GOVERNMENT OF PAKISTAN PLANNING COMMISSION

PC-I FORM

(PRODUCTION SECTORS)

1. Name of the Project: Strengthening and Rehabilitation of Agriculture Research


stations and Institute in Khyber Pakhtunkhwa

2. Location: This Project will be located in the following districts of Khyber Pakhtunkhwa

Southern Districts: D.I. Khan, Kohat, Karak, Bannu


Central districts: Peshawar, Nowshera, Swabi and Mardan
Northern Districts: Swat, Chitral and Buner
Eastern Districts: Abbottabad, Mansehra,

In Khyber Pakhtunkhwa, systematic agricultural research was started in 1908 at Tarnab,


Peshawar. Now a network of 16 Agriculture Research Institutes/stations with 7 sub-stations are
functioning in the province. All these Institutes/Stations are located in different Agro ecological
zones which provide a large spectrum of R&D activities in crops, fruits and vegetables.
The project would be executed at different Research Institutes’/Stations for the strengthening and
rehabilitation for improvement of research and development. The existing set up of Agricultural
Research System will be strengthened through infrastructure facilities and modern
instrumentation.

1
District Wise Coordinates

Location Elevation (m) Latitude (N) Longitude (E)


ARI Tarnab Peshawar 308 33.58.542 071.41.611
DGAR (H.Q) AUP Pesh. 359 34001.220 071028.108
ARI D.I.Khan (Rata Kulachi) 178 31052.370 070053.220
ARI Mangora Swat 916 34°46.727 072°19.813
CCRI, Pirsabak, Nowshehra 288 34°01.112 072°02.501
SCRI, Mardan 310 34°12.309 071°58.404
HARS, Abbottabad 1210 34°12.382 073°14.930
ARS Baffa, Mansehra 912 34026.04 73013.52
SARS Kaghan 2050 34046.57 73031.48
ARS, Swabi 335 34°07.354 072°30.481
BARS kohat 432 33.30.537 071.26.225
ARS Chitral 1533 35055.04 71048.91
Sub-Station Booni 2084 36016.55 72015.85
ARS, Karak (Ahmad wala) 472 33004.261 071000.777
ARS Bannu (Metha khel) 323 32055.177 070041.110
ARS, Sarai Naurang 296 32049.865 070046.718
ARS Buner (AMNAWAR) 712 34°29.243 072°34.385

Authorities responsible for:

Indicate name of agency responsible for sponsoring, execution, operation and maintenance
i. Sponsoring Agriculture, Livestock and Cooperative Department, Government of
Khyber Pakhtunkhwa through ADP 2017-18.

ii. Execution Director General Agriculture Research through concerned


Station Directors.
iii. Operation and maintenance Principal Investigator (P.I) along with concerned
Institute/Stations Directors.

In case of more than one agency, give their component wise responsibility. For provincial
projects, name of the concerned federal ministry be provided.

NA
4. a. Plan provision
If the project is included in the plan, specify actual allocation.
The Project has been included in the ADP 2017-18 with an amount of Rs. 500.00 million,
but the scheme was approved in the PDWP meeting with an amount of 498.600 million and
will be funded by Government of Khyber Pakhtunkhwa with allocation of Rs. 75.00 million
(Capital 60.00 & Revenue 15.00 million) for Current Financial Year.

If not included in the current plan, what warrants its inclusion and how it is
now proposed to be accommodated?

The Project has been included in the ADP 2017-18

2
If the project is proposed to be financed out of the block provision, indicate.

NA

b. Provision in the current year PSDP/ADP

Rs. 75.00 million (Capital 60.00 & Revenue 15.00 million) has been allocated in the
ADP 2017-18 for the project.

5. Project objectives and its relationship with sector objectives:


The objectives of the sector/sub sector as indicated in the medium
term/five year plan to be reproduced. Indicate objectives of the
project and develop a linkage between the proposed project and
sectoral objectives.

Project objectives:

The overall goal of the project is to strengthen the provincial agricultural research system
(in terms of infrastructure, research equipment / machinery, laboratories, farm land etc.), so the
desired capacity to meet future challenges with special emphases on the implementation of the
WTO regime, climate change and to bridge up the scope and harness the research activities
which are not possible under the prevailing hierarchy of the system.
Specific Objectives.
 Strengthening of Food Technology, Soil testing, plant pathology, Cereal and plant
Physiology Laboratory at ARI Tarnab.
 Up-gradation of Weather Stations at ARI Tarnab, CCRI Pirsabak, SCRI Mardan, BARS
Kohat and ARS Chitral.
 Repair and renovation of damaged offices, Labs, and Strengthening of Soil testing
Laboratory at ARI D.I.Khan.
 Installation of Solar Tube Well for irrigation at ARI D.I.Khan.
 Purchase of 13 Acres leased land at GPU Baikan ARI Swat.
 Strengthening of Entomology, cereals and plant pathology laboratory at ARI Swat.
 Repair and renovation of offices, Labs, and other structure at BARS Kohat.
 Construction of Official Building at GPU Jabba Mansehra.
 Installation of Tube Well for irrigation at HARS Abbottabad.
 Repair and renovation of structure at HARS Abbottabad and Sub Station Battakundi.
 Strengthening of Food Technology Laboratory at ARS Chitral.
 Strengthening of Research Laboratory at ARS Karak.

3
 Strengthening of Soil Testing Laboratory and Establishment of tissue culture/ Bio tech
laboratory at ARS Baffa Mansehra.
 Installation of Irrigation Channels at ARS Buner.
 Repair and renovation work at ARI Tarnab Peshawar.

