Volume II
SCHEDULES OF CONCESSION AGREEMENT
Office of
The Executive Engineer
Public Works Division, Solapur
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECT
TABLE OF CONTENTS
Superintending Engineer,
Public Works Circle, Solapur.
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode-PN-153
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECT
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode-PN-153
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECT
SCHEDULE- A
SITE OF THE PROJECT
(See Clause 10.1)
1 The Site
1.1 Site of the Two-Lane Project shall include the land, buildings, structures and road
works as described in Annex-I of this Schedule-A.
1.2 An inventory of the Site including the land, structures, road works, trees and any
other immovable property on, or attached to, the Site shall be prepared jointly by
the Authority Representative and the Concessionaire, and such inventory shall form
part of the memorandum referred to in Clause 10.3.1 of the Agreement.
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid An-
nuity Mode-PN-153 Page -4
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECT
Annex – I
(Schedule – A)
Site for Project
1. Site
The Site of Project Comprises section of Ring Road of outside of Solapur city, following sections of
State Highway (SH)-205 Road.
*Note:
• The overall length of project is 51.147 km, but the project stretch length is 39.733
Km which excludes the following
o The part of Section 2 from Design Ch. Km 5/703 to Km 9/300 is not included in
the project scope.
o The part of Section 4 from Design Ch. Km 35/160 to Km 38/110 is not included
in the project scope.
o The complete Section 6 from Design Ch. Km 46/280 to Km 51.147 has not been
included in the project scope.
2. Land
The site of the Project Highway comprises the land (Right of Way) as described below:
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid An-
nuity Mode-PN-153 Page -6
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECT
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid An-
nuity Mode-PN-153 Page -7
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECT
Note: The Design chainage are tentative and it may change with respective to the Final
Centre Line design.
3. Carriageway
The existing carriageway along the project highway is given below:
Sr. No. Existing Design Design Width of Lane
Chainage (Km) Chainage (Km) Length carriage- Configuration
(Km) way (m)
From To From To
Section 1 from km 0/00 to 6/266
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid An-
nuity Mode-PN-153 Page -8
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECT
4. Major Bridges
The site includes the following Major Bridges
Type of Structure No. of
Existing Design
Sr. Lati- Longitu Spanswith Width
Chainage Chainage Sub Super
No. tude de Foundation Span (m)
(km) (Km) Structure Structure
Length (m)
-NIL-
5. Road Over Bridges (ROB)/ Road under Bridges (RUB)
The Site includes the following ROB (road over railway line)/RUB (road under railway line)
Type of Structure No. of
Existing Design
Sr. Spanswith Width
Chainage Chainage Sub Super
No. Foundation Span Length (m)
(Km) (Km) Structure Structure
(m)
- NIL -
6. Grade Separators
The site includes the following grade separators:
Existing Design Total
Type of Span/ Open-
Sr.No. Chainage Chainage Carriageway Remarks
Structure ing (m)
(Km) (Km) Width (m)
- NIL -
7. Minor Bridges
The site includes the following minor bridges:
