Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 32

No

Material Pending
Manufacturing Manufacturing On Ready for Ready For At updates /
No. of Packages PO Issued Arrived at Documentat
Not Started Yet Going Testing/FAT Delivery Delivery Pending
Site ion
PO
JACKET & STRUCTURAL 35 55 53 1 1
ELECTRICAL 17 20 11 3 1 3 2
INSTRUMENT 34 30 9 1 9 4 7
PIPING 34 30 13 1 4 6 2 1 1 2
MECHANICAL 24 21 1 4 9 3 4
ARCHITECTURE 7 7 6 1
SAFETY 2 3 3
TELECOM 2 2 1 1
MISCELLANEOUS 2 6 3 3
TOTAL 157 174 96 2 13 32 9 12 8 2

NOTES:
*For details on each packages, please refer next tab (DETAILS).

NoDelivery
At updates / Pending PO
Ready For Delivery 5% 1%
7%
Ready for Testing/FAT
5%

Manufacturing On Going
18%

Material Arrived at Site


55%

Manufacturing Not Started Yet


7% Pending Documentation
1%
GDP PURCHASE ORDER LIST

PO
ACKN
PO No. Item Discipline Vendor PO DATE OWLE VDR-VDI STATUS MATERIAL STATUS BUYER
DGEM
ENT

GDP-PO-PM-001 LSAW Pipes Jacket/Structural EEW 9/11/2013 OK N/A Arrived İlhan Hashan

GDP-PO-PM-002 Cone Plate Jacket/Structural MDB 11/28/2013 OK N/A Arrived İlhan Hashan

GDP-PO-PM-003 LSAW Pipes (Additional) Jacket/Structural EEW 11/19/2013 OK N/A Arrived İlhan Hashan

GDP-PO-PM-004 WPS PQR Register Structural LSAW Tubular Ma Jacket/Structural UniversaL Steel 11/21/2013 OK N/A Arrived İlhan Hashan

GDP-PO-PM-005 Bolt Nut and Washer Timber Jacket/Structural KARACA 12/20/2013 OK N/A Arrived Özgenç Akçora

GDP-PO-PM-007 LSAW Tubular Jacket/Structural EEW 12/19/2013 OK N/A Arrived Ali Süha Kın

GDP-PO-PM-008 Bolt Nut and Washer Boatlanding Boom Rest Jacket/Structural Karaca 12/25/2013 OK N/A Arrived Özgenç Akçora

GDP-PO-PM-009 Cathodic Protection Jacket/Structural Ail Industries 12/27/2013 OK Submitted/Closed Arrived Şeyma Erdoğan

GDP-PO-PM-010 Structural Beams Jacket/Structural ROZAK DEMİR 1/23/2014 OK N/A Arrived Fırat Yıldız

GDP-PO-PM-011 Riser Clamp PTFE Bolt Jacket/Structural Geroil 1/20/2014 OK N/A Arrived Özgenç Akçora

GDP-PO-PM-012 Pile Gripper Jacket/Structural Oil States 1/12/2014 OK Submitted/Closed Arrived Erhan Kızılkaya

GDP-PO-PM-013 Grout Seal Jacket/Structural Oil States 12.01.14 OK Submitted/Closed Arrived Erhan Kızılkaya

GDP-PO-PM-015 Steel plate Jacket/Structural MDB 2/1/2014 OK N/A Arrived Ali Süha Kın

GDP-PO-PM-016 Structural Beams (Prismatic Section) Jacket/Structural Metal Service 2/4/2014 OK N/A Arrived Fırat Yıldız

GDP-PO-PM-017 Seamless Pipe Jacket/Structural Metal Service 2/14/2014 OK N/A Arrived Fırat Yıldız

GDP-PO-PM-018 Shock Cell Jacket/Structural IRM 1/29/2014 OK Submitted/Closed Arrived Şeyma Erdoğan

GDP-PO-PM-019 Timber Jacket/Structural Wijma Kampen 30.01.14 OK N/A Arrived Özgenç Akçora

GDP-PO-PM-020 Cone Plate Jacket/Structural Yıldırım Kardeşler 2/5/2014 OK N/A Arrived Fırat Yıldız

GDP-PO-PM-022 Seamless Pipe Jacket/Structural Alchemia (Metal Service) 2/14/2014 OK N/A Arrived Fırat Yıldız

GDP-PO-PM-024 Structural Paint Jacket/Structural Jotun 6/4/2014 OK N/A Arrived Özgenç Akçora

GDP-PO-PM-079 Elastomeric Pad Jacket/Structural IRM 5/5/2014 OK Submitted/Closed Arrived Şeyma Erdoğan

GDP-PO-PM-080 Leg Mating Unit Jacket/Structural IRM 5/16/2014 OK Submitted/Closed Arrived Şeyma Erdoğan

GDP-PO-PM-081 Boatlanding Floatover Fenders Jacket/Structural IRM 5/13/2014 OK Submitted/Closed Arrived Şeyma Erdoğan

GDP-PO-PM-083 Pipe for Grout Distribution Ring Jacket/Structural Güldemir 5/26/2014 OK N/A Arrived Özgenç Akçora

GDP-PO-PM-089 Jacket/Structural Edgen Murray 6/3/2014 OK N/A Arrived Özgenç Akçora


Plate for Bouyancy Tanks Support
GDP-PO-PM-094 Riser Clamp Jacket/Structural YMS 6/17/2014 OK N/A Arrived Mert Gönül

Pipe, elbow, flat bar (hot- dip halvanized) for


GDP-PO-PM-096 Jacket/Structural Shree Steel 6/19/2014 OK N/A Arrived Özgenç Akçora
handrail materials

GDP-PO-PM-097 GRATING jacket/Structural Meiser 6/18/2014 OK N/A Arrived Özgenç Akçora

GDP-PO-PM-100 J TUBE Jacket/Structural Edgen Murray 6/26/2014 OK N/A Arrived Özgenç Akçora

GDP-PO-PM-101 PIPE AND FLANGE FOR OPEN DRAIN CAISSI Jacket/Structural Shree Steel 6/27/2014 OK N/A Arrived Özgenç Akçora

GDP-PO-PM-102 Tertiary steel ( pipe, angle, plate) for Jaket Jacket/Structural SAFET 6/27/2014 OK N/A Arrived Özgenç Akçora

GDP-PO-PM-104 GROUTING U BOLT, STUD BOLT & JACKET Jacket/Structural TripleFast Middle East LTD 7/1/2014 OK N/A Arrived Özgenç Akçora

GDP-PO-PM-106 Pipe, elbow, gasket, pipe cap for Grouting syst Jacket/Structural Güldemir 7/1/2014 OK N/A Arrived Özgenç Akçora

GDP-PO-PM-107 Ball valve for Grouting system Jacket/Structural Batusan 7/3/2014 OK N/A Arrived Özgenç Akçora

GDP-PO-PM-108 Hex bolt, clips for Grating Jacket/Structural BİMAK MAKİNA OTOMOTİV 7/7/2014 OK N/A Arrived Özgenç Akçora

GDP-PO-PM-109 QUICK CONNECTOR , GATE VALVE Jacket/Structural Visvana 7/7/2014 OK N/A Arrived Özgenç Akçora

GDP-PO-PM-114 Anti-slip stair nosing Jacket/Structural Safemate Anti-slip Pty Ltd 7/14/2014 OK N/A Arrived Özgenç Akçora

GDP-PO-PM-116 Plate for Support of Fender Jacket/Structural Masteel UK Limited 7/17/2014 OK N/A Arrived Özgenç Akçora

GDP-PO-PM-118 Rubber mat Jacket/Structural FORESIGHT GLOBAL FZE 8/4/2014 OK N/A Arrived Özgenç Akçora

GDP-PO-PM-120 Neoprene sheet for Boatlanding clamp & Topsi Jacket/Structural OCEAN RUBBER 8/7/2014 OK N/A Arrived Özgenç Akçora

GDP-PO-PM-121 Plate for Topside Jacket/Structural Masteel UK Limited 8/11/2014 OK N/A Arrived Özgenç Akçora

GDP-PO-PM-135 Tube Clamps Jacket/Structural Stauff 8/25/2014 OK N/A Arrived Veysel Arslan

GDP-PO-PM-139 Passive Fire Protection Jacket/Structural International Paint Ltd. 8/29/2014 OK N/A Manufacturing/Production has not startedÖzgenç
yet Akçora

GDP-PO-PM-141 Materials for Jacket Leak Test & Flooding Syst Jacket/Structural SHREE STEEL 9/11/2014 OK N/A Arrived Özgenç Akçora

GDP-PO-PM-146 Additional beam, section, pipe Jacket/Structural EDGEN MURRAY 10/2/2014 OK N/A Arrived Özgenç Akçora

GDP-PO-PM-147 Stud Bolt for Topside of Timber Jacket/Structural Berdan Civata 10/8/2014 OK N/A Arrived Özgenç Akçora

GDP-PO-PM-149 Jacket/Structural Geroil 10/16/2014 OK N/A Arrived Burak Başaran


Plates for Equipment Shimming

GDP-PO-PM-150 Ocean rubber Jacket/Structural NEOPRENE RUBBER 10/21/2014 OK N/A Arrived Özgenç Akçora

GDP-PO-PM-151 Equal angle , NPU for electrical support Jacket/Structural Kocaer Haddecilik 10/21/2014 OK N/A Arrived Özgenç Akçora

GDP-PO-PM-153 Jacket Pile Gripper Add. Tubing Clamp Jacket/Structural Nordival/Swagelok 10/21/2014 OK N/A Arrived Veysel Arslan

GDP-PO-PM-154 Plate for electrical support Jacket/Structural Rozak Demir 10/23/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-155 Handrail hex bolt Jacket/Structural Boztaş Civata 10/23/2014 OK N/A Arrived Özgenç Akçora

GDP-PO-PM-156 Messenger Rope, Green pin for J TUBE Jacket/Structural Göver Çelik Halat 10/24/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-156-A Messenger Rope, Green pin for J TUBE Jacket/Structural Göver Çelik Halat 10/24/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-157 Studbolt & Gasket Jacket/Structural Triple Fast 10/27/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-158 Padlock, lockout equipments Miscallaneous Brady 11/1/2014 OK N/A Manufacturing/Production on going Emine İlbey
GDP-PO-PM-159 INSTRUMENT CABLES (RS-485, CAT-6, TEL1X Instrument CCE 11/13/2014 OK Submitted/On-going
Ready for delivery (RS485 & CAT6 only)
Burak Balkan

GDP-PO-PM-160 INSTRUMENT JUNCTION BOXES Instrument TEMPA PANO 11/4/2014 OK Submitted/On-going


Manufacturing/Production on going Burak Balkan

GDP-PO-PM-161 Black Binder Miscallaneous Produksi Nur-Johan 10/31/2014 OK N/A Arrived Şeyma Erdoğan

GDP-PO-PM-162 DBB Valve with Sampling Probe Piping Icarus 12/2/2014 OK Manufacturing/Production has not startedVeysel
Pending GAD yet Arslan

GDP-PO-PM-163 Prefabricated Bathroom Architectural ENSAR GEMİ 11/17/2014 OK Manufacturing/Production has not startedÖzgenç
PENDING TECH. CLARIFICATION yet Akçora

GDP-PO-PM-164 TOPSIDE LOADOUT PLATE Jacket/Structural SAFET 11/18/2014 OK N/A At delivery Özgenç Akçora
STATUS
Received revised new calculation for fire case of hydrocarbon 120 mins instead of 60 minutes. Tech
discussion are still ongoing
PO has been issued. ETD Turkmenbashi by End January 2015. However, there are some issues with
plate thickness that are still in discussion with RNZ. Estimate to solve the issue by 19/1/2015

ITP has been submitted by vendor. Waiting for vendor to submit GA drawings, estimated readiness of the
materials is the beginning of April.
Pending Technical Clarification

YD 1453, ETD Italy 5/1/2015 ETA Turkmenistan 30/1/2015


PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION, HOOK UP AND COMMISSIONING (EPCC)
OF GARAGOL DENIZ WEST OFFSHORE FACILITIES FOR GARAGOL DENIZ WEST OIL DEVELOPMENT PROJECT
PROJECT MATERIAL QUOTATION TRACKING TABLE-TOPSIDE

