About Wallmakers

All our earlier settlements have always been made of natural materials. But
the sad fact is that, today less than thirty percent of the world’s population
live in buildings made of earth, even though it is a more sustainable and
durable material ; the blame of which may be solely placed on the advent
of industrialisation and a widespread demand for “cement” houses’. We, at
Wallmakers have devoted ourselves to the cause of using mud and waste as
the chief components, to make structures that are both, utilitarian and alluring.

What is waste?

Waste can be classified as anything that was produced, used and then
discarded from its original function. While the work and construction of a
building results in the production of a lot of scrap, we believe in not being
deterred by this demon, but instead have learnt to build with it.

Vinu Daniel completed his B. Arch in 2005 from The College of Engineering,
Trivandrum, following which he worked with Auroville Earth Institute for the
UNDP (United Nations Development Programme) Post-Tsunami construction.
On returning from Pondicherry in 2007 he started ‘Wallmakers’ which was
christened thus by others, as the first project was just a compound wall. By
2008 he had received an award for a low cost, eco-friendly house from
the ‘Save Periyar’ Pollution Control Committee for the house which was
constructed for a cancer patient. Many such eye-openers in the course of his
practice prompted him to resolve to devote his energies towards the cause of
sustainable and cost-effective architecture.
Projects worked on
1.Sanctity ferme abhishek’s residence
Shoolagiri,Tamilnadu,India

2.Sanctity ferme sudheer’s residence


Shoolagiri,Tamilnadu,India

3.Sanctity ferme madhu’s tree house


Shoolagiri,Tamilnadu,India

4.On the rock villa


Shoolagiri,Tamilnadu,India

5.Bistro- sf restaurant
Shoolagiri,Tamilnadu,India

6.Kailasam
Shoolagiri,Tamilnadu,India Sanctity Ferme is a gated farmland community that provides an
alternative lifestyle based on concepts of sustainability.
7.On the rock community the community also offers eco-friendly farm cottages,restaurant,
stay,and public spaces for visitors,investors and all users .
Shoolagiri,Tamilnadu,India
The owner of farm Mr.baiju ck and Ar.vinu daniel working as a
8.Chuzhi team to stay true to the idea of coexisting with the earth while
Shoolagiri,Tamilnadu,India maintaining a contemporary standard of living.
1/2.Sanctity ferme residence typology
Concept :The
:The main idea of the project is to camoflauge the building with the context,not just by physical form but also with
experience and not allow build form to act dominant and one must feel that they are with the rocks,climbing,sitting,feeling it
and living with it.
CLIENT

SANCTITY FERME

PROJECT NAME

SHOOLAGIRI - SANCTITY
37.30 FERME - - TYPOLOGY 1 -
PLOT 6
NOTES
1. ALL DIMENSIONS ARE IN
CM UNLESS SPECIFIED.
2. DO NOT SCALE
DRAWINGS.

A8
3. ANY AMBIGUITY OR
DISCREPANCY

A9
PORCH
DISCOVERED SHALL BE

6.0 X 6.0
+0.05 LVL
REPORTED IMMEDIATELY
TO THE ARCHITECT.

A12
4. ALL LEVELS ARE

+0.00 LVL
A3

MEASURED FROM THE


UNFINISHED FLOOR LEVEL.
5. THESE DRAWINGS TO BE
READ IN CONJUNCTION
WITH STRUCTURAL AND
SERVICES DRAWINGS.

0.60
A7

LIVING, DINING AND KITCHEN


25 FEET ACCESS ROAD

SITE NORTH

A10
9.3 X 7.5
23.60

23.75
A13
UP

NORTH
A1

REFRIGERATOR

BATH1
A6

WALLMAKERS

STORAGE
2.2 X 1.4
architectural consutants

A11
6.0 X 3.65
BED 2

PADIVATTOM, COCHIN

A14
+91 98465 60708
A4

5.0 X 3.65
BED 1
SHEET TITLE
BATH2
A2

CONCEPT PLAN
A5

17.35 8.30 11.20 DRAWN BY: AR. FAWAZ


36.85
CHKD BY: AR. FAWAZ

11.40 DATE: 05 NOV 2020

SHEET NUMBER:

CONCEPT PLAN FOR REVIEW ONLY


CLIENT

SANCTITY FERME

PROJECT NAME

SHOOLAGIRI - SANCTITY
FERME - - TYPOLOGY 1 -
37.30 PLOT 6
17.55 8.25 11.50 NOTES
1. ALL DIMENSIONS ARE IN
CM UNLESS SPECIFIED.
2. DO NOT SCALE
DRAWINGS.
3. ANY AMBIGUITY OR

A8
DISCREPANCY
DISCOVERED SHALL BE

A9
7.10

7.00
REPORTED IMMEDIATELY
TO THE ARCHITECT.
4. ALL LEVELS ARE
MEASURED FROM THE

A12
A3

UNFINISHED FLOOR LEVEL.


5. THESE DRAWINGS TO BE
READ IN CONJUNCTION
WITH STRUCTURAL AND
SERVICES DRAWINGS.

A
A7
25 FEET ACCESS ROAD

SITE NORTH

A10
8.10

8.10
23.60

23.75
A13
NORTH
A1

B
1.20

1.20
WALLMAKERS

C
A6

architectural consutants
1.75

1.75
A11

D
PADIVATTOM, COCHIN

A14
+91 98465 60708
A4

4.15

4.15
SHEET TITLE
A2

SETTINGOUT PLAN

E
A5

1.40

17.55 8.25 11.05 DRAWN BY: AR. FAWAZ


36.85
CHKD BY: AR. FAWAZ
3.95 1.60 1.25 1.45
DATE: 10 NOV 2020
1

SHEET NUMBER:
2

GRID SETTING OUT PLAN FOR EXECUTION


CLIENT

SANCTITY FERME

PROJECT NAME

SHOOLAGIRI - SANCTITY
FERME - - TYPOLOGY 1 -
PLOT 6
A12 NOTES

A13 1. ALL DIMENSIONS ARE IN CM

11.05
UNLESS SPECIFIED.
2. DO NOT SCALE DRAWINGS.
3. ANY AMBIGUITY OR
A14 DISCREPANCY
DISCOVERED SHALL BE
REPORTED IMMEDIATELY TO
THE ARCHITECT.
4. ALL LEVELS ARE MEASURED
FROM THE UNFINISHED
FLOOR LEVEL.
5. THESE DRAWINGS TO BE
READ IN CONJUNCTION
A B C D E WITH STRUCTURAL AND
SERVICES DRAWINGS.
0.35

A9 2
0.20
0.35

6.10 8.90 0.20 5.50 1.35


0.85

0.90
A11

0.20

1.30
1.20
A10
0.40 0.20 0.20 SITE NORTH
5
1.20

1.25
0.20

0.85
0.70

0.20

3.75
2.20 0.20 0.20
4
NORTH

0.40 0.20
3.40

1.20
7.55

0.20
5.00
WALLMAKERS
architectural consutants

3.40
0.20 0.20
0.20 0.20 0.20 0.20
8.90 5.50 PADIVATTOM, COCHIN
0.35

+91 98465 60708

A8 A7
1
SHEET TITLE
0.35

A6 EXCAVATION PLAN

A5
DRAWN BY: AR. FAWAZ

CHKD BY: AR. FAWAZ

DATE: 05 NOV 2020

SHEET NUMBER:

EXCAVATION PLAN A1 FOR REVIEW ONLY


CLIENT

SANCTITY FERME

A12
A13 PROJECT NAME

SHOOLAGIRI - SANCTITY
FERME - - TYPOLOGY 1 -
A14 PLOT 6
NOTES
1. ALL DIMENSIONS ARE IN CM
UNLESS SPECIFIED.
2. DO NOT SCALE DRAWINGS.
3. ANY AMBIGUITY OR
DISCREPANCY
DISCOVERED SHALL BE
A B C D E REPORTED IMMEDIATELY TO
THE ARCHITECT.
4. ALL LEVELS ARE MEASURED
FROM THE UNFINISHED
0.25

