Item Code Description of Works Quan-Tity Unit Input Kind (1) (2) (3) (4) (5) (6) Norms Code

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 6

Norms Unit Input

Item Code
Code Description of Works Quan-tity Kind
[1] [2] [3] [4] [5] [6]

###
EARTH WORK IN EXCAVATION
2.1 1.1a Excavation of soft clay & silty soils including 1.00 Cum Machine
disposal up to 10 m lead & 1.5m lift) including
hauling upto 200m (0.9m3 bucket)

Earthwork in embankment including compaction Cum


1.1b with watering & dressing, earth haulage upto
200m.
1.00 Labour

Machine

2_25-b 2.2.a 1 Cum Labour


Earthwork in filling with 15cm thick soil, including Equipment
lead 10m & 1.5m lift & manually compaction
without sprinkle of water
Earthwork in filling with 15cm thick soil, including Cum
2.2.b lead 10m & 1.5m lift & manually compaction with
2_25-a sprinkle of water 1 Labour
Equipment
2 CEMENT CONCRETE WORKS
7-2-d 2.1 Concreting of foundations, vertical faces, walls, in 1 Cum Labour
1:2:4 (M15) PCC for RCC, cement sand
aggregate mix including supply of materials and
haulage distance upto 30m
Materials

7.4-b 2.2 Concreting of super structure, Vertical faces, Deck 1 Cum Labour
Slab, Beams, Walls of ratio 1:1.5:3 (M20)
including supply of materials and haulage distance
upto 30 m
Materials

7-2-c 2.3 Concreting of foundations, vertical faces, walls, 1 Cum Labour


Abutment in 1:3:6 (M10) cement sand aggregate
mix including supply of materials and haulage
distance upto 30m
Materials

3 REINFORCEMENT
7-5 3.1 1 MT. Labour

Cutting , bending , placing in position and binding


of reinforcement steel bars as per the Materials
design/drawing for RCC works including haulage
to 30m distance.
3.2 Making and errectin Trashracks all complete 1 MT. Labour

Materials

4 GABION WORKS & BOULDER WORKS


16-11 4.1 Boulder supply and filling into Gabion Boxes 1 Cum Labour
Material
sqm
Supplying of Machine madeGI wire gabion Boxes
4.2 of Mesh size 100mm*120mm with heavy coated 1
GI wires (Mesh wire :3mm, selvedge wire 3.9mm
and Lacing wire 2.4mm)

Making gabion boxes incl. cutting wire & netting


etc.Hexagonal mesh size 100mm*120mm Mesh
4.3 wire -10SWG salvedge wire -7SWg
a Box size 2m*1m*1m 1 Each Labour
Labour
Material
Material
b Box size 3m*1m*1m 1 Each Labour
Labour
Material
Material
c Box size 3m*1m*0.5m 1 Each Labour
Labour
Material
Material
d Box size 3m*1m*0.3m 1 Each Labour
Labour
Material
Material
Input Contractor's
Description Quantity Unit Rate Amount Total OH Grand Total Unit Item Rate
[7] [8] [9] [10] [11] [12] [13] [14] [15]

Excavator 0.0128 Hr 2630.23 33.66 33.66 5.049 38.709 38.709

M-day

Skilled 0.0030 690.00 2.07 72.18 10.826 83.00 83.00


Unskilled 0.05 M-day 470.00 23.5
3% of % 0.71
Tools & Equipment unskilled
Roller 0.0167 Hr 1,346.46 22.48
Bulldozer 0.0051 Hr 3,431.46 17.5
Water Tanker 0.0043 Hr 1,376.90 5.92
Unskilled 0.25 M-day 470.00 117.5 121.03 18.154 139.18 139.18
Tools & Equipment 3% 3.53

Unskilled 0.5 M-day 470.00 235 242.05 36.308 278.36 278.36


Tools & Equipment 3% 7.05

Skilled 1 M-day 690.00 690 11,134.36 1670.154 12804.51 12804.51


Unskilled 4 M-day 470.00 1880
Cement 0.32 Mt 15,393.16 4925.81
Aggregates (40 mm) 0.52 Cum 2,818.13 1465.42
Aggregates (20 mm) 0.22 Cum 3,523.13 775.08
Aggregates (10 mm) 0.11 Cum 4,406.73 484.74
Sand 0.445 Cum 2,052.39 913.31
Skilled 0.8 M-day 690.00 552 14157.65 2123.648 16281.30 16281.30
Unskilled 7 M-day 470.00 3290
Cement 0.4 Mt 15,393.16 6157.26
Aggregates (20 mm) 0.57 Cum 3,523.13 2008.18
Aggregates (10 mm) 0.29 Cum 4,406.73 1277.95
Sand 0.425 Cum 2,052.39 872.26
Skilled 1 M-day 690.00 690 9598.44 1439.766 11038.21 11038.21
Unskilled 4 M-day 470.00 1880
Cement 0.22 Mt 15,393.16 3386.49
Aggregates (40 mm) 0.65 Cum 2,818.13 1831.78
Aggregates (20 mm) 0.24 Cum 3,523.13 845.55
Coarse Sand 0.47 Cum 2,052.39 964.62
Skilled 12 M-day 690.00 8280 101275 15191.252 116466.26 116466.26
Unskilled 12 M-day 470.00 5640
Rebars 1.05 Mt 82,393.16 86512.81
Binding Wires 10 Kg 84.22 842.2
Skilled 0 M-day 690.00 0 184777.8 27716.664 212494.42 212494.42
Unskilled 50 M-day 470.00 23500
Foreman 51 M-day 690.00 35190
Welder 52 M-day 690.00 35880
Rebars 1.05 Mt 82,393.16 86512.81
Paint 3.91 Lit 945.00 3694.95

Unskilled 0.5 M-day 470.00 235 3723.46 558.519 4281.98 4281.98


Stone 1.1 Cum 2,630.61 2893.67

1 sqm 245.29 245.29 3197.74 479.661 3677.40 3677.40

skilled 0.45 M-day 470 211.5 2952.45 442.868 3395.32 3395.32


unskilled 0.2 M-day 690 138
G.I. wire 24.15 kg 98 2366.7
Sel.wire 3.15 kg 75 236.25
skilled 0.63 M-day 470 296.1 4236.6 635.490 4872.09 4872.09
unskilled 0.28 M-day 690 193.2
G.I. wire 35.1 kg 98 3439.8
Sel.wire 4.1 kg 75 307.5
skilled 0.45 M-day 470 211.5 2963.7 444.555 3408.26 3408.26
unskilled 0.2 M-day 690 138
G.I. wire 24.15 kg 98 2366.7
Sel.wire 3.3 kg 75 247.5
skilled 0.37 M-day 470 173.9 2451.7 367.755 2819.46 2819.46
unskilled 0.17 M-day 690 117.3
G.I. wire 19.75 kg 98 1935.5
Sel.wire 3 kg 75 225
Remarks
[16]