Relationship with Sectoral objectives

The project falls under the priority area of Government of Khyber Pakhtunkhwa. The main focus
of the current project is to improve infrastructure of Research System and equipped the system
with advanced machinery in order to increase the quality production of fruits, vegetables and
crops in Khyber Pakhtunkhwa and to uplift the service delivery of the system.
Agricultural Research System, Khyber Pakhtunkhwa is engaged to develop varieties in crops,
fruits and vegetables. In the present Scenario of the Province, Country and International trade
Policy of WTO, it is utmost to stream line the research activities on modern basis to achieve the
WTO standards. In order to come out of food deficit list, strengthening of agriculture research
system with modern instrumentation and infrastructure will serve to be a tool to enhance the crop
quality and quantity and for the boosting economy.

In case of revised projects, indicate objectives of the project if different from original PC-I
N.A

6. Description and Justification of Project


Describe the project and indicate existing facilities in the area and justify the
establishment of the project.
This Project “Strengthening and Rehabilitation of Agricultural Research Institutes/stations of
Khyber Pakhtunkhwa” is designed with the aim to strengthen the Research System to augment
the research activities. The Research Institutes/Stations have been involved since long time in the
research activities to develop improved varieties of crops, fruits and vegetables in order to
increase productivity and the socio economic status of the farming community. Since the
establishment of these research Institute/Stations no improvement/or repair work has been
carried-out and most of the buildings including research labs are in dilapidated condition.
Likewise all Laboratories are outdated and have not been equipped with latest tools since its
establishment.

4
This project is covering the overall institutional development to cater for the new developmental
and scientific challenges through strengthening. The existing Food Technology, Soil testing,
plant physiology, cereal and plant pathology laboratory will be strengthened at ARI Tarnab.
Moreover Soil Testing laboratory at ARS Baffa Mansehra will be strengthened and tissue
culture/ Bio tech laboratory will be established for further quality research. Cereal Crops
Research Institute (CCRI) Pirsabak, Nowshera is a focal point of all research and seed
production activities for wheat and maize in Khyber Pakhtunkhwa. Laboratory equipments will
be purchased and Weather Station will be Up-graded at CCRI Pirsbak Nowshehra. The
laboratories and other structures at ARI D.I.Khan is in very worse condition therefore damaged
offices, Labs, and other structures at ARI D.I.Khan will be repaired and Solar Tube Well for
irrigation will be installed. Agricultural Research Station, Swat is involved in producing
improved fruit varieties and fruit plants nurseries. 13 Acres leased land at GPU Baikan ARI Swat
will be purchased to protect the valuable Germplasms of fruit varieties consistently supplying
propagating material.
Barani Agriculture Research Station (BARS) Kohat is involved in research to improve
agriculture productivity of Barani areas through evolving high yielding, drought tolerant varieties
appropriate for the agro-ecological environment of Kohat and adjacent Barani areas.
Laboratories at BARS Kohat will be strengthened with equipments to ensure the year round
research activities in all respects to cope with their requirements.
Hazara Agriculture Research Station (HARS) Abbottabad has been involved in different research
activities i.e Horticulture, Tissue Culture and soil analysis since 1978-79 respectively. The
present population pressure and growing demands of the farmers direly needs it projection to
cope with their needs. Therefore it is utmost important to revisit the station and upgrade the
existing facilities in all respect. A temperate fruit Germplasm unit on an area of 10 acres was
established at Jabba in 2007 but no civil work was carried out at the site therefore the Official
Building at GPU Gabba Mansehra has been demanded. Moreover a Solar Tube Well for
irrigation at HARS Abbottabad will be installed and the structure at HARS Abbottabad, Sub
Station Bttakundi and Sub Station Haripur will be repaired. Research Laboratory at ARS Chitral,
Karak, Swabi, Sarai Nourang and Bannu will be strengthened to improve the research work.

5
Existing Facilities:

At present all the mentioned Research Institutes/Stations have the major facilities like land,
scientists, building etc but to pace up the research activities on modern lines and meet the
requirements of the growing population, some facilities will be acquired that are lacking in the
Research system. Though the Research System has major infrastructure but direly requires new
interventions made in terms of civil work, which are very important for research, safety,
protection of major building, machinery and precious research materials.
Existing and Required facilities:

Location Existing Resources Required Resources Remarks


ARI Tarnab All the major resources
-Repair and renovation of Strengthening of
like building, land,
damaged offices, Labs, and Research
vehicles and staff are
other structure. laboratories is
available. -Equipments for Food needed for the
Technology, Soil testing, quality research.
plant pathology, physiology,
cereals laboratory.
DSPN ARI All the major resources - Repair and renovation of Strengthening of
Tarnab like building, land, damaged offices & Labs. Research laboratory
vehicles and staff are -Equipments for Soil testing with required repair
available. laboratory as the existing are and renovation
obsolete and dis-functional
ARI Swat -DO- -Purchase of 13 Acres leased Land is needed to
land at GPU Baikan, Swat protect the valuable
-Laboratory Equipments germplasm of Apple
and Cherry varieties.
ARI, All the major resources -Repair and renovation of The infrastructure of
D.I.Khan like building, land and damaged offices, Labs, and institute is in very
staff are available. other structure. worst condition.
-Installation of Solar Tube Tube well is needed
Well for irrigation. for the irrigation
-Equipments for Soil testing purpose.
laboratory.
CCRI, -DO- -Laboratory Equipments. For research
Pirsabak -Weather Station activities
ARS, Swabi Infrastructure, land and -Laboratory Equipments Lab Equipments are
other resources are -Farm Machinery needed for various
available research activities
HARS, The major resources -Construction of Official The infrastructure,
Abbottabad like building, land, Building at GPU Gabba tube well and lab
vehicles and staff are Mansehra. Equipments are
available. -Installation of Solar Tube needed to run the
Well for irrigation at HARS routine research
Abbottabad. activities

