Professional Documents
Culture Documents
Expediting Filter
Expediting Filter
Material Pending
Manufacturing Manufacturing On Ready for Ready For At updates /
No. of Packages PO Issued Arrived at Documentat
Not Started Yet Going Testing/FAT Delivery Delivery Pending
Site ion
PO
JACKET & STRUCTURAL 35 55 53 1 1
ELECTRICAL 17 20 11 3 1 3 2
INSTRUMENT 34 30 9 1 9 4 7
PIPING 34 30 13 1 4 6 2 1 1 2
MECHANICAL 24 21 1 4 9 3 4
ARCHITECTURE 7 7 6 1
SAFETY 2 3 3
TELECOM 2 2 1 1
MISCELLANEOUS 2 6 3 3
TOTAL 157 174 96 2 13 32 9 12 8 2
NOTES:
*For details on each packages, please refer next tab (DETAILS).
NoDelivery
At updates / Pending PO
Ready For Delivery 5% 1%
7%
Ready for Testing/FAT
5%
Manufacturing On Going
18%
PO
ACKN
PO No. Item Discipline Vendor PO DATE OWLE VDR-VDI STATUS MATERIAL STATUS BUYER
DGEM
ENT
GDP-PO-PM-001 LSAW Pipes Jacket/Structural EEW 9/11/2013 OK N/A Arrived İlhan Hashan
GDP-PO-PM-002 Cone Plate Jacket/Structural MDB 11/28/2013 OK N/A Arrived İlhan Hashan
GDP-PO-PM-003 LSAW Pipes (Additional) Jacket/Structural EEW 11/19/2013 OK N/A Arrived İlhan Hashan
GDP-PO-PM-004 WPS PQR Register Structural LSAW Tubular Ma Jacket/Structural UniversaL Steel 11/21/2013 OK N/A Arrived İlhan Hashan
GDP-PO-PM-005 Bolt Nut and Washer Timber Jacket/Structural KARACA 12/20/2013 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-007 LSAW Tubular Jacket/Structural EEW 12/19/2013 OK N/A Arrived Ali Süha Kın
GDP-PO-PM-008 Bolt Nut and Washer Boatlanding Boom Rest Jacket/Structural Karaca 12/25/2013 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-009 Cathodic Protection Jacket/Structural Ail Industries 12/27/2013 OK Submitted/Closed Arrived Şeyma Erdoğan
GDP-PO-PM-010 Structural Beams Jacket/Structural ROZAK DEMİR 1/23/2014 OK N/A Arrived Fırat Yıldız
GDP-PO-PM-011 Riser Clamp PTFE Bolt Jacket/Structural Geroil 1/20/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-012 Pile Gripper Jacket/Structural Oil States 1/12/2014 OK Submitted/Closed Arrived Erhan Kızılkaya
GDP-PO-PM-013 Grout Seal Jacket/Structural Oil States 12.01.14 OK Submitted/Closed Arrived Erhan Kızılkaya
GDP-PO-PM-015 Steel plate Jacket/Structural MDB 2/1/2014 OK N/A Arrived Ali Süha Kın
GDP-PO-PM-016 Structural Beams (Prismatic Section) Jacket/Structural Metal Service 2/4/2014 OK N/A Arrived Fırat Yıldız
GDP-PO-PM-017 Seamless Pipe Jacket/Structural Metal Service 2/14/2014 OK N/A Arrived Fırat Yıldız
GDP-PO-PM-018 Shock Cell Jacket/Structural IRM 1/29/2014 OK Submitted/Closed Arrived Şeyma Erdoğan
GDP-PO-PM-019 Timber Jacket/Structural Wijma Kampen 30.01.14 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-020 Cone Plate Jacket/Structural Yıldırım Kardeşler 2/5/2014 OK N/A Arrived Fırat Yıldız
GDP-PO-PM-022 Seamless Pipe Jacket/Structural Alchemia (Metal Service) 2/14/2014 OK N/A Arrived Fırat Yıldız
GDP-PO-PM-024 Structural Paint Jacket/Structural Jotun 6/4/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-079 Elastomeric Pad Jacket/Structural IRM 5/5/2014 OK Submitted/Closed Arrived Şeyma Erdoğan
GDP-PO-PM-080 Leg Mating Unit Jacket/Structural IRM 5/16/2014 OK Submitted/Closed Arrived Şeyma Erdoğan
GDP-PO-PM-081 Boatlanding Floatover Fenders Jacket/Structural IRM 5/13/2014 OK Submitted/Closed Arrived Şeyma Erdoğan
GDP-PO-PM-083 Pipe for Grout Distribution Ring Jacket/Structural Güldemir 5/26/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-100 J TUBE Jacket/Structural Edgen Murray 6/26/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-101 PIPE AND FLANGE FOR OPEN DRAIN CAISSI Jacket/Structural Shree Steel 6/27/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-102 Tertiary steel ( pipe, angle, plate) for Jaket Jacket/Structural SAFET 6/27/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-104 GROUTING U BOLT, STUD BOLT & JACKET Jacket/Structural TripleFast Middle East LTD 7/1/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-106 Pipe, elbow, gasket, pipe cap for Grouting syst Jacket/Structural Güldemir 7/1/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-107 Ball valve for Grouting system Jacket/Structural Batusan 7/3/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-108 Hex bolt, clips for Grating Jacket/Structural BİMAK MAKİNA OTOMOTİV 7/7/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-109 QUICK CONNECTOR , GATE VALVE Jacket/Structural Visvana 7/7/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-114 Anti-slip stair nosing Jacket/Structural Safemate Anti-slip Pty Ltd 7/14/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-116 Plate for Support of Fender Jacket/Structural Masteel UK Limited 7/17/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-118 Rubber mat Jacket/Structural FORESIGHT GLOBAL FZE 8/4/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-120 Neoprene sheet for Boatlanding clamp & Topsi Jacket/Structural OCEAN RUBBER 8/7/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-121 Plate for Topside Jacket/Structural Masteel UK Limited 8/11/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-135 Tube Clamps Jacket/Structural Stauff 8/25/2014 OK N/A Arrived Veysel Arslan
GDP-PO-PM-139 Passive Fire Protection Jacket/Structural International Paint Ltd. 8/29/2014 OK N/A Manufacturing/Production has not startedÖzgenç
yet Akçora
GDP-PO-PM-141 Materials for Jacket Leak Test & Flooding Syst Jacket/Structural SHREE STEEL 9/11/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-146 Additional beam, section, pipe Jacket/Structural EDGEN MURRAY 10/2/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-147 Stud Bolt for Topside of Timber Jacket/Structural Berdan Civata 10/8/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-150 Ocean rubber Jacket/Structural NEOPRENE RUBBER 10/21/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-151 Equal angle , NPU for electrical support Jacket/Structural Kocaer Haddecilik 10/21/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-153 Jacket Pile Gripper Add. Tubing Clamp Jacket/Structural Nordival/Swagelok 10/21/2014 OK N/A Arrived Veysel Arslan