JACKET & STRUCTURAL


QUANTITY DELIVERY LEAD MANUFACTURING / PRODUCTION TRANSPORTATION / DELIVERIES ROS DATE
TIME
(WEEKS) AFTER CONTRACTUAL
SMPR NO BUYER ITEM VENDOR PO NO PO DATE DELIVERY TERM ESTIMATED REMARKS
APPROVAL OF DELIVERY DATE MANUFACTURING PLANNED
CRITICAL ESTIMATED FAT FINAL READINESS OF TRANSPORT / ETD TO ETA ACTUAL ARRIVAL AT
ORDER RCVD O/S COMPLETION DELIVERY EARLIEST LATEST
DOCUMENTS DATE INSPECTION MATERIALS TRUCK NO TURKMENBASHI TURKMENBASHI SITE
DATE PERIOD (DAYS)
DATE

Chartek 7054 kg
As of 6/1/2015
PASSIVE FIRE GTA 123 INTERNATIONAL 706 lt Receive revised new calculation for fire case of hydrocarbon 120 minutes instead of
5239-SB-001 Ö.A. PO-139 29 August, 2014 DDP ATASEHIR WAREHOUSE, ISTANBUL 12 21 November, 2014 30 January, 2015 - - 30 January, 2015 15 30 January, 2015 14 February, 2015 2 February, 2015 2 February, 2015
PROTECTION PAINT Hydrocarbon 60 minutes.
Technical discussion are still ongoing
HK-1 Mesh 1000 m2

Ö.A. TOPSIDE LOADOUT 2200 x 7000mm x 16mm SAFET SPA PO-164 18 November, 2014 27 pcs CFR ISTANBUL, TURKEY 7 6 January, 2015 5 January, 2015 - - 5 January, 2015 YD-1453 25 5 January, 2015 30 January, 2015 2 February, 2015 2 February, 2015 As of 6/1/2015
PLATE Truck YD-1453 departed from Italy on 5/1/2015, ETA Turkmenbashi 30/1/2015

Filename: 529668845.xlsx 8 / 32 Printed at : 06/28/2021 / 09:15:34


PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION, HOOK UP AND COMMISSIONING (EPCC)
OF GARAGOL DENIZ WEST OFFSHORE FACILITIES FOR GARAGOL DENIZ WEST OIL DEVELOPMENT PROJECT
PROJECT MATERIAL QUOTATION TRACKING TABLE-TOPSIDE

TOPSIDE - ELECTRICAL
QUANTITY MANUFACTURING / PRODUCTION TRANSPORTATION / DELIVERIES ROS DATE
DELIVERY LEAD
TIME
(WEEKS) AFTER CONTRACTUAL PLANNED
SMPR NO BUYER ITEM VENDOR PO NO PO DATE DELIVERY TERM MANUFACTURING ESTIMATED FINAL TRANSPORT / ETD TO ACTUAL ARRIVAL AT REMARKS
ORDER RCVD O/S APPROVAL OF DELIVERY DATE ESTIMATED FAT DATE READINESS OF MATERIALS DELIVERY PERIOD ETA TURKMENBASHI EARLIEST LATEST
CRITICAL COMPLETION DATE INSPECTION DATE TRUCK NO TURKMENBASHI SITE
(DAYS)
DOCUMENTS

5239-E-002 MAIN SWITCHBOARD LV SWBD / MCC SB - 7700 PO-041 1 16 March, 2015 20 March, 2015 12 20 March, 2015 1 April, 2015 8 January, 2015 8 January, 2015
DB - 7700 1 As of 6/1/2016:
Waiting approval from PCTSB on VDR submitted in order for vendor to start
DB - 7720 1 manufacturing. Transmittal 9488 / 9493 / 9505
E.I DB - 7721 GVD 3 April, 2014 1 FCA GVD FACILITY, ISTANBUL 12 26 June, 2014
5239-E-003 DISTRIBUTION BOARD DB - 7722 PO-042 1 17 February, 2015 20 February, 2015 12 20 February, 2015 4 March, 2015 17 January, 2015 4 April, 2015 DB manufacturing lead time = 4 weeks
Switchboard manufacturing lead time = 8 weeks
DB - 7723 1
DB - 7724 1
DB - 7726 1
OIL FILTER ELEMENT 2
MAN TRUCK PO-059 8 May, 2014 FCA NUREMBERG 14 14 August, 2014 5 December, 2014 5 December, 2014 YD 1452
GAS ENGINE 2
As of 6/1/2015:
5239-E-006 F.G GENERATOR ALTENATOR AKSA JENERATOR PO-060 2 May, 2014 2 FCA CRAOIVA 16 22 August, 2014 5 December, 2014 5 December, 2014 25 13 March, 2015 7 April, 2015 13 April, 2015 23 April, 2015 Both packages arrived at Borusan's premise

Packager for New GEG & Free Issue GEG BORUSAN PO-067 20 May, 2014 3 EXW CAYIROVA, ISTANBUL 10 29 July, 2014 10 March, 2015 10 March, 2015

Capillary Thermostat : 1 Cable output 260


Capillary Thermostat : 2 Cable output 9
Local Switches 316 SS 269
Marshalling Box 316 SS 63
Self Regulating Cable , Exe, SC-N-10-2-BOT 105

Self Regulating Cable , Exe, SC-N-20-2-BOT 890

Self Regulating Cable , Exe, SC-N-30-2-BOT 3500

Self Regulating Cable , Exe, SC-N-40-2-BOT 1370 As of 6/1/2015:


5239-E-005 D.A HEAT TRACING SIGMA CONTROL PO-099 23 June, 2014 EXW SIGMA CONTROL SRL 7 11 August, 2014 15 October, 2014 19 January, 2015 19 January, 2015 15 October, 2014 25 30 January, 2015 24 February, 2015 25 April, 2015 11 May, 2015 Material are ready to be FAT since 3 month ago. FAT are now rescheduled to Mid
SRL. WAREHOUSE, ITALY January. This is based on PCTSB direction to get all documents Code 1 before
Power Supply Kit for Self Regulating Cable 278 proceeding with FAT.
Termination Kit for self regulating Cable 278
Insulation Entry Kit 278
Roll of Glass Reinforced Adhesive Tape 200
Adhesive Caution Label 950
SUPPORT Bracket For Capillary Thermostat 269
Power/Signal Cable 1900
DB-7727A, 36outputs, c/w 1 ammeter 1
DB-7727B, 54outputs, c/w 1 ammeter 1
DB-7727C, 54outputs, c/w 1 ammeter 1

As of 05/12/2014
Materials(3 drum (P3 cables), 2 drum (P5B cables) & 1 drum (E1 cables)) have arrived at
site on 5/12/2014, waiting for site team to confirm.
5239-EB-004 B.B POWER CABLES UNIKA PO-123 12 August, 2014 EXW CERKEZKOY, TEKIRDAG, TURKEY 8 7 October, 2014 28 November, 2014 4 December, 2014 4 December, 2014 TR-2049 15 20 January, 2015 4 February, 2015 5 November, 2014 3 December, 2014
As of 6/1/2015
Remaining materials are ready for delivery.

JUNCTION BOX:
Manufacturing has already started on 26/11/2014. It will take 4-5 weeks. Estimated
readiness of the materials is end of December, 2014.

as of 20/12/2014:
Manufacturing started with approved document
YD-1387 LIGHTING FIXTURES:
5239-EB-006 E.I JUNCTION BOXES & LIGHTING FIXTURES EATON PO-128 26 August, 2014 290 FCA FCA CHINA 9 28 October, 2014 5 December, 2014 5 December, 2014 YD-1436 45 11 November, 2014 12 January, 2015 16 November, 2014 16 December, 2014 From China (2 shipment)

As of 27/12/2014
1st Shipment : (YD 1387) Arrived
2nd Shipment: Departed 1/12/2014 (YD 1436) .ETA Turkmenbashi 12/1/2014.

Type A Impact Resistance, Glass Fibre- As of 05/12/2014


Reinforced (GHG 4434) 30 Materials(Safety switches) have arrived at site on 05/12/2014.

As of 20/12/2014:
Manufacturing has not started yet for RCU due size requirement shall be follow as
271x134x136mm .
Vendor can only comply with 271x271x136mm.
Tyoe C Impact Resistant Polyamide (GHG 20
2622301R9205) However, PCTSB and RNZ has already accepted the deviatio on 19/12/2014. . TQ has
(RCU) REMOTE been issued with transmittal GDDP‐ILK‐RNZ‐VDR‐776 on 19/12/2014. Waiting for
5239-EB-008 B E.I EATON PO-110 8 July, 2014 FCA GERMANY 6 19 August, 2014 31 October, 2014 31 October, 2014 TR-2049 25 17 November, 2014 12 December, 2014 5 December, 2014 15 November, 2014 16 January, 2015 approval.
CONTROL UNIT
Upon receive approval, manufacturing will recommence. Manufacturing will take 4-6
weeks to be completed

As of 6/1/2015:
Type D Impact-Resistant Polymadie (GHG Waiting reply from PCTSB on drawings & TQ in order for vendor to start manufacturing.
2610005R9086) 54

As of 6/1/2015
E.I. Electrical Bulk Material Additional Earthing Cables UNIKA PO-145 27 October, 2014 4 EXW ISTANBUL 9 12/31/2014 1/20/2015 12 1/20/2015 2/1/2015 Material are ready for delivery

Filename: 529668845.xlsx 9 / 32 Printed at : 06/28/2021 / 09:15:34


PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION, HOOK UP AND COMMISSIONING (EPCC)
OF GARAGOL DENIZ WEST OFFSHORE FACILITIES FOR GARAGOL DENIZ WEST OIL DEVELOPMENT PROJECT
PROJECT MATERIAL QUOTATION TRACKING TABLE-TOPSIDE

TOPSIDE - INSTRUMENT
DELIVERY
QUANTITY LEAD TIME MANUFACTURING / PRODUCTION TRANSPORTATION / DELIVERIES ROS DATE
(WEEKS)
CONTRACTUAL
SMPR NO BUYER ITEM VENDOR PO NO PO DATE DELIVERY TERM AFTER REMARKS
DELIVERY DATE PLANNED
APPROVAL MANUFACTURING ESTIMATED FINAL READINESS OF TRANSPORT / ETD TO ACTUAL ARRIVAL AT
ORDER RCVD O/S OF CRITICAL ESTIMATED FAT DATE DELIVERY PERIOD ETA TURKMENBASHI EARLIEST LATEST
COMPLETION DATE INSPECTION DATE MATERIALS TRUCK NO TURKMENBASHI SITE
DOCUMENTS (DAYS)

SMOKE DETECTOR 27

HYDROCARBON DETECTORS 10

H2 DETECTORS 2

DUSTGUARD 4

EXPROOF PUSHBUTTON 13

EXPROOF SIREN 6 As of 4/11/2014


Inspection has been done on 30/10/2014.
MINI DISC REMOTE INDICATOR 5 Logistic arrangement is in progress.
5239-I-001 B.B DETECTORS NORM TEKNIK PO-053 5 July, 2014 EXW ISTANBUL 14 11 October, 2014 5 November, 2014 30 October, 2014 5 November, 2014 20 31 January, 2015 20 February, 2015 26 December, 2014 13 May, 2015
EXPROOF BREAK GLASS CALL POINT 6 As of 6/1/2015:
FAT report has been transmitted on 28/11/2014 with "GDDP-ILK-RNZ-VDR-721".
Delivery will follow after approval of drawings that has been submitted on 6/1/2015
EXPROOF BEACON 3

HANDHELD INTEROGATOR 1

HEAT DETECTOR 2

SMOKE & HEAT DETECTOR TESTING SET 1

CALIBRATION KIT 2

04-PSV-003-LCB.LCC - 2"/3" with #300#150 2

54-PSV-001A-CF8M - 1"/2" with #150 1


As of 05/12/2014:
54-PSV-001B-CF8M - 1"/2" with #150 1 items 04-PSV-003, 04-PSV-003, 59-PSV-001A and 59-PSV-001B are ready for inspection,
Vendor is waiting for approval of calculation. Once approved, Vendor will revise the GA
drawings to finalize inspection date.
PRESSURE RELIEF 59-PSV-001A-WCB,WCC - 1"/2" with #150 GEDIK DOKUM 1
5239-I-002 A D.A VALVE (LESER) PO-044 7 April, 2014 CIF ISTANBUL, TURKEY 26 6 October, 2014 17 November, 2014 26 January, 2015 26 January, 2015 6 December, 2014 25 31 January, 2015 25 February, 2015 23 November, 2014 1 February, 2015 The new valves 54-PSV-001A 54-PSV-001B with 300lbs rating flanges will be ready end
of December.
As of 6/1/2015:
PSVs are ready for FAT. Waiting approval on GAD and valve test procedures that has
been transmitted to PCTSB on 23/12/2014 (transmittal-9489)
59-PSV-001A-WCB,WCC - 1"/2" with #150 1