6
- Machinery and Equipment.
Location Existing Resources Required Resources Remarks
ARS, Kohat -DO- -Equipments for Soil testing To strengthen the
laboratory. Soil Laboratory for
research purpose.
ARS, All the major resources -Food Technology laboratory To strengthen the
like building, land, Equipments food technology
Chitral
vehicles and staff are -Screen/Green house laboratory and other
available. structure for better
research work,
ARS, Baffa -DO- -Soil & tissue culture lab To strengthen the
Equipments Research
Mansehra
-Farm Machinery Laboratories for
-Strengthening of Tissue research purpose.
culture lab.
ARS Sarai All the major resources -Laboratory Equipments and For research
Naurang like building, land, machinery activities
Bannu vehicles and staff are
available.
ARS Bannu -Do- - installation of Tube well for Availability of
drinking purpose drinking water
-Laboratory Equipments and
machinery
ARS Buner -Do- -Construction of Steel shed To strengthen the
and Road. Research Station
-Machinery
SCRI -Do- -Machinery & Equipments To strengthen the
Mardan Research Station
ARS -DO- -Equipments & machinery To strengthen the
Karak Research
Laboratories for
research purpose.
Directorate All the major resources -Office Equipments To strengthen the
General of like building, land, Directorate for
Agriculture vehicles and staff are effective
Research. available. Administration.
Directorate -Office Equipments To strengthen the
of Outreach -Do- Outreach Directorate
Agriculture
Research

7
Justification of the project:
The justification of the project is given as follows:

Infrastructure and other interventions for selected Research Institutes/Stations

The Research Institutes/Stations, like ARI Tarnab, Swat, D.I.Khan, CCRI Pirsabak, SCRI
Mardan, HARS Abbottabad, BARS Kohat, ARS Chitral, Karak, Bannu, Swabi Sarai Nourang
and Buner have been involved since long time in the research activities to produce improved
varieties in crops, fruits and vegetables to increase production. The ARS, Swabi is a newly
established Station of the Research system which has recently started R&D activities. These
Institutes/stations are important as backbone for the agriculture in the province. They are playing
important role in the agriculture sector. They have developed invaluable and precious research
material which needs to be protected for future use. These institutes/stations are the pioneers in
the research and development process for the province as working under different disciplines.
These institutes/stations have the major infrastructure but need to improve infrastructure of
Research System and equipped the system with advanced machinery in order to increase the
quality production of fruits, vegetables and crops in Khyber Pakhtunkhwa.
Food Technology, Cereal, Soil testing and plant pathology laboratory will be strengthen at ARI
Tarnab and Tissue Culture and Soil testing Laboratory at ARS Baffa Mansehra for improvement
in their working capacity. Food Technology laboratory Equipments will be purchased for Chitral
because ARS Chitral is involved in different research activities in different field crops and there
is a big scope for crops, fruits and vegetables. Tube wells at ARI D.I.Khan, HARS Abbottabad
and ARS Bannu will be installed for the irrigation purpose which will improve Research
efficiency.

8
Provide technical parameters i.e. input and output of the project in quantitative
terms. Also discuss the technology aspect of the project.
S. No Input Output
1. Laboratory instruments for Soil, pathology, Enhance analyzing capacity of Labs for
and food Labs as mentioned on Page No. 10 quality and timely results

2. Installation of Tube well at ARI D.I.Khan, Availability of water for drinking and
HARS Abbottabad & ARS Bannu. augmenting the Research activities.

3. Installation of water channels at Availability of water for Irrigation


ARS Buner purpose to augmenting the Research
activities.
4. Establishment of tissue culture lab at ARS less inputs and time to get more and true
Baffa Mansehra to type nursery
5. Repair and Renovation at ARI Tarnab, Improve working environment
D.I.Khan, HARS Abbottabad, GPU Jabba,
Haripur, Battakundi & ARS Buner,
6. Purchase of Land at ARI Swat Different fruit Nurseries will be
established
7. Green House at ARS Chitral. Availability of control environment and
offseason vegetables.

Provide details of civil work, equipments, machinery and other physical activities
required for the project
The details cost estimates of civil work in the following Institutes/Stations.
S. No Institute/Station Nature of work
1. ARI, Tarnab Repair/Renovation of Office Buildings Laboratories, Seed Stores.
(DCEs attached on Page No. 96)
2. ARI D.I.Khan Repair/Renovation of Office Buildings and laboratories.
(DCEs attached on Page No. 194)
3. HARS Repair/Renovation of Office Buildings, Hostel and Colony.
Abbottabad (DCEs attached on Page No. 209)
Sub Station Repair and Renovation of Soil & Water testing laboratory.
Haripur (DCEs attached on Page No. 280)
GPU Jabba Construction of Office, training hall, store, machinery shed and
Mansehra watchman hut with water supply. (DCEs attached on Page No. 292)
Sub Station Repair of Old Huts, Construction of Office, Hostel, watchman Hut,
Battakundi field track with water supply. (DCEs attached on Page No. 332)
4. ARS Baffa Construction of Tissue culture laboratory with electrification and solar
Mansehra system (DCEs attached on Page No. 370)
5. ARS Buner Construction of steel Seed Shed (DCEs attached on Page No. 386)
Construction of Road in ARS Buner (DCEs attached on Page No. 393)
6. DSPN, Repair/Renovation of Directorate Blocks of S.P.N Peshawar.
ARI Tarnab (DCEs attached on Page No. 407)