GDP-PO-PM-154 Plate for electrical support Jacket/Structural Rozak Demir 10/23/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-155 Handrail hex bolt Jacket/Structural Boztaş Civata 10/23/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-156 Messenger Rope, Green pin for J TUBE Jacket/Structural Göver Çelik Halat 10/24/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-156-A Messenger Rope, Green pin for J TUBE Jacket/Structural Göver Çelik Halat 10/24/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-157 Studbolt & Gasket Jacket/Structural Triple Fast 10/27/2014 OK N/A Arrived Özgenç Akçora
GDP-PO-PM-158 Padlock, lockout equipments Miscallaneous Brady 11/1/2014 OK N/A Manufacturing/Production on going Emine İlbey
GDP-PO-PM-159 INSTRUMENT CABLES (RS-485, CAT-6, TEL1X Instrument CCE 11/13/2014 OK Submitted/On-going
Ready for delivery (RS485 & CAT6 only)
Burak Balkan
GDP-PO-PM-161 Black Binder Miscallaneous Produksi Nur-Johan 10/31/2014 OK N/A Arrived Şeyma Erdoğan
GDP-PO-PM-162 DBB Valve with Sampling Probe Piping Icarus 12/2/2014 OK Manufacturing/Production has not startedVeysel
Pending GAD yet Arslan
GDP-PO-PM-163 Prefabricated Bathroom Architectural ENSAR GEMİ 11/17/2014 OK Manufacturing/Production has not startedÖzgenç
PENDING TECH. CLARIFICATION yet Akçora
GDP-PO-PM-164 TOPSIDE LOADOUT PLATE Jacket/Structural SAFET 11/18/2014 OK N/A At delivery Özgenç Akçora
STATUS
Received revised new calculation for fire case of hydrocarbon 120 mins instead of 60 minutes. Tech
discussion are still ongoing
PO has been issued. ETD Turkmenbashi by End January 2015. However, there are some issues with
plate thickness that are still in discussion with RNZ. Estimate to solve the issue by 19/1/2015
ITP has been submitted by vendor. Waiting for vendor to submit GA drawings, estimated readiness of the
materials is the beginning of April.
Pending Technical Clarification
Chartek 7054 kg
As of 6/1/2015
PASSIVE FIRE GTA 123 INTERNATIONAL 706 lt Receive revised new calculation for fire case of hydrocarbon 120 minutes instead of
5239-SB-001 Ö.A. PO-139 29 August, 2014 DDP ATASEHIR WAREHOUSE, ISTANBUL 12 21 November, 2014 30 January, 2015 - - 30 January, 2015 15 30 January, 2015 14 February, 2015 2 February, 2015 2 February, 2015
PROTECTION PAINT Hydrocarbon 60 minutes.
Technical discussion are still ongoing
HK-1 Mesh 1000 m2
Ö.A. TOPSIDE LOADOUT 2200 x 7000mm x 16mm SAFET SPA PO-164 18 November, 2014 27 pcs CFR ISTANBUL, TURKEY 7 6 January, 2015 5 January, 2015 - - 5 January, 2015 YD-1453 25 5 January, 2015 30 January, 2015 2 February, 2015 2 February, 2015 As of 6/1/2015
PLATE Truck YD-1453 departed from Italy on 5/1/2015, ETA Turkmenbashi 30/1/2015
TOPSIDE - ELECTRICAL
QUANTITY MANUFACTURING / PRODUCTION TRANSPORTATION / DELIVERIES ROS DATE
DELIVERY LEAD
TIME
(WEEKS) AFTER CONTRACTUAL PLANNED
SMPR NO BUYER ITEM VENDOR PO NO PO DATE DELIVERY TERM MANUFACTURING ESTIMATED FINAL TRANSPORT / ETD TO ACTUAL ARRIVAL AT REMARKS
ORDER RCVD O/S APPROVAL OF DELIVERY DATE ESTIMATED FAT DATE READINESS OF MATERIALS DELIVERY PERIOD ETA TURKMENBASHI EARLIEST LATEST
CRITICAL COMPLETION DATE INSPECTION DATE TRUCK NO TURKMENBASHI SITE
(DAYS)
DOCUMENTS
5239-E-002 MAIN SWITCHBOARD LV SWBD / MCC SB - 7700 PO-041 1 16 March, 2015 20 March, 2015 12 20 March, 2015 1 April, 2015 8 January, 2015 8 January, 2015
DB - 7700 1 As of 6/1/2016:
Waiting approval from PCTSB on VDR submitted in order for vendor to start
DB - 7720 1 manufacturing. Transmittal 9488 / 9493 / 9505
E.I DB - 7721 GVD 3 April, 2014 1 FCA GVD FACILITY, ISTANBUL 12 26 June, 2014
5239-E-003 DISTRIBUTION BOARD DB - 7722 PO-042 1 17 February, 2015 20 February, 2015 12 20 February, 2015 4 March, 2015 17 January, 2015 4 April, 2015 DB manufacturing lead time = 4 weeks
Switchboard manufacturing lead time = 8 weeks
DB - 7723 1
DB - 7724 1
DB - 7726 1
OIL FILTER ELEMENT 2
MAN TRUCK PO-059 8 May, 2014 FCA NUREMBERG 14 14 August, 2014 5 December, 2014 5 December, 2014 YD 1452
GAS ENGINE 2
As of 6/1/2015:
5239-E-006 F.G GENERATOR ALTENATOR AKSA JENERATOR PO-060 2 May, 2014 2 FCA CRAOIVA 16 22 August, 2014 5 December, 2014 5 December, 2014 25 13 March, 2015 7 April, 2015 13 April, 2015 23 April, 2015 Both packages arrived at Borusan's premise
Packager for New GEG & Free Issue GEG BORUSAN PO-067 20 May, 2014 3 EXW CAYIROVA, ISTANBUL 10 29 July, 2014 10 March, 2015 10 March, 2015
As of 05/12/2014
Materials(3 drum (P3 cables), 2 drum (P5B cables) & 1 drum (E1 cables)) have arrived at
site on 5/12/2014, waiting for site team to confirm.
5239-EB-004 B.B POWER CABLES UNIKA PO-123 12 August, 2014 EXW CERKEZKOY, TEKIRDAG, TURKEY 8 7 October, 2014 28 November, 2014 4 December, 2014 4 December, 2014 TR-2049 15 20 January, 2015 4 February, 2015 5 November, 2014 3 December, 2014
As of 6/1/2015
Remaining materials are ready for delivery.
JUNCTION BOX:
Manufacturing has already started on 26/11/2014. It will take 4-5 weeks. Estimated
readiness of the materials is end of December, 2014.
as of 20/12/2014:
Manufacturing started with approved document
YD-1387 LIGHTING FIXTURES:
5239-EB-006 E.I JUNCTION BOXES & LIGHTING FIXTURES EATON PO-128 26 August, 2014 290 FCA FCA CHINA 9 28 October, 2014 5 December, 2014 5 December, 2014 YD-1436 45 11 November, 2014 12 January, 2015 16 November, 2014 16 December, 2014 From China (2 shipment)
As of 27/12/2014
1st Shipment : (YD 1387) Arrived
2nd Shipment: Departed 1/12/2014 (YD 1436) .ETA Turkmenbashi 12/1/2014.