A9 2 5.
FLOOR LEVEL.
THESE DRAWINGS TO BE
READ IN CONJUNCTION
0.10 0.10
0.25

WITH STRUCTURAL AND


0.95

6.40 9.10 5.70 1.45

1.10
A11

1.30
SERVICES DRAWINGS.

0.10
1.20 0.10 0.10
A10
0.20
5

1.25
1.20

0.10

1.05
0.50

0.10

3.95
2.30 0.10 0.10

0.20
4

0.20 0.10
3.50
SITE NORTH

1.40
7.65

0.10
NORTH

5.20

3.60
0.20 0.20
0.10 0.10 0.10 0.10
9.00 5.70
0.35

D
WALLMAKERS
A8 A7
1
architectural consutants
0.35

POURED EARTH FN
A6 PADIVATTOM, COCHIN
+91 98465 60708

RCC PLINTH BEAM - M20


A5 SHEET TITLE
6mm STIRRUPS @15cm c/c
PLINTH FOUNDATION PLAN
10mm 2 No.s

DRAWN BY: AR. FAWAZ

CHKD BY: AR. FAWAZ


DETAIL D
A1 DATE: 05 NOV 2020

SHEET NUMBER:

PLINTH FOUNDATION PLAN @ 60CM FROM ROAD LVL A2 FOR REVIEW ONLY
CLIENT

SANCTITY FERME

PROJECT NAME

SHOOLAGIRI - SANCTITY
FERME - - TYPOLOGY 1 -
PLOT 6
A12 NOTES

A13 1. ALL DIMENSIONS ARE IN CM


UNLESS SPECIFIED.
2. DO NOT SCALE DRAWINGS.
3. ANY AMBIGUITY OR
A14 DISCREPANCY
DISCOVERED SHALL BE
REPORTED IMMEDIATELY TO
THE ARCHITECT.
4. ALL LEVELS ARE MEASURED
FROM THE UNFINISHED
FLOOR LEVEL.
5. THESE DRAWINGS TO BE
READ IN CONJUNCTION
A B C D E WITH STRUCTURAL AND
SERVICES DRAWINGS.

A9 2
12.95 2.80 7.50
1.00

A10 A11 5
SITE NORTH

0.40

4
NORTH

WALLMAKERS
architectural consutants

PADIVATTOM, COCHIN
6.50 2.80 7.40 +91 98465 60708

A8 A7
1
SHEET TITLE

A6 STEEL AND MESH - DEBRIS


WALL PLAN

1"x1" MS @ 1m c/c 2 No.s A5


10mm TMT bars DRAWN BY: AR. FAWAZ
16 GUAGE WELDED
MESH COATED WITH SBR CHKD BY: AR. FAWAZ
DEBRIS MIX 3% CEMENT
DATE: 05 NOV 2020
FINAL MUD COAT
1:3 CEMENT PLASTER SHEET NUMBER:

STEEL AND MESH - DEBRIS WALL PLAN


0.33 0.32
1.00
0.33
A1 FOR REVIEW ONLY
CLIENT
TYPICAL EXT. WALL SECTIION
SANCTITY FERME

ORIGINAL EARTH LEVEL

6" COMPACTED EARTH


CONCRETE BLOCK
ORIGINAL EARTH

1"x1"
DEBRIS MIX 3% CEMENT
PROJECT NAME

FOUNDATION

16 GUAGE FENCE MESH

1:3 CEMENT PLASTER


SHOOLAGIRI - SANCTITY

GRANITE BOULDER

1"x1"
COATED WITH SBR

MS @ 1m c/c 2 No.s
FERME - - TYPOLOGY 1 -

FINAL MUD COAT


4" PCC

C:S:M M20 SCREED


PLOT 6
NOTES

MS @ 1m c/c
1. ALL DIMENSIONS ARE IN CM
UNLESS SPECIFIED.
2. DO NOT SCALE DRAWINGS.
3. ANY AMBIGUITY OR
DISCREPANCY
DISCOVERED SHALL BE

