January-19 Generation Data in Respect of DPH BBMB Slapper Part-1

Date Units Generated TOTAL TOTAL Running Hours (HH:MM) Total


1 2 3 4 5 6 Generation Transmission 1 2 3 4 5 6 RH
1 493800 0 0 285000 897000 1574000 3249800 3270792 3:00 0:00 0:00 1:48 5:32 9:49 20:09
2 0 0 0 740000 938000 1551000 3229000 3229344 0:00 0:00 0:00 4:33 5:48 9:36 19:57
3 0 0 0 731000 937000 1453000 3121000 3130284 0:00 0:00 0:00 4:30 5:46 9:00 19:16
4 0 0 0 787000 960000 1580000 3327000 3340779 0:00 0:00 0:00 4:53 5:50 9:44 20:27
5 0 0 389000 785000 411000 1501000 3086000 3105948 0:00 0:00 2:35 4:53 2:33 9:18 19:19
6 0 0 621000 943000 0 1581000 3145000 3142296 0:00 0:00 4:05 5:49 0:00 9:47 19:41
7 0 0 651000 1025000 0 1543000 3219000 3212508 0:00 0:00 4:17 6:20 0:00 9:34 20:11
8 0 149000 543000 902000 0 1622000 3216000 3245004 0:00 1:00 3:35 5:34 0:00 10:03 20:12
9 0 588720 281000 907000 0 1453000 3229720 3249768 0:00 3:38 1:52 5:37 0:00 9:02 20:09
10 0 953960 0 705000 0 1615000 3273960 3297372 0:00 5:50 0:00 4:20 0:00 10:00 20:10
11 0 943160 0 692000 0 1546000 3181160 3195036 0:00 5:46 0:00 4:21 0:00 9:32 19:39
12 0 1026060 0 679000 0 1472000 3177060 3203760 0:00 6:21 0:00 4:15 0:00 9:06 19:42
13 0 931160 0 691000 0 1551000 3173160 3184644 0:00 5:46 0:00 4:16 0:00 9:32 19:34
14 0 934760 0 692000 0 1540000 3166760 3193452 0:00 5:46 0:00 4:18 0:00 9:32 19:36
15 0 943160 0 696000 0 1537000 3176160 3197856 0:00 5:47 0:00 4:20 0:00 9:34 19:41
16 0 949160 0 694000 0 1547000 3190160 3217680 0:00 5:49 0:00 4:19 0:00 9:33 19:41
17 0 1014060 250000 410000 0 1465000 3139060 3158496 0:00 6:17 1:40 2:32 0:00 9:02 19:31
18 0 986420 0 281000 515000 1591000 3373420 3395244 0:00 6:05 0:00 1:46 3:16 9:50 20:57
19 0 544260 0 715000 351000 1882000 3492260 3504924 0:00 3:18 0:00 4:30 2:10 11:34 21:32
20 0 956380 0 680000 0 1640000 3276380 3287808 0:00 5:51 0:00 4:15 0:00 10:05 20:11
21 0 958760 0 701000 0 1311000 2970760 3011304 0:00 5:50 0:00 4:25 0:00 8:03 18:18
22 0 830220 0 0 524000 1524000 2878220 2900640 0:00 5:05 0:00 0:00 3:19 9:17 17:41
23 0 1534260 0 0 1028000 1913000 4475260 4493652 0:00 9:17 0:00 0:00 6:20 11:48 27:25
24 0 1119760 0 0 931000 1769000 3819760 3851904 0:00 6:48 0:00 0:00 5:47 10:48 23:23
25 0 1137820 0 0 811000 1812000 3760820 3762192 0:00 7:03 0:00 0:00 5:04 11:03 23:10
26 0 990000 0 0 719000 1395000 3104000 3109344 0:00 6:01 0:00 0:00 4:30 8:33 19:04
27 0 908300 0 0 720000 1555000 3183300 3168096 0:00 5:31 0:00 0:00 4:29 9:32 19:32
28 0 378460 123000 0 843000 1644000 2988460 3003324 0:00 2:18 0:48 0:00 5:16 10:10 18:32
29 0 0 529000 0 858000 1734000 3121000 3132996 0:00 0:00 3:19 0:00 5:15 10:40 19:14
30 0 0 527000 0 1307000 1135000 2969000 2977668 0:00 0:00 3:30 0:00 8:00 7:01 18:31
31 0 0 610000 0 1416000 1719000 3745000 3748752 0:00 0:00 4:06 0:00 8:45 10:32 23:23
20 -3 0:00
Total 493800 18777860 4524000 14741000 14166000 48755000 101457660 101922864 3:00 115:07 29:47 91:34 87:40 300:40 627:48
Caloulations of Energy Generated
Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 Total Gen. Transmission Running Hours
R/on 24.00 Hrs. dt-31.01.19 77615 58557 78647 33215 112274 64569
127180721642 124361669130 846614:00
R/on 00.00 Hrs dt-01.01.19 77204 43143 76162 18474 98108 40847
Diffrence 411 15505 2485 14741 14166 23722
127079263982 124259746266 845986:12
MF/CF 1200 1200 1000 1000 1000 1000
Units Generated 493200 18754800
101457660 101922864 627:48
Aux Cons(#1&2) 600 23060
493800 18777860 4524000 14741000 14166000 48755000 101457660 101922864
0 0 0 0 0 0 0 0

Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6


124 2072 25067
0 33 34
124 2039 25033
1200 1000 1000
148800 2039000 25033000

Unit-2 Unit-3 Unit-6


Average date 15/1/19 date 15/1/19
Digit 124 Defected Old Defected Old
Meter Change Meter Change
with New One with New One
Jan-19 Generation Data in Respect of DPH BBMB Slapper Part-1
Date Load Factor (%) Avalablitty Factor Maximum Demand (MW)
1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6
1 12.47 0.00 0.00 7.20 22.65 39.75 100 0 100 100 100 100 165 0 0 165 165 165
2 0.00 0.00 0.00 18.69 23.69 39.17 100 0 100 100 100 100 0 0 0 165 165 165
3 0.00 0.00 0.00 18.46 23.66 36.69 100 0 100 100 100 100 0 0 0 165 165 165
4 0.00 0.00 0.00 19.87 24.24 39.90 100 0 100 100 100 100 0 0 0 165 165 165
5 0.00 0.00 9.82 19.82 10.38 37.90 100 0 100 100 100 100 0 0 150 165 165 165
6 0.00 0.00 15.68 23.81 0.00 39.92 100 0 100 100 100 100 0 0 155 165 0 165
7 0.00 0.00 16.44 25.88 0.00 38.96 100 0 100 100 100 100 0 0 155 165 0 165
8 0.00 3.76 13.71 22.78 0.00 40.96 100 40.63 100 100 100 100 0 165 155 165 0 165
9 0.00 14.87 7.10 22.90 0.00 36.69 100 100 100 100 100 100 0 165 155 165 0 165
10 0.00 24.09 0.00 17.80 0.00 40.78 100 100 100 100 100 100 0 165 0 165 0 165
11 0.00 23.82 0.00 17.47 0.00 39.04 100 100 100 100 100 100 0 165 0 165 0 165
12 0.00 25.91 0.00 17.15 0.00 37.17 100 100 100 100 100 100 0 165 0 165 0 165
13 0.00 23.51 0.00 17.45 0.00 39.17 100 100 100 100 100 100 0 165 0 165 0 165
14 0.00 23.61 0.00 17.47 0.00 38.89 100 100 100 100 100 100 0 165 0 165 0 165
15 0.00 23.82 0.00 17.58 0.00 38.81 100 100 100 100 100 100 0 165 0 165 0 165
16 0.00 23.97 0.00 17.53 0.00 39.07 100 100 100 100 100 100 0 165 0 165 0 165
17 0.00 25.61 6.31 10.35 0.00 36.99 100 100 100 100 100 100 0 165 150 165 0 165
18 0.00 24.91 0.00 7.10 13.01 40.18 100 100 100 100 100 100 0 165 0 165 165 165
19 0.00 13.74 0.00 17.17 8.86 47.53 100 100 100 100 100 100 0 165 0 165 165 165
20 0.00 24.15 0.00 17.70 0.00 41.41 100 100 100 100 100 100 0 165 0 165 0 165
21 0.00 24.21 0.00 0.00 0.00 33.11 100 100 100 100 100 100 0 165 0 165 0 165
22 0.00 20.97 0.00 0.00 13.23 38.48 100 100 100 100 100 100 0 165 0 0 165 165
23 0.00 38.74 0.00 0.00 25.96 48.31 100 100 45.83 37.5 100 100 0 165 0 0 165 165
24 0.00 28.28 0.00 0.00 23.51 44.67 100 100 48.28 0 100 100 0 165 0 0 165 165
25 0.00 28.73 0.00 0.00 20.48 45.76 100 100 100 0 100 100 0 165 0 0 165 165
26 0.00 25.00 0.00 0.00 18.16 35.23 100 100 100 0 100 100 0 165 0 0 165 165
27 0.00 22.94 0.00 0.00 18.18 39.27 100 100 100 0 100 100 0 165 0 0 165 165
28 0.00 9.56 3.11 0.00 21.29 41.52 37.5 37.5 100 0 100 100 0 165 150 0 165 165
29 0.00 0.00 13.36 0.00 21.67 43.79 0 0 100 0 100 100 0 0 150 0 165 165
30 0.00 0.00 13.31 0.00 33.01 28.66 0 0 100 0 100 100 0 0 150 0 165 165
31 0.00 0.00 15.40 0.00 35.76 43.41 0 0 100 0 100 100 0 0 150 0 165 165
0.00

Endst No.___________________/ Op38 ( T ) Dated______ /_____/ 2019


Copy To-
1. EIC Gen. BBMB (PW) Nangal.
2. Dy.CE DPH BBMB (PW) Slapper.
3. SE / Regulation BBMB (PW) SNR. Sr. XEN / Operations
BBMB(PW), Slapper.
January-19
Transmission Data with SEM in Respect of BBMB (PW) Slapper
Sr. SEM Description Initial Reading (OLD) Final Reading (New) Diff. M.F. Unit Transmitted
No. No.

1 1616-A 132 KV D-Shimla 69137 122269 53132 480 25503360

2 1609-A 220 KV D-Kangoo 8066 70242 62176 600 37305600

3 1610-A 220 KV D-Gwl-1 39151 45970 6819 2400 16365600

4 1611-A 220 KV D-Gwl-2 53988 62612 8624 2400 20697600

5 1614-A 400 KV D-Rajpura 97916 85452 -12464 3636 -45319104

6 1612-A 400 KV D-Panchkula 60067 73095 13028 3636 47369808

Total Transmission 101922864


Endst No.___________________/ OP 37 ( T ) Dated. ____ / ___ / 2019
Copy of the above is forwarded to the following for information please. Prog.

1.C.E/ Gen BBMB (PW) Nangal. Prog.


2.CE / Comm,HVPN Panchkula.
3.Director / Comm,BBMB Chandigarh.
4.Superintending Engineer DPH BBMB (PW) Slapper.
5.SE / Comml,RRVPND Jai Pur .
6.Dy. Director Comm./ BBMB Chandigarh.
7.PC / PSEB Patiala.
8.PC / HVPN Panchkula. Add.S.E / Sr. XEN / Operations
9.PC / HPSEB Shimla (HP) Divn. BBMB (PW), Slapper.
1 2 3 4 5 6

25 0:00 0:00 0:00 6:35 7:25 11:11 25:11

26 0:00 0:00 6:33 9:36 10:54 2:00 29:03

27 0:00 0:00 6:03 12:55 12:55 0:00 31:53

28 0:00 0:00 9:19 11:19 15:18 0:00 35:56

29 0:00 0:00 6:01 8:56 19:50 0:00 34:47

30 0:00 0:00 5:39 9:16 12:32 0:00 27:27

1 0:00 0:00 6:50 10:46 10:27 0:00 28:03


Diffrence
0:00
From Gen, Sheet 101922864 0 0:00 0:00 40:25 69:23 89:21 13:11 212:20

Prog. Total This Month 124361669130


Prog. Total last Month 124259746266
January-19
Outage Data Returns DPH Slapper
Planned Outage Forced Outage
From To Duration From To Duration
Mcs. Reason of Planned Outage Mcs Reason of Forced Outage
No. Hrs: Hrs: No. Hrs: Hrs:
Min
Date
Min
Date Hrs: Min
Min
Date
Min
Date Hrs: Min 1 87:00
Tripped off on Generator Differential Protection & stator
2 0:00 1/1/19 14:15 8/1/19 182:15 winding Inter-Turn fault. • • • • • • • 2 269:15
Due to BFV no.-2 & Attending the water leakage from forcing
3 11:00 23/1/19 12:25 24/1/19 25:25
secrew of rotary valveof unit no.-4. • • • • • • • 3 25:25
Attending the water leakage from forcing secrew of rotary
4 11:00 23/1/19 24:00 31/1/19 207:00
valve. • • • • • • • 4 207:00
Capital Mtc. of the Machine, Rotary valve of the machine &
1 9:00 28/1/19 24:00 31/1/19 87:00
BFV No.1 • • • • • • •

2 9:00 28/1/19 24:00 31/1/19 87:00 Capital Mtc. of Rotary valve of the machine & BFV No.1 • • • • • • •

Add.SE /Sr.XEN
Op.Divn.DPH.BBMB(PW
Endst No.___________________/ Op33 ( T ) Dated. _____ / ___/ 2019 Slapper (HP)
CC
1. EIC/Gen BBMB Nangal.
2.Superintending Engineer DPH BBMB (PW) Slapper.
3.The P.C BBMB Chandigarh
E-mail :- cegen@ bbmb.nic.in
January-19
Bhakra Beas Management Board (PW)
Total Outage of Unit
Period of Outage
From To Duration of Outage Outage
Unit No.
Code
Reason of Outage Remarks
Hrs Min Date Hrs Min Date Planned Forced
0:00 1/1/19 14:15 8/1/19 182:15 • 2 • Tripped off on Generator Differential Protection & stator winding Inter-Turn fault.