As of 20/12/2014:
Manufacturing has not started yet for RCU due size requirement shall be follow as
271x134x136mm .
Vendor can only comply with 271x271x136mm.
Tyoe C Impact Resistant Polyamide (GHG 20
2622301R9205) However, PCTSB and RNZ has already accepted the deviatio on 19/12/2014. . TQ has
(RCU) REMOTE been issued with transmittal GDDP‐ILK‐RNZ‐VDR‐776 on 19/12/2014. Waiting for
5239-EB-008 B E.I EATON PO-110 8 July, 2014 FCA GERMANY 6 19 August, 2014 31 October, 2014 31 October, 2014 TR-2049 25 17 November, 2014 12 December, 2014 5 December, 2014 15 November, 2014 16 January, 2015 approval.
CONTROL UNIT
Upon receive approval, manufacturing will recommence. Manufacturing will take 4-6
weeks to be completed
As of 6/1/2015:
Type D Impact-Resistant Polymadie (GHG Waiting reply from PCTSB on drawings & TQ in order for vendor to start manufacturing.
2610005R9086) 54
As of 6/1/2015
E.I. Electrical Bulk Material Additional Earthing Cables UNIKA PO-145 27 October, 2014 4 EXW ISTANBUL 9 12/31/2014 1/20/2015 12 1/20/2015 2/1/2015 Material are ready for delivery
TOPSIDE - INSTRUMENT
DELIVERY
QUANTITY LEAD TIME MANUFACTURING / PRODUCTION TRANSPORTATION / DELIVERIES ROS DATE
(WEEKS)
CONTRACTUAL
SMPR NO BUYER ITEM VENDOR PO NO PO DATE DELIVERY TERM AFTER REMARKS
DELIVERY DATE PLANNED
APPROVAL MANUFACTURING ESTIMATED FINAL READINESS OF TRANSPORT / ETD TO ACTUAL ARRIVAL AT
ORDER RCVD O/S OF CRITICAL ESTIMATED FAT DATE DELIVERY PERIOD ETA TURKMENBASHI EARLIEST LATEST
COMPLETION DATE INSPECTION DATE MATERIALS TRUCK NO TURKMENBASHI SITE
DOCUMENTS (DAYS)
SMOKE DETECTOR 27
HYDROCARBON DETECTORS 10
H2 DETECTORS 2
DUSTGUARD 4
EXPROOF PUSHBUTTON 13
HANDHELD INTEROGATOR 1
HEAT DETECTOR 2
CALIBRATION KIT 2
04-PVC-008 NPS8 1
HCV-114 1
HCV-214 1
HCV-224 1
HCV-314 1
As of 4/11/2014
HCV-324 1 1. Actuator PO has been issued on 10/6/2014. ETA vendor premise on 16/10/2014
2. Casting material PO has been issued on 27/6/2014. ETA vendor premise 26/10/2014
HCV-414 1 3. targetted FAT date is 28/11/2014.
5239-I-004 E.O CHOKE VALVE HCV-424 WEIR VALVES PO-052 28 April, 2014 1 EXW ELLAND WVCUK FACTORY , UK 29 17 November, 2014 2 January, 2015 27 January, 2015 27 January, 2015 2 January, 2015 45 31 January, 2015 17 March, 2015 30 June, 2015 30 June, 2015
As of 06/1/2015:
HCV-514 1 Materials will be ready for inspection on 27/01/2015. Delivery date have been delayed
because of supply of tungsten carbide trim materials.
HCV-214 1
HCV-614 1
HCV-624 1
HCV-714 1
HCV-724 1
CONTROL PANEL 1
Notes:
5239-I-006 I.H PIG SIGNALLER PPE PO-023 25 February, 2014 2 EXW CLEVELAND / UK 18 1 July, 2014 25 February, 2015 13 May, 2015 1. Will be deliver together with Pig Launcher package.
Updates shown in T-MECH tab ( GDP-PO-PM-021), "Pig Launcher Package"
As of 5/12/2014:
Estimated completion of the materials is end of January, 2015. ETD to Turkmenbashi
06.02.2015, ETA 26.02.2015
5239-I-007 A F.G TRANSMITTER PRESSURE TEMPERATURE, FLOW AND LEVEL ARKEN PO-068 6 May, 2014 39 CPT TUZLA, ISTANBUL 18 9 September, 2014 30 January, 2015 30 January, 2015 20 6 February, 2015 26 February, 2015 26 December, 2014 13 April, 2015
as of 5/12/2014
Manufacturing will take 6-8 weeks after approval of documents. Waiting approval from
5239-I-007 C F.G TRANSMITTER CORIOLIS FLOWMETER PO-068 2 6 February, 2015 20 26 December, 2014 13 April, 2015 RNZ to proceed with manufacturing.
ARKEN 6 May, 2014 CPT TUZLA, ISTANBUL 18 9 September, 2014 6 February, 2015 6 February, 2015 26 February, 2015
5239-I-007 D F.G TRANSMITTER ULTRASONIC FLOWMETER PO-068 2 6 February, 2015 20 26 December, 2014 13 April, 2015
As of 6/1/2015:
Pending GA from Arken.
5239-I-010 FG CAPACITANCE LEVEL INSTRUMENT ARKEN PO-069 6 May, 2014 1 CPT TUZLA, ISTANBUL 12 29 July, 2014 30 January, 2015 30 January, 2015 20 6 February, 2015 26 February, 2015 26 December, 2014 13 April, 2015
As of 5/12/2014:
Estimated completion of the materials is end of January, 2015. ETD to Turkmenbashi
5239-I-017 F.G MAGNETIC LEVEL ARKEN PO-071 6 May, 2014 1 CPT TUZLA, ISTANBUL 12 29 July, 2014 30 January, 2015 30 January, 2015 20 6 February, 2015 26 February, 2015 26 December, 2014 13 April, 2015 06.02.2015, ETA 26.02.2015
As of 5/12/2014:
5239-I-008 F.G PRESSURE AND TEMPERATURE GAUGES ARKEN PO-070 6 May, 2014 1 CPT TUZLA, ISTANBUL 10 15 July, 2014 30 January, 2015 30 January, 2015 20 6 February, 2015 26 February, 2015 26 December, 2014 13 April, 2015 45 items will be ready end of january, 2015. 6 items are hold.
As of 06/1/2015
Estimated readiness of the materials is 13/03/2015 according to production plan by
5239-I-012 C.D ACTUATED VALVES AND MOV 81 13 March, 2015 13 March, 2015 25 13 March, 2015 7 April, 2015 10 May, 2015 13 May, 2015 Vendor.