Total
Type of Structure
Existing Design Width
S. No.x
Lat Long Chainage Chainage Sub Super across
No. Foundation Span(m)
(Km) (Km) Structure Structure Road
(m)
Wall Solid
17.68998 75.84519 3.163 3.163 open 2x7.0 10.55
1 Type Slab
Wall Solid
2 17.70388 75.94703 42.871 42.245 open 2X8.0 11.3
Type Slab
Wall Solid
3 17.72378 75.94012 45.480 44.835 open 2 x6.0 8.5
Type Slab
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid An-
nuity Mode-PN-153 Page -9
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECT
8. Culverts
The site has the following culverts:
A) List of Pipe Culverts
Existing Design
Sr. Type of No. of Pipe
Lat Long
Chainage Chainage
No. Culvert x Dia (mm)
(Km) (Km)
1 17.71377 75.84724 0.485 0.500 PIPE 1x0.8
2 17.70438 75.845 1.565 1.640 PIPE 1x0.8
3 17.68936 75.84511 3.240 3.240 PIPE 1x0.6
4 17.68411 75.84662 3.837 3.840 PIPE 1x1.0
5 17.67555 75.8479 4.840 4.750 PIPE 1x0.9
6 17.67317 75.84989 5.630 Left Out PIPE 1x0.9
Km.5/700 to km.9/300 is not in scope
7 17.64052 75.82323 10.110 9.555 PIPE 1x0.3
8 17.63889 75.82238 10.311 9.755 PIPE 1x0.9
9 17.63768 75.82206 10.473 9.890 PIPE 1x0.3
10 17.63132 75.81903 11.226 10.670 PIPE 16x0.8
11 17.62845 75.8211 11.721 11.335 PIPE 13x1.2
12 17.62439 75.82419 11.871 12.155 PIPE 1x0.8
13 17.61679 75.82323 13.564 13.005 PIPE 9x0.8
14 17.6122 75.82241 14.083 13.525 PIPE 2x0.8
15 17.60595 75.82648 15.136 14.550 PIPE 2x1.0
16 17.60601 75.83585 15.131 15.545 PIPE 1x0.6
17 17.60606 75.8378 16.341 15.760 PIPE 2x0.8
18 17.60497 75.84343 16.941 16.370 PIPE 2x0.8
19 17.60472 75.84468 17.078 16.500 PIPE 1x0.8
20 17.60473 75.84481 17.091 16.520 PIPE 1x0.8
21 17.60458 75.84604 17.224 16.650 PIPE 1x0.8
22 17.60269 75.85674 18.389 17.825 PIPE 2x1.5
23 17.60254 75.85791 18.516 17.950 PIPE 1x1.2
24 17.6021 75.86078 18.823 18.250 PIPE 2x0.8
25 17.60189 75.86483 19.253 18.685 PIPE 5x0.8
CANAL
26 17.60205 75.86759 19.547 18.985 1x1.2
PIPE
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid An-
nuity Mode-PN-153 Page -10
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECT
Existing Design
Sr. Type of No. of Pipe
Lat Long
Chainage Chainage
No. Culvert x Dia (mm)
(Km) (Km)
34 17.62586 75.96069 30.091 29.490 PIPE 4x1.2
35 17.62647 75.96169 30.186 29.620 PIPE 4x1.2
36 17.636 75.9752 32.003 31.435 PIPE 1x1.0
37 17.63792 75.97758 32.334 31.770 PIPE 1x1.0
38 17.64008 75.97958 32.653 32.090 PIPE 1x1.0
39 17.64121 75.98097 32.848 32.280 PIPE 2x1.0
40 17.6454 75.98532 33.503 32.935 PIPE 1x0.9
41 17.64928 75.98767 34.007 33.440 PIPE 1x1.0
42 17.65033 75.98821 34.136 33.570 PIPE 1x0.9
43 17.65077 75.98811 34.241 33.582 PIPE 1x0.9
44 17.65251 75.99068 34.626 33.995 PIPE 1x0.8
45 17.65706 75.9909 35.138 34.510 PIPE 1x1.0
Km.35/160 to km.38/110 is not in scope
46 17.70003 75.99057 40.288 39.655 PIPE 4x1.0
47 17.70814 75.94605 43.353 42.730 PIPE 3x0.9
48 17.72212 75.94088 45.274 44.625 PIPE 2x0.9
49 17.71804 75.88186 46.930 46.280 PIPE 1x0.9
Note: Lat and long are given in UTM System
B) List of Slab Culverts
Sr. No. Lat Long Existing Chain- Design Chain- Width Span/ Opening
age (Km) age (Km) (m) (m))
1 17.60924 75.9254 25.890 SLAB 1x5.2
26.463
Total number of
b) ROB’s NIL
RuB’s NIL
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid An-
nuity Mode-PN-153 Page -11
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECT
9. Bus Bays
The details of bus bays on the Site are as follows
Existing Chainage Design Chainage Length Left Hand Right Hand
Sr.No.