Due to BFV no.-2 & Attending the water leakage from forcing secrew of rotary
11:00 23/1/19 12:25 24/1/19 25:25 • 3 • valveof unit no.-4.

11:00 23/1/19 24:00 31/1/19 207:00 • 4 • Attending the water leakage from forcing secrew of rotary valve.

9:00 28/1/19 24:00 31/1/19 87:00 • 1 • Capital Mtc. of the Machine

9:00 28/1/19 24:00 31/1/19 87:00 • 2 • due to Carrying out the Capital Mtc.BFV No.1 & rotary valve of the machine.

Sr.No. Main Abstract Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 Total
1 No. of Forced Shut downs 0 0 0 0 0 0 0
2 Hrs. of Forced Shut downs 0:00 0:00 0:00 0:00 0:00 0:00 0:00
3 No. of Planned Shut downs 0 1 0 0 0 0 1
4 Hrs. of Planned Shut downs 87:00 269:15 25:25 207:00 0:00 0:00 588:40
5 Idle Hrs 654:00 359:38 688:48 445:26 656:20 443:20 3247:32
6 Running Hours 3:00 115:07 29:47 91:34 87:40 300:40 627:48
7 Total Outage 87:00 269:15 25:25 207:00 0:00 0:00 588:40
8 Availabilty Factor in % age 88.31 0.00 96.58 72.18 100.00 100.00
9 Energy Loss

Endst No.___________________/ Op 33 ( T ) Dated. ____ / ___/ 2019


Copy of the above is forwarded to the following for information please.
Copy To-
1. EIC Gen. BBMB (PW) Nangal.
2. Dy. CE / PR Chandigarh.
3. SE DPH BBMB (PW) Slapper. Add.S.E / Sr. XEN / Operations
4. The P.C BBMB Chandigarh Divn. BBMB (PW), Slapper.
744:00

4464:00
PROFORMA-C January-19
TECHNICAL DATA RETURNS
DEHAR POWER PLANT:- SLAPPER (HP)
Sr. Unit wise data during the month
Description
No. 1 2 3 4 5 6 Total
1 Total Hours 744:00 744:00 744:00 744:00 744:00 744:00 4464:00
2 Total Running Hrs 3:00 115:07 29:47 91:34 87:40 300:40 627:48
3 Total Available Hrs. 657:00 474:45 718:35 537:00 744:00 744:00 3875:20
4 Planned Outage Hrs. 87:00 269:15 25:25 207:00 0:00 0:00 588:40
5 Force Outage Hrs. 0:00 0:00 0:00 0:00 0:00 0:00 0:00
6 Total Outage Hrs. 87:00 269:15 25:25 207:00 0:00 0:00 588:40
7 Present Installed Capacity in MW 165 165 165 165 165 165 990
8 Target (in LU) 91
9 Actual Generation in units 493800 18777860 4524000 14741000 14166000 48755000 101457660
10 Plant Utilization factor in % 97.94
11 Plant Availability factor in % 86.79
12 Plant Load factor in % age 13.77
13 Max. Demand in MW 495 MW at 05:45 hrs of Dated 01/01/2019

Endst No.___________________/ Op 33 ( T ) Dated. _____ / ____/2019

CC :-
1.The C/E Gen. Nangal.
2.The S/E DPH Slapper.
3.The P.C BBMB Chandigarh Add.SE /Sr.XEN
Op.Divn.DPH.BBMB(PW)
E-mail :- cegen@ bbmb.nic.in Slapper (HP)
744:00

1 88.31
2 63.81
4464:00 3 96.58
4 72.18
5 100.00
6 100.00

97944
72.8915322580645 3247:32 ISD 86.81
13.77
January-19
Revised format of Outage of Transmission Element Month of
Shut down availed previously
From To
S.No. Name of Elemenet Owner Reason From To Reason
Date Time Date Time Date Time Date Time

1 220 KV D-Ganguwal -1 PTW 21/1/19 9:42 21/1/19 17:21

PTW 11/1/19 10:38 11/1/19 16:21

2 221 KV D-Ganguwal -2 Tripped 13/1/19 11:33 13/1/19 14:34

PTW 28/1/19 9:18 29/1/19 20:27

3 400 KV Dehar-Rajpura NIL NIL NIL NIL

5 400 KV D-Panchkulla NIL NIL NIL NIL

7 T/F T-7 NIL NIL NIL NIL

8 T/F T-8 NIL NIL NIL NIL

Endst No.___________________/ Op 33 ( T ) Dated. _____ /____ / 2019


CC
1. EIC/Gen BBMB Nangal.
2.Superintending Engineer DPH BBMB (PW) Slapper.
3.The P.C BBMB Chandigarh Add.SE /Sr.XEN
4.E-mail :- cegen@ bbmb.nic.in Op.Divn.DPH.BBMB(PW)
Slapper (HP)
TRANSMISSION LINES OUTAGE DATA RETURNS
w.e.f - 01/09/2018 to 30/09/2018
DEHAR POWER PLANT:- SLAPPER (HP) Reasons /
Preventive
Sr. Outage Hrs Min & with date Duration
Transmission Lines measures
No. From To Hrs:Min for outage
8:01 1/11/18 18:19 1/11/18 10:18
1 220 KV D-Ganguwal -1
8:01 2/11/18 18:51 2/11/18 10:50

2 220 KV D-Ganguwal -2

3 220 KV D-Kangoo

Endst No.___________________/ Op 33 ( T ) Dated. _____ /____ / 2018


CC
1. EIC/Gen BBMB Nangal.
2.Superintending Engineer DPH BBMB (PW) Slapper.
3.The P.C BBMB Chandigarh Add.SE /Sr.XEN
4.E-mail :- cegen@ bbmb.nic.in Op.Divn.DPH.BBMB(PW)
Slapper (HP)
TRANSMISSION LINES OUTAGE DATA RETURNS
DEHAR POWER PLANT:- SLAPPER (HP)

Reasons /
Outage Hrs Min & with date Duration Preventive
Sr. measures
Transmission Lines
No. for outage

From To Hrs:Min
1 D-Rajpura 400 KV Line

2 D-Panchkulla 400 KV Line

3 D-Ganguwal -1 220 KV Line

4 D-Ganguwal -2 220 KV Line

Endst No.___________________/ Op 33 ( T ) Dated. _____ /____ / 2018


CC
1. EIC/Gen BBMB Nangal.
2.Superintending Engineer DPH BBMB (PW) Slapper.
3.The P.C BBMB Chandigarh Add.SE /Sr.XEN
4.E-mail :- cegen@ bbmb.nic.in Op.Divn.DPH.BBMB(PW)
Slapper (HP)
Annexure-A
Reliability (Protection System)Tripping Report of DPH-Circle ,BBMB, Slapper for the month of Jan-19
S. Volt Line name Line End A End B Trip Trip Restorati Rest Outag Repo Relay Relay
No age owne (owne (owne date time on date orati e rted Indica Indica
r ship) r ship) DR/EL Reason Descripti
. level r on durati Reas tion tion submitted End A (mark 1 for End B (mark 1 for
Yes & 0 for No) for Nu or on of
in time on on End-A End-B by the utility Yes & 0 for No)
Nf Event
KV
End-A End-B Nc Nf Nu Ni Nc Nf Nu Ni End- End- End- End-
A B A B

