Name: Venkat Ch CURRICULUM VITAE

Mobile: +971-522 912 657


Email: venkat.chittela87@gmail.com

Career Objective:

 To take up the tasks that are challenging and to use all my abilities to fulfill professional goals,
constantly move in the direction of career development.

Career Summary:

 Having 4.7 years of UAE Experience in MEP field.


 Worked in Landscape MEP Construction and Facility Management as MEP Engineer.
 Reporting directly to General Manager and Handling a team of 10 people including foremen and
Supervisors.
 Experience in Landscape Lightings, Water features, Fountains and Swimming pools.
 Leading the allotted team successfully, involved in every aspect of the team’s approach towards
success.
 Collaboration with superiors and subordinates. Acting as a link between management and working
personnel.
 Communicating effectively with consultant, clients and internal engineers regarding projects.
 Passionate about troubleshooting technical issues relating to the MEP field.
 Well versed in project estimation, project reporting, site coordination, client meeting presentations
and Team supervision.
 Handling multi-tasking activities efficiently and capable of designing and executing site activities.
 Enthusiastic in learning and implementing new techniques & methodologies.

UAE Experience:
 Working as a MEP Engineer for Pearl Garden Landscape & Irrigation Services LLC, Dubai in MEP Department
from Jun-2018 to Till now.
 Worked as a MEP Engineer for Tulipa Landscaping LLC, Dubai in MEP Department from Aug-2017 to April-2018
 Worked as a MEP Engineer for Proscape LLC, Dubai in MEP Department from Oct-2014 to Aug-2017.

Projects Handled in “Pearl Garden Landscape & Irrigation Services LLC” :


Name of the Project Client
1. Marsa Al Seef M/s. Meraas.
2. Tiara United Towers M/s. North & Zabeel
3. Town Square (Activation Zone, Plot:7, OR- M/s. Nshama.
2,3,4 & 5 & Mosque Area)
4. Al Jada Development M/s. Arada
5. Reem Residence & Sukna Residence M/s. Nshama.

Responsibilities:
 Thorough study of general specifications and technical specifications of the project.
 Preparation of estimation for electrical works as per IFC drawings, BOQ and Specifications.
 Submitting material submittals to the consultants for the allotted project.
 Claiming variances if the consultant insists for the material which is not the specified one.
 Proposing alternative models of the materials if the specified models are not available or not being produced.
 Analyzing design of the Landscape Lighting and water Feature.
 Alterations in design like pipe sizes, pump capacities, cable sizes, power requirements etc. should be discussed
with consultants and incorporated in shop drawings.
 Preparation of Electrical load schedules and getting approvals from consultant.
 Coordinating with drafting personnel for making shop drawings in accordance with the IFC drawings received
from the consultants.
 Deviations in the shop drawings from IFC should be intimated to consultant in order to get approvals for the
shop drawings.
 Quantities of Mechanical & electrical items should be taken from shop drawings after getting approval from
consultant’s.
 Material requisition should be raised and sent to procurement team for ordering the required quantities of
Materials.
 Method statement should be prepared and submitted to consultant which explains how the execution is
carried out in site and during which stages of execution the work inspection is raised.
 Material inspection request should be raised after receiving the materials for consultant’s approval.
 Once received enough materials, site execution should be started by coordinating with all other contractor’s for
smooth going of project.
 Consultant should be called for each stage of site execution for their approval and for suggesting changes in
execution.
 Monitoring the progress of the project by comparing with the completion date and address the issues that
delay’s the project.
 Assigning day by day targets to the execution team in order to have a better progress of the project.
 Monitoring the performance of working personnel based on their skills and giving feedback to the management
periodically.
 Ensuring the quality of work during execution of the project.
 Managing usage of manpower effectively.
 Work Progress is to be presented to management with photos and power point presentations.
 Material stock status should be checked on weekly basis for ordering the required material.
 Issues related to the site execution should be elevated and solved by arranging meetings with client, other
contractors and consultants.
 Ensuring the safety of all the execution team members by strictly insisting them to follow safety procedures
and standards.
 Depending on the situation and site conditions, site work and plant room works can be carried out either
sequentially or simultaneously.
 Testing & Commissioning of Landscape Lightings and Water Features should be carried out separately first and
then with consultant for his approval.
 Preparing Operation & Maintenance manual for the executed project and handing over it officially to the client.
 Handing over the project officially by rectifying the snags issued by the client and by giving proper training to
the maintenance team who are taking over the project.

Projects Handled in “Tulipa Landscaping LLC” :


Name of the Project Client
1. Remraam Re-construction Pool No.-1 M/s. Dubai Properties.
2. Remraam Community Housing Pool No.-2 M/s. Dubai Properties.
3. Majan & Arjan Entry M/s. Dubai Properties.
4. Al Qusais Park & Oud Al Muteena Park M/s. Dubai Municipality.
5. JAFZA - Techno Park M/s. JAFZA.