FFL
REPORTED IMMEDIATELY TO
THE ARCHITECT.
4. ALL LEVELS ARE MEASURED
FROM THE UNFINISHED

3.60 0.60 5.
FLOOR LEVEL.
THESE DRAWINGS TO BE
READ IN CONJUNCTION
WITH STRUCTURAL AND
SERVICES DRAWINGS.
0.50

0.50
0.70

0.35
SITE NORTH
0.20
0.70 0.70
10mm 6 No.s +

RCC PLINTH
BEAM - M20

DPC
8mm @15cm c/c

NORTH
ROAD LVL

PU RED COAT
OVER TAR SHEET
CONCRETE
5" M20
EXISTING FILLED SOIL
LEVEL @SITE
FILLED SOIL

0.60
POURED EARTH FN -
MSand = 2:5:5:5
(8mm) : Sieved Waste :
Cement: Sieved Soil

WALLMAKERS
architectural consutants

PADIVATTOM, COCHIN
+91 98465 60708

SHEET TITLE

TYPICAL EXT. WALL


SECTIION

DRAWN BY: AR. FAWAZ

CHKD BY: AR. FAWAZ

DATE: 10 NOV 2020

SHEET NUMBER:

FOR EXECUTION
CLIENT
R.C.C Beam
M.S channels as/str. SANCTITY FERME

0.65
0.85
2.30 4.50 1.45 1.45 2.00 2.05 1.15 2.90 4.40

1.25
PROJECT NAME

SHOOLAGIRI - SANCTITY
FERME - - TYPOLOGY 1 -
PLOT 6

4.25
5.30

5.30
5" M20 Concrete RCC coping NOTES
1. ALL DIMENSIONS ARE IN CM
Pured Coat Over Tar Sheet UNLESS SPECIFIED.
2. DO NOT SCALE DRAWINGS.
2" Ferrocement 3. ANY AMBIGUITY OR

8.25

8.25

8.25

8.25
Chicken mesh layed on DISCREPANCY
2.15

1.00
casurina poles DISCOVERED SHALL BE
REPORTED IMMEDIATELY TO
Pured coat over tar sheet
THE ARCHITECT.
2.80 4. ALL LEVELS ARE MEASURED
10mm TMT bars 150mm c/c FROM THE UNFINISHED
FLOOR LEVEL.
240x120x5mm MS channel 5. THESE DRAWINGS TO BE
READ IN CONJUNCTION
Binding wire holding casurina
WITH STRUCTURAL AND
4.05 poles to MS angle
SERVICES DRAWINGS.

0.20
40x2mm MS Angle welded to
steel beam
BEAM PLAN 300x150mm 4-6" Casurina Poles tied on
240x120mm to MS angle using binding
200x100mm wire
1"x1" MS @ 1m c/c SITE NORTH
1"x1" MS @ 1m c/c 2 No.s

Debris mix 3% cement

Debris wall Ferrocement


NORTH

Casurina poles
0.65

3.70
0.85
2.30 4.50 1.45 1.45 2.00 2.05 1.15 2.90 4.40

1.25
WALLMAKERS
architectural consutants
4.25
5.30

5.30

PADIVATTOM, COCHIN
+91 98465 60708
8.25

8.25

8.25

8.25
2.15 SHEET TITLE

BEAM AND ROOF PLAN


2.80
0.50
FFL

DRAWN BY: AR. FAWAZ


4.05

CHKD BY: AR. FAWAZ

ROOF PLAN DATE: 05 NOV 2020

SHEET NUMBER:

BEAM AND ROOF PLANS ROOF DETAIL FOR REVIEW ONLY


CLIENT

LEGEND MOUNT HEIGHT SANCTITY FERME


2.85 3.05
3.25 3.75

1 WAY SWITCH WALL 1.20m (B)


3.10

2.40 1.90 2.75


2 WAY SWITCH WALL 1.20m (B)

0.60
0.60
2.45

0.70
CEILING LIGHT POINT CEILING PROJECT NAME
0.15
WALL LIGHT POINT WALL 2.70m

1.85

eq
MIRROR LIGHT POINT WALL 2.10m SHOOLAGIRI - SANCTITY

2.40
1.00

FERME - - TYPOLOGY 1 -
0.35

CHANDLIER LIGHT CEILING

UP
BATH1

2.75
1.85

OUTDOOR PLANT LIGHT


PLOT 6

0.55
0.50
3.95

1.05 0.50
0.25
1.15

BED 1 CEILING
1.05 1.00
2.90

CEILING FAN NOTES


STORAGE
REFRIGERATOR

3.95

0.65
1.05
5.0 X 3.65

eq
2.2 X 1.4

1.30
1. ALL DIMENSIONS ARE IN CM
2.75

1.55
0.85
EXHAUST FAN F.CEILING
LIVING, DINING AND KITCHEN

0.45
UNLESS SPECIFIED.
9.3 X 7.5
1.75

1.90
1.45
1.60 0.60

TV SOCKET WALL 0.60m (B) 2. DO NOT SCALE DRAWINGS.