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

1 400 400 KV Dehar-Panchkula NIL NIL NIL NIL NIL

2 400 400 KV Dehar-Rajpura NIL NIL NIL NIL NIL

3 220 220 KV Dehar Ganguwal-FDR-I NIL NIL NIL NIL NIL

4 220 220 KV Dehar Ganguwal-FDR-2 NIL NIL NIL NIL NIL

5 220 220 KV Dehar -Kangoo NIL NIL NIL NIL NIL

Endst No :- Dated:-____ /___ / 2019


Copy of the above is forwarded to the following for information and necessary action please
1 EIC / Gen., BBMB (PW) Nangal.
2 SE/ DPH- Circle, BBMB (PW), Slapper
3 PC, BBMB (PW) Chandigarh. ASE/Sr. Executive Engineer,
4 E-mail: cegen@bbmb.nic.in Operation Division, BBMB(PW),
BBMB (PW) Slapper
Annexure-A
Reliability (Protection System)Tripping Report of DPH-Circle ,BBMB, Slapper for the month of NOV-2018
S. Volt Line name Line End A End B Trip dateTrip timeRestorati Rest Outag Repo Relay Relay DR/EL End A (mark 1 for End B (mark 1 for Reason Descripti
No age owne (owne (owne
rship) rship)
on date orati e rted Indica Indica End-AEnd-B
submitted NcYes Nf
& 0 for
NuNo)Ni Nc Nf Nu Ni End-A End-B
End-A
End-B
. level r on durati Reas tion tion
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
1 400 400 KV Dehar-Rajpura BBMBBBMBBBMB 8/11/18 5:47 8/11/18 18:04 12:17
2 132 T/F T-7 BBMBBBMBBBMB 16/11/18 16:00 30/11/18 ### ###
3 132 T/F T-8 BBMBBBMBBBMB 16/11/18 16:03 16/11/18 16:20 0:17

Endst No :- Dated:-____ /___ / 2018

Oct-18
1 220 220 KV Dehar- BBMBBBMBBBMB ### ### ### ### ### Due Z1- B-ph YES NA 1 0 0 0 NA NA LA NA
Ganguwal-II to optd.Y trip,Z got
LA - 1 da
phase,
Brus Trippe trip,A/ ma
t d BN R ged
2nd- phase optd
phas
e

2 220 220 KV Dehar-Kangoo BBMBBBMBHPSEB ### ### ### ### ### Trip 51N2, YES NA 1 0 0 0 NA NA NA
Back 86
do
up AB
prot.
3 132 132 KV Dehar-Kangoo BBMBBBMBHPSEB ### ### ### ### ### No Distan YES NA 1 0 0 0 NA NA NA
any ce
indica ,SOTF
tion,B ,186
r.B2,B ABC,2
3 86
do remai
ned
closed

Endst No :- Dated:- /11 / 2018

Copy of the above is forwarded to the following for information and necessary action please
1. EIC / Gen., BBMB (PW) Nangal.
2. SE/ DPH- Circle, BBMB (PW), Slapper
3. PC, BBMB (PW) Chandigarh.
4. E-mail: cegen@bbmb.nic.in

Sr. Executive Engineer,


Operation Division, BBMB(PW),
BBMB (PW) Slapper.

Annexure-A
Reliability (Protection System)Tripping Report of DPH-Circle ,BBMB, Slapper for the month of OCT-2018
S. Volt Line name Line End A End B Trip dateTrip timeRestorati Rest Outag Repo Relay Relay DR/EL End A (mark 1 for End B (mark 1 for Reason Descripti
No age owne (owne (owne
rship) rship)
on date orati e rted Indica Indica End-AEnd-B
submitted NcYes Nf
& 0 for
NuNo)Ni Nc Nf Nu Ni End-A End-B
End-A End-B
. level r on durati Reas tion tion
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
1 220 220 KV Dehar- BBMBBBMBBBMB ### ### ### ### ### Due Z1- B-ph YES NA 1 0 0 0 NA NA LA NA
Ganguwal-II to optd.Y trip,Z got
LA - 1 da
phase,
Brus Trippe trip,A/ ma
t d BN R ged
2nd- phase optd
phas
e

2 220 220 KV Dehar-Kangoo BBMBBBMBHPSEB ### ### ### ### ### Trip 51N2, YES NA 1 0 0 0 NA NA NA
Back 86
do
up AB
prot.
3 132 132 KV Dehar-Kangoo BBMBBBMBHPSEB ### ### ### ### ### No Distan YES NA 1 0 0 0 NA NA NA
any ce
indica ,SOTF
tion,B ,186
r.B2,B ABC,2
3 86
do remai
ned
closed

Endst No :- Dated:- /11 / 2018

Copy of the above is forwarded to the following for information and necessary action please
1. EIC / Gen., BBMB (PW) Nangal.
2. SE/ DPH- Circle, BBMB (PW), Slapper
3. PC, BBMB (PW) Chandigarh.
4. E-mail: cegen@bbmb.nic.in
),
d-B
d-B
January-19
Tripping Report of 400 KV Line

Auto Protection Scheme


Sr. Time of Time of Relay Indication
Name of Line Date Date Reclosed Facia Operated Main -I,Main- Relay Indication
No. Tripping Restore At Other End
or Not II(i.e.Name of Scheme)

1 2 3 4 5 6 7 8 9 10 11
400 KV
1 Dehar- NIL NIL NIL NIL NIL NIL NIL NIL NIL
Rajpura

400 KV
2 Dehar- NIL NIL NIL NIL NIL NIL NIL NIL NIL
Panchkula

Endst No.___________________/ Op 33 ( T ) Dated. _____ /___ / 2019


CC :-
1. EIC/Gen BBMB Nangal.
2. P.C. BBMB Chandigarh. Add.S.E/ Sr. XEN / Operations
3. Superintneding Engineer DPH Slapper. Divn. BBMB (PW), Slapper.
12.17
WHOLE TRANSMISSION SYSTEM OUTAGE DATA IN RESPECT OF TRANSFORMER OF DEHAR POWER HOUSE, SLAPPER.
w.e.f - 01/01/2019 to 27/01/2018
Period: January-19 (Element wise Chronological listing)

Time Time Element


Name of the Deemed Weightage considere considere (Ti-Tnai) Wi Wi (Ti- wise
Sr. No. Transmission Outage Restoration Duration of Outage Attributable to Availability SIL Ckt. factor d for d for non (Ti- Tnai) / availability Reason of
Km. (Wi) availablit Outage
element % 14x16 availablit y (Tnai) 17-18 Tnai) 16x19 Ti 20/17 %
y (Ti) hrs 21/16
Hrs

3 4 5 6 7 8 9 10 11 12

Date Time Date Time Utility Itself Others System Constraint /


1 2 Natural 13 14 15 16 17 18 19 20 21 22 23

DD/MM/YY Hrs/Min. DD/MM/YY Hrs/Min. Hrs. Min. Hrs. Min. Hrs. Min.

