AFIJ/SF/PROD/04102016/04

AL FARA'A INTERIORS & JOINERY


QUALITY CHECKLIST- Wooden Doors

FORM NO. ______________________ DATE: ………. / ……… / 2017

PROJECT NAME: ____________________________________________________________________________________________

PRODUCT NAME & DETAILS: (BOQ/PRODUCT REF. NO.)________________________________________________________________________________

QUANTITY: ________________________________________________________________________________________________________________

SR. NO. CHECKLIST POINTS YES þ NO ý COMMENTS, IF ANY

MATERIALS TYPE/ SIZE/ FINISHES - AS PER DRAWINGS AND


1
SPECIFICATIONS ¨ ¨
INTERNAL OPENING SIZES - AS PER DRAWINGS AND/OR SITE
2
MEASUREMENTS ¨ ¨
3 EXTERNAL SIZES - AS PER DRAWINGS AND/OR SITE MEASUREMENTS
¨ ¨
4 CORRECT FIT - NO VISIBLE SPACES, GAPS, UNEVENNESS, ETC.
¨ ¨
5 ALL HARDWARES FIXED - AS PER DRAWINGS AND SPECIFICATIONS
¨ ¨
6 ALL JOINTS - FIXED PROPERLY
¨ ¨
7 EDGES AND JOINTS - ALIGNED AND FLUSH
¨ ¨
8 CLEANLINESS - CLEANED PROPERLY: CAULKS, GLUES, ETC.
¨ ¨
PAINT / FINAL FINISH - PROPERLY DONE / MAINTAINED AS PER SAMPLE
9
AND/OR SPECIFICATION ¨ ¨
10 IRONMONGERIES ENCLOSED (if applicable) - TO BE FIXED AT SITE
¨ ¨
11 ANY OTHER - MEP clearance
¨ ¨

FINAL CONCLUSION / COMMENTS YES þ NO ý COMMENTS, IF ANY

APPROVED FOR PACKING AND DISPATCH


¨ ¨

SIGN & DATE: SIGN & DATE:

NAME: NAME:

QA/QC IN-CHARGE PRODUCTION IN-CHARGE


AFIJ/SF/PROD/04102016/04

AL FARA'A INTERIORS & JOINERY


QUALITY CHECKLIST- Wardrobes

FORM NO. ______________________ DATE: ………. / ……… / 2017

PROJECT NAME: ____________________________________________________________________________________________

PRODUCT NAME & DETAILS: (BOQ/PRODUCT REF. NO.)________________________________________________________________________________

QUANTITY: ________________________________________________________________________________________________________________

SR. NO. CHECKLIST POINTS YES þ NO ý COMMENTS, IF ANY

MATERIALS TYPE/ SIZE/ FINISHES - AS PER DRAWINGS AND


1
SPECIFICATIONS ¨ ¨
INTERNAL OPENING SIZES - AS PER DRAWINGS AND/OR SITE
2
MEASUREMENTS ¨ ¨
3 EXTERNAL SIZES - AS PER DRAWINGS AND/OR SITE MEASUREMENTS
¨ ¨
4 CORRECT FIT - NO VISIBLE SPACES, GAPS, UNEVENNESS, ETC.
¨ ¨
5 ALL HARDWARES FIXED - AS PER DRAWINGS AND SPECIFICATIONS
¨ ¨
6 ALL JOINTS - FIXED PROPERLY
¨ ¨
7 EDGES AND JOINTS - ALIGNED AND FLUSH
¨ ¨
8 CLEANLINESS - CLEANED PROPERLY: CAULKS, GLUES, ETC.
¨ ¨
PAINT / FINAL FINISH - PROPERLY DONE / MAINTAINED AS PER SAMPLE
9
AND/OR SPECIFICATION ¨ ¨
10 IRONMONGERIES ENCLOSED (if applicable) - TO BE FIXED AT SITE
¨ ¨
11 ANY OTHER - MEP Clearance
¨ ¨

FINAL CONCLUSION / COMMENTS YES þ NO ý COMMENTS, IF ANY

APPROVED FOR PACKING AND DISPATCH


¨ ¨

SIGN & DATE: SIGN & DATE:

NAME: NAME:

QA/QC IN-CHARGE PRODUCTION IN-CHARGE


AFIJ/SF/PROD/04102016/04

AL FARA'A INTERIORS & JOINERY


QUALITY CHECKLIST- Vanities

FORM NO. ______________________ DATE: ………. / ……… / 2017

PROJECT NAME: ____________________________________________________________________________________________

PRODUCT NAME & DETAILS: (BOQ/PRODUCT REF. NO.)________________________________________________________________________________

QUANTITY: ________________________________________________________________________________________________________________

SR. NO. CHECKLIST POINTS YES þ NO ý COMMENTS, IF ANY

MATERIALS TYPE/ SIZE/ FINISHES - AS PER DRAWINGS AND


1
SPECIFICATIONS ¨ ¨
INTERNAL OPENING SIZES - AS PER DRAWINGS AND/OR SITE
2
MEASUREMENTS ¨ ¨
3 EXTERNAL SIZES - AS PER DRAWINGS AND/OR SITE MEASUREMENTS
¨ ¨
4 CORRECT FIT - NO VISIBLE SPACES, GAPS, UNEVENNESS, ETC.
¨ ¨
5 ALL HARDWARES FIXED - AS PER DRAWINGS AND SPECIFICATIONS
¨ ¨
6 ALL JOINTS - FIXED PROPERLY
¨ ¨
7 EDGES AND JOINTS - ALIGNED AND FLUSH
¨ ¨
8 CLEANLINESS - CLEANED PROPERLY: CAULKS, GLUES, ETC.
¨ ¨
PAINT / FINAL FINISH - PROPERLY DONE / MAINTAINED AS PER SAMPLE
9
AND/OR SPECIFICATION ¨ ¨
10 IRONMONGERIES ENCLOSED (if applicable) - TO BE FIXED AT SITE
¨ ¨
11 ANY OTHER - MEP clearance
¨ ¨

FINAL CONCLUSION / COMMENTS YES þ NO ý COMMENTS, IF ANY

APPROVED FOR PACKING AND DISPATCH


¨ ¨

SIGN & DATE: SIGN & DATE:

NAME: NAME:

QA/QC IN-CHARGE PRODUCTION IN-CHARGE


AFIJ/SF/PROD/04102016/04

AL FARA'A INTERIORS & JOINERY


QUALITY CHECKLIST- Reception Counter

FORM NO. ______________________ DATE: ………. / ……… / 2017

PROJECT NAME: ____________________________________________________________________________________________

PRODUCT NAME & DETAILS: (BOQ/PRODUCT REF. NO.)________________________________________________________________________________

QUANTITY: ________________________________________________________________________________________________________________

SR. NO. CHECKLIST POINTS YES þ NO ý COMMENTS, IF ANY

MATERIALS TYPE/ SIZE/ FINISHES - AS PER DRAWINGS AND


1
SPECIFICATIONS ¨ ¨
INTERNAL OPENING SIZES - AS PER DRAWINGS AND/OR SITE
2
MEASUREMENTS ¨ ¨
3 EXTERNAL SIZES - AS PER DRAWINGS AND/OR SITE MEASUREMENTS
¨ ¨
4 CORRECT FIT - NO VISIBLE SPACES, GAPS, UNEVENNESS, ETC.
¨ ¨
5 ALL HARDWARES FIXED - AS PER DRAWINGS AND SPECIFICATIONS
¨ ¨
6 ALL JOINTS - FIXED PROPERLY
¨ ¨
7 EDGES AND JOINTS - ALIGNED AND FLUSH
¨ ¨
8 CLEANLINESS - CLEANED PROPERLY: CAULKS, GLUES, ETC.
¨ ¨
PAINT / FINAL FINISH - PROPERLY DONE / MAINTAINED AS PER SAMPLE
9
AND/OR SPECIFICATION ¨ ¨
10 IRONMONGERIES ENCLOSED (if applicable) - TO BE FIXED AT SITE
¨ ¨
11 ANY OTHER - MEP clearance.
¨ ¨

FINAL CONCLUSION / COMMENTS YES þ NO ý COMMENTS, IF ANY

APPROVED FOR PACKING AND DISPATCH


¨ ¨

SIGN & DATE: SIGN & DATE:

NAME: NAME:

QA/QC IN-CHARGE PRODUCTION IN-CHARGE


AFIJ/SF/PROD/04102016/04

AL FARA'A INTERIORS & JOINERY


QUALITY CHECKLIST- Wall Panelling/Cladding

FORM NO. ______________________ DATE: ………. / ……… / 2017

PROJECT NAME: ____________________________________________________________________________________________

PRODUCT NAME & DETAILS: (BOQ/PRODUCT REF. NO.)________________________________________________________________________________

QUANTITY: ________________________________________________________________________________________________________________

SR. NO. CHECKLIST POINTS YES þ NO ý COMMENTS, IF ANY

MATERIALS TYPE/ SIZE/ FINISHES - AS PER DRAWINGS AND


1
SPECIFICATIONS ¨ ¨
INTERNAL OPENING SIZES - AS PER DRAWINGS AND/OR SITE
2
MEASUREMENTS ¨ ¨
3 EXTERNAL SIZES - AS PER DRAWINGS AND/OR SITE MEASUREMENTS
¨ ¨
4 CORRECT FIT - NO VISIBLE SPACES, GAPS, UNEVENNESS, ETC.
¨ ¨
5 ALL HARDWARES FIXED - AS PER DRAWINGS AND SPECIFICATIONS
¨ ¨
6 ALL JOINTS - FIXED PROPERLY
¨ ¨
7 EDGES AND JOINTS - ALIGNED AND FLUSH
¨ ¨
8 CLEANLINESS - CLEANED PROPERLY: CAULKS, GLUES, ETC.
¨ ¨
PAINT / FINAL FINISH - PROPERLY DONE / MAINTAINED AS PER SAMPLE
9
AND/OR SPECIFICATION ¨ ¨
10 IRONMONGERIES ENCLOSED (if applicable) - TO BE FIXED AT SITE
¨ ¨
11 ANY OTHER - MEP clearance.
¨ ¨

FINAL CONCLUSION / COMMENTS YES þ NO ý COMMENTS, IF ANY

APPROVED FOR PACKING AND DISPATCH


¨ ¨

SIGN & DATE: SIGN & DATE:

NAME: NAME:

QA/QC IN-CHARGE PRODUCTION IN-CHARGE


AFIJ/SF/PROD/04102016/04

AL FARA'A INTERIORS & JOINERY


QUALITY CHECKLIST- Shoe Rack

FORM NO. ______________________ DATE: ………. / ……… / 2017

PROJECT NAME: ____________________________________________________________________________________________

PRODUCT NAME & DETAILS: (BOQ/PRODUCT REF. NO.)________________________________________________________________________________

QUANTITY: ________________________________________________________________________________________________________________

SR. NO. CHECKLIST POINTS YES þ NO ý COMMENTS, IF ANY

MATERIALS TYPE/ SIZE/ FINISHES - AS PER DRAWINGS AND


1
SPECIFICATIONS ¨ ¨
INTERNAL OPENING SIZES - AS PER DRAWINGS AND/OR SITE
2
MEASUREMENTS ¨ ¨
3 EXTERNAL SIZES - AS PER DRAWINGS AND/OR SITE MEASUREMENTS
¨ ¨
4 CORRECT FIT - NO VISIBLE SPACES, GAPS, UNEVENNESS, ETC.
¨ ¨
5 ALL HARDWARES FIXED - AS PER DRAWINGS AND SPECIFICATIONS
¨ ¨
6 ALL JOINTS - FIXED PROPERLY
¨ ¨
7 EDGES AND JOINTS - ALIGNED AND FLUSH
¨ ¨
8 CLEANLINESS - CLEANED PROPERLY: CAULKS, GLUES, ETC.
¨ ¨
PAINT / FINAL FINISH - PROPERLY DONE / MAINTAINED AS PER SAMPLE
9
AND/OR SPECIFICATION ¨ ¨
10 IRONMONGERIES ENCLOSED (if applicable) - TO BE FIXED AT SITE
¨ ¨
11 ANY OTHER - MEP clearance.
¨ ¨

FINAL CONCLUSION / COMMENTS YES þ NO ý COMMENTS, IF ANY

APPROVED FOR PACKING AND DISPATCH


¨ ¨

SIGN & DATE: SIGN & DATE:

NAME: NAME:

QA/QC IN-CHARGE PRODUCTION IN-CHARGE


AFIJ/SF/PROD/04102016/04

AL FARA'A INTERIORS & JOINERY


QUALITY CHECKLIST- Indoor Mini Bar Counter & Shelving Unit

FORM NO. ______________________ DATE: ………. / ……… / 2017

PROJECT NAME: ____________________________________________________________________________________________

PRODUCT NAME & DETAILS: (BOQ/PRODUCT REF. NO.)________________________________________________________________________________

QUANTITY: ________________________________________________________________________________________________________________

SR. NO. CHECKLIST POINTS YES þ NO ý COMMENTS, IF ANY

MATERIALS TYPE/ SIZE/ FINISHES - AS PER DRAWINGS AND


1
SPECIFICATIONS ¨ ¨
INTERNAL OPENING SIZES - AS PER DRAWINGS AND/OR SITE
2
MEASUREMENTS ¨ ¨
3 EXTERNAL SIZES - AS PER DRAWINGS AND/OR SITE MEASUREMENTS
¨ ¨
4 CORRECT FIT - NO VISIBLE SPACES, GAPS, UNEVENNESS, ETC.
¨ ¨
5 ALL HARDWARES FIXED - AS PER DRAWINGS AND SPECIFICATIONS
¨ ¨
6 ALL JOINTS - FIXED PROPERLY
¨ ¨
7 EDGES AND JOINTS - ALIGNED AND FLUSH
¨ ¨
8 CLEANLINESS - CLEANED PROPERLY: CAULKS, GLUES, ETC.
¨ ¨
PAINT / FINAL FINISH - PROPERLY DONE / MAINTAINED AS PER SAMPLE
9
AND/OR SPECIFICATION ¨ ¨
10 IRONMONGERIES ENCLOSED (if applicable) - TO BE FIXED AT SITE
¨ ¨
11 ANY OTHER - MEP clearance.
¨ ¨

FINAL CONCLUSION / COMMENTS YES þ NO ý COMMENTS, IF ANY

APPROVED FOR PACKING AND DISPATCH


¨ ¨

SIGN & DATE: SIGN & DATE:

NAME: NAME:

QA/QC IN-CHARGE PRODUCTION IN-CHARGE


AFIJ/SF/PROD/04102016/04

AL FARA'A INTERIORS & JOINERY


QUALITY CHECKLIST- Timber Pergola

FORM NO. ______________________ DATE: ………. / ……… / 2017

PROJECT NAME: ____________________________________________________________________________________________

PRODUCT NAME & DETAILS: (BOQ/PRODUCT REF. NO.)________________________________________________________________________________

QUANTITY: ________________________________________________________________________________________________________________

SR. NO. CHECKLIST POINTS YES þ NO ý COMMENTS, IF ANY

MATERIALS TYPE/ SIZE/ FINISHES - AS PER DRAWINGS AND


1
SPECIFICATIONS ¨ ¨
INTERNAL OPENING SIZES - AS PER DRAWINGS AND/OR SITE
2
MEASUREMENTS ¨ ¨
3 EXTERNAL SIZES - AS PER DRAWINGS AND/OR SITE MEASUREMENTS
¨ ¨
4 CORRECT FIT - NO VISIBLE SPACES, GAPS, UNEVENNESS, ETC.
¨ ¨
5 ALL HARDWARES FIXED - AS PER DRAWINGS AND SPECIFICATIONS
¨ ¨
6 ALL JOINTS - FIXED PROPERLY
¨ ¨
7 EDGES AND JOINTS - ALIGNED AND FLUSH
¨ ¨
8 CLEANLINESS - CLEANED PROPERLY: CAULKS, GLUES, ETC.
¨ ¨
PAINT / FINAL FINISH - PROPERLY DONE / MAINTAINED AS PER SAMPLE
9
AND/OR SPECIFICATION ¨ ¨
10 IRONMONGERIES ENCLOSED (if applicable) - TO BE FIXED AT SITE
¨ ¨
11 ANY OTHER - MEP clearance.
¨ ¨

FINAL CONCLUSION / COMMENTS YES þ NO ý COMMENTS, IF ANY

APPROVED FOR PACKING AND DISPATCH


¨ ¨

SIGN & DATE: SIGN & DATE:

NAME: NAME:

QA/QC IN-CHARGE PRODUCTION IN-CHARGE