Approval on GAD are needed in order to start production for API6A valves
RMT PO-058 25 April, 2014 EXW ITALY 28 7 November, 2014
VALVOMECCANICA
As of 06/1/2015
5239-I-023 C.D HIPPS VALVES 4 24 April, 2015 24 April, 2015 25 30 April, 2015 25 May, 2015 16 May, 2015 21 May, 2015 Approval on GAD are needed in order to start production for API6A valves. Estimated
time of readiness of the materials is end of April, 2015.
1/2" WCC 3
1/2" CF8M 3
As of 28/11/2014
Waiting for FAT report approval which is submitted on 24/10/2014 with GDDP-ILK-RNZ-
VDR-565. Still waiting RNZ/PCTSB approval. (Materials are ready to be collected)
5239-I-014 B.B SAND MONITORING CLAMPON PO-055 30 April, 2014 13 EXW NORWAY 14 6 August, 2014 20 October, 2014 20 October, 2014 25 19 January, 2015 13 February, 2015 10 May, 2015 1 June, 2015 As of 05/12/2014
FAT report have been transmitted from RNZ to PCTSB with P5239-PCTSB-V-9377 on
28/11/2014. Waiting for PCTSB approval to proceed.
As of 6/1/2015:
Material are ready for delivery. waiting for PCTSB feedback.
As of 05/12/2014:
The panel is nearly ready. TQ3 has been sent to Vendor on 05/12/2014 for three
pressure transmitter. Estimated readiness of the materials is early January, 2015.
As of 6/1/2014:
5239-I-018 F.G FUSIBLE PLUG SYSTEM PROSERV PO-031 27 February, 2014 1 EXW JEBEL ALI, DUBAI 20 17 July, 2014 6 January, 2014 19 January, 2014 23 January, 2014 20 26 January, 2014 15 February, 2014 10 January, 2015 1 May, 2015 Material are ready for FAT. NOI will be submitted to PCTSB.
FAT are planned to be on 19/1/2014
As of 6/1/2015:
Vendor are in the midst to close all punchlist based on previous FAT.
5239-I-019 F.G SIS, FGS & PMCS YOKOGAWA (M) PO-057 28 April, 2014 1 FCA PUCHONG, MALAYSIA 32 16 January, 2015 19 January, 2014 16 January, 2015 35 23 January, 2015 27 February, 2015 25 February, 2015 24 March, 2015
As of 6/1/2015:
5239-IB-006 B.B JUNCTION BOXES TEMPA PANO PO-160 4 November, 2014 32 EXW TURKEY 6 16 December, 2014 16 December, 2014 31 January, 2015 15 31 January, 2015 15 February, 2015 12 January, 2015 27 January, 2015 PO has been issued. ETA Turkmenbashi by End January 2015.
However, there are some issues with plate thickness that are still in discussion with
RNZ. Estimate to solve the issue by 19/1/2015
TOPSIDE - PIPING
DELIVERY
QUANTITY MANUFACTURING / PRODUCTION TRANSPORTATION / DELIVERIES ROS DATE
LEAD TIME
(WEEKS)
CONTRACTUAL
SMPR NO BUYER ITEM VENDOR PO NO PO DATE DELIVERY TERM AFTER ESTIMATED REMARKS
DELIVERY DATE PLANNED
APPROVAL MANUFACTURING ESTIMATED FAT FINAL READINESS OF TRANSPORT / ACTUAL ARRIVAL AT
ORDER RCVD O/S OF CRITICAL DELIVERY PERIOD ETD TO TURKMENBASHI ETA TURKMENBASHI EARLIEST LATEST
COMPLETION DATE DATE INSPECTION MATERIALS TRUCK NO SITE
DOCUMENTS (DAYS)
DATE
5239-P-007 E.K STAINLESS STEEL PIPES **Please refer to "SS & DUPLEX" tab 13 January, 2015 20 January, 2015
5239-P-008 E.K DUPLEX PIPES **Please refer to "SS & DUPLEX" tab INTERNATIONAL 19 January, 2015 20 January, 2015
PIPING PRODUCT IPP WAREHOUSE, ACCORDING TO "SS & ACCORDING TO "SS & TBA ACCORDING TO "SS TBA ACCORDING TO "SS As of 6/1/2015:
PO-066 16 May, 2014 FCA STAFFORDSHIRE, U.K. 20 3 October, 2014 DUPLEX" TAB DUPLEX" TAB 30 & DUPLEX" TAB & DUPLEX" TAB **Please refer to "SS & DUPLEX" tab
5239-P-009 (IPP)
B E.K SS & DUPLEX FITTINGS **Please refer to "SS & DUPLEX" tab 19 January, 2015 20 January, 2015
5239-P-009
C E.K SS & DUPLEX FLANGES **Please refer to "SS & DUPLEX" tab 19 January, 2015 20 January, 2015
51-SP-015 Y Strainer 1
As of 5/12/2014:
Materials will be ready by end of February, 2015.
64-SP-001 64-SP-002 Y Strainer 2
SUNGOV
5239-P-011 V.A PIPING STRAINERS ENGINEERING PO-076 30 May, 2014 EXW CHENNAI, INDIA 23 7 November, 2014 4 March, 2015 9 March, 2015 35 9 March, 2015 13 April, 2015 ### 28 December, 2014 As of 6/1/2014:
64-SP-003 64-SP-004 Y Strainer 2 updates will be provided by end of this week as manufacturer are close due to
christmas & new year holiday.
67-SP-005 Y Strainer 1
As of 6/1/2015
Waiting information from vendor for hose reel. Manufacturing of hose reel will take 36
5239-P-012 V.A FLEXIBLE HOSES & COUPLINGS PO-077 weeks after approval.
Discussion on the feasibility of the hose reel are still ongoing between RNZ/PCTSB and
ILK.
as of 06/1/2015
5239-P-014 V.A CORROSION COUPON & PROBES ROSE CORROSION PO-078 ### 3 EXW TELFORD, UK 14 23 December, 2014 15 February, 2015 15 February, 2015 30 20 February, 2015 22 March, 2015 26 March, 2015 26 March, 2015 Manufacturing started. Waiting for updated schedule from vendor
As of 05/12/2014
5239-P-026 O.A PIPING INSULATION 10 20 March, 2015 1 May, 2015 Waiting for pipe isometrics and MTO from ILK site team
As of 05/12/2014
5239-P-027 V.A BIRD SCREEN ### 15 January, 2015 Fabrication will be completed at site.
