Site Modernization Report Of: U0351Gyinyasi
Site Modernization Report Of: U0351Gyinyasi
Site Modernization Report Of: U0351Gyinyasi
U0351GYINYASI
Huawei Technologies Co., Ltd.
FEB 26, 2021
1
Document Control
1. Revision History
Revision
Date Name Revision
Number
V1.0
2. Reviewers
Reviewer Date Feedback
2
Content
1 BASIC PARAMETERS............................................................................................................................ 2
1.1 SITE INFORMATION...............................................................................................................................2
2 SITE CHECKLIST.................................................................................................................................... 2
3 THE ANALYSIS ON DT........................................................................................................................... 2
3.1 PSC DISTRIBUTION..............................................................................................................................2
3.2 EC / IO DISTRIBUTION.........................................................................................................................2
3.3 RSCP DISTRIBUTION............................................................................................................................2
4 DATA SERVICE TEST............................................................................................................................. 2
4.1 THROUGHPUT CELL 1................................................................................................................................2
4.2 THROUGHPUT CELL 2................................................................................................................................2
4.3 THROUGHPUT CELL 3................................................................................................................................2
5 ACTIONS.............................................................................................................................................. 2
6 SUMMARY.......................................................................................................................................... 2
APPENDIX THE CONTACT ENGINEERS............................................................................................................ 2
1 BASIC PARAMETERS
Antenna
Cell ID Antenna type M tilt E Tilt Azimuth
Height
03511 OCTABAND 6 RET 0 35
2 SITE CHECKLIST
No. Activity/Process Cell 1 Cell 2 Cell 3 Result
UL DL UL DL UL DL
Uplink Frequency /
1 1972.40 2162.40 1972.40 2162.40 1972.40 2162.40 ok
Downlink Frequency
Scrambling Code
2 175 ok 176 ok 177 ok ok
correctly defined
Idle
2 THE ANALYSIS ON DT
3.1 PSC DISTRIBUTION
Before Modernization After Modernization
3.2 EC / IO DISTRIBUTION
5 Summary
The site’s basic functionalities are working fine and stable as verified by site survey and Drive test. The
performance of the site is OK and the township is well covered.
Approved Approved