ICT
1 11/1/19 9:22 11/1/19 18:18 8 56 NIL NIL 8 56 98.80 315 1 . 744:00 8:56 735:04 . . 98.80 .
400/220
KV

ASE/Senior Executive Engineer /OP


DPH BBMB(PW) Slapper(HP)
Endst No.___________________/ Op 33 ( T ) Dated. _____ / _____ / 2019 mail id
1.EIC/Gen.BBMB(PW) Nangal. cets@bbmb.nic.in
3. Superintneding Engineer DPH Slapper. cegenaeworks@bbmb.nic.in
3.PC BBMB,Chandigarh. drwsecsedph@bbmb.nic.in
xenwcets@bbmb.nic.in
January-19
WHOLE TRANSMISSION SYSTEM OUTAGE DATA IN RESPECT OF TRANSFORMER OF DEHAR POWER HOUSE, SLAPPER. ANNEXURE-IV
Period:
January-19 (Element wise Chronological listing)

Time Time
Name of the Deemed Ckt. Weightage considere considere
d for non (Ti-Tnai) Wi (Ti- Wi (Ti- Element
wise Reason of
Sr. No. Transmission Outage Restoration Duration of Outage Attributable to Availability SIL Km. factor d for availablit Tnai) 16x19 Tnai) / availability Outage
element % (Wi) 14x16 availablit y (Tnai) 17-18 Ti 20/17 % 21/16
y (Ti) hrs
Hrs

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Date Time Date Time Utility Itself Others System Constraint /
Natural
DD/MM/YY Hrs/Min. DD/MM/YY Hrs/Min. Hrs. Min. Hrs. Min. Hrs. Min.

ICT 400/220
1 KV 0:00 0:00 0 0 100% 315 1 0 720:00 0:00 720:00

ASE/Senior Executive Engineer /OP


DPH BBMB(PW) Slapper(HP)
Endst No.___________________/ Op 33 ( T ) Dated. 01 / 04 / 2018 mail id
1.EIC/Gen.BBMB(PW) Nangal. cets@bbmb.nic.in
3. Superintneding Engineer DPH Slapper. cegenaeworks@bbmb.nic.in
3.PC BBMB,Chandigarh. drwsecsedph@bbmb.nic.in
xenwcets@bbmb.nic.in
AVAILABILITY FACTOR OF TRANSFORMERS OF BBMB AT DEHAR POWER HOUSE SLAPPER Commulative
Tripping
No of No of
trippi trippi
Duratio Duratio AF ng ng
Name TNA TA WAF
Name of SIL Total n of n of durin durin Current Previous
of the
the T/F MW Hrs. schdule forced (5+6) (4-7) (8/4) (3x9) g g
Remarks
year year
Month station %
Sr. No. Mtc. outage curre previ
/year
nt ous
year year

2
1 3 4 5 6 7 8 9 10 11 12 13 14 15

1 Jan-19 DPH 400/220KV ICT 250 744.00 12.47 0.00 12.47 731.53 98.32 24580 1 4 − − −

40/36/4MVA
2 Jan-19 DPH T/F T-7 40 744.00 16.50 12.47 28.97 715.03 96.11 3844 3 4 − − −

40/36/4MVA
3 Jan-19 DPH T/F T-8 40 744.00 0.00 744.00 744.00 0.00 0.00 0.00 0 1 − − −

Note : Hours are in decimals


Endst No.___________________/ OP 33 ( T ) Dated__________ / 2009
CC
1. EIC Gen BBMB (PW) Nangal
2. Dy. CE DPH Slapper.
Sr. XEN / Operations
BBMB(PW), Slapper (HP)
E-mail :- cegen@ bbmb.nic.in

WHOLE TRANSMISSION SYSTEM OUTAGE DATA IN RESPECT OF TRANSFORMER OF DEHAR POWER HOUSE, SLAPPER. ANNEXURE-IV
Period:
Period Dec-99 (Element wise Chronological listing)
Sr. No.

Time Time
Name of the Deemed Ckt. Weightage considere considere
d for non (Ti-Tnai) Wi (Ti- Wi (Ti- Element
wise Reason of
Transmission Outage Restoration Duration of Outage Attributable to Availability SIL Km. factor d for availablit Tnai) 16x19 Tnai) / availability Outage
element % (Wi) 14x16 availablit y (Tnai) 17-18 Ti 20/17 % 21/16
y (Ti) hrs
Hrs

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
System Constraint /
Date Time Date Time Utility Itself Others Natural
DD/MM/YY Hrs/Min. DD/MM/YY Hrs/Min. Hrs. Min. Hrs. Min. Hrs. Min.
1 4/17/2018 12:08 4/17/2018 18:50 6 42
ICT 400/220
KV 28/04/18 16:36 29/04/18 17:20 24 44 99.85% 315 1 315 744 8:32 735:28 231613 314.53 99.85% Tripped

Transformer
T-7 40/36/4 100.00% 40 1 40 744 744 40 100.00%
MVA
Transformer
T-8 40/40/13 100.00% 40 1 40 744 744 40 100.00%
MVA
UNIT WISE GENERATION,TOTAL TRANSMISSION & TOTAL AUXALIARY FOR THE YEAR - 2018-19 (April to March)
Month Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 Total Gen. Total Trans. Total Aux.

124093984982 121300388855
Jan-18 6292100 24207200 13504000 0 0 38918000 82921300 84197448 503920
Feb-18 7405960 17048860 9443000 31040000 0 9840000 74777820 76125420 444160
Mar-18 16001160 31722180 21892000 21229000 0 0 90844340 92202576 537960
Apr-18 22281220 92098380 10171000 35746000 0 0 160296600 161036556 791980
May-18 34552480 104464680 13467000 56289000 0 59079000 267852160 266528028 1234320
Jun-18 58629180 107667080 55430000 81481000 0 107130000 410337260 405481608 1869680
Jul-18 21629760 108175940 67402000 94230000 46461000 111822000 449720860 443356656 2023520
Aug-18 29698420 110068640 41262000 72804000 80584000 106444000 440861060 434565324 1927400
Sep-18 28596140 20744320 77583000 104590000 75501000 105547000 412561460 404530812 1884220
Oct-18 19213720 0 41303000 113608000 47113000 79352000 300589720 297497388 1406080
Nov-18 17116160 0 10179000 55860000 41072000 50361000 174588160 173780220 870560
Dec-18 0 0 0 740000 938000 1551000 3229000 3229344 661240
Jan-19 493800 18777860 4524000 14741000 14166000 48755000 101457660 101922864 601240
-40 -160 -5
Total 261910060 634975140 366160000 682358000 305835000 718799000 2970037240 2944454239 14756280

Progressive Total ( Jan to Dec 2018)


Generation Transmission
31-Dec-18 127064022222 124244843094
1-Jan-18 124093984982 121300388855
2970037240 2944454239

UNIT WISE GENERATION,TOTAL TRANSMISSION & TOTAL AUXALIARY FOR THE YEAR - 2018 (Jan. to Dec.)
Month Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 Total Gen. Total Trans. Total Aux.