As of 6/1/2015:
Tag no.s : 54-SP-014 & 59-SP-014 ARMSTRONG Materials are ready to deliver. Waiting for vendor to revise GAD prior to delivery
5239-P-028 V.A AUTO DRAINER ANSI 150 ıb. 1"150# RF Type : 33-LD (VALFTEK) PO-092 11 June, 2014 2 EXW HERSTAL, BELGIUM 11 27 August, 2014 30 December, 2014 30 December, 2014 25 19 December, 2014 13 January, 2015 ### 10 April, 2015
TOPSIDE - MECHANICAL
DELIVERY
QUANTITY LEAD TIME MANUFACTURING / PRODUCTION TRANSPORTATION / DELIVERIES ROS DATE
(WEEKS)
CONTRACTUAL
SMPR NO BUYER ITEM VENDOR PO NO PO DATE DELIVERY TERM AFTER REMARKS
DELIVERY DATE PLANNED
APPROVAL MANUFACTURING ESTIMATED FAT ESTIMATED FINAL READINESS OF TRANSPORT / ETD TO
ORDER RCVD O/S OF CRITICAL DELIVERY PERIOD ETA TURKMENBASHI ACTUAL ARRIVAL AT SITE EARLIEST LATEST
COMPLETION DATE DATE INSPECTION DATE MATERIALS TRUCK NO TURKMENBASHI
DOCUMENTS (DAYS)
As of 05/12/2014
1. New targetted completion date will be middle of February 2015 by assuming that major
documents will be approved this week.
5239-M-001 I.A NITROGEN PACKAGE CES PO-051 3 May, 2014 1 FCA HOUSTAN, TEXAS 22 4 October, 2014 30 December, 2014 4 January, 2015 60 27 February, 2015 28 April, 2015 10 May, 2015 1 June, 2015 2. FAT planned to be end of February, 2015
As of 6/1/2015:
Teleconference are scheduled on 7/1/2014, Wednesday.
As of 05/12/2014
1. New targetted completion date will be middle of February 2015 by assuming that major
documents will be approved this week.
5239-M-002 I.A AIR COMPRESSOR & DRYER PACKAGE CES PO-050 3 May, 2014 1 FCA HOUSTAN, TEXAS 22 4 October, 2014 30 December, 2014 4 January, 2015 60 27 February, 2015 28 April, 2015 9 April, 2015 14 April, 2015 2. FAT planned to be end of February, 2015
As of 6/1/2015:
Teleconference are scheduled on 7/1/2014, Wednesday.
5239-M-018 TEST SEPERATOR (V-0400) 1 4 October, 2014 14 October, 2014 14 November, 2014 1 December, 2014
As of 6/1/2015
Construction and assembly are 98% completed as of 31/12/2014.
5239-M-008 D.A PEDESTAL CRANE MEPEL PO-006 ### 1 FCA VERONA, ITALY 42 9 October, 2014 19 January, 2014 19 January, 2014 20 January, 2015 45 31 January, 2015 17 March, 2015 25 April, 2015 20 May, 2015 NOI FAT will be issue to PCTSB asap. Estimated readiness of the materials is end of January
2015
as of 4/11/2014
The current estimated ship date is March 24th 2015. The driving factor for the delay is the fact
that vendor could not purchase the baseplate as their General Arrangement Drawings were
CLOSED DRAIN DRUM BOOSTER PUMP CPC PUMP 2 rejected until early last month
5239-M-010 A INTERNATIONAL PO-046 8 April, 2014 EXW CPC FACTORY, CANADA 32 18 November, 2014 14 March, 2015 24 March, 2015 55 24 March, 2015 18 May, 2015 22 January, 2015 15 April, 2015 As of 5/12/2014
The current delivery time is 24/03/2015 as planned.
I.A CENTRIFUGAL PUMPS
BC As of 6/1/2015:
5239-M-010 B POTABLE WATER PUMP / ISO PUMP PO-103 22 July, 2014 1 EXW GERMANY 23 30 December, 2014 16 December, 2014 19 December, 2014 26 December, 2014 35 31 January, 2015 7 March, 2015 17 February, 2015 18 March, 2015 Teleconference will take place on 7/1/2015
PETROCHEMICAL
PIPELINE As of 6/1/2015
5239-M-015 I.H PIG LAUNCHER & RECEIVER (L-2900) PRECISION PO-021 ### 1 EXW CLEVELAND, UK 18 24 June, 2014 20 October, 2014 31 October, 2014 31 October, 2014 19 December, 2014 35 20 January, 2015 24 February, 2015 30 June, 2015 30 June, 2015 Inspection was done on 31/10/2014 Painting are done.
ENGINEERING Delivery arrangement is in progress.
As of 05/12/2014
30.1.2015-
5239-M-020 S.E FUEL GAS PACKAGES FILTER COALESCER (S-6001 A/B) SEDIA TEGUH PO-035 4 April, 2014 2 FCA MALAYSIA 24 ### 7 January, 2014 5 February, 2015 45 10 February, 2015 27 March, 2015 27 March, 2015 20 May, 2015 FAT is planned on from 30/01/2015 to 03/02/2015. Estimated readiness of the materials is
03.02.2015 5/02/2015
As of 5/12/2014
5239-M-017 I.A HVAC UNIT NEMOCHEM PO-105 22 July, 2014 1 EXW FACTORY,UK 16 11 November, 2014 23 January, 2015 12 February, 2015 12 February, 2015 19 February, 2015 45 19 February, 2015 5 April, 2015 13 March, 2015 1 April, 2015 FAT estimated to be perform on 12/02/2015. ETD to Turkmenbashi 19/2/2015, ETA
Turkmenbashi on 05/04/2015
as of 05/12/2014
Documents have been transmitted to RNZ on 1/11/2014 with GDDP-ILK-RNZ-VDR-591.
5239-MB-001 V.A MATERIAL HANDLING EQUIPMENTS MS TIME PO-148 ### CFR ISTANBUL 18 18 February, 2015 18 March, 2015 12 18 March, 2015 30 March, 2015 1 June, 2015 1 June, 2015
5239-M-014 B,BSRN MEG STORAGE TANK ECLIPSE PO-GH-014 27 August, 2014 3 25 October, 2014 31 October, 2014 As of 6/1/2015
Material has been purchased based on MTO given by vendor. Design documents are
commented by RNZ, vendor to revise and resubmit
Filename: 529668845.xlsx 14 / 32 Printed at : 06/28/2021 / 09:15:35
As of 6/1/2015
Material has been purchased based on MTO given by vendor. Design documents are
commented by RNZ, vendor to revise and resubmit
5239-M-019 B,BSRN OPEN DRAIN DECANTING TANK ECLIPSE PO-GH-014 27 August, 2014 1 25 October, 2014 1 January, 2015
As of 05/12/2014
Materials are ready, FAT date is planned on 3-4/12/2014.
5239-A-004 O.A PREFABRICATED Prefabricated Bathroom with Shower ENSAR GEMI PO-163 17 November, 2014 2 6 May, 2015 ### As of 6/1/2015:
BATHROOM update will be given later
TOPSIDE - SAFETY
Code 1 : Approved
PO ISSUED : 2 Code 2 : Approved with comments
Code 3 : Rejected
Code 4 : for info only
DELIVERY
QUANTITY LEAD TIME MANUFACTURING / PRODUCTION TRANSPORTATION / DELIVERIES ROS DATE
(WEEKS)
CONTRACTUAL
SMPR NO BUYER ITEM VENDOR PO NO PO DATE DELIVERY TERM AFTER ESTIMATED REMARKS
DELIVERY DATE PLANNED ACTUAL
APPROVAL MANUFACTURING ESTIMATED FAT FINAL READINESS OF TRANSPORT / ETD TO ETA
ORDER RCVD O/S OF CRITICAL DELIVERY PERIOD ARRIVAL AT EARLIEST LATEST
COMPLETION DATE DATE INSPECTION MATERIALS TRUCK NO TURKMENBASHI TURKMENBASHI
DOCUMENTS (DAYS) SITE
DATE
As of 28/11/2014
5239-SF-001 S.E SAFETY SIGN METARIALS SOLAS MARINE PO-087 27 May, 2014 141 FCA DUBAI 2 10 June, 2014 ### - - 26 December, 2014 12 26 December, 2014 7 January, 2015 ### 25 May, 2015 Documents which has been submitted to RNZ on 01/10/2014 and 09/09/2014 are
waiting for RNZ to approval. Vendor is waiting for approval to complete production.