(Km) (Km) (m) Side Side
- NIL -
10. Truck Lay Byes
The details of truck lay byes are as follows:
Sr. Existing Chainage Design Chainage Length Left Hand Right Hand
No. (Km) (Km) (m) Side Side
- NIL -
11. Bus bays and Truck Lay byes
The total number of bus bays and truck lay byes on the Project is noted below:
Category
Existing Design Category and Type of
S.No. Left Right
Chainage Chainage of Road No.of junction
road
1 0.000 0.000 NH NH-204 T Solapur Pune
2 6.266 5.703 SH SH-149 T Solapur Kolapur
3 6.266 5.703 SH SH-150 T Solapur Kolapur
4 21.955 21.390 NH NH-13 T Solapur Vijaypura
5 21.955 21.390 NH NH-13 T Solapur Vijaypura
6 34.154 33.611 SH SH-151 T Solapur Akalkot
7 41.038 40.410 NH NH-65 T Solapur Hyderabad
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid An-
nuity Mode-PN-153 Page -12
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECT
Category
Existing Design
Category and Type of
S.No. Chainage Chainage Left Right
of Road No.of junction
(Km) (Km)
road
Km.5/700 to km.9/300 is not in scope
1 12.295 11.740 VR VR T Kawthe Dongaon
2 14.540 13.980 VR VR T Dongaon Kandalgaon
3 14.720 14.160 VR VR T Saregaon
4 17.865 17.300 VR VR T Bhatewadi
5 21.340 VR VR T Solapur
6 27.150 26.600 VR VR X Kumthe Hathur
7 27.410 26.850 ODR ODR T Solapur Fathewadi
8 31.554 31.025 ODR ODR X Solapur Bidi Gokul
Shriram
Shriram Krish-
10 41.69 41.065 VR VR T Krishna
na Nagr
Nagr
Shriram Krish-
11 41.865 41.24 VR VR T
na Nagr
13. Permanent Bridge, Bye Pass or Tunnel costing Rs. 50 crore or more
The Site includes the following permanent bridge/ bypass/ tunnel which was
Constructed at the cost noted below:
The Site includes the following parcels of land for provision of wayside Amenities:
- NIL –
15. Level Crossing
The Site includes the following railway level crossings
S. Existing Design Name of Leads to Railway Line
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid An-
nuity Mode-PN-153 Page -13
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECT
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid An-
nuity Mode-PN-153 Page -14
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECT
31 35 35.000 35.000
32 36.000 36.000
33 37 37.000 37.000
34 38.690 38.690
35 40.900 40.900
36 41 41.000 41.000
37 42 42.000 42.000
38 43.204 43.204
39 48 48.400 48.400
40 49.000 49.000
41 50 50.000 50.000
42 51.000 51.000
43 52.000 52.000
44 53.480 53.480
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid An-
nuity Mode-PN-153 Page -15
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECT
SCHEDULE - B
DEVELOPMENT OF PROJECT HIGHWAY
(See Clause 2.1)
1 Development of the Project
2.1 Two Laning with Paved Shoulder shall include the project highway as described in Annex-I of
this Schedule-B and Annex-I of Schedule-C.
2.2 Two-Laning with Paved Shoulder shall be completed by Concessionaire in conformity with
the Specifications and Standards set forth in Annex-I of Schedule-D
2.3 Two lane with paved shoulder means two lane with 1.5mtr wide paved shoulder on both
sides of two lane road and earthen shoulders 1.0 mtr on each side with site specific
condition. The width of earthen shoulders may get reduced where land is available with the
authority.
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid An-
nuity Mode-PN-153 Page -16
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECT
Annex - I
(Schedule B)
Description of Project Highway
1. Width of Carriageway
1.1 Widening of Existing Highway
The Project Highway shall follow the existing alignment unless otherwise specified by the
Authority and shown in the alignment plans and profile specified in Appendix B-II of
Annexure-I of Schedule-B. Geometric deficiencies, if any, in the existing horizontal and
vertical profiles shall be corrected as per the prescribed standards to the extent land widths
are available.
1.2 Width of Carriageway
Two-Laning with Paved Shoulder/Two-Lane shall be undertaken. The paved carriageway for Two-
Laning with Paved Shoulder and Two-Lane shall be 10.0mtr and 7.0 mtr wide as mentioned in
Schedule-B.
Except as otherwise provided in this agreement, [but subject to the provisions of Annex – I of
this Schedule – B] the width of the paved carriageway shall conform to Clause 1.2 above.
2 Project Facilities
Project Facilities shall be constructed in conformity with Annex – I of Schedule – C.
3 Specifications and Standards
The Project Highway shall be constructed in conformity with the Specifications and Standards
specified in Annex – I of Schedule – D.
