sections AED AED
PAGE XVI-1
CONTRACT NO. 231-6
DEVELOPMENT OF ROADS, INFRASTRUCTURE AND STREETSCAPE AT KHALIFA CITY SOUTH EAST SECTORS 25, 26, 35 AND 36 (CONTRACT 231-6)
MUNICIPALITY OF ABU DHABI - U.A.E.
BILL OF QUANTITIES - VOLUME 4
Applicable
Item Description Specification Unit Quantity Rate in Words Rate in Figures Amount
Clauses or
Sections AED AED
BROUGHT FORWARD: 455,592.00
Applicable
Item Description Specification Unit Quantity Rate in Words Rate in Figures Amount
Clauses or
Sections AED AED
PAGE XVI-2
CONTRACT NO. 231-6
DEVELOPMENT OF ROADS, INFRASTRUCTURE AND STREETSCAPE AT KHALIFA CITY SOUTH EAST SECTORS 25, 26, 35 AND 36 (CONTRACT 231-6)
MUNICIPALITY OF ABU DHABI - U.A.E.
BILL OF QUANTITIES - VOLUME 4
Applicable
Item Description Specification Unit Quantity Rate in Words Rate in Figures Amount
Clauses or
Sections AED AED
SECTION XVI - LIGHTING BROUGHT FORWARD: 1,283,644.00
AND ELECTRICAL
DISTRIBUTION WORKS
(Cont'd)
SS/XVI-14 &
16.104 Install Low Voltage Cable 4 Core 10mm² L.M. 8,774 15 131,610.00
PS/XVI-16.03
Applicable
Item Description Specification Unit Quantity Rate in Words Rate in Figures Amount
Clauses or
Sections AED AED
PAGE XVI-3
CONTRACT NO. 231-6
DEVELOPMENT OF ROADS, INFRASTRUCTURE AND STREETSCAPE AT KHALIFA CITY SOUTH EAST SECTORS 25, 26, 35 AND 36 (CONTRACT 231-6)
MUNICIPALITY OF ABU DHABI - U.A.E.
BILL OF QUANTITIES - VOLUME 4
Applicable
Item Description Specification Unit Quantity Rate in Words Rate in Figures Amount
Clauses or
Sections AED AED
SECTION XVI - LIGHTING BROUGHT FORWARD: 2,020,760.00
AND ELECTRICAL
DISTRIBUTION WORKS
(Cont'd)
SS/XVI-7 &
16.143 Supply 10m High Light Pole. No. 19 2,250 42,750.00
PS/XVI_16.02
SS/XVI-7 &
16.143a Supply 14m High Light Pole. No. 143 3,550 507,650.00
PS/XVI_16.02
SS/XVI-7 &
16.144 Install 10m High Light Pole. No. 19 1,100 20,900.00
PS/XVI_16.02
SS/XVI-7 &
16.144a Install 14m High Light Pole. No. 143 1,200 171,600.00
PS/XVI_16.02
Applicable
Item Description Specification Unit Quantity Rate in Words Rate in Figures Amount
Clauses or
Sections AED AED
PAGE XVI-4
CONTRACT NO. 231-6
DEVELOPMENT OF ROADS, INFRASTRUCTURE AND STREETSCAPE AT KHALIFA CITY SOUTH EAST SECTORS 25, 26, 35 AND 36 (CONTRACT 231-6)
MUNICIPALITY OF ABU DHABI - U.A.E.
BILL OF QUANTITIES - VOLUME 4
Applicable
Item Description Specification Unit Quantity Rate in Words Rate in Figures Amount
Clauses or
Sections AED AED
SECTION XVI - LIGHTING BROUGHT FORWARD: 3,195,010.00
AND ELECTRICAL
DISTRIBUTION WORKS
(Cont'd)
PAGE XVI-5
CONTRACT NO. 231-6
DEVELOPMENT OF ROADS, INFRASTRUCTURE AND STREETSCAPE AT KHALIFA CITY SOUTH EAST SECTORS 25, 26, 35 AND 36 (CONTRACT 231-6)
MUNICIPALITY OF ABU DHABI - U.A.E.