Responsibilities:
 Study the scope of work for the allotted projects.
 Brief study of general specifications and technical specifications of the project.
 Preparation of estimation for electrical works as per IFC drawings, BOQ and Specifications.
 Coordinating with drafting personnel for making of electrical shop drawings in accordance with the IFC
drawings.
 Preparation of electrical load schedules and getting approvals from consultant.
 Applying electricity & water NOC and getting approvals from DEWA.
 Responsible for Method statement should be prepared and submitted to consultant which explains how the
execution is carried out in site and during which stages of execution the work inspection is raised.
 Material inspection request should be raised after receiving the materials for consultant’s approval.
 After receiving enough materials, site execution should be started by coordinating with all other contractor’s
for smooth going of project.
 Consultant should be called for each stage of site execution for their approval and for suggesting changes in
execution.
 Elevating the Issues related to the site execution and solved by arranging meetings with client, other
contractors and consultants.
 Testing & Commissioning of MEP works should be carried out separately first and then with consultant for his
approval.
 After completion of all electrical works, applying DEWA LV inspection and getting approvals from DEWA
engineer in order to get permanent power supply at earliest.
 Completing all works of water meter cabinet and getting approvals from DEWA engineers in order to get water
connection and water meter.
 Preparing Operation & Maintenance manual for the executed project and handing over it officially to the client.
 Handing over the project officially by rectifying the snags issued by the client and by giving proper training to
the maintenance team who are taking over the project.

Projects Handled in “Proscape LLC”:


Name of the Project Client
1. Mudon Development Phase-1 M/s. Dubai Properties.
2. Mudon Buffer Zone M/s. Dubai Properties.
3. Mudon Entrance Gate M/s. Dubai Properties.

Responsibilities in MEP Construction:


 Analyzing the scope of work for the allotted projects.
 Thorough study of general specifications and technical specifications of the project.
 Comparing the budget of specified materials with the tendered budget.
 Variances in the budget should be highlighted and alternate materials should be proposed to consultant and
Client in order to avoid loss in procuring those materials.
 Analyzing design of the water Feature or swimming pool.
 Alterations in design like pipe sizes, pump capacities, cable sizes, power requirements etc. should be discussed
with consultants and incorporated in shop drawings.
 Submitting material submittals to the consultants for the allotted project.
 Claiming variances if the consultant insists for the material which is not the specified one.
 Proposing alternative models of the materials if the specified models are not available or not being produced.
 Coordinating with drafting personnel for making shop drawings in accordance with the IFC drawings received
from the consultants.
 Deviations in the shop drawings from IFC should be intimated to consultant in order to get approvals for the
shop drawings.
 Quantities of Mechanical & electrical items should be taken from shop drawings after getting approval from
consultant’s.
 Material requisition should be raised and sent to procurement team for ordering the required quantities of
Materials.
 Method statement should be prepared and submitted to consultant which explains how the execution is
carried out in site and during which stages of execution the work inspection is raised.
 Material inspection request should be raised after receiving the materials for consultant’s approval.
 After receiving enough materials, site execution should be started by coordinating with all other contractor’s
for smooth going of project.
 Consultant should be called for each stage of site execution for their approval and for suggesting changes in
execution.
 Monitoring the progress of the project by comparing with the completion date and address the issues that
delay’s the project.
 Assigning day by day targets to the execution team in order to have a better progress of the project.
 Monitoring the performance of working personnel based on their skills and giving feedback to the management
periodically.
 Ensuring the quality of work during execution of the project.
 Managing usage of manpower effectively.
 Work Progress is to be presented to management with photos and power point presentations.
 Material stock status should be checked on weekly basis for ordering the required material.
 Issues related to the site execution should be elevated and solved by arranging meetings with client, other
contractors and consultants.
 Ensuring the safety of all the execution team members by strictly insisting them to follow safety procedures
and standards.
 Depending on the situation and site conditions, site work and plant room works can be carried out either
sequentially or simultaneously.
 Testing & Commissioning of Water Features or swimming pools should be carried out separately first and then
with consultant for his approval.
 Preparing Operation & Maintenance manual for the executed project and handing over it officially to the client.
 Handing over the project officially by rectifying the snags issued by the client and by giving proper training to
the maintenance team who are taking over the project.
 Cost comparison of the completed project with the tender stage budget which includes manpower, material,
machinery etc.

Some of the Maintenance Projects Which I handled in “Proscape FM”:


Name of the Project Client
1. Dubai Silicon Oasis. M/s. Dubai Silicon Oasis Authority.
2. Emaar Square 3 Chairman Office Terrace. M/s. Emaar Properties.
3. Dubai International Financial Centre (DIFC). M/s. Enova Facilities Management Services LLC.
4. Maintenance of common & private
M/s. Idama Facilities Management Solutions.
swimming pools in JBR.
5. Mudon Entrance Gate. M/s. Dubai Properties.
6. Layan Community & Remraam Community. M/s. Idama Facilities Management Solutions.
7. Burjdaman Residential. M/s. Place Strata Management LLC, Dubai.
8. Ghoroob Mirdif. M/s. Dubai Properties.
9. Mirdif City Centre & Deira City Centre. M/s. Majid Al Futtaim Properties.
10. NAS Sports Complex. M/s. E.O
11. Mr. Shiraz Allana Villa, Emirates Hills. M/s. IFFCO Investments Limited.