4. Other Features of Project Highway
General
The Geometric design and general features of the Project Highway shall be in accordance
with Section 2 of IRC: SP: 73-2015 with certain deviations as per the Schedule-D. The design
speed shall be as per the existing land availability. No Land shall be acquired at along the
project Highway.
4.1 Cross-section
The Project Highway shall be constructed and widened to the configuration for the
entire project length as specified in Schedule – B. The schedule of typical cross-
sections and TCS of highway are as indicated in Appendix B-I. (The TCS are indicative
and shall be read in conjunction with plan & profile).
Cross section should follow IRC SP73:2015
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid An-
nuity Mode-PN-153 Page -17
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECT
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid An-
nuity Mode-PN-153 Page -18
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECT
An alignment plan and vertical profile of project highway is given at Appendix BII in
soft copy. The minimum FRL given in enclosed drawing shall have to be achieved by
concessionaire.
There are no bypasses and re-alignments in the project highway. The details of
realignment to be provided are given at Appendix B-III.
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid An-
nuity Mode-PN-153 Page -19
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECT
(a) In built-up sections, Drain cum Footpaths shall be provided as per following table.
Deleted
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid An-
nuity Mode-PN-153 Page -20
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECT
Design
Design Type of
S. No. Chainage (Km)
Length (km) Pavement
From To
As per Typical Cross-Section (TCS)
4.9.3 Design Requirements
New Flexible pavement shall be designed for a minimum design period of 15 years. Rigid
pavement shall be designed for a minimum design period of 30 years. Stage construction
shall not be permitted.
5.5 Design Thickness
Not with standing anything to the contrary contained in this Agreement or the Manual IRC SP
73:2015 the Concessionaire shall design the Flexible pavement for a design traffic of 20
million standard axles or as per the actual traffic whichever is higher for Section-I and 10
million standard axles or as per the actual traffic whichever is higher for Section-II, III, IV & V
of Ring Road. Minimum pavement composition to be adopted for new pavement for Flexible
and Rigid pavement shall be as below: -
Flexible Pavement for new pavement/reconstruction of Main carriageway & paved
shoulder:
Sr. Layers Minimum Crust Minimum Crust Strengthening,
No. Composition (mm) (mm) for 10 Minimum Crust
for 20 MSA MSA (mm) for 10 MSA
1 BC 40 40 40
2 DBM 85 60 60
3 WMM 250 250
4 GSB 200 200
Total (mm) 570 550
Rigid Pavement for new pavement/reconstruction of Main carriageway & Paved shoulder:
Sr. No. Layers Minimum Crust
Composition (mm)
1 PQC 280
2 DLC 150
3 GSB 200
Total (mm) 630
Note: 1) The Embankment & Subgrade Thickness shall be provided as per the minimum
Design FRL has given in Plan & Profile. Subgrade if shown in TCS, it shall compulsorily be
provided.
2) The Project road has Black Cotton Soil. The Concessionaire shall provide necessary
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid An-
nuity Mode-PN-153 Page -21
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECT
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid An-
nuity Mode-PN-153 Page -22
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECT
4.18 Utilities
Various utilities like electric and telephone poles, OFC lines, water pipe lines/sewage
pipes and Hand pumps are located close to the Project Highway. With the proposal of
widening of the existing road from Single-lane to 2-lane with paved shoulders, it will
be necessary to shift the utilities falling in the widening alignment, in consultation
with IE/Authority.
4.19 Type and Width of Median
The minimum width of median, subject to availability of Right of way, for various
locations shall be as in Appendix BXVI according to clause 2.5.1 of IRC:SP:73-2015.
4.20 Location of Footpath and drains
Drain cum footpath shall be provided in urban stretches as Appendix – BXVII. The
dimensions of the footpath and drain shall be approved by Independent
engineer/Authority.
4.21 Provision for extra widening at sharp curves
Extra widening to the carriageway shall be provided at sharp curve locations. The
details of extra widening locations are as given in Appendix BXVIII.
4.22 Hazardous Locations
The safety barriers shall also be provided at the following hazardous locations:
Sr. No. Location stretch from (km) to (km) LHS/RSH
As per Manual of Specifications and Standards for Two-Laning of Highways (IRC: SP:
73-2015) &As per manual and Site Requirement
4.23. Special Requirement for Hill Roads
Sr. No. Location stretch from (km) to (km) LHS/RSH
As per Manual of Specifications and Standards for Two-Laning of Highways (IRC: SP:
73-2015) &As per manual and Site Requirement
4.24 Retaining Wall / Breast Wall
Retaining wall / breast wall shall be provided as per site requirements and Cross sections
given in Appendix B-I to accommodate in the proposed ROW with Minimum to be provided
150 mtr.