Jan-18 6292100 24207200 13504000 0 0 38918000 82921300 84197448 503920


Feb-18 7405960 17048860 9443000 31040000 0 9840000 74777820 76125420 444160

Mar-18 16001160 31722180 21892000 21229000 0 0 90844340 92202576 537960

Apr-18 22281220 92098380 10171000 35746000 0 0 160296600 161036556 791980

May-18 34552480 104464680 13467000 56289000 0 59079000 267852160 266528028 1234320

Jun-18 58629180 107667080 55430000 81481000 0 107130000 410337260 405481608 1869680

Jul-18 21629760 108175940 67402000 94230000 46461000 111822000 449720860 443356656 2023520

Aug-18 29698420 110068640 41262000 72804000 80584000 106444000 440861060 434565324 1927400

Sep-18 28596140 20744320 77583000 104590000 75501000 105547000 412561460 404530812 1884220

Oct-18 19213720 0 41303000 113608000 47113000 79352000 300589720 297497388 1406080

Nov-18 17116160 0 10179000 55860000 41072000 50361000 174588160 173780220 870560

Dec-18 493800 18777860 4524000 14741000 14166000 48755000 101457660 101922864 661240
-40 -160 -5
Total 261910060 634975140 366160000 681618000 304897000 717248000 2966808240 2941224895 14155040

Progressive Total ( Jan to Dec 2018)


Generation Transmission

31-Dec-18 127060793222 124241613750

1-Jan-18 124093984982 121300388855

2966808240 2941224895
ASE/Sr. Executive Engineer,
Operation Division DPH BBMB (PW),
Slapper.
UNIT WISE GENERATION,TOTAL TRANSMISSION & TOTAL AUXALIARY FOR THE YEAR Jan. 17 to Dec. 17
Month Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 Total Gen. Total Trans. Total Aux.
Jan-17 0 0 45265000 28150000 22003000 0 95418000 94100964 589880
Feb-17 0 0 58864000 29700000 14424000 102988000 102256464 605590
Mar-17 3085420 45564000 44419000 49933000 143001420 142152300 733880
Apr-17 72252240 0 52896000 95992000 100819000 0 321959240 318118080 1404330
May-17 106713060 0 111940000 121248000 5264000 0 345165060 340355424 1502850
Jun-17 100376000 88566260 110484000 108974000 0 0 408400260 403026192 1803910
Jul-17 53013240 111871500 103082000 111037000 0 87213000 466216740 459635112 2032560
Aug-17 32235100 100098620 98044000 103553000 0 104272000 438202720 431861460 1972980
Sep-17 27352060 107176860 84000000 59860000 0 108712000 387100920 382057176 1724900
Oct-17 20419180 83427300 15338000 39406000 0 71421000 230011480 229565268 1075010
Nov-17 13360520 39917040 8079000 1044000 0 71721000 134121560 134902044 709050
Dec-17 26794980 8584420 11826000 0 0 58423000 105628400 106684872 587560
Total 455601800 539642000 745382000 743383000 192443000 501762000 3178213800 3144715356 14742500

Progressive Tottal
Generation Transmission
124093984982 121300388855
120915771182 118155673499
3178213800 3144715356
Jan-17 95418000 95.418 Jan-18 82921300 82.9213

Apr-17 321959240 321.95924 Apr-18 160296600


May-17 345165060 345.16506 May-18 267852160

Jun-17 408400260 408.40026 Jun-18 410337260

Jul-17 466216740 466.21674 Jul-18 449720860

Aug-17 438202720 438.20272 Aug-18 440861060

Sep-17 387100920 387.10092 Sep-18 412561460

Oct-17 230011480 230.01148 Oct-18 300589720

Nov-17 134121560 134.12156 Nov-18 174588160

Dec-17 105628400 105.6284 Dec-18 101457660

3178.2138
###
UNIT WISE RUNNING HOURS FOR THE YEAR 2018 (Jan to Dec)
Month Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 Total R.Hrs.

January-18 38:16 147:45 82:39 00:00 00:00 235:42 504:22

February-18 45:23 103:52 57:41 188:08 00:00 59:50 454:54

March-18 97:49 192:27 133:42 129:02 00:00 00:00 553:00

April-18 136:01 555:46 63:05 216:26 00:00 00:00 971:18

May-18 214:04 641:30 86:01 347:03 00:00 367:39 1656:17

June-18 381:41 687:13 378:04 536:05 00:00 696:25 2679:28

July-18 136:35 693:37 466:23 616:42 287:27 732:13 2932:57

August-18 184:10 677:17 281:41 455:11 501:32 665:04 2764:55

September-18 186:20 125:37 526:42 680:15 500:15 682:25 2701:34

October-18 116:24 00:00 276:56 715:28 300:23 507:37 1916:48

November-18 104:37 00:00 67:36 341:00 252:41 310:10 1076:04

December-18 03:00 115:07 29:47 91:34 87:40 300:40 627:48

Total 1644:20 3940:11 2450:17 4316:54 1929:58 4557:45 18839:25

ASE/Sr. Executive Engineer,


Operation Division DPH BBMB (PW),
November-18 Slapper.
December-18
January-19 03:00 115:07 29:47 91:34 87:40 300:40 627:48
UNIT WISE RUNNING HOURS FOR THE YEAR April 2017 to March 2018
Month Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 Total R.Hrs.
Apr-17 445:07 0:00 335:52 590:53 624:13 0:00 1996:05
May-17 651:20 00:00 701:22 744:00 34:31 00:00 2131:13
Jun-17 634:05 565:22 714:36 690:47 00:00 00:00 2604:50
Jul-17 340:02 721:34 691:34 722:07 00:00 564:46 3040:03
Aug-17 207:10 663:08 666:40 687:33 00:00 699:53 2924:24
Sep-17 172:46 684:20 553:11 394:43 00:00 700:41 2505:41
Oct-17 125:58 514:35 98:20 248:23 00:00 441:09 1428:25
Nov-17 82:29 247:22 49:49 07:03 00:00 461:18 848:01
Dec-17 162:45 52:03 73:11 00:00 00:00 355:42 643:41
Jan-18 38:16 147:45 82:39 00:00 00:00 235:42 504:22
Feb-18 45:23 103:52 57:41 188:08 00:00 59:50 454:54
Mar-18 97:49 192:27 133:42 129:02 00:00 00:00 553:00
Total 3003:10 3892:28 4158:37 4402:39 658:44 3519:01 19634:39
720:00
720 6 4320