9
List of equipments and Machinery: Rs. Million

S.No Items Cost


ARI Tarnab Peshawar
1 List of Equipments for different Research Labs are Annexed on 54.046
page No. 25&26
DSPN ARI Tarnab Peshawar
2 List of Equipments for different Research Labs are Annexed on 30.125
page No. 26
CCRI, Pirsabak
3 List of Equipments for different Research Labs are Annexed on 15.250
page No. 29
ARI D.I.Khan
4 List of Equipments for different Research Lab is Annexed on page 21.320
No. 28
HARS, Abbottabad
5 List of Equipments for different Research Labs are Annexed on 5.450
page No. 27
ARS Baffa Mansehra
6 List of Equipments and machinery are Annexed on page No. 29 27.825
ARS Swabi
7 List of Equipments and machinery are Annexed on page No. 30 3.500
BARS Kohat
8 List of Equipments are Annexed on page No. 28 18.300
ARI Swat
9 List of Equipments and machinery are Annexed on page No. 27 8.820
ARS Bannu
10 List of Equipments and machinery are Annexed on page No. 30 2.215
ARS Sarai Naurang Bannu
11 List of Equipments and machinery are Annexed on page No. 30 0.955
ARS Chitral
12 Food Processing Unit is Annexed on page No. 31 10.000
ARS Karak
13 List of Equipments and machinery are Annexed on page No. 31 4.250
ARS Buner
14 Rotavator Annexed on page No. 28 0.100
SCRI Mardan
15 List of Equipments are Annexed on page No. 27 8.800
Directorate General Office
16 List of Equipments are Annexed on page No. 31 1.240
Directorate of Outreach
17 List of Equipments are Annexed on page No. 31 0.680

Grand Total (Equipments & Machinery) 212.876

10
Indicate governance issues of the sector relevant to the project and strategy to
resolve them.
NA

7. Capital Cost Estimates


Indicate date of estimation of project cost estimates: July, 2017

Basis for determining the capital cost be provided. It includes market survey,
schedule rates, estimation on the basis of previous work done etc.

Rates included in the PC-1 are based on MRS-2017 market analysis and on the basis of previous
similar nature of work done by the department.

Provide Year wise estimation of physical activities as per following:


Summarized Physical Activities to be carried out in this Project:

S. No Plan of work with units Unit Over all Targets


1 Repair and Renovation of Offices, % 100
Laboratories and other Structures
2 Purchase of Equipments and Machinery for % 100
Laboratories as mentioned on page No.10
3 Installation of Tube well at HARS No. 3
Abbottabad & ARS Bannu and Solar Tube
Well at ARI D.I.Khan.
4 Installation of Weather Station (Automatic) at No. 5
ARI Tarnab, D.I.Khan, CCRI Pirsbak, SCRI
Mardan and BARS Kohat.
5 Green/Screen House at ARS Chitral No. 1

6 Water channel at ARS Buner No. 1

8 Establishment of Tissue Culture Laboratory No. 1


at ARS Baffa Mansehra.
9 Strengthening of Food Tech. Lab at ARI No. 2
Tarnab and ARS Chitral
10 Strengthening of Soil Labs at ARI Tarnab, No. 3
D.I.Khan and ARS Baffa Mansehra
11 Seed Store Construction at ARS Bunir No. 1

12 Purchase of Leased Land at ARI Swat Acres 13

11
Provide year wise estimation of physical activities as per following
ARI Tarnab
Item of Work Unit 2017-18 2018-19 2019-20 Total
Purchase of food, Pathology, Physiology, cereal % 40 50 10 100
Laboratory Equipments.
Repair and Renovation of Labs and offices % 70 20 10 100
DSPN ARI Tarnab
Purchase of Soil Laboratory Equipments. % -- 60 40 100
Repair and Renovation of Labs and offices % 30 40 30 100
Weather Station installation (Auto) No. 1 -- -- 1
ARI D.I.Khan
Repair & renovation of offices, Labs. % 30 40 30 100
Installation of Solar Tube Well No. -- 1 -- 1
(DCEs attached on page No. 70)
Purchase of Soil Laboratory Equipments. % -- 40 60 100
Weather Station installation (Auto) No. -- 1 -- 1
ARI Swat
Purchase of leased land (GPU Biakan) Swat Acres -- 13 -- 13
Purchase of Laboratory Equipments % -- 60 40 100
CCRI Pirsabak
Purchase of Laboratory Equipments. % -- 40 60 100
Weather Station installation (Auto) No. -- 1 -- 1
ARS Swabi
Purchase of Laboratory Equipments % -- 100 -- 100
HARS Abbottabad
Construction of Official Building at GPU Jabba % 20 40 40 100
Mansehra.
Installation of Tube Well No -- 1 -- 1
(DCEs attached on page No. 57)
Repair and Renovation of structure at % 20 40 40 100
Abbottabad, Sub Station Battakundi & Haripur
BARS Kohat
Purchase of Equipments % -- 80 20 100
Weather Station installation (Auto) No. -- 1 -- 1
ARS Chitral
Food Technology laboratory Equipments % -- -- 100 100
Glass/Green house No -- 1 -- 1
ARS Baffa Mansehra
Purchase of Soil & tissue culture lab Equip. % -- 60 40 100
Establishment of Tissue culture lab % -- 30 70 100
ARS Sarai Nourang Bannu
Purchase of lab Equipments. % -- 100 -- 100
ARS Bannu
Purchase of Equipments & machinery % -- 100 -- 100
Tub well installation for drinking water No. -- 1 -- 1
(DCEs attached on page No. 50)
ARS Karak
Purchase of Equipments & machinery % -- -- 100 100
SCRI Mardan
Installation of Weather Station (Automatic) No. -- 1 -- 1
Purchase of lab Equipments. % -- 100 -- 100