BILL OF QUANTITIES - VOLUME 4
Applicable
Item Description Specification Unit Quantity Rate in Words Rate in Figures Amount
Clauses or
Sections AED AED
SECTION XVI - LIGHTING BROUGHT FORWARD: 4,172,100.00
AND ELECTRICAL
DISTRIBUTION WORKS
(Cont'd)
SS/XVI-7 &
16.148 Install….. Watt, Type 1 LED Luminaire. No. 83 450 37,350.00
PS/XVI_16.05
SS/XVI-7 &
16.148a Install….. Watt, Type 2 LED Luminaire. No. 166 450 74,700.00
PS/XVI_16.05
SS/XVI-7 &
16.148b Install….. Watt, Type 3 LED Luminaire. No. 19 450 8,550.00
PS/XVI_16.05
SS/XVI-7 &
16.149 Supply Flag holder. No. 162 100 16,200.00
PS/XVI_16.02
SS/XVI-7 &
16.150 Install Flag holder. No. 162 66 10,692.00
PS/XVI_16.02
Applicable
Item Description Specification Unit Quantity Rate in Words Rate in Figures Amount
Clauses or
Sections AED AED
PAGE XVI-6
CONTRACT NO. 231-6
DEVELOPMENT OF ROADS, INFRASTRUCTURE AND STREETSCAPE AT KHALIFA CITY SOUTH EAST SECTORS 25, 26, 35 AND 36 (CONTRACT 231-6)
MUNICIPALITY OF ABU DHABI - U.A.E.
BILL OF QUANTITIES - VOLUME 4
Applicable
Item Description Specification Unit Quantity Rate in Words Rate in Figures Amount
Clauses or
Sections AED AED
SECTION XVI - LIGHTING BROUGHT FORWARD: 4,409,502.00
AND ELECTRICAL
DISTRIBUTION WORKS
(Cont'd)
PAGE XVI-7
CONTRACT NO. 231-6
DEVELOPMENT OF ROADS, INFRASTRUCTURE AND STREETSCAPE AT KHALIFA CITY SOUTH EAST SECTORS 25, 26, 35 AND 36 (CONTRACT 231-6)
MUNICIPALITY OF ABU DHABI - U.A.E.
BILL OF QUANTITIES - VOLUME 4
Applicable
Item Description Specification Unit Quantity Rate in Words Rate in Figures Amount
Clauses or
Sections AED AED
SECTION XVI - LIGHTING BROUGHT FORWARD: 4,636,740.00
AND ELECTRICAL
DISTRIBUTION WORKS
(Cont'd)
Applicable
Item Description Specification Unit Quantity Rate in Words Rate in Figures Amount
Clauses or
Sections AED AED
PAGE XVI-8
CONTRACT NO. 231-6
DEVELOPMENT OF ROADS, INFRASTRUCTURE AND STREETSCAPE AT KHALIFA CITY SOUTH EAST SECTORS 25, 26, 35 AND 36 (CONTRACT 231-6)
MUNICIPALITY OF ABU DHABI - U.A.E.
BILL OF QUANTITIES - VOLUME 4
Applicable
Item Description Specification Unit Quantity Rate in Words Rate in Figures Amount
Clauses or
Sections AED AED
SECTION XVI - LIGHTING BROUGHT FORWARD: 4,685,454.00
AND ELECTRICAL
DISTRIBUTION WORKS
(Cont'd)
SS/XVI-7,
SS/XVI10,
16.162 Supply Cable Glands. No. 370 90 33,300.00
SS/XVI14 &
PS/XVI_16.02
SS/XVI-7,
SS/XVI10,
16.163 Install Cable Glands. No. 370 40 14,800.00
SS/XVI14 &
PS/XVI_16.02
SS/XVI-7,
16.164 Supply Earth Lug. SS/XVI-14 & No. 370 188 69,560.00
PS/XVI_16.02
SS/XVI-7,
16.165 Install Earth Lug. SS/XVI-14 & No. 370 40 14,800.00
PS/XVI_16.02
PAGE XVI-9
CONTRACT NO. 231-6
DEVELOPMENT OF ROADS, INFRASTRUCTURE AND STREETSCAPE AT KHALIFA CITY SOUTH EAST SECTORS 25, 26, 35 AND 36 (CONTRACT 231-6)
MUNICIPALITY OF ABU DHABI - U.A.E.