04-PVC-008 NPS8 1

04-PVC-001 NPS4 1 As of 06/12/2014


PCTSB has confirmed that sizing calculations of all control valves are acceptable. Vendor
ISTANBUL, HAYDARPASA, has recommenced assembly. Estimated readiness of materials for FAT is end of
5239-I-003 D.A CONTROL VALVE 04-LVC-003 NPS1 5 METSO PO-056 21 April, 2014 1 CPT 20 8 September, 2014 1 September, 2014 16 January, 2015 16 January, 2015 8 December, 2014 30 31 January, 2015 2 March, 2015 26 December, 2014 30 April, 2015 December.
TURKEY
As of 6/1/2015:
FAT is schedule on 16/1/2015. NOI has been transmitted to PCTSB
04-LVC-009 NPS 2 1

HCV-113 ( gas line / manual) 1

HCV-114 1
HCV-214 1
HCV-224 1
HCV-314 1
As of 4/11/2014
HCV-324 1 1. Actuator PO has been issued on 10/6/2014. ETA vendor premise on 16/10/2014
2. Casting material PO has been issued on 27/6/2014. ETA vendor premise 26/10/2014
HCV-414 1 3. targetted FAT date is 28/11/2014.
5239-I-004 E.O CHOKE VALVE HCV-424 WEIR VALVES PO-052 28 April, 2014 1 EXW ELLAND WVCUK FACTORY , UK 29 17 November, 2014 2 January, 2015 27 January, 2015 27 January, 2015 2 January, 2015 45 31 January, 2015 17 March, 2015 30 June, 2015 30 June, 2015
As of 06/1/2015:
HCV-514 1 Materials will be ready for inspection on 27/01/2015. Delivery date have been delayed
because of supply of tungsten carbide trim materials.
HCV-214 1

HCV-614 1

HCV-624 1

HCV-714 1

HCV-724 1

CONTROL PANEL 1

NITROGEN CYLINDER RACKS 1 As of 4/11/2014


some of the materials has been ordered. Waiting for the unpriced PO from Vendor.
Targetted to finish by end of Feb 2015. ETA Turkmenbashi on 25/4/2014
5239-I-005 I.A WHCP ASCO POMPE PO-030 27 February, 2014 EXW FACTORY - ASCO POMPE, 28 11 September, 2014 19 February, 2015 27 February, 2015 27 February, 2015 27 February, 2015 30 2 March, 2015 1 April, 2015 23 February, 2015 1 June, 2015
ITALY as of 05/12/2014:
Vendor confirmed on 14th November that they're not expecting any variation in
MANUAL ADJUSTABLE HIGH PRESSURE delivery date. Manufacturing and delivery plan remained the same which readiness of
REGULATOR 6 material will be on 2/3/2015. ETA to site 01/04/2015

Notes:
5239-I-006 I.H PIG SIGNALLER PPE PO-023 25 February, 2014 2 EXW CLEVELAND / UK 18 1 July, 2014 25 February, 2015 13 May, 2015 1. Will be deliver together with Pig Launcher package.
Updates shown in T-MECH tab ( GDP-PO-PM-021), "Pig Launcher Package"

As of 5/12/2014:
Estimated completion of the materials is end of January, 2015. ETD to Turkmenbashi
06.02.2015, ETA 26.02.2015
5239-I-007 A F.G TRANSMITTER PRESSURE TEMPERATURE, FLOW AND LEVEL ARKEN PO-068 6 May, 2014 39 CPT TUZLA, ISTANBUL 18 9 September, 2014 30 January, 2015 30 January, 2015 20 6 February, 2015 26 February, 2015 26 December, 2014 13 April, 2015

as of 5/12/2014
Manufacturing will take 6-8 weeks after approval of documents. Waiting approval from
5239-I-007 C F.G TRANSMITTER CORIOLIS FLOWMETER PO-068 2 6 February, 2015 20 26 December, 2014 13 April, 2015 RNZ to proceed with manufacturing.

ARKEN 6 May, 2014 CPT TUZLA, ISTANBUL 18 9 September, 2014 6 February, 2015 6 February, 2015 26 February, 2015

5239-I-007 D F.G TRANSMITTER ULTRASONIC FLOWMETER PO-068 2 6 February, 2015 20 26 December, 2014 13 April, 2015

As of 6/1/2015:
Pending GA from Arken.
5239-I-010 FG CAPACITANCE LEVEL INSTRUMENT ARKEN PO-069 6 May, 2014 1 CPT TUZLA, ISTANBUL 12 29 July, 2014 30 January, 2015 30 January, 2015 20 6 February, 2015 26 February, 2015 26 December, 2014 13 April, 2015

As of 5/12/2014:
Estimated completion of the materials is end of January, 2015. ETD to Turkmenbashi
5239-I-017 F.G MAGNETIC LEVEL ARKEN PO-071 6 May, 2014 1 CPT TUZLA, ISTANBUL 12 29 July, 2014 30 January, 2015 30 January, 2015 20 6 February, 2015 26 February, 2015 26 December, 2014 13 April, 2015 06.02.2015, ETA 26.02.2015

Filename: 529668845.xlsx 10 / 32 Printed at : 06/28/2021 / 09:15:34


64 - FIT - 001 1
As of 5/12/2014:
5239-I-015 E.I ROTAMETER ARKEN PO-064 6 May, 2014 DAP TUZLA, ISTANBUL 8 1 July, 2014 30 January, 2015 30 January, 2015 20 6 February, 2015 26 February, 2015 21 February, 2015 21 March, 2015 Estimated completion of the materials is end of January, 2015. ETD to Turkmenbashi
64 - FIT - 002 1 06.02.2015, ETA 26.02.2015

As of 5/12/2014:
5239-I-008 F.G PRESSURE AND TEMPERATURE GAUGES ARKEN PO-070 6 May, 2014 1 CPT TUZLA, ISTANBUL 10 15 July, 2014 30 January, 2015 30 January, 2015 20 6 February, 2015 26 February, 2015 26 December, 2014 13 April, 2015 45 items will be ready end of january, 2015. 6 items are hold.

4" LPS 316 3


-Safety head & sensor
5239-I-009 B.B BURSTING DISC BS&B PO-063 2 May, 2014 EXW IRELAND 12 25 July, 2014 22 December, 2014 22 December, 2014 22 December, 2014 35 19 January, 2015 23 February, 2015 26 December, 2014 13 April, 2014 As of 6/1/2015:
FAT done on 22/12/2014. Material are ready for delivery.
6" LPS 316
-Safety head & sensor 3

GENERAL GENERAL INSTRUMENTS As of 6/1/2015:


5239-I-011 E.I RESTRICTION ORIFICE & FLANGE SETS INSTRUMENT PO-062 13 May, 2014 23 EXW CONSORTIUM 16 2 September, 2014 22 January, 2015 29 January, 2014 45 29 January, 2014 15 March, 2014 16 February, 2015 13 May, 2015 Estimated to be completed by 22/1/2015. ETA Turkmenbashi on 15/3/2015
WAREHOUSE,INDIA

As of 06/1/2015
Estimated readiness of the materials is 13/03/2015 according to production plan by
5239-I-012 C.D ACTUATED VALVES AND MOV 81 13 March, 2015 13 March, 2015 25 13 March, 2015 7 April, 2015 10 May, 2015 13 May, 2015 Vendor.
Approval on GAD are needed in order to start production for API6A valves
RMT PO-058 25 April, 2014 EXW ITALY 28 7 November, 2014
VALVOMECCANICA
As of 06/1/2015
5239-I-023 C.D HIPPS VALVES 4 24 April, 2015 24 April, 2015 25 30 April, 2015 25 May, 2015 16 May, 2015 21 May, 2015 Approval on GAD are needed in order to start production for API6A valves. Estimated
time of readiness of the materials is end of April, 2015.

1/2" WCC 3

1" WCC 3 As of 6/1/2015


5239-I-013 B.B PRESSURE REGULATOR IKONTROL PO-054 13 May, 2014 CPT ASHGABAT, TURKMENISTAN 21 7 October, 2014 6 April, 2014 6 April, 2014 15 6 April, 2014 21 April, 2014 25 December, 2014 26 April, 2015 Manufacturing is ongoing for 12 items. Estimated readiness of the materials is early
1 CF8M 2 April, 2015.

1/2" CF8M 3

As of 28/11/2014
Waiting for FAT report approval which is submitted on 24/10/2014 with GDDP-ILK-RNZ-
VDR-565. Still waiting RNZ/PCTSB approval. (Materials are ready to be collected)
5239-I-014 B.B SAND MONITORING CLAMPON PO-055 30 April, 2014 13 EXW NORWAY 14 6 August, 2014 20 October, 2014 20 October, 2014 25 19 January, 2015 13 February, 2015 10 May, 2015 1 June, 2015 As of 05/12/2014
FAT report have been transmitted from RNZ to PCTSB with P5239-PCTSB-V-9377 on
28/11/2014. Waiting for PCTSB approval to proceed.
As of 6/1/2015:
Material are ready for delivery. waiting for PCTSB feedback.

As of 05/12/2014:
The panel is nearly ready. TQ3 has been sent to Vendor on 05/12/2014 for three
pressure transmitter. Estimated readiness of the materials is early January, 2015.
As of 6/1/2014:
5239-I-018 F.G FUSIBLE PLUG SYSTEM PROSERV PO-031 27 February, 2014 1 EXW JEBEL ALI, DUBAI 20 17 July, 2014 6 January, 2014 19 January, 2014 23 January, 2014 20 26 January, 2014 15 February, 2014 10 January, 2015 1 May, 2015 Material are ready for FAT. NOI will be submitted to PCTSB.
FAT are planned to be on 19/1/2014

As of 6/1/2015:
Vendor are in the midst to close all punchlist based on previous FAT.

5239-I-019 F.G SIS, FGS & PMCS YOKOGAWA (M) PO-057 28 April, 2014 1 FCA PUCHONG, MALAYSIA 32 16 January, 2015 19 January, 2014 16 January, 2015 35 23 January, 2015 27 February, 2015 25 February, 2015 24 March, 2015

TYPE EARTH - 1G25 823 M


TYPE EARTH - 1G70 582 M
TYPE F2X - 1x2x1 246 M
TYPE F1X - 10x2x1 246 M
TYPE F2X - 1x2x1 1194 M
TYPE F2X - 5x2x1 804 M
TYPE F4X - 1x3x1,5 312 M
TYPE F4X - 10x3x1,5 732 M
TYPE 12X - 1x2x1 7092 M
As of 6/1/2015
TYPE 12X - 2x2x1 37M Materials are ready, FAT are done on 3 & 4/12/2014.
5239-IB-004 B.B INSTRUMENT CABLE TYPE 12X - 10x2x1 UNIKA PO-127 13 August, 2014 811 M EXW TEKIRDAG, TURKEY 6 24 September, 2014 3-4 December, 2014 20 December, 2014 15 19 January, 2015 3 February, 2015 11 January, 2015 ###
TYPE 12X - 20x2x1 1480 M
TYPE P3X - 2x2,5 5378 M
TYPE P3X - 4x2,5 3600 M
TYPE P3X - 6x2,5 974 M
TYPE P3X - 14x2,5 316 M
TYPE P3X - 24x2,5 4232 M
TYPE P5X - 2x2,5 2982 M
TYPE P5X - 2x2,5 12 M
TYPE P5X - 6x2,5 234 M
TYPE P5X - 14x2,5 360 M

As of 6/1/2015:
5239-IB-006 B.B JUNCTION BOXES TEMPA PANO PO-160 4 November, 2014 32 EXW TURKEY 6 16 December, 2014 16 December, 2014 31 January, 2015 15 31 January, 2015 15 February, 2015 12 January, 2015 27 January, 2015 PO has been issued. ETA Turkmenbashi by End January 2015.
However, there are some issues with plate thickness that are still in discussion with
RNZ. Estimate to solve the issue by 19/1/2015