12
Item of Work Unit 2017-18 2018-19 2019-20 Total
ARS Buner
Installation of Water Channel No. -- 1 -- 1
(DCEs attached on page No. 33)
Construction of steel Seed Shed No. -- 1 -- 1
Lath House Construction No. -- 3 -- 3
Directorate General Agriculture Research
Purchase of lab Equipments. No. 30 70 -- 100
Directorate of Outreach Agriculture Research
Purchase of lab Equipments. No. 40 60 -- 100

13
Year Wise/Component Wise Capital Cost Estimates
Summarized Financial Phasing (2017-18 To 2019-20) Rs. Million

14
15
16
17
18
8. Annual operating and maintenance cost after completion of the Project Item wise
annual operating cost based on proposed capacity utilization for 5 years .
Rs. 10.000 million

9. DEMAND AND SUPPLY ANALYSIS

Description of product/services
Demand/supply along with unit price for the last five years
NA
Import/exports for the last five years along with unit price (if applicable)
NA
Project demand /supply for 10 years.
NA
Proposed year wise production and unit price of the product.
NA
Existing and proposed arrangements for marketing
NA

10. FINANCIAL PLAN

Source of Financing:
(a) Equity:
Indicate the amount of equity to be financed from each source
 Sponsored own resources N.A
 Federal Government N.A
 Provincial Government 500.00 million
 DFI’s/Banks NA
 General Public NA
 Foreign equity NA
 NGO’s/ Beneficiaries NA
 Others NA
(b) Debt:
Indicate the local and foreign debt, interest rate, grace period and repayment period for each
loan separately. The loan repayment schedule be also annexed. N.A
(c) Grants along with source: N.A

19
(d) Weighted cost of capital: N.A
11. PROJECT BENEFITS AND ANALYSIS

Financial:

Income to the project along with assumptions:

There is no direct financial benefit; however, with the increased agricultural production the revenue
of the government will be enhanced.
It is expected that the project will generate an income by using the same cropped area with
increments in production due to the use of modern instruments in crop data and forecasting to
minimize loss in crop production.
However, it is worth mentioning that agriculture sector is open to natural calamities e.g., bad
weather including wind storm, hail storm, drought stresses, epidemics, insect pests and many other
such unfavorable weather conditions which can adversely affect the production targets.

Economic Benefits:
Benefit to the economy along with assumptions

The project activities are intended to enhance the agricultural production of the Province, thus
increasing farm income. The ultimate beneficiary would be the farming community of the Province.
With the increase farm income economic activity would be generated which will benefit farmers,
entrepreneurs and other stakeholders down the value chain.
The project is economically viable as it has long term benefits.
The project will result in boosting the economy of the province indirectly through:
1. Increase in agricultural production through new interventions
2. Boosting food industry and other food products through increased raw material.
3. Create job opportunity directly in the project activities and indirectly due to the
increased production.

Social benefits

The activities of the project will enhance the capacity of the stations through strengthening of
Research Laboratories and farm machinery and proper infrastructure which will improve the
research work and the farmers will be benefited from the advance technology that will increase the
social status of the farming communities.

20
The project will have the following social benefits.

1. Living standard of the rural communities (farmers) will be improved.


2. The project will help in poverty alleviation especially in rural areas of the province.
The main beneficiaries of this project would be the farming community (men and women) of
Khyber Pakhtunkhwa. Enhancement in crops, vegetables and fruit plants productivity which
ultimately encourages agriculture related business, absorbing more and more people in the
agriculture industry.

Environmental impact assessment:


The project is environment friendly with no adverse impact on the environment.

Financial/Economic Analysis (with assumptions) of the Project.

This Project comprised of strengthening of all research stations. The IRR values of the Project
based on the average net benefits. The details of the assumed benefits (Both qualitative and
quantitative) with respect to the assumed operational cost are given as:

NPV, IRR AND COST BENEFIT RATIO:


Year Project Cost O&M Cost Total Cost Benefits Net Benefits
2017-18 75.000 0.000 75.000 0.000 -75.000
2018-19 286.412 0.000 286.412 0.000 -286.412
2019-20 137.188 0.000 137.188 0.000 -137.188
2020-21 0.000 0.500 0.500 30.000 29.500
2021-22 0.000 0.500 0.500 45.000 44.500
2022-23 0.000 0.700 0.700 60.000 59.300
2023-24 0.000 0.700 0.700 80.000 79.300
2024-25 0.000 0.700 0.700 95.000 94.300
2025-26 0.000 1.000 1.000 105.000 104.000
2026-27 0.000 1.000 1.000 120.000 119.000
2027-28 0.000 1.000 1.000 130.000 129.000
2028-29 0.000 1.200 1.200 145.000 143.800
2029-30 0.000 1.200 1.200 160.000 158.800
2030-31 0.000 1.200 1.200 175.000 173.800
2031-32 0.000 1.500 1.500 190.000 188.500
2032-33 0.000 1.500 1.500 210.000 208.500
2033-34 0.000 1.500 1.500 220.000 218.500
Total 498.600 14.200 512.800 1765.000 1252.200

21
NPV 77.102
IRR 14.36%
Benefit Cost Ratio 3.4

SWOT Analysis of Khyber Pakhtunkhwa Agricultural Research System


Strengths
Highly qualified, well trained and experienced research staff in some fields but needs capacity
building
Research Laboratories are available in all the stations but need some strengthening through latest
equipments.
The infrastructure of all the Research Institutes/Stations is available but many buildings are very
old and need repair and renovation.
Tremendous experience of working with foreign donor projects.
Made significant contributions through successful strategic interventions at selected locations
around Khyber Pakhtunkhwa.
Weaknesses
Poor contacts with national and international research organizations.
Most scientists are short of writing skills and technical knowledge in new Enterprises including
computer literacy and use of modern instruments.
Poor in-service training.
Channels of communication too long to be effective.
Opportunities
Great chances for improved collaboration and efficiency through merger of similar organization
i.e., research, education and extension.
Excellent opportunities for collaboration with public research and extension organizations, private
companies and NGOs.
Better services and more tangible benefits for researchers would uplift their lost moral.
Great opportunities for collaboration with all stakeholders.
Greater opportunity for well thought out research interventions as has been successful in the past.
The existing wider yield gap is also a great opportunity. We are far below the achievable potential.
Threats
Prevailing economic situation: unlikely that Khyber Pakhtunkhwa government will increase
budgetary allocations.
Instability in macro-economic and political environment. As a result foreign donors are
withdrawing.
Pressure due to law and order situation may force closures of projects at some locations
Hostile socio-economic environment threatens research operations and harassment of researchers.
Unpredictable fuel supplies and public strikes can discontinue research activities at critical stages.
12. (a) Implementation Schedule
 Starting date July, 2017-18