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid An-
nuity Mode-PN-153 Page -23
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECT
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid An-
nuity Mode-PN-153 Page -24
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to 54/150 and 62/00 to 66/550, DPR
Tal- North Solapur, District Solapur ( Km) in the state of Maharashtra Under Hybrid Annuity- (PN-153)
VOLUME1
Thoughts 25
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to 54/150 and 62/00 to 66/550, DPR
Tal- North Solapur, District Solapur ( Km) in the state of Maharashtra Under Hybrid Annuity- (PN-153)
VOLUME1
Thoughts 26
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to 54/150 and 62/00 to 66/550, DPR
Tal- North Solapur, District Solapur ( Km) in the state of Maharashtra Under Hybrid Annuity- (PN-153)
VOLUME1
Thoughts 27
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to 54/150 and 62/00 to 66/550, DPR
Tal- North Solapur, District Solapur ( Km) in the state of Maharashtra Under Hybrid Annuity- (PN-153)
VOLUME1
250 mm
Thoughts 28
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to 54/150 and 62/00 to 66/550, DPR
Tal- North Solapur, District Solapur ( Km) in the state of Maharashtra Under Hybrid Annuity- (PN-153)
VOLUME1
85 mm
Thoughts 29
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to 54/150 and 62/00 to 66/550, DPR
Tal- North Solapur, District Solapur ( Km) in the state of Maharashtra Under Hybrid Annuity- (PN-153)
VOLUME1
Thoughts 30
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to 54/150 and 62/00 to 66/550, DPR
Tal- North Solapur, District Solapur ( Km) in the state of Maharashtra Under Hybrid Annuity- (PN-153)
VOLUME1
Thoughts 31
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to 54/150 and 62/00 to 66/550, DPR
Tal- North Solapur, District Solapur ( Km) in the state of Maharashtra Under Hybrid Annuity- (PN-153)
VOLUME1
Thoughts 32
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to 54/150 and 62/00 to 66/550, DPR
Tal- North Solapur, District Solapur ( Km) in the state of Maharashtra Under Hybrid Annuity- (PN-153)
VOLUME1
Thoughts 33
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
I Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to 54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur
in the state of Maharashtra Under Hybrid Annuity Mode- PN-153 Page -34
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -35
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
Appendix-B III
Existing Design
Design Length
S.No. Chainage (Km) Chainage (Km) Remarks
(Km)
From To From To
NIL
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -36
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
Appendix B IV
Details of Service Roads
Service Total
Design Length Road Linear
S.No. Side Remarks
Chainage (m) (m) Width Length
(m) (m)
NIL
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -37
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
Appendix B V
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -38
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
Appendix B VI
Details of Proposed ROW
Existing Chainage Design Chainage Design
(Km) (Km) Length Exisiting
S. No. From To From To (Km) ROW (m)
Section 1 from km 0/00 to 6/266
1 0 0.44 0 0.44 0.43 13
2 0.44 3.2 0.44 3.2 2.773 18
3 3.2 3.448 3.2 3.448 0.247 10
4 3.448 4.775 3.448 4.775 1.33 18
5 4.775 6.085 4.775 6.085 0.74 12
6 6.085 6.266 6.085 6.266 0.183 18
Section 2 from km 6/266 to 21/957
7 6.266 6.342 6.266 6.342 0.082 16
8 6.342 8.965 6.342 8.965 2.625 10
9 8.965 9.85 8.965 9.85 0.89 16
10 9.85 12.2 9.85 12.2 2.35 10
11 12.2 12.485 12.2 12.485 0.275 16
12 12.485 14.39 12.485 14.39 1.895 16
13 14.39 15.075 14.39 15.075 0.675 10
14 15.075 19.428 15.075 19.428 4.365 16
15 19.428 20.7 19.428 20.7 1.27 16
16 20.7 21.66 20.7 21.66 0.96 10
17 21.66 21.957 21.66 21.957 0.299 16
Section 3 from km 21/957 to 27+579
18 21.957 26.755 21.957 26.755 4.786 16
19 26.755 27.42 26.755 27.42 0.675 10
20 27.42 27.579 27.42 27.579 0.163 16
Section 4 from km 27/579 to 41/038
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -39
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -40
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
Appendix B VII
At Grade Intersection
a) Major Junctions
The details of major junctions along project stretch are as follows:
Category
Existing Design
Category and Type of
S.No. Chainage Chainage Left Right
of Road No.of junction
(Km) (Km)
road
Km.5/700 to km.9/300 is not in scope
1 12.295 11.740 VR VR T Kawthe Dongaon
5 21.340 VR VR T Solapur
6 27.150 26.600 VR VR X Kumthe Hattur
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -41
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
Category
Existing Design
Category and Type of
S.No. Chainage Chainage Left Right
of Road No.of junction
(Km) (Km)
road
Shriram
Shriram Krish-
10 41.69 41.065 VR VR T Krishna
na Nagr
Nagr
Shriram Krish-
11 41.865 41.24 VR VR T
na Nagr
Note:
1) All chainges mentioned above are tentative actual location of junctions shall be as per the
site condition and direction of PWD/IE.