Filename: 529668845.xlsx 11 / 32 Printed at : 06/28/2021 / 09:15:35


PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION, HOOK UP AND COMMISSIONING (EPCC)
OF GARAGOL DENIZ WEST OFFSHORE FACILITIES FOR GARAGOL DENIZ WEST OIL DEVELOPMENT PROJECT
PROJECT MATERIAL QUOTATION TRACKING TABLE-TOPSIDE

TOPSIDE - PIPING
DELIVERY
QUANTITY MANUFACTURING / PRODUCTION TRANSPORTATION / DELIVERIES ROS DATE
LEAD TIME
(WEEKS)
CONTRACTUAL
SMPR NO BUYER ITEM VENDOR PO NO PO DATE DELIVERY TERM AFTER ESTIMATED REMARKS
DELIVERY DATE PLANNED
APPROVAL MANUFACTURING ESTIMATED FAT FINAL READINESS OF TRANSPORT / ACTUAL ARRIVAL AT
ORDER RCVD O/S OF CRITICAL DELIVERY PERIOD ETD TO TURKMENBASHI ETA TURKMENBASHI EARLIEST LATEST
COMPLETION DATE DATE INSPECTION MATERIALS TRUCK NO SITE
DOCUMENTS (DAYS)
DATE

5239-P-007 E.K STAINLESS STEEL PIPES **Please refer to "SS & DUPLEX" tab 13 January, 2015 20 January, 2015

5239-P-008 E.K DUPLEX PIPES **Please refer to "SS & DUPLEX" tab INTERNATIONAL 19 January, 2015 20 January, 2015
PIPING PRODUCT IPP WAREHOUSE, ACCORDING TO "SS & ACCORDING TO "SS & TBA ACCORDING TO "SS TBA ACCORDING TO "SS As of 6/1/2015:
PO-066 16 May, 2014 FCA STAFFORDSHIRE, U.K. 20 3 October, 2014 DUPLEX" TAB DUPLEX" TAB 30 & DUPLEX" TAB & DUPLEX" TAB **Please refer to "SS & DUPLEX" tab
5239-P-009 (IPP)
B E.K SS & DUPLEX FITTINGS **Please refer to "SS & DUPLEX" tab 19 January, 2015 20 January, 2015

5239-P-009
C E.K SS & DUPLEX FLANGES **Please refer to "SS & DUPLEX" tab 19 January, 2015 20 January, 2015

04-SP-015 Basket Strainer 1

04-SP-016 Basket Strainer 1

51-SP-015 Y Strainer 1
As of 5/12/2014:
Materials will be ready by end of February, 2015.
64-SP-001 64-SP-002 Y Strainer 2
SUNGOV
5239-P-011 V.A PIPING STRAINERS ENGINEERING PO-076 30 May, 2014 EXW CHENNAI, INDIA 23 7 November, 2014 4 March, 2015 9 March, 2015 35 9 March, 2015 13 April, 2015 ### 28 December, 2014 As of 6/1/2014:
64-SP-003 64-SP-004 Y Strainer 2 updates will be provided by end of this week as manufacturer are close due to
christmas & new year holiday.
67-SP-005 Y Strainer 1

68-SP-017 68-SP-018 Y Strainer 2

64-SP-028 64-SP-029 Y Strainer 2

As of 6/1/2015
Waiting information from vendor for hose reel. Manufacturing of hose reel will take 36
5239-P-012 V.A FLEXIBLE HOSES & COUPLINGS PO-077 weeks after approval.
Discussion on the feasibility of the hose reel are still ongoing between RNZ/PCTSB and
ILK.

as of 06/1/2015
5239-P-014 V.A CORROSION COUPON & PROBES ROSE CORROSION PO-078 ### 3 EXW TELFORD, UK 14 23 December, 2014 15 February, 2015 15 February, 2015 30 20 February, 2015 22 March, 2015 26 March, 2015 26 March, 2015 Manufacturing started. Waiting for updated schedule from vendor

10" Detonatıon Flame Arrestor (64-SP-007) 1

6" Detonatıon Flame Arrestor(64-SP-004) 1 as of 6/1/2015


5239-P-016 V.A FLAME ARRESTORS ENARDO PO-075 17 June, 2014 EXW OKLAHOMA, USA 10 26 August, 2014 19 January, 2015 19 January, 2015 35 26 January, 2015 2 March, 2015 ### 28 December, 2014 Vendor started manufacturing on 2/11/2014. Estimated to be completed by 31/01/2015
4" Detonatıon Flame Arrestor (68-SP-
011,012,013 and (64-SP-017) 4

5239-P-017 GATE VALVES 95 ### 1 February, 2015 As of 6/1/2015


API 6D:
5239-P-018 GLOBE VALVES 37 ### 1 February, 2015 FAT for GATE,GLOBE,NEEDLE, SWING CHECK & PISTON LIFT CHECK VALVE are scheduled
on 12 & 13/1/2015
TEGAS KOMBINASI PO-084 9 May, 2014 EXW FRANCE 26 7 November, 2014 12 January, 2015 ### ### 6 February, 2015 25 6 February, 2015 3 March, 2015 FAT for DUAL PLATE CHECK VALVE is scheduled on 14/1/2014
5239-P-019 CHECK VALVES (include Dual Plate Check Valves) 121 ### 1 February, 2015
C.D API 6A:
5239-P-021 NEEDLE VALVES 7 ### 1 February, 2015 Waiting for GAD approval in order to start manufacturing

MANUAL BALL VALVES 630 ### 1 February, 2015 as of 6/1/2015


RMT
VALVOMECCANICA PO-058 25 April, 2014 EXW ITALY 28 7 November, 2014 26 January, 2015 ### 31 January, 2015 45 31 January, 2015 17 March, 2015 API6D valves are ready for FA which scheduled on 26/1/2015. Meanwhile, Approval on
5239-P-022 DOUBLE BLOCK BLEED VALVES 198 ### 1 February, 2015 GAD are needed in order to start production for API6A valves
As of 6/1/2015:
PRESTIGE planned delivery date is beginning of February, documents will be revise latest on
5239-P-024 E.O STAND PIPE ENGINEERING PO-152 ### 2 EXW DUBAI 12 15 January, 2015 10 February, 2014 20 February, 2014 15 20 February, 2014 7 March, 2014 20 March, 2015 25 March, 2015 9/1/2015
As of 6/1/2015
Valves will be ready by the beginning of Feb 2015.
5239-P-025 C.D BUTTERFLY VALVES TEGAS KOMBINASI PO-084 9 May, 2014 11 EXW FRANCE 26 7 November, 2014 2 February, 2015 25 2 February, 2015 27 February, 2015 ### 1 February, 2015

As of 05/12/2014
5239-P-026 O.A PIPING INSULATION 10 20 March, 2015 1 May, 2015 Waiting for pipe isometrics and MTO from ILK site team

As of 05/12/2014
5239-P-027 V.A BIRD SCREEN ### 15 January, 2015 Fabrication will be completed at site.

As of 6/1/2015:
Tag no.s : 54-SP-014 & 59-SP-014 ARMSTRONG Materials are ready to deliver. Waiting for vendor to revise GAD prior to delivery
5239-P-028 V.A AUTO DRAINER ANSI 150 ıb. 1"150# RF Type : 33-LD (VALFTEK) PO-092 11 June, 2014 2 EXW HERSTAL, BELGIUM 11 27 August, 2014 30 December, 2014 30 December, 2014 25 19 December, 2014 13 January, 2015 ### 10 April, 2015

3/4" L=133mm in ASTM A320 L7M/A194 7M 7 As of 6/1/2015


5239-P-029 V.A API 10K FLANGES NEMOCHEM PO-098 20 June, 2014 EXW NORTHERN, ITALY 8 15 August, 2014 7 November, 2014 10 November, 2014 2090 24 9 December, 2014 2 January, 2015 2 January, 2015 ### 18 December, 2014 Material arrived at site. Site team to check
1" L=171mm in ASTM A320 L7M/A194 7M 13 Same truck with fire door and window
Metallic Bellows (DN25*300mm) 3 As of 4/11/2014
5239-P-030 B.B. BELLOWS BELMAN PO-136 26 August, 2014 EXW DENMARK 6 7 October, 2014 3 October, 2014 24 October, 2014 YD-1372 14 4 November, 2014 18 November, 2014 19 November, 2014 ### 10 April, 2015 Materials has arrived at site on 19/11/2014.
Metallic Bellows (DN40*200mm) 6
As of 6/1/2015
DBB VALVE WTIH ITP has been submitted by vendor. Waiting for vendor to submit GA drawings,
5239-P-031 V.A SAMPLING PROBES ICARUS PO-162 ### EXW BELGIUM 22 27 December, 2703 27 December, 2014 27 December, 2014 25 6 April, 2015 1 May, 2015 ### 1 February, 2015 estimated readiness of the materials is the beginning of April.

Tag no: 68SP-030/31/32/33


DN 300 sch 40 DBB Valve C/W Injection 4
INJECTION QUILL WITH Notched Quill As of 6/1/2015
5239-P-032 V.A DBB VALVES Tag no : 68-SP-029 KOROSI SPECINDO PO-142 ### EXW JAKARTA 14 19 December, 2014 19 January, 2014 19 January, 2014 35 22 January, 2015 26 February, 2015 ### 1 February, 2015 Machining completed. Estimated readiness of materials by end of january.
dn 250 300 mm DBB Valve C/W Injection 1
Notched Quill

Filename: 529668845.xlsx 12 / 32 Printed at : 06/28/2021 / 09:15:35


Filename: 529668845.xlsx 13 / 32 Printed at : 06/28/2021 / 09:15:35
PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION, HOOK UP AND COMMISSIONING (EPCC)
OF GARAGOL DENIZ WEST OFFSHORE FACILITIES FOR GARAGOL DENIZ WEST OIL DEVELOPMENT PROJECT
PROJECT MATERIAL QUOTATION TRACKING TABLE-TOPSIDE
TOTAL PACKAGE : 24
PO ISSUED : 24

TOPSIDE - MECHANICAL
DELIVERY
QUANTITY LEAD TIME MANUFACTURING / PRODUCTION TRANSPORTATION / DELIVERIES ROS DATE
(WEEKS)
CONTRACTUAL
SMPR NO BUYER ITEM VENDOR PO NO PO DATE DELIVERY TERM AFTER REMARKS
DELIVERY DATE PLANNED
APPROVAL MANUFACTURING ESTIMATED FAT ESTIMATED FINAL READINESS OF TRANSPORT / ETD TO
ORDER RCVD O/S OF CRITICAL DELIVERY PERIOD ETA TURKMENBASHI ACTUAL ARRIVAL AT SITE EARLIEST LATEST
COMPLETION DATE DATE INSPECTION DATE MATERIALS TRUCK NO TURKMENBASHI
DOCUMENTS (DAYS)

As of 05/12/2014
1. New targetted completion date will be middle of February 2015 by assuming that major
documents will be approved this week.
5239-M-001 I.A NITROGEN PACKAGE CES PO-051 3 May, 2014 1 FCA HOUSTAN, TEXAS 22 4 October, 2014 30 December, 2014 4 January, 2015 60 27 February, 2015 28 April, 2015 10 May, 2015 1 June, 2015 2. FAT planned to be end of February, 2015
As of 6/1/2015:
Teleconference are scheduled on 7/1/2014, Wednesday.

As of 05/12/2014
1. New targetted completion date will be middle of February 2015 by assuming that major
documents will be approved this week.
5239-M-002 I.A AIR COMPRESSOR & DRYER PACKAGE CES PO-050 3 May, 2014 1 FCA HOUSTAN, TEXAS 22 4 October, 2014 30 December, 2014 4 January, 2015 60 27 February, 2015 28 April, 2015 9 April, 2015 14 April, 2015 2. FAT planned to be end of February, 2015

As of 6/1/2015:
Teleconference are scheduled on 7/1/2014, Wednesday.