22
Completion date June, 2019-20 (36 months)
 Activity Flow Chart (Annexed on Page No. 452 )

(b) Result Based Monitoring (RBM) Indicators


S.No Input Output Outcome Target impact
Baseline Targets after
indicator completion of project
1 Strengthening of Repair of Existing Protection of precious Improved service
Research Infrastructure Infrastructure research material of delivery to the
Institutes/Stations (Labs, Offices crops, fruits, vegetables farming
and others) and security measures community
Advance Obsolete Quality Research
Equipments and Instruments
machinery
2 Strengthening of Tube well and Installation of 3 No. of Tube wells and Availability of
Research water channels New tube well water channels Water for
Institutes/Stations Irrigation and
drinking purpose.
3 Strengthening of Purchase of Farm land for 13 Acres land will be to augment
Research leased land Research available for Research Research activities
Institutes/Stations
4 Strengthening of Weather Stations Installation of 5 No. Weather Stations Weather data will
Research Weather Stations will be available for be available for
Institutes/Stations Weather Data collection Research activities

13. Management structure and manpower requirements including specialized skills during
construction and operational phases

All the Activities of this project will be executed through Director General Agricultural Research.
However the concerned Station Directors will be responsible for the implementation of the relevant
intervention.
Monitoring Mechanism: the following committee will be constituted for the monitoring of
the project activities
 Director Planning Research (DRP)
 Deputy Director Outreach
 Concerned Station Directors
 Annotated Reply of the observations made by M&E P&D department Khyber
Pakhtunkhwa is attached on Page No. 459
TORs
 Timely monitoring of the project activities.
 Proposing timely corrective measures, if any, to the concerned Station Director.
 Proper reporting to the Directorate General Agriculture Research.

14. Additional Projects/Decisions Required

23
N.A

24
15. Certified that the project has been prepared on the basis of instructions provided by the
planning commission for the preparation of PC-1 for production sector projects

PREPARED BY:
---------------------------------------------
Dr. Bashir Ahmad
Director Planning (Research)
Directorate General Agric. Res.
System

---------------------------------------------
Syed Sadaqat Ali Shah
Assistant Director Planning
Directorate General Agric. Res.
System

---------------------------------------------
Miss Ubairah
Assistant Director Planning
Directorate General Agric. Res.
System

CHECKED BY: ---------------------------------------------


Dr. Naveed Akhtar
Director General Research,
Agril. Research Khyber
Pakhtunkhwa Peshawar

COUNTERSIGNED BY: ---------------------------------------------


Muhammad Israr Khan
Secretary
Government of Khyber Pakhtunkhwa,
Agriculture, Livestock &
Cooperative Deptt

Approved by PDWP in its meeting held on 30-11-2017

25
Annexure-1
Machinery and Equipments

ARI Tarnab:
(Food Science and Technology)
S.NO Name of Machinery/ Equipments Qty. Cost
Rs. (millions)
1. Ethylene analyser 1 2.500
2. Digital Varnier callipers 1 0.040
3. Cell turgidity 1 0.700
4. Nitrogen/Protein analyser unit 1 5.000
5. Incubator (-20 to +10 C) 1 0.600
6. Water bath (shaking + static) 1 0.250
7. Centrifuge machine up to 4-degree C 1 0.800
8. Rotary Evaporator 1 1.800
9. Homogeniser 1 0.800
10. Texture analyser 1 2.500
11. Powder Flow Tester 1 3.900
12. Rheo-meter Cone & Plate 1 2.200
13. Viscometer new Latest Touch Screen 1 0.900
14. Autoclave 1 1.500
Sub-Total -- 23.490

(Plant Pathology)
S.NO Name of Machinery/ Equipments Qty. Cost
Rs. (millions)
1. Autoclave 1 1.500
2. Microscope with digital camera with PC, laptop or attachable 1 0.800
LCD monitor or screen.
3. Laminar flow unit 1 0.800
4. Centrifuge Machine 1 0.800
5. Distillation unit 1 0.100
Sub-Total - 4.000
(Plant physiology)
S.NO Name of Machinery/ Equipments Qty. Cost
Rs. (millions)
1. Autoclave 1 1.500
2. Atomic Absorption 1 13.000
3. Microscope with digital camera with PC, laptop or attachable 1 0.800
LCD monitor or screen.
4. Canopy Analyser for Leaf area measurement 1 1.200
5. Nitrogen / Protein Analyzer 1 5.000
6. PH meter 1 0.150
7. Mini Chlorophyll Florescence Analyser 1 0.500
8. Distillation unit 1 0.100
9. ELISA Reader + ELISA Plates, Plant diseases detection 1 1.000
through serological tech.
Sub-Total - 23.250