4 kg life buoy 4
Immersion suit 16
Collapsible Stretcher 2
Rope Ladder 2
Fire blanket 1
Fireman axe 2
Life Line 2
Ex - proof torch 2
Voltage dedectors 1
Dededctors - ampermetre 1
Insulating platform 1
Safety Glasses 1
ınsulating boots 1
As of 05/12/2014
5239-SF-002 S.E SAFETY EQUIPMENT Evacuation Chute SURVITEC GROUP PO-088 29 May, 2014 2 EXW USA 20 16 October, 2014 31 October, 2014 15 November, 2014 60 11 December, 2014 9 February, 2015 ### 25 May, 2015 Materials are in delivery progress, Estimated time of delivery 11/12/2014. ETA
9/02/2015
TOPSIDE - TELECOM
DELIVERY
QUANTITY LEAD TIME MANUFACTURING / PRODUCTION TRANSPORTATION / DELIVERIES ROS DATE
(WEEKS)
CONTRACTUAL
SMPR NO BUYER ITEM VENDOR PO NO PO DATE DELIVERY TERM AFTER REMARKS
DELIVERY DATE PLANNED ACTUAL
APPROVAL MANUFACTURING ESTIMATED FAT ESTIMATED FINAL READINESS OF TRANSPORT /
ORDER RCVD O/S OF CRITICAL DELIVERY PERIOD ETD TO TURKMENBASHI ETA TURKMENBASHI ARRIVAL AT EARLIEST LATEST
COMPLETION DATE DATE INSPECTION DATE MATERIALS TRUCK NO
DOCUMENTS (DAYS) SITE
As of 06/12/2014:
VHF FM MARINE RADIO SYSTEM 1 SYSTEM FAT has been done on25-26/11/2014.
as of 6/1/2015:
UHF FM RADIO SYSTEM 1 SYSTEM Next week (14/1/2015) is scheduled for dismantling, packing and shipping.
Email that was sent to PCTSB on 18/12/2014 still don’t have any reply.
CCTV SYSTEM 1 SYSTEM
LAN SYSTEM 1
Management 1
As of 4/11/2014
FIBRE OPTIC CABLE 22.10.2014 - 22.10.2014 - 1. FAT is done on 22/10/2014 to 29/10/2014
5239-TB-001 F.G PL4C PO-082 16 May, 2014 FOB SHANGHAI, CHINA 10 25 July, 2014 21 October, 2014 25 December, 2014 55 9 March, 2015 3 May, 2015 1 May, 2015 1 June, 2015 2. One big Drum for Fiber Optic Cable will be shipped through the Don-Volga Canal next
AND EQUIPMENT Fiber Optic Cable 1 29.10.2014 29.10.2014
year
Termination Accessories 1
5239T-Mısc- As of 6/1/2015:
001 E.I LOCKOUT AND TAG OUT (LOTO EQUIPMENT) BRADY PO-158 1 November, 2014 15 31 January, 2015 15 February, 2015 Estimated readiness of materials is 31/1/2015
DESCRIPTION
10" X 2" BONNEY SWEETPOLET 30.00MM THK X SCH 160 ASTM A182 F51
10" X 3" BONNEY SWEEPOLET 30.00MM THK X SCH 160 ASTM A182 F51
12" X 2" BONNEY SWEEPOLET 35.00MM THK X SCH 160 ASTM A182 F 51
12" X 3" BONNEY SWEEPOLET 35.00MM THK X SCH 160 ASTM A182 F51
6" X 2" BONNEY SWEEPOLET SCH 160 X 160 ASTM A182 F51
6" X 1" BONNEY SWEEPOLET SCH 160 X 80S ASTM A182 F51
6" X 2" WELDOLET SCH 160 X 160 ASTM A182 F51
3" X 1" BONNEY SWEEPOLET 20.00MM THK X SCH XXS ASTM A182 F316
4" X 3/4" BRANCH FITTING OUTLET PLAIN END SCH 10S X 40S ASTM A182 F316
6" X 3/4" BRANCH FITTING OUTLET PLAIN END SCH 10S X 40S ASTM A182 F316
2" X 3/4" BRANCH FITTING OUTLET PLAIN END SCH 10 X 40S ASTM A182 F316
3" X 1/2" BRANCH FITTING OUTLET PLAIN END SCH 10S X 40S ASTM A182 F316
8" X 3/4" FLANGOLET 150MM ASME B16.5 150# RF SCH 10SXS/40S ASTM A182 F31
2" X 1/2" FLANGOLET 150MM ASME B16.5 150# RF SCH 10SXS/40S ASTM A182 F31
2" X 3/4" FLANGOLET 150MM ASME B16.5 150# RF SCH 10SXS/40S ASTM A182 F 3
3" X 3/4" FLANGOLET 150MM ASME B16.5 150# RF SCH10SXS/40S ASTM A182 F31
3" X 3/4" FLANGOLET 150MM ASME B16.5 150# RF SCH 10SXS/40S ASTM A182 F31
4" X 3/4" FLANGOLET 150MM ASME B16.5 300# RF SCH 10SXS/40S ASTM A182 F31
2" X 1/2" FLANGOLET 150MM ASME B16.5 300# RF SCH 10SXS/40S ASTM A182 F31
2" X 3/4" FLANGOLET 150MM ASME B16.5 300# RF SCH 10SXS/40S ASTM A182 F31
8" X 2" WELDOLET MSS SP97 BW SCH 10SXS/10S ASTM A182 F316
8" X 3" WELDOLET MSS SP97 BW SCH 10SXS/10S ASTM A182 F316
2" X 3/4" BLEED RING 150# RF WITH DN 20 FLANGOLET SCH 40S ASTM A240 TP31
3" X 3/4" BLEED RING 150# RF WITH DN 20 FLANGOLET SCH 40S ASTM A240 TP31
2" SPECTACLE BLIND 150# RF STD.DWG.NO.S38.011 ASTM A240 TP316
2" SPECTACLE BLIND 150# RF STD.DWG.NO.S38.011 ASTM A240 TP316
3" SPECTACLE BLIND 150# RF.STD.DWG.NO.S38.011 ASTM A240 TP316
8" SPECTACLE BLIND 150# RF STD.DWG.NO.S38.011 ASTM A240 TP316
8" CAP STANDARD ASME B16.9 BW SCH 10S ASTM A403 WP316L
2" ELBOW 45 DEG LR ASME B16.9 BW 14.00MM THK ASTM A403 WP316L
1" ELBOW 45 DEG LR ASME B16.9 BW SCH 10S ASTM A403 WP316L