PORCH
2.25

3. ANY AMBIGUITY OR
3.90
0.60 0.50

0.60
1.00
6.0 X 6.0 WALL 0.60m (B)
2.30

DISCREPANCY
0.70 0.15

+0.05 LVL
1.90 1.10 0.95 3.20
1x6A, SWITCHED SOCKET ON RAW POWER
BED 2
4.40

DISCOVERED SHALL BE

eq
1.80
6.0 X 3.65
16A DP SOCKET FOR WATER HEATER POINT WALL 2.70m (B) REPORTED IMMEDIATELY TO
THE ARCHITECT.
AIR CONDITIONER WALL 2.70m (B)

2.45
2.30

4. ALL LEVELS ARE MEASURED


3.70

2.95

BATH2 FROM THE UNFINISHED

0.25
Bell push WALL 1.20M (B)

1.25
5.35

FLOOR LEVEL.

eq
1.85
2.55
M.B. METER BOARD WALL 2.70m (B) 5. THESE DRAWINGS TO BE

1.05
0.70
1.20

D.B. READ IN CONJUNCTION


2.80 1.95
M.B.

B.P
CABINET LIGHT counter
0.35
0.80
1.50
WITH STRUCTURAL AND
3.25
3.25
3.75
D.B. DISTRIBUTION BOARD WALL 2.70m (B) SERVICES DRAWINGS.

2x6A, SWITCHED SOCKET ON RAW POWER 1.20m


WALL
1x6/16A, SWITCHED SOCKET ON RAW POWER 1.20m

1x6/16A, SWITCHED SOCKET ON RAW POWER WALL 1.20m


B.P Bell point WALL 2.70m
SITE NORTH
LEACH PIT
fixture position alignments
B - Bottom aligned
landscape

t - top aligned
Towards

l - left aligned
Domestic Water Supply
From Main
SEPTIC TANK r - right aligned NORTH
unmarked - center aligned

SOAK PIT
0.40

0.65

mixer
@90cmLVL Shower
WALLMAKERS
from FFL @210cm LVL architectural consutants
from FFL
0.25

Health 0.30
faucet
BATH1
UP

@ +25 from
FFL 0.25
0.35
BED 1
5.0 X 3.65 PADIVATTOM, COCHIN
0.90 0.80 0.70 0.45

0.50 0.70 0.60 1.60

RO Water
Purifier
Water
REFRIGERATOR

STORAGE
0.35 0.45 +91 98465 60708
Heater
2.2 X 1.4
PORCH LIVING, DINING AND KITCHEN
6.0 X 6.0 9.3 X 7.5 SHEET TITLE

0.05
+0.05 LVL 1.20
Shower 0.50
@210cm LVL
from FFL

1.20
1.35

ELECTRICAL AND
Health
faucet
PLUMBING PLANS
BED 2 @ +25 from
0.50

FFL
6.0 X 3.65 BATH2
1.15
0.55

DRAWN BY: AJAY


1.25

CHKD BY: AR. FAWAZ

DATE: 15TH DEC 2020


landscape
Towards

SHEET NUMBER:

ELECTRICAL AND PLUMBING PLANS FOR REVIEW ONLY


Section view A

Section view B
On site executions

1.Marking and Excavation 2.Poured earth filling in excavation 3.concrete block foundation
trench

7.Sbr coated double layered chicken 8.Debris filling of walls 9.Boulders placement and concreting of
mesh binding on steel frames boulders
4.Plinth reinforcement work and steel 5.Concreting of plinth beam 6.Steel frame for walls
frame support for walls