2) Culverts of cross Roads at Junctions need to be widend as per the Junction Improvement
Plan
3) All Junctions shall be improved as per IRC SP:73 2015 within available ROW
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -42
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
Appendix B VIII
Minimum Road to be
Design Length of carried
Salient
S.No. Location Chainage viaduct to over/under Remarks
Features
(m) be provided the
(m) structure
NIL
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -43
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
Appendix B IX
Details of Proposed Utility Structures
Existing Design
Type of Proposed span
Sl. No. Chainage Chainage Remarks
Structure Arrangement(m)
(km) (km)
NIL
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -44
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
Appendix B X
Minimum Road to be
Design Length of carried
Salient
S.No. Location Chainage viaduct to over/under Remarks
Features
(m) be provided the
(m) structure
NIL
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -45
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
Appendix B XI
Min.
Propose Type of
Existing Design Vertical
d Span Super - Overall
S.No. Location Chainag Chainag Clearanc
Arrange Structur width
e e e
ment e
(m)
NIL
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -46
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
Appendix B XII
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -47
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
Appendix B XIII
Details of new Minor Bridges and Rehabilitation/Repair /widening Scheme for Existing Minor Bridges
Reconstruction Re-
2 17.631315 75.819032 11.226 10.670 construction as New
Pipe 16x0.8 10.00 5x5.0x3.0 Box
Bridge as per figure
7.2 of IRC SP 73
Reconstruction Re-
3 17.628446 75.821103 11.721 11.330 construction as New
Pipe 13x1.2 9.10 5x5.0x4.0 Box
Bridge as per figure
7.2 of IRC SP 73
Reconstruction as
4 17.616791 75.823229 13.564 13.005 New Bridge as per
Pipe 9x0.8 10.00 3x5.0x3.0 Box
figure 7.2 of IRC SP
73
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to 54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur
in the state of Maharashtra Under Hybrid Annuity Mode- PN-153 Page -48
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
Reconstruction as
5 17.601885 75.864825 19.253 18.685 New Bridge as per
Pipe 5x0.8 7.70 3x3.0x3.0 Box
figure 7.2 of IRC SP
73
Reconstruction as
6 17.603747 75.906771 23.879 23.310 New Bridge as per
Pipe 2x1.0+3x0.9 9.00 3x3.0x2.0 Box
figure 7.2 of IRC SP
73
Reconstruction as
7 17.625862 75.960693 30.091 29.490 New Bridge as per
Pipe 4x1.2 9.50 2X5.0X4.0 Box
figure 7.2 of IRC SP
73
Reconstruction as
8 17.626473 75.96169 30.186 29.620 New Bridge as per
Pipe 4x1.2 9.10 2X5.0X4.0 Box
figure 7.2 of IRC SP
73
Reconstruction as
9 17.70003 75.990569 40.288 39.655 New Bridge as per
Pipe 4x1.0 9.25 2x5.0x3.0 Box
figure 7.2 of IRC SP
73
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to 54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur
in the state of Maharashtra Under Hybrid Annuity Mode- PN-153 Page -49
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
11 Wall
17.723784 75.940115 45.480 44.835 open
Type
Solid Slab 2 x6.0 8.5 Retained& Repair -
Note: 1) All the Minor bridges shall be widened and reconstructed as per section 7.3 of IRC: SP: 73-2015
2) The repair & Strengthen shall be done as per Section 7 of IRC: SP: 73-2015
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to 54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur
in the state of Maharashtra Under Hybrid Annuity Mode- PN-153 Page -50
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
Appendix B XIV
Details of Proposed Scheme for Culverts
The culverts requiring reconstruction / widening / new construction are given below:
A) Reconstruction/ Widening of Pipe Culverts
The Following Pipe culverts shall be Re-constructed /widened to the roadway width of
the project highway and Repairs and strengthening of existing where required shall be
carried out as per section 7.3 of IRC: SP: 73-2015.