A-6840 WAX INHIBITOR INJECTION PACKAGE 1

A-6850 CORROSSION INHIBITOR INJECTION ASCO POMPE WORKSHOP, As of 5/12/2014


CHEMICAL INJECTION PACKAGE 1
5239-M-003 I.H ASCO POMPE PO-029 REV 1 ### EXW ROZZANO (MILAN DISTRICT) / 24 14 August, 2014 30 December, 2014 30 December, 2014 45 2 March, 2015 16 April, 2015 25 February, 2015 13 April, 2015 Once getting approval of documents, Estimated readiness of the materials are early March,
PACKAGE
ITALY 2015
A-6860 SCALE INHIBITOR INJECTION 1
PACKAGE
P-6892 A/B MEG INJECTION PUMPS 1
As of 5/12/2014
5239-M-004 NITROGEN RECEIVER (V-5901) 1 20 September, 2014 14 October, 2014 11 March, 2015 1 June, 2015 Nitrogen Receiver and Air receiver is ready to deliver. Waiting from paint supplier for warranty
letter.
Estimated readiness of the Test Seperator is first week of January 2015.
5239-M-005 INSTRUMENT/UTILITY AIR RECEVER (V-5401) 1 20 September, 2014 14 October, 2014 9 April, 2015 14 April, 2015
FERROFAB FACILITY, as of 6/1/2015:
E.Ö. PRESSURE VESSEL FERROFAB FZE PO-039 3 April, 2014 EXW 12 26 June, 2014 30 October, 2014 20 13 January, 2015 2 February, 2015 for CDD, still in discussion regarding the clashing of cleats between RNZ/PCTSB/ILK
CLOSED DRAIN DRUM (KO DRUM) WITH DUBAI/U.A.E
5239-M-013 1 20 September, 2014 14 October, 2014 22 January, 2015 15 April, 2015
BOOT (V-6401)

5239-M-018 TEST SEPERATOR (V-0400) 1 4 October, 2014 14 October, 2014 14 November, 2014 1 December, 2014

As of 6/1/2015
Construction and assembly are 98% completed as of 31/12/2014.
5239-M-008 D.A PEDESTAL CRANE MEPEL PO-006 ### 1 FCA VERONA, ITALY 42 9 October, 2014 19 January, 2014 19 January, 2014 20 January, 2015 45 31 January, 2015 17 March, 2015 25 April, 2015 20 May, 2015 NOI FAT will be issue to PCTSB asap. Estimated readiness of the materials is end of January
2015

RAW DIESEL FILTER 1 As of 6/1/2015


AEE FACTORY, JEBEL ALI The vessels are now ready for dispatch and the only concern is on the approval of painting
5239-M-009 S.E FILTERS ANGLO EASTERN PO-025 ### FCA 8 22 April, 2014 5 November, 2014 9 November, 2014 6 January, 2015 20 19 January, 2015 8 February, 2015 21 January, 2015 20 March, 2015 procedure. Client approved documents or written consent from your good-selves is required
,DUBAI/U.A.E for vendor to complete their QC procedures for the dispatch of vessels.
TREATED DIESEL FILTER 1

as of 4/11/2014
The current estimated ship date is March 24th 2015. The driving factor for the delay is the fact
that vendor could not purchase the baseplate as their General Arrangement Drawings were
CLOSED DRAIN DRUM BOOSTER PUMP CPC PUMP 2 rejected until early last month
5239-M-010 A INTERNATIONAL PO-046 8 April, 2014 EXW CPC FACTORY, CANADA 32 18 November, 2014 14 March, 2015 24 March, 2015 55 24 March, 2015 18 May, 2015 22 January, 2015 15 April, 2015 As of 5/12/2014
The current delivery time is 24/03/2015 as planned.
I.A CENTRIFUGAL PUMPS

DIESEL TRANSFER PUMP 2

BC As of 6/1/2015:
5239-M-010 B POTABLE WATER PUMP / ISO PUMP PO-103 22 July, 2014 1 EXW GERMANY 23 30 December, 2014 16 December, 2014 19 December, 2014 26 December, 2014 35 31 January, 2015 7 March, 2015 17 February, 2015 18 March, 2015 Teleconference will take place on 7/1/2015
PETROCHEMICAL

FLARE/CLOSED DRAIN DRUM TRANSFER


PUMP (P-6402 A/B) 2

PESCHIERA BORROMEO, As of 6/1/12015:


5239-M-012 I.A RECIPROCATINGPUMP SEKO PO-047 9 April, 2014 EXW 27 15 October, 2014 2 December, 2014 9 December, 2014 9 December, 2014 2 December, 2014 35 31 January, 2015 7 March, 2015 22 January, 2015 15 April, 2015
MILAN / ITALY FAT done on 9 - 12/12/2014. waiting for documents to be approve prior to delivery.
WELLHEAD EQUALIZATION PUMPS (P-6893
A/B) 2

PIPELINE As of 6/1/2015
5239-M-015 I.H PIG LAUNCHER & RECEIVER (L-2900) PRECISION PO-021 ### 1 EXW CLEVELAND, UK 18 24 June, 2014 20 October, 2014 31 October, 2014 31 October, 2014 19 December, 2014 35 20 January, 2015 24 February, 2015 30 June, 2015 30 June, 2015 Inspection was done on 31/10/2014 Painting are done.
ENGINEERING Delivery arrangement is in progress.

FLARE TIP PACKAGE (A-6201) 1


As of 5/12/2014
5239-M-016 I.A FLARE TIP SAMIA PO-049 14 April, 2014 EXW MILANO, ITALY 16 4 August, 2014 16 January, 2015 16 January, 2015 16 January, 2015 23 January, 2015 35 23 January, 2015 27 February, 2015 25 February, 2015 1 June, 2015 FAT estimated to be perform on 16/1/2015. ETD to Turkmenbashi 23/01/2015, ETA
FLARE IGNITION PACKAGE & CONTROL Turkmenbashi on 27/2/2015
1
PANEL (A-6202 / LP-4202)

GAS SCRUBBER (V-6001) 1

As of 05/12/2014
30.1.2015-
5239-M-020 S.E FUEL GAS PACKAGES FILTER COALESCER (S-6001 A/B) SEDIA TEGUH PO-035 4 April, 2014 2 FCA MALAYSIA 24 ### 7 January, 2014 5 February, 2015 45 10 February, 2015 27 March, 2015 27 March, 2015 20 May, 2015 FAT is planned on from 30/01/2015 to 03/02/2015. Estimated readiness of the materials is
03.02.2015 5/02/2015

SUPER HEATER (E-6001 A/B) 2

5239-M-021 20 Kw DECANTING OIL TANK HEATER (E- 1


6403)

5239-M-022 30 kW FLARE/CLOSED DRAIN DRUM HEATER 1


(E-6401)
MASTERWATT FACTORY, As of 27/12/2014
E.O ELECTRICAL HEATERS MASTERWATT PO-048 8 April, 2014 EXW 10 17 June, 2014 30 November, 2014 21 November, 2014 21 November, 2014 26 December, 2014 2115 15 26 December, 2014 10 January, 2015 25 February, 2015 18 March, 2015 Material just been transffered from YD-1434 to 2115. ETD 26/12/2014 and ETA Turkmenbashi
PIANEZZA / ITALY 10/1/2014
5239-M-023 30 kW TEST SEPERATOR(E-0400) 1

35kW FRESH WATER STORAGE TANK (E-


5239-M-024 2
5101/S)

As of 5/12/2014
5239-M-017 I.A HVAC UNIT NEMOCHEM PO-105 22 July, 2014 1 EXW FACTORY,UK 16 11 November, 2014 23 January, 2015 12 February, 2015 12 February, 2015 19 February, 2015 45 19 February, 2015 5 April, 2015 13 March, 2015 1 April, 2015 FAT estimated to be perform on 12/02/2015. ETD to Turkmenbashi 19/2/2015, ETA
Turkmenbashi on 05/04/2015

as of 05/12/2014
Documents have been transmitted to RNZ on 1/11/2014 with GDDP-ILK-RNZ-VDR-591.
5239-MB-001 V.A MATERIAL HANDLING EQUIPMENTS MS TIME PO-148 ### CFR ISTANBUL 18 18 February, 2015 18 March, 2015 12 18 March, 2015 30 March, 2015 1 June, 2015 1 June, 2015

5239-M-014 B,BSRN MEG STORAGE TANK ECLIPSE PO-GH-014 27 August, 2014 3 25 October, 2014 31 October, 2014 As of 6/1/2015
Material has been purchased based on MTO given by vendor. Design documents are
commented by RNZ, vendor to revise and resubmit
Filename: 529668845.xlsx 14 / 32 Printed at : 06/28/2021 / 09:15:35
As of 6/1/2015
Material has been purchased based on MTO given by vendor. Design documents are
commented by RNZ, vendor to revise and resubmit

5239-M-019 B,BSRN OPEN DRAIN DECANTING TANK ECLIPSE PO-GH-014 27 August, 2014 1 25 October, 2014 1 January, 2015

As of 05/12/2014
Materials are ready, FAT date is planned on 3-4/12/2014.

Filename: 529668845.xlsx 15 / 32 Printed at : 06/28/2021 / 09:15:35


PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION, HOOK UP AND COMMISSIONING (EPCC)
OF GARAGOL DENIZ WEST OFFSHORE FACILITIES FOR GARAGOL DENIZ WEST OIL DEVELOPMENT PROJECT
PROJECT MATERIAL QUOTATION TRACKING TABLE-TOPSIDE

TOPSIDE - ARCHITECTURAL DELIVERY


QUANTITY LEAD TIME VDI/VDR (CRITICAL DOCUMENTS) MANUFACTURING / PRODUCTION TRANSPORTATION / DELIVERIES ROS DATE
(WEEKS)
CONTRACTUAL
SMPR NO BUYER ITEM VENDOR PO NO PO DATE DELIVERY TERM AFTER ESTIMATED REMARKS
DELIVERY DATE SUBMISSION DATE PLANNED
APPROVAL SUBMISSION DATE APPROVAL DATE MANUFACTURING ESTIMATED FAT FINAL READINESS OF TRANSPORT / ETD TO ACTUAL ARRIVAL AT
ORDER RCVD O/S OF CRITICAL FROM RNZ TO DELIVERY PERIOD ETA TURKMENBASHI EARLIEST LATEST
FROM ILK TO RNZ FROM PCTSB COMPLETION DATE DATE INSPECTION MATERIALS TRUCK NO TURKMENBASHI SITE
DOCUMENTS PCTSB (DAYS)
DATE

5239-A-004 O.A PREFABRICATED Prefabricated Bathroom with Shower ENSAR GEMI PO-163 17 November, 2014 2 6 May, 2015 ### As of 6/1/2015:
BATHROOM update will be given later

SEWAGE WATER As of 6/1/2015:


O.A TREATMENT Beta Mühendisilik PO-144 17 November, 2014 6 May, 2015 ### update will be given later

Filename: 529668845.xlsx 16 / 32 Printed at : 06/28/2021 / 09:15:35


PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION, HOOK UP AND COMMISSIONING (EPCC)
OF GARAGOL DENIZ WEST OFFSHORE FACILITIES FOR GARAGOL DENIZ WEST OIL DEVELOPMENT PROJECT
PROJECT MATERIAL QUOTATION TRACKING TABLE-TOPSIDE
TOTAL PACKAGE : 2

TOPSIDE - SAFETY
Code 1 : Approved
PO ISSUED : 2 Code 2 : Approved with comments
Code 3 : Rejected
Code 4 : for info only

Green = documents approved / for info


Red = Pending from RNZ/VENDOR
Blue = Pending from PCTSB

DELIVERY
QUANTITY LEAD TIME MANUFACTURING / PRODUCTION TRANSPORTATION / DELIVERIES ROS DATE
(WEEKS)
CONTRACTUAL
SMPR NO BUYER ITEM VENDOR PO NO PO DATE DELIVERY TERM AFTER ESTIMATED REMARKS
DELIVERY DATE PLANNED ACTUAL
APPROVAL MANUFACTURING ESTIMATED FAT FINAL READINESS OF TRANSPORT / ETD TO ETA
ORDER RCVD O/S OF CRITICAL DELIVERY PERIOD ARRIVAL AT EARLIEST LATEST
COMPLETION DATE DATE INSPECTION MATERIALS TRUCK NO TURKMENBASHI TURKMENBASHI
DOCUMENTS (DAYS) SITE
DATE

As of 28/11/2014
5239-SF-001 S.E SAFETY SIGN METARIALS SOLAS MARINE PO-087 27 May, 2014 141 FCA DUBAI 2 10 June, 2014 ### - - 26 December, 2014 12 26 December, 2014 7 January, 2015 ### 25 May, 2015 Documents which has been submitted to RNZ on 01/10/2014 and 09/09/2014 are
waiting for RNZ to approval. Vendor is waiting for approval to complete production.

