13 Jan - 2019
13 Jan - 2019
2 9:00 28/1/19 24:00 31/1/19 87:00 Capital Mtc. of Rotary valve of the machine & BFV No.1 • • • • • • •
Add.SE /Sr.XEN
Op.Divn.DPH.BBMB(PW
Endst No.___________________/ Op33 ( T ) Dated. _____ / ___/ 2019 Slapper (HP)
CC
1. EIC/Gen BBMB Nangal.
2.Superintending Engineer DPH BBMB (PW) Slapper.
3.The P.C BBMB Chandigarh
E-mail :- cegen@ bbmb.nic.in
January-19
Bhakra Beas Management Board (PW)
Total Outage of Unit
Period of Outage
From To Duration of Outage Outage
Unit No.
Code
Reason of Outage Remarks
Hrs Min Date Hrs Min Date Planned Forced
0:00 1/1/19 14:15 8/1/19 182:15 • 2 • Tripped off on Generator Differential Protection & stator winding Inter-Turn fault.
Due to BFV no.-2 & Attending the water leakage from forcing secrew of rotary
11:00 23/1/19 12:25 24/1/19 25:25 • 3 • valveof unit no.-4.
11:00 23/1/19 24:00 31/1/19 207:00 • 4 • Attending the water leakage from forcing secrew of rotary valve.
9:00 28/1/19 24:00 31/1/19 87:00 • 2 • due to Carrying out the Capital Mtc.BFV No.1 & rotary valve of the machine.
Sr.No. Main Abstract Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 Total
1 No. of Forced Shut downs 0 0 0 0 0 0 0
2 Hrs. of Forced Shut downs 0:00 0:00 0:00 0:00 0:00 0:00 0:00
3 No. of Planned Shut downs 0 1 0 0 0 0 1
4 Hrs. of Planned Shut downs 87:00 269:15 25:25 207:00 0:00 0:00 588:40
5 Idle Hrs 654:00 359:38 688:48 445:26 656:20 443:20 3247:32
6 Running Hours 3:00 115:07 29:47 91:34 87:40 300:40 627:48
7 Total Outage 87:00 269:15 25:25 207:00 0:00 0:00 588:40
8 Availabilty Factor in % age 88.31 0.00 96.58 72.18 100.00 100.00
9 Energy Loss
4464:00
PROFORMA-C January-19
TECHNICAL DATA RETURNS
DEHAR POWER PLANT:- SLAPPER (HP)
Sr. Unit wise data during the month
Description
No. 1 2 3 4 5 6 Total
1 Total Hours 744:00 744:00 744:00 744:00 744:00 744:00 4464:00
2 Total Running Hrs 3:00 115:07 29:47 91:34 87:40 300:40 627:48
3 Total Available Hrs. 657:00 474:45 718:35 537:00 744:00 744:00 3875:20
4 Planned Outage Hrs. 87:00 269:15 25:25 207:00 0:00 0:00 588:40
5 Force Outage Hrs. 0:00 0:00 0:00 0:00 0:00 0:00 0:00
6 Total Outage Hrs. 87:00 269:15 25:25 207:00 0:00 0:00 588:40
7 Present Installed Capacity in MW 165 165 165 165 165 165 990
8 Target (in LU) 91
9 Actual Generation in units 493800 18777860 4524000 14741000 14166000 48755000 101457660
10 Plant Utilization factor in % 97.94
11 Plant Availability factor in % 86.79
12 Plant Load factor in % age 13.77
13 Max. Demand in MW 495 MW at 05:45 hrs of Dated 01/01/2019
CC :-
1.The C/E Gen. Nangal.
2.The S/E DPH Slapper.
3.The P.C BBMB Chandigarh Add.SE /Sr.XEN
Op.Divn.DPH.BBMB(PW)
E-mail :- cegen@ bbmb.nic.in Slapper (HP)
744:00
1 88.31
2 63.81
4464:00 3 96.58
4 72.18
5 100.00
6 100.00
97944
72.8915322580645 3247:32 ISD 86.81
13.77
January-19
Revised format of Outage of Transmission Element Month of
Shut down availed previously
From To
S.No. Name of Elemenet Owner Reason From To Reason
Date Time Date Time Date Time Date Time
2 220 KV D-Ganguwal -2
3 220 KV D-Kangoo
Reasons /
Outage Hrs Min & with date Duration Preventive
Sr. measures
Transmission Lines
No. for outage
From To Hrs:Min
1 D-Rajpura 400 KV Line
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
Oct-18
1 220 220 KV Dehar- BBMBBBMBBBMB ### ### ### ### ### Due Z1- B-ph YES NA 1 0 0 0 NA NA LA NA
Ganguwal-II to optd.Y trip,Z got
LA - 1 da
phase,
Brus Trippe trip,A/ ma
t d BN R ged
2nd- phase optd
phas
e
2 220 220 KV Dehar-Kangoo BBMBBBMBHPSEB ### ### ### ### ### Trip 51N2, YES NA 1 0 0 0 NA NA NA
Back 86
do
up AB
prot.