26
(Cereal Section)
S.NO Name of Machinery/ Equipments Qty. Unit Cost Cost
Rs. (millions)
1. Experimental Thresher 1 0.180 0.180
2. Mini Combine maize peeler 1 0.080 0.080
3. Experimental Maize and wheat planter 1 0.070 0.070
4. Digital Automatic Seed Counter 1 0.065 0.065
5. Combined soil Nutrient Tester 1 0.125 0.125
6. Seed Cleaner 1 0.070 0.070
7. High Efficiency maize Sheller 1 0.130 0.130
Sub-Total - 0.720 0.720
(Farm Management)
S.NO Name of Machinery/ Equipments Qty. Unit Cost Cost
Rs. (millions)
1. Rotavator 2 0.380 0.760
2. Ridger 1 0.086 0.086
3. Wheat Reaper 2 0.150 0.300
4. Panj pala 3 0.0566 0.170
5. Cultivator 2 0.085 0.170
6. Photocopier 1 0.400 0.400
7. Generator 1 0.700 0.700
Sub-Total - - 2.586
Total Tarnab -- - 54.046

Qty. Unit Cost Cost


S. No. Name of Machinery/ Equipments Rs. (millions)
1. Atomic Absorption 1 13.000 13.000
2. Flame Photometer 1 1.000 1.000
3. Spectrophotometer 1 1.500 1.500
4. Nitrogen / Protein Analyzer 1 5.000 5.000
5. pH meter 2 0.150 0.300
6. EC meter 2 0.100 0.200
7. Analytical Balance 2 0.150 0.300
8. Hot Plate 2 0.1025 0.205
9. Drying cabinet 1 1.000 1.000
10. Fume Hood 1 1.000 1.000
11. Centrifuge 12000 RPM 2 0.700 1.400
12. Electric Shaker 1 0.050 0.050
13. Furnace 1 0.500 0.500
14. Leaf Grinder 1 0.070 0.070
15. Soil Grinder 1 0.200 0.200
16. Water distillation Unit 2 0.100 0.200
17. Limner Flow Unit 1 0.800 0.800
18. Auto clave 1 1.500 1.500
19. Weather Station (Automatic) 1 1.500 1.500
20. Photocopier 1 0.400 0.400
Total - -- 30.125

27
Directorate of Soil & Plant Nutrition ARI Tarnab Peshawar

SCRI Mardan
S. No. Name of Machinery/ Equipments Qty. Cost
Rs. (millions)
1 Weather Station (Automatic) 1 1.500
2 Sugarcane planter 1 6.000
3 Microscope with digital camera with PC, laptop or 1 0.800
attachable LCD monitor or screen.
4 Sugarcane Digger 1 0.500
Total - 8.800

ARI Swat
S. No. Name of Machinery/ Equipments Quantity Unit Cost Cost
Rs. (millions)
1. Microscope with digital camera with PC, laptop or 1 0.800 0.800
attachable LCD monitor or screen.
2. Ultra low freezer 2 1.500 3.000
3. Insect Activator (Aluminum) 2 0.125 0.250
4. Chemical and Glassware -- -- 1.000
5. Oven 1 0.400 0.400
6. Grain Analyser 1 1.800 1.800
7. Mini Reaper 1 0.200 0.200
8. Rice Vacum Emasculator 1 0.120 0.120
9. Liquid Nitrogen Container 1 0.050 0.050
10. Gel Documentation System 1 1.200 1.200
11. Diagnostic Kits - 0.500 0.500
Total - - 8.820

HARS Abbottabad
S. No. Name of Machinery/ Equipments Quantity Unit Cost Cost
Rs. (millions)
1 Incubator 1 0.500 0.500
2 ELISA Plate Reader with printer 1 1.000 1.000
3 Glassware and chemicals - - 3.000
4 Digital Balance 2 0.125 0.250
5 Generator 13 KVA 1 0.700 0.700
Total - - 5.450

28
ARI D.I.Khan
S. No Name of Machinery/ Equipments Quantity Cost
Rs. (millions)
1. Flame Photometer 1 1.000
2. Spectrophotometer 1 1.500
3. Portable Photosynthesis 1 4.000
4. Nitrogen / Protein Analyzer 1 5.000
5. pH meter 1 0.150
6. EC meter 1 0.100
7. Analytical Balance 1 0.150
8. Hot Plate 1 0.100
9. Fume Hood 1 1.000
10. Centrifuge 12000 RPM 1 0.700
11. Electric Shaker 1 0.050
12. Furnace 1 0.500
13. Leaf Grinder 1 0.070
14. Soil Grinder 1 0.200
15. Kjeldhal digestion, distillation and accessories 1 2.500
16. Water distillation Unit 1 0.100
17. Limner Flow Unit 1 0.800
18. Auto clave 1 1.500
19. Weather Station (Automatic) 1 1.500
20. Photocopier 1 0.400
Total _ 21.320

ARS BUNER
S. No Name of Machinery/ Equipments Quantity Unit Cost Cost
Rs. (millions)
1 Lath Houses 3 0.200 0.600
2 Rotavator 1 0.100 0.100
Total - - 0.700

BARS Kohat

S. No Name of Machinery/ Equipments Quantity Cost


Rs. (millions)
1 Atomic Absorption 1 13.000
2 Kjeldahl digestion, distillation and accessories 1 2.500
3 Chlorophyll Meter 1 0.500
4 Weather Station (Automatic) 1 1.500
5 Microscope with digital camera with PC, laptop or
1 0.800
attachable LCD monitor or screen
Total - 18.300

