PREVAILING WIND

DIRECTION
(SSW)

TRUE
NORTH

PLANT
NORTH N

MECCA

³ ³

VENDOR

CUMMINS POWER SYSTEM - AFRICA MIDDLE EAST

A3 (420 x 297) PLOT DATE / TIME : 4/12/2021 7:42:39 PM


CLIENT : EPC CONTRACTOR: PROJECT TITLE:
RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)
DRAWING TITLE:
DOC. CLASS/CAT. : GA DRAWINGS WITH OVERALL DIMENSION
AND WEIGHT FOR ENCLOSED DIESEL GENSET
中国石油管道局工程有限公司 PROJECT No. 9686 (IP65) - 2500kVA (930-EDG-001B)
A 12-04-21 ISSUED FOR PRELIMINARY GG KC/SU FK - SCALE DRAWING No. SHEET REV.
REV DATE DESCRIPTION BY CH'D APP APP NTS 9686-6120-43-PO0074-0002 01 OF 09 A
This document contains information which is subject to obligations of non-disclosure and is to be returned to Oman Tank Terminal Company L.L.C. upon request. The contents may not be copied, disclosed or made available to any CAD FILE NAME : QSK78-G29-ENC-FOUNDATION _recover.dwg
third party or used other than for the intended purpose for which it has been provided unless Oman Tank Terminal Company L.L.C. provides written consent for such copy, disclosure, availability and/or use.
PREVAILING WIND
DIRECTION
(SSW)

TRUE
NORTH

PLANT
NORTH N

MECCA

³ ³

VENDOR

CUMMINS POWER SYSTEM - AFRICA MIDDLE EAST

A3 (420 x 297) PLOT DATE / TIME : 4/12/2021 7:42:35 PM


CLIENT : EPC CONTRACTOR: PROJECT TITLE:
RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)
DRAWING TITLE:
DOC. CLASS/CAT. : GA DRAWINGS WITH OVERALL DIMENSION
AND WEIGHT FOR ENCLOSED DIESEL GENSET
中国石油管道局工程有限公司 PROJECT No. 9686 (IP65) - 2000kVA (930-EDG-001B)
A 12-04-21 ISSUED FOR PRELIMINARY GG KC/SU FK - SCALE DRAWING No. SHEET REV.
REV DATE DESCRIPTION BY CH'D APP APP NTS 9686-6120-43-PO0074-0002 04 OF 09 A
This document contains information which is subject to obligations of non-disclosure and is to be returned to Oman Tank Terminal Company L.L.C. upon request. The contents may not be copied, disclosed or made available to any CAD FILE NAME : QSK60-G22-ENC-FOUNDATION_recover.dwg
third party or used other than for the intended purpose for which it has been provided unless Oman Tank Terminal Company L.L.C. provides written consent for such copy, disclosure, availability and/or use.
PLANT NORTH
PREVAILING WIND
DIRECTION
(SSW)
MECCA

³ ³

VENDOR

CUMMINS POWER SYSTEM - AFRICA MIDDLE EAST

A3 (420 x 297) PLOT DATE / TIME : 4/12/2021 7:57:15 PM


CLIENT : EPC CONTRACTOR: PROJECT TITLE:
RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)
DRAWING TITLE:
DOC. CLASS/CAT. : GA DRAWINGS WITH OVERALL DIMENSION
AND WEIGHT FOR ENCLOSED DIESEL GENSET
中国石油管道局工程有限公司 PROJECT No. (IP65) - 1000kVA (TAG NO- 930-EDG-001D)

A 12-04-21 ISSUED FOR PRELIMINARY GG KC/SU FK - SCALE DRAWING No. SHEET REV.
REV DATE DESCRIPTION BY CH'D APP APP NTS 9686-6120-43-PO0074-0002 07 OF 09 A
This document contains information which is subject to obligations of non-disclosure and is to be returned to Oman Tank Terminal Company L.L.C. upon request. The contents may not be copied, disclosed or made available to any CAD FILE NAME : KTA50-G3-(ENCLOSURE FOUNDATION) REV-B1_recover.dwg
third party or used other than for the intended purpose for which it has been provided unless Oman Tank Terminal Company L.L.C. provides written consent for such copy, disclosure, availability and/or use.

You might also like