3 132 132 KV Dehar-Kangoo BBMBBBMBHPSEB ### ### ### ### ### No Distan YES NA 1 0 0 0 NA NA NA
any ce
indica ,SOTF
tion,B ,186
r.B2,B ABC,2
3 86
do remai
ned
closed
Copy of the above is forwarded to the following for information and necessary action please
1. EIC / Gen., BBMB (PW) Nangal.
2. SE/ DPH- Circle, BBMB (PW), Slapper
3. PC, BBMB (PW) Chandigarh.
4. E-mail: cegen@bbmb.nic.in
Annexure-A
Reliability (Protection System)Tripping Report of DPH-Circle ,BBMB, Slapper for the month of OCT-2018
S. Volt Line name Line End A End B Trip dateTrip timeRestorati Rest Outag Repo Relay Relay DR/EL End A (mark 1 for End B (mark 1 for Reason Descripti
No age owne (owne (owne
rship) rship)
on date orati e rted Indica Indica End-AEnd-B
submitted NcYes Nf
& 0 for
NuNo)Ni Nc Nf Nu Ni End-A End-B
End-A End-B
. level r on durati Reas tion tion
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
1 220 220 KV Dehar- BBMBBBMBBBMB ### ### ### ### ### Due Z1- B-ph YES NA 1 0 0 0 NA NA LA NA
Ganguwal-II to optd.Y trip,Z got
LA - 1 da
phase,
Brus Trippe trip,A/ ma
t d BN R ged
2nd- phase optd
phas
e
2 220 220 KV Dehar-Kangoo BBMBBBMBHPSEB ### ### ### ### ### Trip 51N2, YES NA 1 0 0 0 NA NA NA
Back 86
do
up AB
prot.
3 132 132 KV Dehar-Kangoo BBMBBBMBHPSEB ### ### ### ### ### No Distan YES NA 1 0 0 0 NA NA NA
any ce
indica ,SOTF
tion,B ,186
r.B2,B ABC,2
3 86
do remai
ned
closed
Copy of the above is forwarded to the following for information and necessary action please
1. EIC / Gen., BBMB (PW) Nangal.
2. SE/ DPH- Circle, BBMB (PW), Slapper
3. PC, BBMB (PW) Chandigarh.
4. E-mail: cegen@bbmb.nic.in
),
d-B
d-B
January-19
Tripping Report of 400 KV Line
1 2 3 4 5 6 7 8 9 10 11
400 KV
1 Dehar- NIL NIL NIL NIL NIL NIL NIL NIL NIL
Rajpura
400 KV
2 Dehar- NIL NIL NIL NIL NIL NIL NIL NIL NIL
Panchkula
3 4 5 6 7 8 9 10 11 12
DD/MM/YY Hrs/Min. DD/MM/YY Hrs/Min. Hrs. Min. Hrs. Min. Hrs. Min.
ICT
1 11/1/19 9:22 11/1/19 18:18 8 56 NIL NIL 8 56 98.80 315 1 . 744:00 8:56 735:04 . . 98.80 .
400/220
KV
Time Time
Name of the Deemed Ckt. Weightage considere considere
d for non (Ti-Tnai) Wi (Ti- Wi (Ti- Element
wise Reason of
Sr. No. Transmission Outage Restoration Duration of Outage Attributable to Availability SIL Km. factor d for availablit Tnai) 16x19 Tnai) / availability Outage
element % (Wi) 14x16 availablit y (Tnai) 17-18 Ti 20/17 % 21/16
y (Ti) hrs
Hrs
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Date Time Date Time Utility Itself Others System Constraint /
Natural
DD/MM/YY Hrs/Min. DD/MM/YY Hrs/Min. Hrs. Min. Hrs. Min. Hrs. Min.
ICT 400/220
1 KV 0:00 0:00 0 0 100% 315 1 0 720:00 0:00 720:00
2
1 3 4 5 6 7 8 9 10 11 12 13 14 15
1 Jan-19 DPH 400/220KV ICT 250 744.00 12.47 0.00 12.47 731.53 98.32 24580 1 4 − − −
40/36/4MVA
2 Jan-19 DPH T/F T-7 40 744.00 16.50 12.47 28.97 715.03 96.11 3844 3 4 − − −
40/36/4MVA
3 Jan-19 DPH T/F T-8 40 744.00 0.00 744.00 744.00 0.00 0.00 0.00 0 1 − − −
WHOLE TRANSMISSION SYSTEM OUTAGE DATA IN RESPECT OF TRANSFORMER OF DEHAR POWER HOUSE, SLAPPER. ANNEXURE-IV
Period:
Period Dec-99 (Element wise Chronological listing)
Sr. No.