29
CCRI PIRSABAK
S. No Name of Machinery/ Equipments Quantity Unit Cost Cost
Rs. (millions)
1. Spectrophotometer 1 1.500 1.500
2. Flame photometer 1 1.000 1.000
3. pH meter 1 0.150 0.150
4. Conductivity meter 1 0.100 0.100
5. Grinder 1 0.100 0.100
6. Analytical balance 2 0.150 0.300
7. Kjeldahl digestion, distillation and accessories 1 2.500 2.500
8. Nitrogen / Protein Analyzer 1 5.000 5.000
9. Microscope with digital camera with PC, laptop or 1 0.800 0.800
attachable LCD monitor or screen.
10. Autoclave 1 1.500 1.500
11. Limner Flow Unit 1 0.800 0.800
12. Weather Station (Automatic) 1 1.500 1.500
Total - - 15.250

ARS Baffa, Mansehra


Equipments for Soil and Other Laboratories
S. No Name of Machinery/ Equipments Quantity Cost
Rs. (millions)
1. Atomic Absorption Spectrophotometer 1 13.000
2. Kjeldahl digestion, distillation and accessories 1 2.500
3. Limner Flow Unit 1 0.800
4. Fume Hood 1 1.000
5. Automatic Pipetting Machine 1 0.015
6. Water Distillation Unit 1 0.100
7. High Performance Touch Screen Supercycler™ Gradient 1 1.000
8. Gel documentation system 1 1.200
9. Horizontal mini gel electrophoresis unit 1 0,070
10. Vertical gel electrophoresis unit mini 1 0.150
Sub-Total - 19.765
Equipments for Tissue Culture Laboratory
S. No Name of Machinery/ Equipments Quantity Cost
Rs. (millions)
1. Auto clave 1 1.500
2. Micro wave Oven 1 0.040
3. Incubator (More than 100 Litre) 1 0.700
4. Water Distillation Unit 1 0.100
5. Digital Balance Micro 1 0.300
6. pH meter 1 0.150
7. Refrigerator 1 0.100
8. Hotplate/magnetic stirrer 1 0.100
9. Hot air oven 1 0.270
10. Centrifuge 1 0.200
11. Air conditioner 2 tons 1 0.100
12. Biosafety cabinet size (mm):1500*750*2200 1 1.000
13. Shaker Speed Range:100-500 RPM 1 0.200
14. Growth chamber stainless steel (Capacity (L):1365) 1 3.300
Sub-Total -- 8.060

30
Total ARS Mansehra -- 27.825
ARS Sarai Nourang Bannu
S. No Name of Machinery/ Equipments Quantity Unit Cost Cost
Rs. (millions)
1 Generator 1 0.210 0.210
2 Hydraulic Tractor Trolley 1 0.360 0.360
3 Tractor front blade 1 0.075 0.075
4 Tractor tyres 2 0.085 0.170
5 Solar system 1 0.140 0.140
Total - - 0.955

ARS Bannu
S. No Name of Machinery/ Equipments Quantity Cost
Rs. (millions)
1. Refrigerator 1 0.055
2. Photocopier 1 0.400
3. Hydraulic Tractor Trolley 1 0.360
4. Wheat Reaper 1 0.200
5. Solar System 1 0.250
6. Water Filtration Plant 1 0.300
7. Generator 1 0.150
8. Water Pumping Machine 1 0.200
9. Wheat Grading Machine 1 0.300
Total _ 2.215

ARS Swabi
S. No. Name of Machinery/ Equipments Quantity Cost
Rs. (millions)
1. Microscope with digital camera with PC, laptop or 1 0.800
attachable LCD monitor or screen
2. Analytical Balance 1 0.150
3. pH meter 1 0.150
4. EC meter 1 0.100
5. Wheat Reaper 1 0.200
6. Disc Harrow 1 0.150
7. Rotavator 1 0.250
8. Cultivator 1 0.100
9. Ridges maker 1 0.050
10. Banna maker 1 0.050
11. Wheat planter 1 0.200
12. Maize Sheller 1 0.150
13. Trolli (small) 1 0.200
14. Fertilizer broadcaster 1 0.050
15. Wheat thresher 1 0.400
16. Water distillation Unit 1 0.100
17. Oven 1 0.400

31
Total - 3.500

ARS Karak
S. No. Name of Machinery/ Equipments Quantity Cost
Rs. (millions)
1. Kjeldahl digestion, distillation and Accessories 1 2.500
2. Water Resins Osmosis plate for water filtration 1 1.300
3. Refrigerator Incubator 1 0.250
4. Gram Experimental Thresher 1 0.200
Total - 4.250
Directorate General Agriculture Research
S. No. Name of Machinery/ Equipments Quantity Unit Cost Cost
Rs. (millions)
1. Office Computers 3 0.090 0.270
2. Office Printers 3 0.030 0.090
3. Photocopier 2 0.400 0.800
4. Scanner 2 0.040 0.080
Total - - 1.240
Directorate of Outreach
S. No. Name of Machinery/ Equipments Quantity U nit Cost Cost
Rs. (millions)
1. Office Computers 2 0.090 0.180
2. Office Printers 2 0.030 0.060
3. Photocopier 1 0.400 0.400
4. Scanner 1 0.040 0.040
Total - - 0.680

ARS Chitral
Unit Cost/ Specification for Medium Size Food Processing Unit
S. No. Name of Machine Quantity Unit Cost Cost
Rs. (Million)
1. Pulper 1 0.600 0.600
2. Mixing and filling Tank 1 0.200 0.200
3. Storage Tank 1 0.150 0.150
4. Thermo-break 1 0.600 0.600
5. Evaporator 1 1.850 1.850
6. Boiler 1 1.500 1.500
7. Chopper machine 1 0.300 0.300
8. Accessories 0.500 0.500
9. Generator 1 1.000 1.000
10. Processing Table 2 0.100 0.200
11. Wooden stove 2 0.100 0.200
12. Steam jacketed kettle 1 0.300 0.300
13. Furniture & Fixture - -- 0.600
14. Solar Tunnel Dryer 1 ton 2.000 2.000
Total:- 10.000