Exist Proposed Cul-
ing verts
Existing Design No. of
Sr. Type
Chai- Chai- Pipe x Type No. of
No Lat Long of Remarks
nage nage Dia(m of Pipe x
. Cul-
(Km) (Km) m) Cul- Dia
vert
vert (mm)
75.8472
17.7137 0.485 0.500 PIPE 1x0.8
67 38 PIPE 1x1.2 Reconstruction
1
17.7043 75.8450
1.565 1.640 PIPE 1x0.8
2 84 03 PIPE 1x1.2 Reconstruction
17.6893 75.8451
3.240 3.240 PIPE 1x0.6
3 55 13 PIPE 1x1.2 Reconstruction
17.6841 75.8466
3.837 3.840 PIPE 1x1.0
4 10 15 PIPE 1x1.2 Reconstruction
17.6755 75.8478
4.840 4.750 PIPE 1x0.9
5 53 99 PIPE 1x1.2 Reconstruction
17.6405 75.8232
10.110 9.555 PIPE 1x0.3
18 18 34 PIPE 1x1.2 Reconstruction
17.6388 75.8223
10.311 9.755 PIPE 1x0.9
19 93 78 PIPE 1x1.2 Reconstruction
17.6376 75.8220
10.473 9.890 PIPE 1x0.3
20 82 56 PIPE 1x1.2 Reconstruction
17.6243 75.8241
11.871 12.155 PIPE 1x0.8
21 89 89 PIPE 1x1.2 Reconstruction
17.6121 75.8224
14.083 13.525 PIPE 2x0.8
22 96 09 PIPE 2x1.2 Reconstruction
17.6060 75.8358
15.545 1 x0.6
23 07 48 PIPE 1x1.2 Reconstruction
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -51
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
17.6045 75.8460
17.224 16.650 PIPE 1x0.8
25 76 41 PIPE 1x1.2 Reconstruction
17.6025 75.8579
18.516 17.950 PIPE 1x1.2
26 37 14 PIPE 1x1.2 Reconstruction
17.6020 75.8607
18.823 18.250 PIPE 2x0.8
27 99 81 PIPE 2x1.2 Reconstruction
CAN
17.6020 75.8675
19.547 18.985 AL 1x1.2
54 87
28 PIPE PIPE 1x1.2 Retained
17.6010 75.8794
20.813 20.240 PIPE 2x0.9
29 59 27 PIPE 2x1.2 Reconstruction
17.6010 75.8847
21.372 20.805 PIPE 1x0.8
30 15 02 PIPE 1x1.2 Reconstruction
17.6010 75.8849
21.399 20.830 PIPE 2x0.8
31 60 27 PIPE 2x1.2 Reconstruction
17.6360 75.9752
32.003 31.435 PIPE 1x1.0
32 00 02 PIPE 1x1.2 Reconstruction
17.6379 75.9775
32.334 31.770 PIPE 1x1.0
33 21 77 PIPE 1x1.2 Reconstruction
17.6400 75.9795
32.653 32.090 PIPE 1x1.0
34 81 78 PIPE 1x1.2 Reconstruction
17.6412 75.9809
32.848 32.280 PIPE 2x1.0
35 11 66 PIPE 2x1.2 Reconstruction
17.6453 75.9853
33.503 32.935 PIPE 1x0.9
36 96 16 PIPE 1x1.2 Reconstruction
17.6492 75.9876
34.007 33.440 PIPE 1x1.0
37 82 69 PIPE 1x1.2 Reconstruction
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -52
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
17.6507 75.9881
34.241 33.582 PIPE 1x0.9
39 67 12 PIPE 1x1.2 Reconstruction
17.6525 75.9906
34.626 33.995 PIPE 1x0.8
40 11 80 PIPE 1x1.2 Reconstruction
17.6570 75.9908
35.138 34.510 PIPE 1x1.0
41 60 98 PIPE 1x1.2 Reconstruction
17.7081 75.9460
43.353 42.730 PIPE 3x0.9
44 37 54 PIPE 3x1.2 Reconstruction
17.7221 75.9408
45.274 44.625 PIPE 2x0.9
45 18 83 PIPE 2x1.2 Reconstruction
Note:
1) All Pipe Culverts shall be widend up to Approach Road width as per proposed TCS and
Site Conditions.