8 persons life - saft 2

Search and Rescue Radar Transponder 3

Emergency Multi-Channel Radio-Telephone 3

Emergency Position Indıcation Radio Beacon 3

Life jacket with light and whistle 16

Life jacket cabinet 2

2,5 kg life buoy 3

2,5 kg life buoy (with 30mt bouyant line) 9

2,5 kg life buoy (with water activating light) 6

4 kg life buoy 4

Immersion suit cabinet 2

Immersion suit 16

Work Life Vest 8

Work Life Vest Cabinet 1


Self Contained / portable type - safety 1
shover
Self Contained / portable type - eyewash 2
with heater
First Aid Kit 1

Collapsible Stretcher 2

Rope Ladder 2

9 kg DCP portable fire extinguisher 9

5 kg CO2 portable fire extinguisher 4

9 lt foam portable fire extinguisher 7

10 kg CO2 wheeled fire extinguisher 1

Fire Water Manitor 3

Fire blanket 1

Safety Equipment Cabinet 3

water proof torch 24

Gloves with heater 24

Emergency escape breathing device-EEBD 24 As of 06/12/2014


5239-SF-002 S.E SAFETY EQUIPMENT ALTANLAR PO-086 21 May, 2014 DDP ILK CONSTRUCTION 4 18 June, 2014 30 October, 2014 30 November, 2014 45 23 January, 2015 9 March, 2015 ### 25 May, 2015
Manufacturing has started for B-commented dwg.s.
Fire fighting equipment cabinet 1 For the commented dwg.s, ALTANLAR has sent their reply to RNZ today (06.12.2014).

Fireman outfit SET 2

Breathing aparatuse & air cylinder 2

Spare air cylinder 2

Fireman axe 2

Aluminized safety belt 2

Life Line 2

Ex - proof torch 2

Electrical safety kit cabinet 1


Rubber insulating gloves, protectors and 1
sleeves
Dielectrik footwear 1

Insulating blankets and eccessories 1

Switch board matting 4


Hot stick, Static discharge stick, Rescue 1
hooks
Isolated face shield and goggles 1

Lockout / tagout bax 2

Portable warning notice 1

Voltage dedectors 1

Dededctors - ampermetre 1

Insulating platform 1

Cable cutter with insulated handles 1

Talcum powder can 1

Arc flash suit 1

Safety Glasses 1

Filename: 529668845.xlsx 17 / 32 Printed at : 06/28/2021 / 09:15:35


As of 06/12/2014
5239-SF-002 S.E SAFETY EQUIPMENT ALTANLAR PO-086 21 May, 2014 DDP ILK CONSTRUCTION 4 18 June, 2014 30 October, 2014 30 November, 2014 45 23 January, 2015 9 March, 2015 ### 25 May, 2015 Manufacturing has started for B-commented dwg.s.
For the commented dwg.s, ALTANLAR has sent their reply to RNZ today (06.12.2014).

Helmet Electrically insulated 1

ınsulating boots 1

ınsulated rubber matts 1


Portable fire extinguisher cabinet (45 x 23 x
70) 7
Portable fire extinguisher cabinet (22 x 22 x 3
70)

As of 05/12/2014
5239-SF-002 S.E SAFETY EQUIPMENT Evacuation Chute SURVITEC GROUP PO-088 29 May, 2014 2 EXW USA 20 16 October, 2014 31 October, 2014 15 November, 2014 60 11 December, 2014 9 February, 2015 ### 25 May, 2015 Materials are in delivery progress, Estimated time of delivery 11/12/2014. ETA
9/02/2015

Filename: 529668845.xlsx 18 / 32 Printed at : 06/28/2021 / 09:15:35


PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION, HOOK UP AND COMMISSIONING (EPCC)
OF GARAGOL DENIZ WEST OFFSHORE FACILITIES FOR GARAGOL DENIZ WEST OIL DEVELOPMENT PROJECT
PROJECT MATERIAL QUOTATION TRACKING TABLE-TOPSIDE
TOTAL PACKAGE : 2
PO ISSUED : 2

TOPSIDE - TELECOM
DELIVERY
QUANTITY LEAD TIME MANUFACTURING / PRODUCTION TRANSPORTATION / DELIVERIES ROS DATE
(WEEKS)
CONTRACTUAL
SMPR NO BUYER ITEM VENDOR PO NO PO DATE DELIVERY TERM AFTER REMARKS
DELIVERY DATE PLANNED ACTUAL
APPROVAL MANUFACTURING ESTIMATED FAT ESTIMATED FINAL READINESS OF TRANSPORT /
ORDER RCVD O/S OF CRITICAL DELIVERY PERIOD ETD TO TURKMENBASHI ETA TURKMENBASHI ARRIVAL AT EARLIEST LATEST
COMPLETION DATE DATE INSPECTION DATE MATERIALS TRUCK NO
DOCUMENTS (DAYS) SITE
As of 06/12/2014:
VHF FM MARINE RADIO SYSTEM 1 SYSTEM FAT has been done on25-26/11/2014.

as of 6/1/2015:
UHF FM RADIO SYSTEM 1 SYSTEM Next week (14/1/2015) is scheduled for dismantling, packing and shipping.
Email that was sent to PCTSB on 18/12/2014 still don’t have any reply.
CCTV SYSTEM 1 SYSTEM

TELEPHONE SYSTEM 1 SYSTEM

RACON SYSTEM 1 SYSTEM

SELSMIC DETECTION SYSTEM 1 SYSTEM


RSL (RADIO PO-032 & 032
5239-T-001 D.A TELECOM PACKAGES 7 April, 2014 FCA ALDERMASTON 14 14 July, 2014 31 October, 2014 4 November, 2014 4 November, 2014 7 November, 2014 35 20 January, 2015 24 February, 2015 1 May, 2015 1 June, 2015
SYSTEM LTD) ADDITIONAL
TELECOMMUNICATIONS CABINET SYSTEM 1 SYSTEM

CRANE RADIO AND CCTV SYSTEM 1

LAN SYSTEM 1

OTN Transmission Equipment 2

Management 1
As of 4/11/2014
FIBRE OPTIC CABLE 22.10.2014 - 22.10.2014 - 1. FAT is done on 22/10/2014 to 29/10/2014
5239-TB-001 F.G PL4C PO-082 16 May, 2014 FOB SHANGHAI, CHINA 10 25 July, 2014 21 October, 2014 25 December, 2014 55 9 March, 2015 3 May, 2015 1 May, 2015 1 June, 2015 2. One big Drum for Fiber Optic Cable will be shipped through the Don-Volga Canal next
AND EQUIPMENT Fiber Optic Cable 1 29.10.2014 29.10.2014
year

Termination Accessories 1

Filename: 529668845.xlsx 19 / 32 Printed at : 06/28/2021 / 09:15:35


PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION, HOOK UP AND COMMISSIONING (EPCC)
OF GARAGOL DENIZ WEST OFFSHORE FACILITIES FOR GARAGOL DENIZ WEST OIL DEVELOPMENT PROJECT
PROJECT MATERIAL QUOTATION TRACKING TABLE-TOPSIDE
TOTAL PACKAGE : 2
PO ISSUED : 1
PENDING PO : 1 (LOCKOUT & TAG OUT -LOTO)
TOPSIDE - MISCELLANEOUS
DELIVERY
QUANTITY LEAD TIME MANUFACTURING / PRODUCTION TRANSPORTATION / DELIVERIES ROS DATE
(WEEKS)
CONTRACTUAL
SMPR NO BUYER ITEM VENDOR PO NO PO DATE DELIVERY TERM AFTER ESTIMATED REMARKS
DELIVERY DATE PLANNED ACTUAL
APPROVAL MANUFACTURING ESTIMATED FAT FINAL READINESS OF TRANSPORT / ETD TO
ORDER RCVD O/S OF CRITICAL DELIVERY PERIOD ETA TURKMENBASHI ARRIVAL AT EARLIEST LATEST
COMPLETION DATE DATE INSPECTION MATERIALS TRUCK NO TURKMENBASHI
DOCUMENTS (DAYS) SITE
DATE

5239T-Mısc- As of 6/1/2015:
001 E.I LOCKOUT AND TAG OUT (LOTO EQUIPMENT) BRADY PO-158 1 November, 2014 15 31 January, 2015 15 February, 2015 Estimated readiness of materials is 31/1/2015

Filename: 529668845.xlsx 20 / 32 Printed at : 06/28/2021 / 09:15:35


ITEM QTY CUSTDEL
1.1 96 27/11/2014
2.1 6 27/11/2014
3.1 348 27/11/2014
4.1 6 27/11/2014
5.1 6 27/11/2014
6.1 6 27/11/2014
7.1 6 27/11/2014
8.1 108 27/11/2014
9.1 384 27/11/2014
10.1 24 27/11/2014
11.1 876 27/11/2014
12.1 156 27/11/2014
13.1 36 27/11/2014
14.1 6 27/11/2014
15.1 96 27/11/2014
16.1 72 27/11/2014
17.1 28 27/11/2014
150 27/11/2014
150 27/11/2014
320 27/11/2014
18.1 168 27/11/2014
19.1 90 27/11/2014
90 27/11/2014
180 27/11/2014
20.1 6 27/11/2014
22.1 54 27/11/2014
23.1 42 27/11/2014
25.1 6 27/11/2014
26.1 30 27/11/2014
27.1 6 27/11/2014
28.1 6 27/11/2014
29.1 6 27/11/2014

ITEM QTY CUSTDEL


001.2 8 27/11/2014
002.2 3 27/11/2014
003.2 8 27/11/2014
004.2 4 27/11/2014
005.2 125 27/11/2014
006.2 110 27/11/2014
008.2 2 27/11/2014
010.2 3 27/11/2014
011.2 2 27/11/2014
012.2 3 27/11/2014
013.2 13 27/11/2014
014.2 2 27/11/2014
015.2 4 27/11/2014
016.2 7 27/11/2014
017.2 24 27/11/2014
018.2 4 27/11/2014
019.2 5 27/11/2014
020.2 2 27/11/2014
021.2 7 27/11/2014
022.2 3 27/11/2014
023.2 4 27/11/2014
024.2 7 27/11/2014
025.2 6 27/11/2014
026.2 18 27/11/2014
027.2 9 27/11/2014
028.2 8 27/11/2014
029.2 4 27/11/2014
030.2 5 27/11/2014
031.2 2 27/11/2014
032.2 6 27/11/2014
033.2 24 27/11/2014
034.2 50 27/11/2014
035.2 16 27/11/2014
036.2 7 27/11/2014
037 8 27/11/2014
038 9 27/11/2014
039 28 27/11/2014
040 160 27/11/2014
041 18 27/11/2014
042 450 27/11/2014
043 96 27/11/2014
044 22 27/11/2014
045 3 27/11/2014
046 50 27/11/2014
047 6 27/11/2014
048 84 27/11/2014
049 220 27/11/2014
050 3 27/11/2014
051 4 27/11/2014
052 5 27/11/2014
053 20 27/11/2014
054 7 27/11/2014
055 7 27/11/2014
056 4 27/11/2014
059 3 27/11/2014
060 2 27/11/2014
061 2 27/11/2014
062 9 27/11/2014
063 4 27/11/2014
064 55 27/11/2014
065 11 27/11/2014
066 2 27/11/2014
067 7 27/11/2014
068 6 27/11/2014
069 15 27/11/2014
070 20 27/11/2014
071 3 27/11/2014
072 3 27/11/2014
073 34 27/11/2014
074 2 27/11/2014
075 17 27/11/2014
076 12 27/11/2014
077 2 27/11/2014
079 15 27/11/2014
080 2 27/11/2014
081 2 27/11/2014
082 20 27/11/2014
083 100 27/11/2014
100 27/11/2014
130 27/11/2014
084 4 27/11/2014
085 17 27/11/2014
086 17 27/11/2014
087 16 27/11/2014
088 24 27/11/2014
089 15 27/11/2014
090 100 27/11/2014
100 27/11/2014
70 27/11/2014
091 10 27/11/2014
092 2 27/11/2014
093 164 27/11/2014
094 254 27/11/2014
095 66 27/11/2014
096 3 27/11/2014
097 2 27/11/2014
098 10 27/11/2014
099 7 27/11/2014
100 7 27/11/2014
101 18 27/11/2014
102 2 27/11/2014
103 3 27/11/2014
104 4 27/11/2014
105 4 27/11/2014
106 15 27/11/2014
107 14 27/11/2014