Time Time
Name of the Deemed Ckt. Weightage considere considere
d for non (Ti-Tnai) Wi (Ti- Wi (Ti- Element
wise Reason of
Transmission Outage Restoration Duration of Outage Attributable to Availability SIL Km. factor d for availablit Tnai) 16x19 Tnai) / availability Outage
element % (Wi) 14x16 availablit y (Tnai) 17-18 Ti 20/17 % 21/16
y (Ti) hrs
Hrs
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
System Constraint /
Date Time Date Time Utility Itself Others Natural
DD/MM/YY Hrs/Min. DD/MM/YY Hrs/Min. Hrs. Min. Hrs. Min. Hrs. Min.
1 4/17/2018 12:08 4/17/2018 18:50 6 42
ICT 400/220
KV 28/04/18 16:36 29/04/18 17:20 24 44 99.85% 315 1 315 744 8:32 735:28 231613 314.53 99.85% Tripped
Transformer
T-7 40/36/4 100.00% 40 1 40 744 744 40 100.00%
MVA
Transformer
T-8 40/40/13 100.00% 40 1 40 744 744 40 100.00%
MVA
UNIT WISE GENERATION,TOTAL TRANSMISSION & TOTAL AUXALIARY FOR THE YEAR - 2018-19 (April to March)
Month Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 Total Gen. Total Trans. Total Aux.
124093984982 121300388855
Jan-18 6292100 24207200 13504000 0 0 38918000 82921300 84197448 503920
Feb-18 7405960 17048860 9443000 31040000 0 9840000 74777820 76125420 444160
Mar-18 16001160 31722180 21892000 21229000 0 0 90844340 92202576 537960
Apr-18 22281220 92098380 10171000 35746000 0 0 160296600 161036556 791980
May-18 34552480 104464680 13467000 56289000 0 59079000 267852160 266528028 1234320
Jun-18 58629180 107667080 55430000 81481000 0 107130000 410337260 405481608 1869680
Jul-18 21629760 108175940 67402000 94230000 46461000 111822000 449720860 443356656 2023520
Aug-18 29698420 110068640 41262000 72804000 80584000 106444000 440861060 434565324 1927400
Sep-18 28596140 20744320 77583000 104590000 75501000 105547000 412561460 404530812 1884220
Oct-18 19213720 0 41303000 113608000 47113000 79352000 300589720 297497388 1406080
Nov-18 17116160 0 10179000 55860000 41072000 50361000 174588160 173780220 870560
Dec-18 0 0 0 740000 938000 1551000 3229000 3229344 661240
Jan-19 493800 18777860 4524000 14741000 14166000 48755000 101457660 101922864 601240
-40 -160 -5
Total 261910060 634975140 366160000 682358000 305835000 718799000 2970037240 2944454239 14756280
UNIT WISE GENERATION,TOTAL TRANSMISSION & TOTAL AUXALIARY FOR THE YEAR - 2018 (Jan. to Dec.)
Month Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 Total Gen. Total Trans. Total Aux.
Jul-18 21629760 108175940 67402000 94230000 46461000 111822000 449720860 443356656 2023520
Aug-18 29698420 110068640 41262000 72804000 80584000 106444000 440861060 434565324 1927400
Sep-18 28596140 20744320 77583000 104590000 75501000 105547000 412561460 404530812 1884220
Dec-18 493800 18777860 4524000 14741000 14166000 48755000 101457660 101922864 661240
-40 -160 -5
Total 261910060 634975140 366160000 681618000 304897000 717248000 2966808240 2941224895 14155040
2966808240 2941224895
ASE/Sr. Executive Engineer,
Operation Division DPH BBMB (PW),
Slapper.
UNIT WISE GENERATION,TOTAL TRANSMISSION & TOTAL AUXALIARY FOR THE YEAR Jan. 17 to Dec. 17
Month Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 Total Gen. Total Trans. Total Aux.