10.Stone bed placement and floor p.c.c. 11.Ms box section beams placement 12.Borex and boric acid treated casurina
poles tied on ms angle which is welded
on ms beam
3/7. Sf madhu’s residence and On the rock community house
typology
Concept
The buildings imagined stay true to idea of conserving the land on which we builds.
Taking sustainable architecture a step further, the residences are built on top of
structures which rise up above the ground. This allows for maximum usage of the land
below for flora and fauna. These structures, made out of salvaged waste materials,
are built using the chain-link mechanism.
mechanism The individual links are then consecutively
connected to provide a sturdy base for the houses. In doing so, the construction
minimises our carbon footprint and gives the phrase “elevated
elevated living”
living a whole new
meaning!
CLIENT

SANCTITY FERME

PROJECT NAME

NOTES
1. ALL DIMENSIONS ARE IN CM
UNLESS SPECIFIED.
2. DO NOT SCALE DRAWINGS.
3. ANY AMBIGUITY OR
DISCREPANCY
DISCOVERED SHALL BE
Deck REPORTED IMMEDIATELY TO
19.6 sq.m THE ARCHITECT.
4. ALL LEVELS ARE MEASURED
Deck FROM THE UNFINISHED
19.6 sq.m FLOOR LEVEL.
5. THESE DRAWINGS TO BE
READ IN CONJUNCTION
WITH STRUCTURAL AND
+260.00 Cm SERVICES DRAWINGS.

+260.00 Cm

Down
Down

SITE NORTH

Pantry Pantry NORTH


5.8 sq.m
5.8 sq.m

Drawing/ Dining
6.7 sq.m Drawing/ Dining
6.7 sq.m WALLMAKERS
architectural consutants

+300.00 Cm

Entry PADIVATTOM, COCHIN


+300.00 Cm
+91 98465 60708

0.00 Cm
Up Entry
SHEET TITLE

0.00 Cm
Up BEDSPACE
13.6 sq.m

BEDSPACE
13.6 sq.m
DRAWN BY: AR. FAWAZ

CHKD BY:

5 FEB 2020
DATE:
Plan @ +300.00 cm
SHEET NUMBER:

Plan @ +300.00 cm FOR REVIEW ONLY


On site executions

1.Precasting of tyre 2.Adapting chain link form before setting


time of concrete

3.Formation of chain 4.module


4.On the rock villa
Concept : The villa is generated by defining spaces with help of debris wall on top of big
boulder,which is site and hence,the rock will be the habitable space with mechanical bamboo
facade and roof
CLIENT

MR.BAIJU CK

PROJECT NAME

ON THE ROCK VILLA


1522.76
Detail
B(TRUSS)
NOTES
1. ALL DIMENSIONS ARE IN
METERS UNLESS SPECIFIED.
2. DO NOT SCALE
DRAWINGS.
3. ANY AMBIGUITY OR
20 DISCREPANCY
+4 DISCOVERED SHALL BE
REPORTED IMMEDIATELY
TO THE ARCHITECT.
4. ALL LEVELS ARE MEASURED
FROM THE UNFINISHED
FLOOR LEVEL.
5. THESE DRAWINGS TO BE
READ IN CONJUNCTION

20
WITH STRUCTURAL AND
70
+4
SERVICES DRAWINGS.
+3
.60

E
290

SITE NORTH
.00
125

NORTH
00

DETAIL AT A
93.

02
.33

D 5
+ 19
240

859.62
WALLMAKERS
architectural consutants
837 F
.91
O PADIVATTOM, COCHIN
+91 98465 60708
Detail A
70
+3 SHEET TITLE

C GROUND FLOOR
95
+1 PLANS
68.
00 360
.00 DRAWN BY: AJAY

03
DETAIL AT B
CHKD BY: VINU DANIEL

DATE: 18/12/2020
701.39
GROUND FLOOR PLAN

107.69
01 SHEET NUMBER:
1:200 2'' ferrocement slab
4 1 0 2 8 1'' tube A-1.00
695.36 cement board
FOR REVIEW ONLY
Mechanical bamboo facde and roof ,allowing rocks as a habitable living space
On site executions

Ground floor bedroom area Dinning and living space(Rock top with
debris partition wall )

Courtyard and outdoor spaces Entrance courtyard (stairway)


5.Bistro- sf restaurant
CLIENT

BAIJU C K

PROJECT NAME

SHOOLAGIRI-SANCTITY
KITCHEN
62.7 SQ.M FERME RESTAURANT

NOTES
1. ALL DIMENSIONS ARE IN CM
UNLESS SPECIFIED.
2. DO NOT SCALE DRAWINGS.
3. ANY AMBIGUITY OR
DISCREPANCY
DISCOVERED SHALL BE
REPORTED IMMEDIATELY TO
THE ARCHITECT.
4. ALL LEVELS ARE MEASURED
FROM THE UNFINISHED
FLOOR LEVEL.
5. THESE DRAWINGS TO BE
READ IN CONJUNCTION
WITH STRUCTURAL AND
SERVICES DRAWINGS.