ITEM QUANTIT CUSTDEL


001 2 27/11/2014
002 20 27/11/2014
003 2 27/11/2014
004 2 27/11/2014
005 2 27/11/2014
007 72 27/11/2014
008 16 27/11/2014
009 25 27/11/2014
010 7 27/11/2014
011 2 27/11/2014
012 2 27/11/2014
013 20 27/11/2014
014 3 27/11/2014
015 76 27/11/2014
016 11 27/11/2014
017 170 27/11/2014
018 65 27/11/2014
019 8 27/11/2014
020 7 27/11/2014
021 26 27/11/2014
022 13 27/11/2014
023 14 27/11/2014
024 20 27/11/2014
025 6 27/11/2014
026 40 27/11/2014
027 3 27/11/2014
028 7 27/11/2014
029 3 27/11/2014
030 10 27/11/2014
031 11 27/11/2014
032 15 27/11/2014
033 3 27/11/2014
034 3 27/11/2014
035 3 27/11/2014
DESCRIPTION
2" PIPE SEAMLESS ASME B36.10 BE 14.00MM THK ASTM A312 TP 316L
3" PIPE SEAMLESS ASME B36.10 BE 20.00MM THK ASTM A312 TP 316L
1" PIPE SEAMLESS ASME B36.10 PE SCH XXS ASTM A312 TP 316L
2" PIPE SEAMLESS ASME B36.19 BE SCH 10S ASTM A312 TP 316L
3" PIPE SEAMLESS ASME B36.19 BE SCH 10S ASTM A312 TP 316L
4" PIPE SEAMLESS ASME B36.19 BE SCH 10S ASTM A312 TP 316L
6" PIPE SEAMLESS ASME B36.19 BE SCH 10S ASTM A312 TP 316L
8" PIPE SEAMLESS ASME B36.19 BE SCH10S ASTM A312 TP 316L
1" PIPE SEAMLESS ASME B36.19 PE SCH 10S ASTM A312 TP 316L
1 1/2" PIPE SEAMLESS ASME B36.19 PE SCH10S ASTM A312 TP 316L
2" PIPE SEAMLESS ASME B36.19 PE SCH 10S ASTM A312 TP 316L
3" PIPE SEAMLESS ASME B36.19 PE SCH 10S ASTM A312 TP 316L
4" PIPE SEAMLESS ASME B36.19 PE SCH 10S ASTM A312 TP 316L
1/2" PIPE SEAMLESS ASME B36.19 PE SCH 40S ASTM A312 TP 316L
3/4" PIPE SEAMLESS ASME B36.19 PE SCH 40S ASTM A312 TP 316L
3" PIPE SEAMLESS ASME B36.10 BE SCH 160S ASTM A790 UNS S31803
6" PIPE SEAMLESS ASME B36.10 BE SCH 160S ASTM A790 UNS S31803
6" PIPE SEAMLESS ASME B36.10 BE SCH 160S ASTM A790 UNS S31803
6" PIPE SEAMLESS ASME B36.10 BE SCH 160S ASTM A790 UNS S31803
6" PIPE SEAMLESS ASME B36.10 BE SCH 160S ASTM A790 UNS S31803
1" PIPE SEAMLESS ASME B36.10 PE SCH 80S ASTM A790 UNS S31803
2" PIPE SEAMLESS ASME B36.10 PE SCH 160S ASTM A790 UNS S31803
2" PIPE SEAMLESS ASME B36.10 PE SCH 160S ASTM A790 UNS S31803
2" PIPE SEAMLESS ASME B36.10 PE SCH 160S ASTM A790 UNS S31803
2" PIPE SEAMLESS ASME B36.19 PE SCH 10S ASTM A790 UNS S31803
10" PIPE WELDED ASME B36.10 BE 30.00MM THK ASTM A928 CL1 UNS S31803
12" PIPE WELDED ASME B36.10 BE 35.00MM THK ASTM A928 CL1 UNS S31803
4" PIPE SEAMLESS ASME B36.10 BE S160 ASTM A790 UNS S31803
1" PIPE SEAMLESS ASME B36.19 PE S10S ASTM A790 UNS S31803
6" PIPE SEAMLESS ASME B36.19 BE S120 ASTM A790 UNS S31803
10" PIPE SAWL ASME B36.10 BE S100 ASTM A928 CL1 UNS S31803
12" PIPE WELDED ASME B36.10 BE SCH20 ASTM A928 CL1 UNS S31803

DESCRIPTION
10" X 2" BONNEY SWEETPOLET 30.00MM THK X SCH 160 ASTM A182 F51
10" X 3" BONNEY SWEEPOLET 30.00MM THK X SCH 160 ASTM A182 F51
12" X 2" BONNEY SWEEPOLET 35.00MM THK X SCH 160 ASTM A182 F 51
12" X 3" BONNEY SWEEPOLET 35.00MM THK X SCH 160 ASTM A182 F51
6" X 2" BONNEY SWEEPOLET SCH 160 X 160 ASTM A182 F51
6" X 1" BONNEY SWEEPOLET SCH 160 X 80S ASTM A182 F51
6" X 2" WELDOLET SCH 160 X 160 ASTM A182 F51
3" X 1" BONNEY SWEEPOLET 20.00MM THK X SCH XXS ASTM A182 F316
4" X 3/4" BRANCH FITTING OUTLET PLAIN END SCH 10S X 40S ASTM A182 F316
6" X 3/4" BRANCH FITTING OUTLET PLAIN END SCH 10S X 40S ASTM A182 F316
2" X 3/4" BRANCH FITTING OUTLET PLAIN END SCH 10 X 40S ASTM A182 F316
3" X 1/2" BRANCH FITTING OUTLET PLAIN END SCH 10S X 40S ASTM A182 F316
8" X 3/4" FLANGOLET 150MM ASME B16.5 150# RF SCH 10SXS/40S ASTM A182 F31
2" X 1/2" FLANGOLET 150MM ASME B16.5 150# RF SCH 10SXS/40S ASTM A182 F31
2" X 3/4" FLANGOLET 150MM ASME B16.5 150# RF SCH 10SXS/40S ASTM A182 F 3
3" X 3/4" FLANGOLET 150MM ASME B16.5 150# RF SCH10SXS/40S ASTM A182 F31
3" X 3/4" FLANGOLET 150MM ASME B16.5 150# RF SCH 10SXS/40S ASTM A182 F31
4" X 3/4" FLANGOLET 150MM ASME B16.5 300# RF SCH 10SXS/40S ASTM A182 F31
2" X 1/2" FLANGOLET 150MM ASME B16.5 300# RF SCH 10SXS/40S ASTM A182 F31
2" X 3/4" FLANGOLET 150MM ASME B16.5 300# RF SCH 10SXS/40S ASTM A182 F31
8" X 2" WELDOLET MSS SP97 BW SCH 10SXS/10S ASTM A182 F316
8" X 3" WELDOLET MSS SP97 BW SCH 10SXS/10S ASTM A182 F316
2" X 3/4" BLEED RING 150# RF WITH DN 20 FLANGOLET SCH 40S ASTM A240 TP31
3" X 3/4" BLEED RING 150# RF WITH DN 20 FLANGOLET SCH 40S ASTM A240 TP31
2" SPECTACLE BLIND 150# RF STD.DWG.NO.S38.011 ASTM A240 TP316
2" SPECTACLE BLIND 150# RF STD.DWG.NO.S38.011 ASTM A240 TP316
3" SPECTACLE BLIND 150# RF.STD.DWG.NO.S38.011 ASTM A240 TP316
8" SPECTACLE BLIND 150# RF STD.DWG.NO.S38.011 ASTM A240 TP316
8" CAP STANDARD ASME B16.9 BW SCH 10S ASTM A403 WP316L
2" ELBOW 45 DEG LR ASME B16.9 BW 14.00MM THK ASTM A403 WP316L
1" ELBOW 45 DEG LR ASME B16.9 BW SCH 10S ASTM A403 WP316L
2" ELBOW 45 DEG LR ASME B16.9 BW SCH 10S ASTM A403 WP316L
3" ELBOW 45 DEG LR ASME B16.9 BW SCH 10S ASTM A403 WP316L
4" ELBOW 45 DEG LR ASME B16.9 BW SCH 10S ASTM A403 WP316L
8" ELBOW 45 DEG LR ASME B16.9 BW SCH10S ASTM A403 WP316L
3/4" ELBOW 45 DEG LR ASME B16.9 BW SCH 40S ASTM A403 WP316L
2" ELBOW 90 DEG LR ASME B16.9 BW 140.00MM THK ASTM A403 WP316L
1" ELBOW 90 DEG LR ASME B16.9 BW SCH 10S ASTM A403 WP316L
1 1/2" ELBOW 90 DEG LR ASME B16.9 BW SCH 10S ASTM A403 WP316L
2" ELBOW 90 DEG LR ASME B16.9 BW SCH 10S ASTM A403 WP316L
3" ELBOW 90 DEG LR ASME B16.9 BW SCH10S ASTM A403 WP316L
4" ELBOW 90 DEG LR ASME B16.9 BW SCH 10S ASTM A403 WP316L
6" ELBOW 90 DEG LR ASME B16.9 BW SCH 10S ASTM A403 WP316L
8" ELBOW 90 DEG LR ASME B16.9 BW SCH 10S ASTM A403 WP316L
1/2" ELBOW 90 DEG LR ASME B16.9 BW SCH 40S ASTM A403 WP316L
3/4" ELBOW 90 DEG LR ASME B16.9 BW SCH 40S ASTM A403 WP316L
1" ELBOW 90 DEG LR ASME B16.9 BW SCH XXS ASTM A403 WP316L
2" X 1" REDUCER CONC ASME B16.9 BW 14.00MM THK X SCH XXS ASTM A403 WP
4" X 2" REDUCER CONC ASME B16.9 BW SCH 10SXS /10S ASTM A403 WP316L
1 1/2" X 1" REDUCER CONC ASME B16.9 BW SCH 10SXS /10S ASTM A403 WP316L
2" X 1" REDUCER CONC ASME B16.9 BW SCH 10SXS /10S ASTM A403 WP316L
2" X 1 1/2" REDUCER CONC ASME B16.9 BW SCH 10SXS /10S ASTM A403 WP316L
3" X 2" REDUCER CONC ASME B16.9 BW SCH 10SXS /10S ASTM A403 WP316L
1" X 1/2" REDUCER CONC ASME B16.9 BW SCH 10SXS /40S ASTM A403 WP316L
4" X 2" REDUCER ECC ASME B16.9 BW SCH 10SXS /10S ASTM A403 WP316L
4" X 3" REDUCER ECC ASME B16.9 BW SCH 10SXS /10S ASTM A403 WP316L
2" X 1 1/2" REDUCER ECC ASME B16.9 BW SCH 10SXS /10S ASTM A403 WP316L
2" TEE EQUAL ASME B16.9 BW 14.00MM THK X 14.00MM THK ASTM A403 WP316L
1" TEE EQUAL ASME B16.9 BW SCH10SXS/10S ASTM A403 WP316L
2" TEE EQUAL ASME B16.9 BW SCH 10SXS/10S ASTM A403 WP316L
3" TEE EQUAL ASME B16.9 BW SCH 10SXS/10S ASTM A403 WP316L
3" TEE EQUAL ASME B16.9 BW SCH10SXS/10S
8" TEE EQUAL ASME B16.9 BW SCH 10SXS/10S ASTM A403 WP316L
3/4" TEE EQUAL ASME B16.9 BW SCH 40SXS/40S ASTM A403 WP316L
1" TEE EQUAL ASME B16.9 BW SCH XXS x XXS ASTM A403 WP316L
2"X 1" TEE REDUCING ASME B16.9 BW 14.00MM THK x XS - XXS ASTM A403 WP31
4"X 2" TEE REDUCING ASME B16.9 BW SCH 10SXS/10S ASTM A403 WP316L
8"X 6" TEE REDUCING ASME B16.9 BW SCH 10SXS/10S ASTM A403 WP316L
2" X 1" TEE REDUCING ASME B16.9 BW SCH 10SXS/10S ASTM A403 WP316L
2" X 1 1/2" TEE REDUCING ASME B16.9 BW SCH 10SXS/10S ASTM A403 WP316L
3" X 2" TEE REDUCING ASME B16.9 BW SCH 10SXS/10S ASTM A403 WP316L
1" X 3/4" TEE REDUCING ASME B16.9 BW SCH 10SXS/40S ASTM A403 WP316L
2" ELBOW 90 DEG LR ASME B16.9 BW SCH 10S ASTM A815 WPS UNS S31803
6" X 4" REDUCER CONC ASME B16.9 BW SCH 160 X 160 ASTM A815 WPS UNS S31
10" TEE EQUAL ASME B16.9 BW 30.00MM X 30.00MM THK ASTM A815 WPS UNS S3
12" TEE EQUAL ASME B16.9 BW 35.00MM THK X 35.00MM THK ASTM A815 WPS UN
2" TEE EQUAL ASME B16.9 BW SCH 160 X 160 ASTM A815 WPS UNS S31803
6" TEE EQUAL ASME B16.9 BW SCH 160 X 160 ASTM A815 WPS UNS S31803
6" TEE EQUAL ASME B16.9 BW SCH 160 X 160 ASTM A815 WPS UNS S31803
6" TEE EQUAL ASME B16.9 BW SCH 160 X 160 ASTM A815 WPS UNS S31803
2" X 3/4" TEE REDUCING ASME B16.9 BW 14.00MM THK X SCH XXS ASTM A815 W
10" X 6" TEE REDUCING ASME B16.9 BW 30.00MM THK X SCH160 ASTM A815 WPS
12" X 6" TEE REDUCING ASME B16.9 BW 35.00MM THK X SCH160 ASTM A815 WPS
6" X 3" TEE REDUCING ASME B16.9 BW SCH 160 X 160 ASTM A815 WPS UNS S318
2" X 3/4" TEE REDUCING BW ASME B16.9 SCH 160 X 80S ASTM A815 WPS UNS S3
2" X 1" TEE REDUCING BW ASME B16.9 SCH 160 X 80S ASTM A815 WPS UNS S318
6" CAP STANDARD ASME B16.9 BW SCH 160 ASTM A815 WPS UNS S31803
6" CAP STANDARD ASME B16.9 BW SCH 160 ASTM A815 WPS UNS S31803
6" CAP STANDARD ASME B16.9 BW SCH 160 ASTM A815 WPS UNS S31803
2" ELBOW 45 DEG LR ASME B16.9 BW SCH 160 ASTM A815 WPS UNS S31803
3" ELBOW 45 DEG LR ASME B16.9 BW SCH 160 ASTM A815 WPS UNS S31803
1" ELBOW 90 DEG LR ASME B16.9 BW SCH 80S ASTM A815 WPS UNS S31803
2" ELBOW 90 DEG LR ASME B16.9 BW SCH 160 ASTM A815 WPS UNS S31803
3" ELBOW 90 DEG LR ASME B16.9 BW SCH 160 ASTM A815 WPS UNS S31803
10" ELBOW 45 DEG LR ASME B16.9 BW 30.00MM THK ASTM A815 WPS/WX UNS S3
12" ELBOW 45 DEG LR ASME B16.9 BW 35.00MM THK ASTM A815 WPS/WX UNS S3
10" ELBOW 90 DEG LR ASME B16.9 BW 30.00MM THK ASTM A815 WPS/WX UNS S3
12" ELBOW 90 DEG LR ASME B16.9 BW 35.0MM THK ASTM A815 WPS/WX UNS S31
6" ELBOW 90 DEG LR ASME B16.9 BW SCH 160 ASTM A815 WPS/WX UNS S31803
3" X 1" BONNEY SWEEPOLET SCH 160 X SCH 80S ASTM A182 F51
1.1/2" X 1/2" CON RED ASME B16.9 BW S 10S X 40S ASTM A403 WP316L
6" X 4" CON RED ASME B16.9 BW S 40S X 10S ASTM A403 WP316L
2" X 3/4" ECC RED ASME B16.9 BW S10S X 40S ASTM A403 WP316L
3/4" X 1/2" ECC RED ASME B16.9 BW S40S X 40S ASTM A403 WP316L
1" ELBOW 90DEG LR ASME B16.9 BW S10S ASTM A815 WP-S UNS S31803
1" ELBOW 45 DEG LR ASME B16.9 BW S80S ASTM A815 WP-S UNS S31803