Jan-17 0 0 45265000 28150000 22003000 0 95418000 94100964 589880
Feb-17 0 0 58864000 29700000 14424000 102988000 102256464 605590
Mar-17 3085420 45564000 44419000 49933000 143001420 142152300 733880
Apr-17 72252240 0 52896000 95992000 100819000 0 321959240 318118080 1404330
May-17 106713060 0 111940000 121248000 5264000 0 345165060 340355424 1502850
Jun-17 100376000 88566260 110484000 108974000 0 0 408400260 403026192 1803910
Jul-17 53013240 111871500 103082000 111037000 0 87213000 466216740 459635112 2032560
Aug-17 32235100 100098620 98044000 103553000 0 104272000 438202720 431861460 1972980
Sep-17 27352060 107176860 84000000 59860000 0 108712000 387100920 382057176 1724900
Oct-17 20419180 83427300 15338000 39406000 0 71421000 230011480 229565268 1075010
Nov-17 13360520 39917040 8079000 1044000 0 71721000 134121560 134902044 709050
Dec-17 26794980 8584420 11826000 0 0 58423000 105628400 106684872 587560
Total 455601800 539642000 745382000 743383000 192443000 501762000 3178213800 3144715356 14742500
Progressive Tottal
Generation Transmission
124093984982 121300388855
120915771182 118155673499
3178213800 3144715356
Jan-17 95418000 95.418 Jan-18 82921300 82.9213
3178.2138
###
UNIT WISE RUNNING HOURS FOR THE YEAR 2018 (Jan to Dec)
Month Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 Total R.Hrs.
672:00
672 6 4032
744:00
744 6 4464
720:00
720 6 4320
744:00
744 6 4464
744:00
744 6 4464
744:00
744 6 4464
744:00
744 6 4464
720:00
720 6 4320
744:00
744 6 4464
720:00
720 6 4320
744:00
744 6 4464 48096
845986 12
827041 18
18944 54
744:00
Unit Wise IDLE Hours for the Year 2018 (Jan to Dec)
UNIT WISE IDLE HOURS FOR THE YEAR April 2017 to March 2018
Month Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 Total R.Hrs.
Apr-17 274:17 00:00 361:25 127:27 51:30 00:00 814:39
May-17 92:40 00:00 42:38 00:00 00:00 00:00 135:18
Jun-17 85:55 00:34 00:00 29:13 00:00 00:00 115:42
Jul-17 403:58 22:26 52:26 21:53 00:00 92:50 593:33
Aug-17 536:50 80:52 77:20 56:27 00:00 44:07 795:36
Sep-17 547:14 35:40 166:49 325:17 00:00 19:19 1094:19
Oct-17 618:02 229:25 270:55 330:44 00:00 127:30 1576:36
Nov-17 637:31 472:38 485:06 83:04 00:00 258:42 1937:01
Dec-17 561:33 186:35 670:49 00:00 00:00 388:18 1807:15
Jan-18 235:09 458:35 641:26 00:00 00:00 508:18 1843:28
Feb-18 515:07 480:08 614:19 464:20 00:00 141:10 2215:04
Mar-18 646:11 551:33 589:43 594:23 00:00 00:00 2381:50
Total = 5154:27 2518:26 3972:56 2032:48 51:30 1580:14 15310:21
1 Total Running Hours 8760 8760 8760 8760 8760 8760 52560
6 No,s of FSD 2 2 0 1 3 2 10
7 DPP Load Factor in % 34.42
8 Capacity Utilization factor in % 96.36
9 Max. Demand in MW 990 MW at 19:55 HRS of dated 04.08.2018
10 Plant Availability factor in % 74.98
11 Plant schedule Outage % 21.38
12 Plant Un-Scheduled Outage % 3.64
13 Discharge through Bye-Pass chute 1340 Cusec dated 20/11/18 at 15:23 Hrs to 15:43 hrs duration 00:20 Min.
Maximum Load Transmitted on Diferent Feeders during the year 2018 (Jan to Dec)
Sr. Name of Feeder Time & Date (Hrs,) of Accutance Load in MW
No.
1 132 KV Dehar Shimla 18:30 12/30/2018 60
2 220 KV Dehar-Kangoo Line 11:00 5/18/2018 85
3 220 KV Dehar Ganguwal Curcit-1 10:30 5/24/2018 240
4 220 KV Dehar Ganguwal Curcit-2 18:30 5/15/2018 230
5 400 KV Dehar -Rajpura Line 19:00 9/2/2018 440
6 400 KV Dehar- Panchkula Line 17:00 9/7/2018 600
Runninf Hours,Idle Hours,Planned Hrs,Force Hrs.,No,s of FSD, Plant Availability factor, Capacity Utilization factor for the year 2018 (Jan to Dec)
DEHAR POWER PLANT:- SLAPPER (HP)
Sr. Unit wise data during the year 2018
Description
No. 1 2 3 4 5 6 Total
1 Total Running Hours
2 Running Hours
3 Idle Hours
4 Planned Hours
5 Force Hours
6 No,s of FSD
7 DPP Load Factor in %
8 Capacity Utilization factor in %
9 Max. Demand in MW
10 Plant Availability factor in %
11 Plant schedule Outage %
12 Plant Un-Scheduled Outage %
13 Discharge through Bye-Pass chut
PW),