Responsibilities in MEP Facility Management:


 Preparing Quotations for annual maintenance of Swimming Pools, Water Features and Fountains.
 Preparing and submitting conditional survey report for Swimming Pools, Water Features and Fountains for
every confirmed project.
 Operation and maintenance of Swimming Pools, Water Features, Fountains and its related pump rooms.
 Checking the chlorine and pH levels with digital test kit on every visit.
 Checking the functioning of nozzles, underwater lights and all MEP related equipments inside the plant room
and informing to client incase of any faults / problems.
 Preparing and submitting detailed incident report to client in case of any faults / problems from MEP
equipments.
 Preparing and submission of Quotation for damaged equipments as per client request.
 Completing works after getting P.O from client and getting approvals on job completion certificate for
submitting invoice.
 Preparing and submitting reports like weekly checklists, monthly reports, monthly schedules and monthly
forecasts.
 Handing over the project officially to client and by giving proper training to the maintenance team who are
taking over the project.

Indian Experience:
 Worked as a Senior CAD Engineer for Lokesh Machines Limited, Hyderabad in Engineering Services
Division Department From May-2011 to Oct-2014.
 Worked as a CAD Engineer for Best & Crompton Engineering Projects Limited, Hyderabad in Design
Department From Jun-2008 to May-2011.

M/s. Lokesh Machines Ltd.


“Lokesh Machines Ltd” Located in Hyderabad, is the Engineering Solution Provider in Machine Tools,
Design, Development, Production Supply of Machine Tools, Jigs & Fixtures for Global Automotive Industries
like Machining Centre (VMC&HMC) Turning Centre (CNC), SPMs, Transfer Lines & Auto Components. Using
Pro-E, Cre-O, Solid Works & AutoCAD.

Responsibilities:
 Involved in designing of assemblies and sub-assemblies. (All detail drawings of plan and sectional
views) with dimensionally as per ISO standards.
 Involved in designing and drafting of SPM Machines of Milling, Boring, Drilling, Gun drilling & Straddle
Milling M/C. etc.
 Designing and detailing at feed slides and compound slides having hard and guide ways and linear
motion guide ways with ball screws and hydraulic feed cylinders.
 Designing of Main base, Columns and various other weldments, structures & all type of casting
structures.
 Standardization of Machine Parts like Boring & Milling Head Housings, Bed's, Slides.
 Development of Parts for Special Purpose Machines.
 Design of tools using Customer standards like Mahindra & Mahindra, Ashok Leyland, Volvo, Tata
Motors, Bajaj Auto Ltd, Eicher & Honda. Design using standard items of FANUC, NSK, KHK, THK, and
NACHI & FAG.
 To Follow up Modified design to Desired Component.
 Good Hand on Pro-E (Conversion of 2D to 3D, Bottom up & Top down Assembly approach), AutoCAD.
 To Prepare BOM & Detail Drawings.

Project Details:
Project - 1: Special Purpose Machine
 Title : BORING HEAD & MILLING HEAD & MOTOR MOUNTING ASSEMBLY
 Client : VOLVO, Chennai.
 CAD Software : Pro-E (4.0), AutoCAD.

Description: The project Design involves Casting, CNC Milling, Boring and Drilling & Super
Finishing Operations, Calculations of Mass Properties & RPMs of Spindle and Pulley, Type of Bearings,
Motors, Oil Seals & O-Rings to be provided. Designing Body structure, Assembly & 2D Manufacturing
Drawings, BOM Release, CAM Models.

Project - 2: Special Purpose Machine


 Title : BED & SADDLE ASSEMBLEY
 Client : VOLVO, Chennai.
 CAD Software : Pro-E (4.0), AutoCAD.
Description: The project Design involves Welding, Casting, CNC Milling, Drilling & Super Finishing
Operations, and Calculations of Mass Properties & Type of Guide ways, Motors, Ball Screws and
Hydraulic Cylinders to be provided. Designing Body structure, Assembly & 2D Manufacturing Drawings,
BOM Release, CAM Models.
TECHNICAL EXPERTISE:

 Software Known : AutoCAD, Pro-E, Cre-O & Solid Works.


 Packages : MS office.
 Operating System : All kinds of OS.

EDUCATIONAL QUALIFICATIONS:

 B.E “Mechanical Engineering” from Acharya Nagarjuna University, Guntur. During 2004-2008
(Attested by UAE Ministry).
 Intermediate in M.P.C from Uma Maheswara Junior College, Ongole. During 2002-2004.

PERSONAL PROFILE:

Name : Venkat Ch
Date of birth : 21/05/1987
UAE Driving License : 3781516 (Valid till 10/01/2020)
Languages known : English, Hindi, Telugu & Tamil.
Permanent Address : Prakasam (D.t), Andhra Pradesh, India.

DECLARATION:

I hereby declare that the above mentioned particulars are true to the best of my knowledge and belief. I
assure you that I will discharge my duties to entire satisfaction.

Date :
Place : Dubai. (Venkat Ch)