672:00
672 6 4032

744:00
744 6 4464

720:00
720 6 4320

744:00
744 6 4464

744:00
744 6 4464

744:00
744 6 4464

744:00
744 6 4464

720:00
720 6 4320

744:00
744 6 4464

720:00
720 6 4320

744:00
744 6 4464 48096

8760:00 6 52560:00 52560

845986 12
827041 18
18944 54

744:00
Unit Wise IDLE Hours for the Year 2018 (Jan to Dec)

Month Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 Total

Jan-18 235:09 458:35 641:26 00:00 00:00 508:18 1843:28

Feb-18 515:07 480:08 614:19 464:20 00:00 141:10 2215:04

Mar-18 646:11 551:33 589:43 594:23 00:00 00:00 2381:50

Apr-18 583:59 164:14 656:55 503:34 00:00 00:00 1908:42

May-18 529:56 102:30 657:59 323:24 00:00 170:23 1784:12

Jun-18 292:28 29:14 341:56 73:03 00:00 23:35 760:16

Jul-18 588:10 31:08 277:37 127:18 18:12 11:47 1054:12

Aug-18 559:50 66:43 462:19 158:08 131:53 60:51 1439:44

Sep-18 533:40 03:37 193:18 39:45 39:20 37:35 847:15

Oct-18 389:16 00:00 467:04 28:32 65:05 176:56 1126:53

Nov-18 615:23 01:30 652:24 379:00 351:13 231:17 2230:47

Dec-18 654:00 359:38 688:48 445:26 656:20 443:20 3247:32

Total 6143:09 2248:50 6243:48 3136:53 1262:03 1805:12 20839:55

ASE/Sr. Executive Engineer,


Operation Division DPH BBMB (PW),
November-18 Slapper.
December-18
January-19 654:00 359:38 688:48 445:26 656:20 443:20 3247:32

UNIT WISE IDLE HOURS FOR THE YEAR April 2017 to March 2018
Month Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 Total R.Hrs.
Apr-17 274:17 00:00 361:25 127:27 51:30 00:00 814:39
May-17 92:40 00:00 42:38 00:00 00:00 00:00 135:18
Jun-17 85:55 00:34 00:00 29:13 00:00 00:00 115:42
Jul-17 403:58 22:26 52:26 21:53 00:00 92:50 593:33
Aug-17 536:50 80:52 77:20 56:27 00:00 44:07 795:36
Sep-17 547:14 35:40 166:49 325:17 00:00 19:19 1094:19
Oct-17 618:02 229:25 270:55 330:44 00:00 127:30 1576:36
Nov-17 637:31 472:38 485:06 83:04 00:00 258:42 1937:01
Dec-17 561:33 186:35 670:49 00:00 00:00 388:18 1807:15
Jan-18 235:09 458:35 641:26 00:00 00:00 508:18 1843:28
Feb-18 515:07 480:08 614:19 464:20 00:00 141:10 2215:04
Mar-18 646:11 551:33 589:43 594:23 00:00 00:00 2381:50
Total = 5154:27 2518:26 3972:56 2032:48 51:30 1580:14 15310:21

ASE/Sr. Executive Engineer,


Operation Division DPH BBMB (PW),
Slapper.
744:00
709:29
34:31
UNIT WISE FORCED HOURS FOR THE YEAR 2018 (Jan to Dec)

Month Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 Total R.Hrs.

Jan-18 00:00 00:00 00:00 00:00 00:00 00:00 0:00

Feb-18 00:00 00:00 00:00 00:00 00:00 00:00 0:00

Mar-18 00:00 00:00 00:00 00:00 00:00 00:00 0:00

Apr-18 00:00 0:00 0:00 0:00 0:00 0:00 0:00


x

May-18 00:00 0:00 0:00 0:00 0:00 0:00 0:00

Jun-18 45:51 3:33 0:00 110:52 0:00 0:00 160:16

Jul-18 0:00 0:00 0:00 0:00 0:00 0:00 0:00

Aug-18 0:00 0:00 0:00 0:00 5:20 0:00 5:20

Sep-18 0:00 590:46 0:00 0:00 9:00 0:00 599:46

Oct-18 21:50 744:00 0:00 0:00 3:32 0:00 769:22

Nov-18 0:00 153:00 0:00 0:00 0:00 112:02 265:02

Dec-18 00:00 00:00 00:00 00:00 00:00 00:00 0:00

Total 67:41 1491:19 0:00 110:52 17:52 112:02 1799:46

ASE/Sr. Executive Engineer,


Operation Division DPH BBMB (PW),
Slapper.
December-18
January-19 00:00 00:00 00:00 00:00 00:00 00:00 00:00
UNIT WISE FORCED HOURS FOR THE YEAR April 2017 to March 2018
Month Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 Total R.Hrs.
Apr-17 0:36 0:00 22:43 1:40 44:17:00 0:00 69:16
May-17 00:00 0:00 0:00 0:00 709:29 0:00 709:29
Jun-17 00:00 0:00 0:00 0:00 720:00 0:00 720:00
Jul-17 00:00 0:00 0:00 0:00 744:00 0:00 744:00
Aug-17 00:00 00:00 00:00 00:00 744:00 00:00 744:00
Sep-17 00:00 0:00 0:00 0:00 720:00 00:00 720:00
Oct-17 00:00 0:00 0:00 0:00 744:00 00:00 744:00
Nov-17 00:00 0:00 0:00 0:00 720:00 00:00 720:00
Dec-17 19:42 0:00 0:00 0:00 744:00 00:00 763:42
Jan-18 00:00 00:00 00:00 00:00 00:00 00:00 0:00
Feb-18 00:00 00:00 00:00 00:00 00:00 00:00 0:00
Mar-18 00:00 00:00 00:00 00:00 00:00 00:00 0:00
Total 20:18 0:00 22:43 1:40 5889:46 0:00 5934:27
UNIT WISE PLANNED HOURS FOR THE YEAR 2018 (Jan to Dec)
Month Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 Total R.Hrs.
Jan-18 470:35 137:40 19:55 744:00 744:00 00:00 2116:10