2" ELBOW 45 DEG LR ASME B16.9 BW SCH 10S ASTM A403 WP316L
3" ELBOW 45 DEG LR ASME B16.9 BW SCH 10S ASTM A403 WP316L
4" ELBOW 45 DEG LR ASME B16.9 BW SCH 10S ASTM A403 WP316L
8" ELBOW 45 DEG LR ASME B16.9 BW SCH10S ASTM A403 WP316L
3/4" ELBOW 45 DEG LR ASME B16.9 BW SCH 40S ASTM A403 WP316L
2" ELBOW 90 DEG LR ASME B16.9 BW 140.00MM THK ASTM A403 WP316L
1" ELBOW 90 DEG LR ASME B16.9 BW SCH 10S ASTM A403 WP316L
1 1/2" ELBOW 90 DEG LR ASME B16.9 BW SCH 10S ASTM A403 WP316L
2" ELBOW 90 DEG LR ASME B16.9 BW SCH 10S ASTM A403 WP316L
3" ELBOW 90 DEG LR ASME B16.9 BW SCH10S ASTM A403 WP316L
4" ELBOW 90 DEG LR ASME B16.9 BW SCH 10S ASTM A403 WP316L
6" ELBOW 90 DEG LR ASME B16.9 BW SCH 10S ASTM A403 WP316L
8" ELBOW 90 DEG LR ASME B16.9 BW SCH 10S ASTM A403 WP316L
1/2" ELBOW 90 DEG LR ASME B16.9 BW SCH 40S ASTM A403 WP316L
3/4" ELBOW 90 DEG LR ASME B16.9 BW SCH 40S ASTM A403 WP316L
1" ELBOW 90 DEG LR ASME B16.9 BW SCH XXS ASTM A403 WP316L
2" X 1" REDUCER CONC ASME B16.9 BW 14.00MM THK X SCH XXS ASTM A403 WP
4" X 2" REDUCER CONC ASME B16.9 BW SCH 10SXS /10S ASTM A403 WP316L
1 1/2" X 1" REDUCER CONC ASME B16.9 BW SCH 10SXS /10S ASTM A403 WP316L
2" X 1" REDUCER CONC ASME B16.9 BW SCH 10SXS /10S ASTM A403 WP316L
2" X 1 1/2" REDUCER CONC ASME B16.9 BW SCH 10SXS /10S ASTM A403 WP316L
3" X 2" REDUCER CONC ASME B16.9 BW SCH 10SXS /10S ASTM A403 WP316L
1" X 1/2" REDUCER CONC ASME B16.9 BW SCH 10SXS /40S ASTM A403 WP316L
4" X 2" REDUCER ECC ASME B16.9 BW SCH 10SXS /10S ASTM A403 WP316L
4" X 3" REDUCER ECC ASME B16.9 BW SCH 10SXS /10S ASTM A403 WP316L
2" X 1 1/2" REDUCER ECC ASME B16.9 BW SCH 10SXS /10S ASTM A403 WP316L
2" TEE EQUAL ASME B16.9 BW 14.00MM THK X 14.00MM THK ASTM A403 WP316L
1" TEE EQUAL ASME B16.9 BW SCH10SXS/10S ASTM A403 WP316L
2" TEE EQUAL ASME B16.9 BW SCH 10SXS/10S ASTM A403 WP316L
3" TEE EQUAL ASME B16.9 BW SCH 10SXS/10S ASTM A403 WP316L
3" TEE EQUAL ASME B16.9 BW SCH10SXS/10S
8" TEE EQUAL ASME B16.9 BW SCH 10SXS/10S ASTM A403 WP316L
3/4" TEE EQUAL ASME B16.9 BW SCH 40SXS/40S ASTM A403 WP316L
1" TEE EQUAL ASME B16.9 BW SCH XXS x XXS ASTM A403 WP316L
2"X 1" TEE REDUCING ASME B16.9 BW 14.00MM THK x XS - XXS ASTM A403 WP31
4"X 2" TEE REDUCING ASME B16.9 BW SCH 10SXS/10S ASTM A403 WP316L
8"X 6" TEE REDUCING ASME B16.9 BW SCH 10SXS/10S ASTM A403 WP316L
2" X 1" TEE REDUCING ASME B16.9 BW SCH 10SXS/10S ASTM A403 WP316L
2" X 1 1/2" TEE REDUCING ASME B16.9 BW SCH 10SXS/10S ASTM A403 WP316L
3" X 2" TEE REDUCING ASME B16.9 BW SCH 10SXS/10S ASTM A403 WP316L
1" X 3/4" TEE REDUCING ASME B16.9 BW SCH 10SXS/40S ASTM A403 WP316L
2" ELBOW 90 DEG LR ASME B16.9 BW SCH 10S ASTM A815 WPS UNS S31803
6" X 4" REDUCER CONC ASME B16.9 BW SCH 160 X 160 ASTM A815 WPS UNS S31
10" TEE EQUAL ASME B16.9 BW 30.00MM X 30.00MM THK ASTM A815 WPS UNS S3
12" TEE EQUAL ASME B16.9 BW 35.00MM THK X 35.00MM THK ASTM A815 WPS UN
2" TEE EQUAL ASME B16.9 BW SCH 160 X 160 ASTM A815 WPS UNS S31803
6" TEE EQUAL ASME B16.9 BW SCH 160 X 160 ASTM A815 WPS UNS S31803
6" TEE EQUAL ASME B16.9 BW SCH 160 X 160 ASTM A815 WPS UNS S31803
6" TEE EQUAL ASME B16.9 BW SCH 160 X 160 ASTM A815 WPS UNS S31803
2" X 3/4" TEE REDUCING ASME B16.9 BW 14.00MM THK X SCH XXS ASTM A815 W
10" X 6" TEE REDUCING ASME B16.9 BW 30.00MM THK X SCH160 ASTM A815 WPS
12" X 6" TEE REDUCING ASME B16.9 BW 35.00MM THK X SCH160 ASTM A815 WPS
6" X 3" TEE REDUCING ASME B16.9 BW SCH 160 X 160 ASTM A815 WPS UNS S318
2" X 3/4" TEE REDUCING BW ASME B16.9 SCH 160 X 80S ASTM A815 WPS UNS S3
2" X 1" TEE REDUCING BW ASME B16.9 SCH 160 X 80S ASTM A815 WPS UNS S318
6" CAP STANDARD ASME B16.9 BW SCH 160 ASTM A815 WPS UNS S31803
6" CAP STANDARD ASME B16.9 BW SCH 160 ASTM A815 WPS UNS S31803
6" CAP STANDARD ASME B16.9 BW SCH 160 ASTM A815 WPS UNS S31803
2" ELBOW 45 DEG LR ASME B16.9 BW SCH 160 ASTM A815 WPS UNS S31803
3" ELBOW 45 DEG LR ASME B16.9 BW SCH 160 ASTM A815 WPS UNS S31803
1" ELBOW 90 DEG LR ASME B16.9 BW SCH 80S ASTM A815 WPS UNS S31803
2" ELBOW 90 DEG LR ASME B16.9 BW SCH 160 ASTM A815 WPS UNS S31803
