Professional Documents
Culture Documents
1.1 Introduction To Interlocking
1.1 Introduction To Interlocking
1 Introduction to Interlocking
1-8 Materials
All materials used for the work shall be of the best grade of the respective kinds and as
described in these specifications.
The contractor shall submit for the approval of the Engineer a list of the names and
addresses of the manufacturers, trademarks and types of all materials and articles he
proposes to comply, together with all specifications and description that may be required in
this connection before any orders are placed.
All materials and equipment shall comply as a minimum:
With the latest relevant recommendations of the codes mentioned in item (4).
1-9 Workmanship
The whole of the works shall be carried out to the Consulting Engineer's satisfaction
thorough engineering and workmanlike manner in accordance with the drawings and the
specification. The work shall be carried out in such a manner as may be directed by the
Engineer.