Feb-18 111:30 88:00 00:00 19:32 672:00 471:00 1362:02

Mar-18 00:00 00:00 20:35 20:35 744:00 744:00 1529:10

Apr-18 00:00 00:00 00:00 00:00 720:00 720:00 1440:00 x

May-18 00:00 00:00 00:00 73:33 744:00 205:58 1023:31

Jun-18 0:00 0:00 0:00 0:00 720:00 0:00 720:00

Jul-18 19:15 19:15 0:00 0:00 438:21 0:00 476:51

Aug-18 0:00 0:00 0:00 130:41 105:15 18:05 254:01

Sep-18 0:00 0:00 0:00 0:00 171:25 0:00 171:25

Oct-18 216:30 0:00 0:00 0:00 375:00 59:27 650:57

Nov-18 0:00 565:30 0:00 0:00 116:06 66:31 748:07

Dec-18 87:00 269:15 25:25 207:00 00:00 00:00 588:40

Total = 904:50 1079:40 65:55 1195:21 5550:07 2285:01 11080:54

ASE/Sr. Executive Engineer,


Operation Division DPH BBMB (PW),
Slapper.
December-18
January-19 87:00 269:15 25:25 207:00 00:00 00:00 588:40
UNIT WISE PLANNED HOURS FOR THE YEAR April 2017 to March 2018
Month Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 Total R.Hrs.
Apr-17 00:00 720:00 00:00 00:00 00:00 720:00 1440:00
May-17 00:00 744:00 00:00 00:00 00:00 744:00 1488:00
Jun-17 00:00 154:04 05:24 00:00 00:00 720:00 879:28
Jul-17 00:00 00:00 00:00 00:00 00:00 86:24 86:24
Aug-17 00:00 00:00 00:00 00:00 00:00 00:00 0:00
Sep-17 00:00 00:00 00:00 00:00 00:00 00:00 0:00
Oct-17 00:00 00:00 374:45 164:53 00:00 175:21 714:59
Nov-17 00:00 00:00 185:05 629:53 00:00 00:00 814:58
Dec-17 00:00 505:22 00:00 744:00 00:00 00:00 1249:22
Jan-18 470:35 137:40 19:55 744:00 744:00 00:00 2116:10
Feb-18 111:30 88:00 00:00 19:32 672:00 471:00 1362:02
Mar-18 00:00 00:00 20:35 20:35 744:00 744:00 1529:10
Total = 582:05 2349:06 605:44 2322:53 2160:00 3660:45 11680:33
Runninf Hours,Idle Hours,Planned Hrs,Force Hrs.,No,s of FSD, Plant Availability factor, Capacity Utilization factor for the year 2018 (Jan to Dec)

DEHAR POWER PLANT:- SLAPPER (HP)


Sr. Unit wise data during the year 2017-18
Description
No. 1 2 3 4 5 6 Total

1 Total Running Hours 8760 8760 8760 8760 8760 8760 52560

2 Running Hours 1644:20 3940:11 2450:17 4316:54 1929:58 4557:45 18839:25

3 Idle Hours 6143:09 2248:50 6243:48 3136:53 1262:03 1805:12 20839:55

4 Planned Hours 904:50 1079:40 65:55 1195:21 5550:07 2285:01 11080:54

5 Force Hours 67:41 1491:19 0:00 110:52 17:52 112:02 1799:46

6 No,s of FSD 2 2 0 1 3 2 10
7 DPP Load Factor in % 34.42
8 Capacity Utilization factor in % 96.36
9 Max. Demand in MW 990 MW at 19:55 HRS of dated 04.08.2018
10 Plant Availability factor in % 74.98
11 Plant schedule Outage % 21.38
12 Plant Un-Scheduled Outage % 3.64
13 Discharge through Bye-Pass chute 1340 Cusec dated 20/11/18 at 15:23 Hrs to 15:43 hrs duration 00:20 Min.

Maximum Load Transmitted on Diferent Feeders during the year 2018 (Jan to Dec)
Sr. Name of Feeder Time & Date (Hrs,) of Accutance Load in MW
No.
1 132 KV Dehar Shimla 18:30 12/30/2018 60
2 220 KV Dehar-Kangoo Line 11:00 5/18/2018 85
3 220 KV Dehar Ganguwal Curcit-1 10:30 5/24/2018 240
4 220 KV Dehar Ganguwal Curcit-2 18:30 5/15/2018 230
5 400 KV Dehar -Rajpura Line 19:00 9/2/2018 440
6 400 KV Dehar- Panchkula Line 17:00 9/7/2018 600

ASE/Sr. Executive Engineer,


Operation Division DPH BBMB (PW),
Slapper.
Runninf Hours,Idle Hours,Planned Hrs,Force Hrs.,No,s of FSD, Plant Availability factor, Capacity Utilization factor for the year 2017-18
DEHAR POWER PLANT:- SLAPPER (HP)
Sr. Unit wise data during the year 2017-18
Description
No. 1 2 3 4 5 6 Total
1 Running Hours 3003:10 3892:28 4158:37 4402:39 658:44 3519:01 19634:39
2 Idle Hours 5154:27 2518:26 3972:56 2032:48 51:30 1580:14 15310:21
3 Planned Hours 582:05 2349:06 605:44 2322:53 2160:00 3660:45 11680:33
4 Force Hours 20:18 0:00 22:43 1:40 5889:46 0:00 5934:27
5 No,s of FSD 2 0 1 1 2 0 6
6 DPP Load Factor in % 35.58
7 Capacity Utilization factor in % 95.25
8 Max. Demand in MW 825 MW at 19;05 HRS of dated 11.07.2017
9 Plant Availability factor in % 66.49
10 Plant schedule Outage % 22.22
11 Plant Un-Scheduled Outage % 11.29
12 Discharge through Bye-Pass chut NIL

Maximum Load Transmitted on Diferent Feeders during the year 2017-18


Sr.
No. Name of Feeder Time & Date (Hrs,) of Accutance Load in MW
1 132 KV Dehar Shimla 7:00 08.11.2017 60
2 220 KV Dehar-Kangoo Line 12:00 19.07.17 90
3 220 KV Dehar Ganguwal Curcit-1 16:00 03.07.2017 220
4 220 KV Dehar Ganguwal Curcit-2 19:00 09.10.17 230
5 400 KV Dehar -Rajpura Line 18:00 20.01.2018 -350
6 400 KV Dehar- Panchkula Line 21:00 19.07.2017 410
ASE/Sr. Executive Engineer,
Operation Division DPH BBMB (PW),
Slapper.

Runninf Hours,Idle Hours,Planned Hrs,Force Hrs.,No,s of FSD, Plant Availability factor, Capacity Utilization factor for the year 2018 (Jan to Dec)
DEHAR POWER PLANT:- SLAPPER (HP)
Sr. Unit wise data during the year 2018
Description
No. 1 2 3 4 5 6 Total
1 Total Running Hours
2 Running Hours
3 Idle Hours
4 Planned Hours
5 Force Hours
6 No,s of FSD
7 DPP Load Factor in %
8 Capacity Utilization factor in %
9 Max. Demand in MW
10 Plant Availability factor in %
11 Plant schedule Outage %
12 Plant Un-Scheduled Outage %
13 Discharge through Bye-Pass chut

Maximum Load Transmitted on Diferent Feeders during the year 2018


Sr.
No. Name of Feeder Time & Date (Hrs,) of Accutance Load in MW

1 132 KV Dehar Shimla


2 220 KV Dehar-Kangoo Line
3 220 KV Dehar Ganguwal Curcit-1
4 220 KV Dehar Ganguwal Curcit-2
5 400 KV Dehar -Rajpura Line
6 400 KV Dehar- Panchkula Line

ASE/Sr. Executive Engineer,


Operation Division DPH BBMB (PW),
Slapper.
52560:00 52560:00