3" ELBOW 90 DEG LR ASME B16.9 BW SCH 160 ASTM A815 WPS UNS S31803
10" ELBOW 45 DEG LR ASME B16.9 BW 30.00MM THK ASTM A815 WPS/WX UNS S3
12" ELBOW 45 DEG LR ASME B16.9 BW 35.00MM THK ASTM A815 WPS/WX UNS S3
10" ELBOW 90 DEG LR ASME B16.9 BW 30.00MM THK ASTM A815 WPS/WX UNS S3
12" ELBOW 90 DEG LR ASME B16.9 BW 35.0MM THK ASTM A815 WPS/WX UNS S31
6" ELBOW 90 DEG LR ASME B16.9 BW SCH 160 ASTM A815 WPS/WX UNS S31803
3" X 1" BONNEY SWEEPOLET SCH 160 X SCH 80S ASTM A182 F51
1.1/2" X 1/2" CON RED ASME B16.9 BW S 10S X 40S ASTM A403 WP316L
6" X 4" CON RED ASME B16.9 BW S 40S X 10S ASTM A403 WP316L
2" X 3/4" ECC RED ASME B16.9 BW S10S X 40S ASTM A403 WP316L
3/4" X 1/2" ECC RED ASME B16.9 BW S40S X 40S ASTM A403 WP316L
1" ELBOW 90DEG LR ASME B16.9 BW S10S ASTM A815 WP-S UNS S31803
1" ELBOW 45 DEG LR ASME B16.9 BW S80S ASTM A815 WP-S UNS S31803
DESCRIPTION
2" FLANGE WN ASME B16.5 150# RF SCH10S ASTM A182 F51
3" FLANGE WN ASME B16.5 150# RF SCH 10S ASTM A182 F51
6" FLANGE WN ASME B16.5 300# RF SCH 10S ASTM A182 F51
10" FLANGE WN ASME B16.5 300# RF SCH 10S ASTM A182 F51
12" FLANGE WN ASME B16.5 300# RF SCH 20 ASTM A182 F51
3/4" FLANGE BLIND ASME B16.5 150# RF ASTM A182 F316
1" FLANGE BLIND ASME B16.5 150# RF ASTM A182 F316
2" FLANGE BLIND ASME B16.5 150# RF ASTM A182 F316
3" FLANGE BLIND ASME B16.5 150# RF ASTM A182 F316
4" FLANGE BLIND ASME B16.5 150# RF ASTM A182 F316
8" FLANGE BLIND ASME B16.5 150# RF ASTM A182 F316
3/4" FLANGE BLIND ASME B16.5 300# RF ASTM A182 F316
1" FLANGE BLIND ASME B16.5 300# RF ASTM A182 F316
1" FLANGE WN ASME B16.5 150# RF SCH 10S ASTM A182 F316
1 1/2" FLANGE WN ASME B16.5 150# RF SCH 10S ASTM A182 F316
2" FLANGE WN ASME B16.5 150# RF SCH 10S ASTM A182 F316
3" FLANGE WN ASME B16.5 150# RF SCH 10S ASTM A182 F316
4" FLANGE WN ASME B16.5 150# RF SCH 10S ASTM A182 F316
6" FLANGE WN ASME B16.5 150# RF SCH 10S ASTM A182 F316
8" FLANGE WN ASME B16.5 150# RF SCH 10S ASTM A182 F316
1/2" FLANGE WN ASME B16.5 150# RF SCH 40S ASTM A182 F316
3/4" FLANGE WN ASME B16.5 150# RF SCH 40S ASTM A182 F316
1" FLANGE WN ASME B16.5 300# RF SCH10S ASTM A182 F316
1 1/2" FLANGE WN ASME B16.5 300# RF SCH 10S ASTM A182 F316
2" FLANGE WN ASME B16.5 300# RF SCH 10S ASTM A182 F316
3" FLANGE WN ASME B16.5 300# RF SCH 10S ASTM A182 F316
4" FLANGE WN ASME B16.5 300# RF SCH 10S ASTM A182 F316
1" FLANGE WN ASME B16.5 300# RF SCH10S (MATCHING) ASTM A182 F316
2" FLANGE WN ASME B16.5 300# RF SCH 10S (MATCHING) ASTM A182 F316
3/4" FLANGE WN ASME B16.5 300# RF SCH40S ASTM A182 F316
1" FLANGE WN ASME B16.5 150# RF S10S ASTM A182 F51
2" FLANGE WN ASME B16.5 300# RF S10S ASTM A182 F316
6" FLANGE WN ASME B16.5 300# RF S40S ASTM A182 F316
1/2" FLANGE BLIND ASME B16.5 150# RF WITH 6MM NPT ASTM A350 LF2 CL1
Update Forecast date of readiness
Due from Supplier w/c 09/02/15 - Schoeller B 2/20/2015
In stock - lab results due 09/01 1/16/2015
Due from Supplier w/c 09/02/15 - Schoeller B 2/20/2015
Ready to pack 1/9/2015
Ready to pack 1/9/2015
Ready to pack 1/9/2015
Ready to pack 1/9/2015
Due from Supplier w/c 09/02/15 - Schoeller B 2/20/2015
Due from Supplier w/c 09/02/15 - Schoeller B 2/20/2015
Ready to pack 1/9/2015
Ready to pack 1/9/2015
Ready to pack 1/9/2015
Due from Supplier 09/01/15 - Testing required 1/23/2015
Ready to pack 1/9/2015
Ready to pack 1/9/2015
In Stock - Upgrade testing 1/16/2015
Item in stock / incoming stock - Testing upgrad27 mtrs 16/01/2014
Incoming stock - SMST 150mtrs 13/02/2015
Incoming stock - SMST 150mtrs 13/02/2015
Incoming stock - SMST 300mtrs 27/02/2015
Incoming stock 16/02/15 - SMST 2/20/2015
In Stock - Upgrade testing 1/16/2015
Incoming stock 16/02/15 - SMST 2/20/2015
Incoming stock 16/02/15 - Schoeller Bleckmann2/20/2015
In Stock - Upgrade testing 1/16/2015
Ready to collect 09/01/15 - Butting 1/9/2015
Ready to collect 16/01/15 - Butting 1/16/2015
Ready to pack 1/9/2015
Stock - Upgrade testing required 1/30/2015
In Stock - Upgrade testing 1/16/2015
Due from Supplier 09/01/15 - Upgrade testing 1/16/2015
Due from Supplier 09/01/15 - Upgrade testing 1/16/2015