MAINTAIN POTENTIAL FACILITIES OFFSHORE

RFI TRACKING SHEET - LTA

Actual Inspection
Contractor Inspection Inspection Activity Paint
S.N QMIS # Inspection Facility Equipment Id / Item Location Inspection Description Inspector PID Responsibility
RFI No Date Time Code System
Date
H W
3.3 Inspection of Primer Coat prior to top/mid coat Application of APCS 19C on ITEM :
QTIF-161/170 JKT SUPPORT (REPORT NO. 57-QCJ-RN-015, 57-QDJ-RN-019) Mr.Pritam singh Mob.
1 GSC-LTA57-43 6/26/2021 6/26/2021 3.00 PM QTIF-JKT QTIF-161/170 JKT SUPPORT 3.3 SHOP-3 19C MR. SHAJAHAN IBRAHIM H W
FACILITY- QTIF-161/170 JKT (ITP # SATIP-H-100-01) WITNESS point for SAPID 0504379768

STAR/QC/COATING/RFI TRACING Page 1 06/26/2021