SITE NORTH

NORTH

35.0 35.0

WALLMAKERS
architectural consutants
12.5 12.5
8mm thick RCC @ every 8mm thick RCC @ every
90cm -8 mm rod @ 20 x 90cm -8 mm rod @ 20 x
20 c/c 20 c/c BENGALURU,
+91 9786721215

12.5 12.5
SHEET TITLE

RAMP SIDE RAMP SIDE


EARTH FILLING COURSED RUBBLE EARTH FILLING COURSED RUBBLE
RETAINING WALL WITH RETAINING WALL WITH FOUNDATION MARKING 1
CEMENT MORTAR 1:6 CEMENT MORTAR 1:6
100

100
RCC Tie beam -
M20
10mm 5 No.s +
8mm @15cm c/c
FFL FFL
4" PCC
6" COMPACTED EARTH 4" PCC 4" PCC DRAWN BY: AR. SRIVIJI
As per site

As per site
RCC TIE BEAM- M20 6" COMPACTED EARTH RCC TIE BEAM 6" COMPACTED EARTH
-10mm 6 No.s + 8mm M20 -10mm 6 No.s +
FILLED SOIL stirrups @15cm c/c 60.0 8mm stirrups @15cm c/c 60.0 CHKD BY:
CONCRETE BLOCK FILLED EARTH
15

15
FOUNDATION
ORIGINAL EARTH ORIGINAL EARTH R.R MASONRY WELL 12 APRIL 2021
POURED EARTH FN -
PACKED WITH QUARRY DATE:

55.0
ORIGINAL EARTH
60.0

POURED EARTH FN - Cement: Sieved Soil


DUST OR SAND

70
(8mm) : Sieved Waste :
Cement: Sieved Soil P.C.C 1:5:10
MSand = 2:5:5:5
(8mm) : Sieved Waste :
SHEET NUMBER:

15
MSand = 2:5:5:5
100.0
100.0 01

SECTION ZZ' SECTION YY' SECTION XX' FOR REVIEW ONLY


CLIENT

MR. BAIJU

PROJECT NAME

SANCTITY FERME - RESTAURANT


69

NOTES
1. ALL DIMENSIONS ARE IN CM
UNLESS SPECIFIED.
2. DO NOT SCALE DRAWINGS.
3. ANY AMBIGUITY OR
DISCREPANCY
DISCOVERED SHALL BE
REPORTED IMMEDIATELY TO
THE ARCHITECT.
STORE
+228 CM LVL 4. ALL LEVELS ARE MEASURED
TOILET
FROM THE UNFINISHED
+182 CM LVL

67.0
+120 CM LVL
FLOOR LEVEL.
+50 CM LVL
+21 CM LVL
+0 CM LVL
5. THESE DRAWINGS TO BE
-10 CM LVL
READ IN CONJUNCTION
-67 CM LVL
WITH STRUCTURAL AND
SECTION 01
SERVICES DRAWINGS.

SECTION 01
SITE NORTH

NORTH

WALLMAKERS
architectural consutants

12.5
DETAIL YY'

12.5 STORE
+228 CM LVL +228 CM LVL
41.0

+182 CM LVL +182 CM LVL TOILET


100

134.0
67.0

67.0

90.0
+120 CM LVL
FFL
+120 CM LVL
DETAIL ZZ'

157.0
60.0

90.0
+50 CM LVL +50 CM LVL
+21 CM LVL +21 CM LVL

SHEET TITLE
+0 CM LVL +0 CM LVL
-10 CM LVL -10 CM LVL

-67 CM LVL -67 CM LVL

STORE AND TOILET SECTION SANCTITY FERME

SECTION 02
RESTAURANT SECTIONS

DRAWN BY: AR. SRIVIJI

CHKD BY:

11 APRIL 2021
DATE:

SHEET NUMBER:

04

FOR REVIEW ONLY


On site executions

1.Marking and Excavation 2.P.C.C 3.Rubble masonry foundation

4.Plinth reinforcement 5.concreting of plinth beam 6.Borex+boric acid treated casurina


poles for structure’s facade
6.kailasam
Concept
The mountain had been created by piling waste rock from a nearby quarry that had been worked on for 10 years. The
dumped waste became a mountain and the quarry an abandoned hole in the face of the earth.
This debris mounatin now given an architectural justice and will be utilized as habitable space
the idea is to provide a roof which will be covered with all the debris on site and allow site to not loose its history and attract
users
CLIENT

MR. BAIJU

PROJECT NAME

SANCTITY FERME - KAILASAM

NOTES
1. ALL DIMENSIONS ARE IN
CM UNLESS SPECIFIED.
2. DO NOT SCALE
DRAWINGS.
3. ANY AMBIGUITY OR
DISCREPANCY
DISCOVERED SHALL BE
REPORTED IMMEDIATELY
TO THE ARCHITECT.
4. ALL LEVELS ARE
MEASURED FROM THE
UNFINISHED FLOOR
LEVEL.
5. THESE DRAWINGS TO BE
READ IN CONJUNCTION
WITH STRUCTURAL AND
SERVICES DRAWINGS.

SITE NORTH

NORTH

WALLMAKERS
architectural consutants

SHEET TITLE

SANCTITY FERME
CONCEPT PLAN

DRAWN BY: AJAY KUSHWAHA

CHKD BY: AR.VINU DANIEL


11 APRIL 2021
DATE:

SHEET NUMBER:

01

FOR REVIEW ONLY


SHEET NUMBER: NORTH
+91 98465 60708
PADIVATTOM, COCHIN 03 FEB 2021 DATE
architectural consutants
RAFT FOUNDATION : CONCEALED BEAM DETAIL
WALLMAKERS
CHKD BY:
DRAWN BY:
4 2 1 0
1287.5
_1 43 9
BP 0 .4
3

.08
7
5
541.09
4.8
40

409
41 .47
7.7
29

.26
2

546
9
_1
_2 .81
100.0

BP

.45
BP
71
_3 .44

702
BP 440
2.1
346 .1 44
.0 334
8 371

.94
.23
8 27
180.99

_1

847
9.
299 BP 55

155.94
.2 _4
BP 368.25 333.12

8
55

160.64
8.

312.0

4.1
70

33
8

96
3.4
10 4 5.5 8
3.0 36
101.75

321.84
35 276.
57 385.47 _1

119.45
52
7

6 0. BP

32
_6
0.
_5 352.59 _1
1

8.
BP 85
34
BP BP

35
305.96

150.64
344.1

352.15
3
.81

4 23
_8 _1 7.0 0.7
2 97
177

.2
8 BP BP
8.3

125
26
0 2 381
.1
_1 _1 4
BP BP

9
4

5
_1

9.2
0.5

9
5.1

.23
38

35
BP

5.2
10

_7

.02
244
.83

11
BP

260
358

251.1
09
6.

7
4.
37

36
12

375.65

365.248
0 99

4
. 55 1.
10

370.
_9

370.8
BP 3
11 _1 1
1.9 BP 8.7
9 10
1
_1
BP
116.4
5 4
108.47 105.1
112.49

6
.8
54
19

.33
1702
.9
91
.
m
75
.1
07
:4
ea
ar
On site executions

1.Marking and Excavation 2.P.C.C 3.Raft foundation reinforcement

4.Concreting of foundation 5.Base pipes placement 6.Roof pipes placement


8.Chuzhi
Concept : Chuzhi(spiral) is a residence in which there is no concept of wall and roof
a inverse cone turn out in walls and roof and provide habitable space on ground
Construction technique : Precast bottle beams and traditional mud cobing walls

On site executions

1.Precasting waste bottles 2.Excavation,poured earth and plinth 3.Concreting of plinth beam
beam reinforcement

4.Mud cobing 5.Bottle beam concreting 6.Repeating the process in spiral form