DESCRIPTION
2" FLANGE WN ASME B16.5 150# RF SCH10S ASTM A182 F51
3" FLANGE WN ASME B16.5 150# RF SCH 10S ASTM A182 F51
6" FLANGE WN ASME B16.5 300# RF SCH 10S ASTM A182 F51
10" FLANGE WN ASME B16.5 300# RF SCH 10S ASTM A182 F51
12" FLANGE WN ASME B16.5 300# RF SCH 20 ASTM A182 F51
3/4" FLANGE BLIND ASME B16.5 150# RF ASTM A182 F316
1" FLANGE BLIND ASME B16.5 150# RF ASTM A182 F316
2" FLANGE BLIND ASME B16.5 150# RF ASTM A182 F316
3" FLANGE BLIND ASME B16.5 150# RF ASTM A182 F316
4" FLANGE BLIND ASME B16.5 150# RF ASTM A182 F316
8" FLANGE BLIND ASME B16.5 150# RF ASTM A182 F316
3/4" FLANGE BLIND ASME B16.5 300# RF ASTM A182 F316
1" FLANGE BLIND ASME B16.5 300# RF ASTM A182 F316
1" FLANGE WN ASME B16.5 150# RF SCH 10S ASTM A182 F316
1 1/2" FLANGE WN ASME B16.5 150# RF SCH 10S ASTM A182 F316
2" FLANGE WN ASME B16.5 150# RF SCH 10S ASTM A182 F316
3" FLANGE WN ASME B16.5 150# RF SCH 10S ASTM A182 F316
4" FLANGE WN ASME B16.5 150# RF SCH 10S ASTM A182 F316
6" FLANGE WN ASME B16.5 150# RF SCH 10S ASTM A182 F316
8" FLANGE WN ASME B16.5 150# RF SCH 10S ASTM A182 F316
1/2" FLANGE WN ASME B16.5 150# RF SCH 40S ASTM A182 F316
3/4" FLANGE WN ASME B16.5 150# RF SCH 40S ASTM A182 F316
1" FLANGE WN ASME B16.5 300# RF SCH10S ASTM A182 F316
1 1/2" FLANGE WN ASME B16.5 300# RF SCH 10S ASTM A182 F316
2" FLANGE WN ASME B16.5 300# RF SCH 10S ASTM A182 F316
3" FLANGE WN ASME B16.5 300# RF SCH 10S ASTM A182 F316
4" FLANGE WN ASME B16.5 300# RF SCH 10S ASTM A182 F316
1" FLANGE WN ASME B16.5 300# RF SCH10S (MATCHING) ASTM A182 F316
2" FLANGE WN ASME B16.5 300# RF SCH 10S (MATCHING) ASTM A182 F316
3/4" FLANGE WN ASME B16.5 300# RF SCH40S ASTM A182 F316
1" FLANGE WN ASME B16.5 150# RF S10S ASTM A182 F51
2" FLANGE WN ASME B16.5 300# RF S10S ASTM A182 F316
6" FLANGE WN ASME B16.5 300# RF S40S ASTM A182 F316
1/2" FLANGE BLIND ASME B16.5 150# RF WITH 6MM NPT ASTM A350 LF2 CL1
Update Forecast date of readiness
Due from Supplier w/c 09/02/15 - Schoeller B 2/20/2015
In stock - lab results due 09/01 1/16/2015
Due from Supplier w/c 09/02/15 - Schoeller B 2/20/2015
Ready to pack 1/9/2015
Ready to pack 1/9/2015
Ready to pack 1/9/2015
Ready to pack 1/9/2015
Due from Supplier w/c 09/02/15 - Schoeller B 2/20/2015
Due from Supplier w/c 09/02/15 - Schoeller B 2/20/2015
Ready to pack 1/9/2015
Ready to pack 1/9/2015
Ready to pack 1/9/2015
Due from Supplier 09/01/15 - Testing required 1/23/2015
Ready to pack 1/9/2015
Ready to pack 1/9/2015
In Stock - Upgrade testing 1/16/2015
Item in stock / incoming stock - Testing upgrad27 mtrs 16/01/2014
Incoming stock - SMST 150mtrs 13/02/2015
Incoming stock - SMST 150mtrs 13/02/2015
Incoming stock - SMST 300mtrs 27/02/2015
Incoming stock 16/02/15 - SMST 2/20/2015
In Stock - Upgrade testing 1/16/2015
Incoming stock 16/02/15 - SMST 2/20/2015
Incoming stock 16/02/15 - Schoeller Bleckmann2/20/2015
In Stock - Upgrade testing 1/16/2015
Ready to collect 09/01/15 - Butting 1/9/2015
Ready to collect 16/01/15 - Butting 1/16/2015
Ready to pack 1/9/2015
Stock - Upgrade testing required 1/30/2015
In Stock - Upgrade testing 1/16/2015
Due from Supplier 09/01/15 - Upgrade testing 1/16/2015
Due from Supplier 09/01/15 - Upgrade testing 1/16/2015

Update Forecast date of readiness


Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Due from Supplier 27/01/15 - IPP Scomark 1/30/2015
Due from Supplier 27/01/15 - IPP Scomark 1/30/2015
Due from Supplier 27/01/15 - IPP Scomark 1/30/2015
Due from Supplier 27/01/15 - IPP Scomark 1/30/2015
Due from Supplier 27/01/15 - IPP Scomark 1/30/2015
Due from Supplier 27/01/15 - IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/23/2015
Item in manufacture at IPP Scomark 1/23/2015
Item in manufacture at IPP Scomark 1/23/2015
Item in manufacture at IPP Scomark 1/23/2015
Item in manufacture at IPP Scomark 1/23/2015
Item in manufacture at IPP Scomark 1/23/2015
Item in manufacture at IPP Scomark 1/23/2015
Item in manufacture at IPP Scomark 1/23/2015
Item in manufacture at IPP Scomark 1/23/2015
Item in manufacture at IPP Scomark 1/23/2015
Item in manufacture at IPP Scomark 1/23/2015
Item in manufacture at IPP Scomark 1/23/2015
Item in manufacture at IPP Scomark 1/23/2015
Item in manufacture at IPP Scomark 1/23/2015
Item in manufacture at IPP Scomark 1/23/2015
Item in manufacture at IPP Scomark 1/23/2015
Item in manufacture at IPP Scomark 1/16/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/23/2015
Item in manufacture at IPP Scomark 100 pieces 23/01/2015
Item in manufacture at IPP Scomark 100 pieces 06/02/2015
Item in manufacture at IPP Scomark Balance 20/02/2015
Item in manufacture at IPP Scomark 1/23/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 2/6/2015
Item in manufacture at IPP Scomark 1/23/2015
Item in manufacture at IPP Scomark 1/23/2015
Item in manufacture at IPP Scomark 1/23/2015
Item in manufacture at IPP Scomark 100 pieces 16/01/2015
Item in manufacture at IPP Scomark 100 pieces 30/01/2015
Item in manufacture at IPP Scomark Balance 13/02/2015
Item in manufacture at IPP Scomark 1/16/2015
Item in manufacture at IPP Scomark 1/16/2015
Item in manufacture at IPP Scomark 1/16/2015
Item in manufacture at IPP Scomark 1/16/2015
Item in manufacture at IPP Scomark 1/16/2015
Item in manufacture at IPP Scomark 1/16/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/16/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/16/2015
Due from Supplier 03/02/15 - IPP Scomark 2/6/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/30/2015
Item in manufacture at IPP Scomark 1/16/2015
Item in manufacture at IPP Scomark 1/16/2015

Update Forecast date of readiness


Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015
Due from Supplier 28/01/15 - W Maass 1/30/2015

You might also like