BILL OF QUANTITIES - VOLUME 4
11.1 11kV 3 Core 300mm2 Armoured, XLPE, Copper Cable m 58 - 431.00 24,998.00 25.00 1,450.00 26,448.00
11.2 11kV 3 Core 240mm2 Armoured, XLPE, Copper Cable m 610 - 345.00 210,450.00 25.00 15,250.00 225,700.00
11.5 LV 4 Core 240mm2 Armoured, XLPE, Copper Cable m 25,460 - 330.00 8,401,800.00 20.00 509,200.00 8,911,000.00
11.6 LV 4 Core 120mm2 Armoured, XLPE, Copper Cable m 2,240 - 168.00 376,320.00 20.00 44,800.00 421,120.00
11.7 LV 4 Core 70mm2 Armoured, XLPE, Copper Cable m 3,300 - 105.00 346,500.00 20.00 66,000.00 412,500.00
11.8 32F, Fiber Optic Cable along with 11KV 3C x 240 mm2 m 793 - 28.00 22,204.00 20.00 15,860.00 38,064.00
12.5 Joint for 32F, Fiber Optic Cable Set 21 - 3,200.00 67,200.00 3,300.00 69,300.00 136,500.00
1.1 11kV Ring Main Substation - Type 1 (Shallow Foundation) No 1 - - 428,000.00 428,000.00 428,000.00
1.2 11kV Ring Main Substation - Type 2 (Raft Foundation) No 1 - - 440,000.00 440,000.00 440,000.00
1.3 11kV Ring Main Substation - Type 3 (Pile Foundation) No 2 - - 510,000.00 1,020,000.00 1,020,000.00
Supply & Installation of RCC precast foundation for Feeder pillar
2 No 1 - - 1,750.00 1,750.00 1,750.00
type A
Supply & Installation of RCC precast foundation for Feeder pillar
3 No 25 - - 1,750.00 43,750.00 43,750.00
type B
Supply & Installation of RCC precast foundation for 11/0.415kV
4 No 1 - - 6,600.00 6,600.00 6,600.00
1500/1000/500kVA Package Unit Substation
Supply and installation of complete substation earthing system
5 Lot 4 - - 28,000.00 112,000.00 112,000.00
complying with specification requirement
Supply, Installation, Testing and commissioning of ORM (2F+2T),
Fully automated RMU with self powered protection, Earthing
6 system, DMS interface cubicle and all required accessories for No 4 - 98,200.00 392,800.00 8,800.00 35,200.00 428,000.00
Manual/Electrical remote operation and for DMS integration as per
specification requirement.
Supply and Install 25Kg trolley type dry power fire extinguisher
15 No 4 - 850.00 3,400.00 500.00 2,000.00 5,400.00
inside the substation
16 Supply and Installation energy meter inside the substation No 4 - 4,000.00 16,000.00 1,000.00 4,000.00 20,000.00
Supply and Install 24V DC supply system to feed the 11kV RMU
17 and RTU for electrical operation and all required cabling and No 4 45,000.00 180,000.00 - 10,000.00 40,000.00 220,000.00
accessories as per the specification.
Pull box 1000x1000x1500mm for 32F, Fiber Optic cable along with
22 Set 4 - 5,000.00 20,000.00 1,250.00 5,000.00 25,000.00
11KV 3Cx240mm2