2) Overall width of all culverts shall be equal to the roadway width or 12.0 mtr whichever
is higher of the approaches.
3) Widening of Culverts and their sizes shall be as per site conditions and it shall not be
treated Change of Scope.
4) The Repairs shall include the replacements of railing/parapets, flooring and protection
works of the existing culverts
B) Box /Slab Culverts
The Following box /slab culverts shall be reconstructed /widened to the roadway width
higher of the project highway or 12.0 mtr whichever is higher and Repairs and strengthening
of existing where required shall be carried out as per section 7 of IRC: SP: 73-2015.
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -53
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
1X2.0X2. Reconstruc
17.604966 75.843430 16.941 16.370 PIPE 2x0.8
2 BOX 0 tion
1X2.0X2. Reconstruc
17.604722 75.844679 17.078 16.500 PIPE 1x0.8
3 BOX 0 tion
1X2.0X2. Reconstruc
17.604727 75.844812 17.091 16.520 PIPE 1x0.8
4 BOX 0 tion
1x3.0x2. Reconstruc
17.602686 75.856735 18.389 17.825 PIPE 2x1.5
5 BOX 0 tion
1x2.0X2. Reconstruc
17.601270 75.898478 22.947 22.375 PIPE 2x0.8
6 BOX 0 tion
2x3.0x2. Reconstruc
17.609243 75.925402 26.463 25.890 BOX 1x5.2
7 BOX 0 tion
1x3.0x3. Reconstruc
17.616282 75.946670 28.153 27.590 PIPE 2x1.0
8 BOX 0 tion
1X5.0x4. Reconstruc
17.625707 75.960232 30.009 29.450 PIPE 2x1.0
9 BOX 0 tion
Note:
1. The width of all Proposed Box /Slab Culverts shall equal to the width of Approach Road
width as per proposed TCS or 12.0 mtr whichever is higher and Site Conditions.
c) New Culverts:
The Culverts at the following locations shall be re-constructed as new culverts as per section
7.3 of IRC: SP: 73-2015.:
Pipe
Proposed Culverts
Design Chai-
Sr. No. Latitude Longitude Type of No. of Pipe x Dia Remarks
nage (Km)
Culvert (mm)
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -54
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
Proposed Culverts
Design Chai-
Sr. No. Latitude Longitude Type of No. of Pipe x Dia Remarks
nage (Km)
Culvert (mm)
2 17.601414 75.898988 22.430 PIPE 1x1.2 NEW
Box/Slab Culverts
Proposed Cul-verts
Design Chai-
Sr. No. Latitude Longitude Type of No. of span x Remarks
nage (Km)
Culvert (opeing M XM))
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -55
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
17.605176
Note
1) The width of all Proposed New Box/ Pipe Culverts shall equal to the width of Approach
Road width as per proposed TCS or 12.0 mtr whichever is higher and Site Conditions.
2) Locations shall be decided in consultation with PWD/IE
3) The Minimum 26 Number of 1 x 1.2 m Pipe culverts shall be provided on cross roads &
junctions in 12 m width.
Appendix B XV
Location of
Location of ROB
SI. ROB Design Chai- Span Ar- Length of
(at existing
No. (at Design nage Viaduct rangement bridge (m)
chainage km) Remarks
chainage km)
740 (Including
Approach width
From 4.780 to the approaches
1 5.150 5.56 37.28m 8.5 m & Viaduct
5.520 and the via-
width 11.8 m
ducts)
NIL
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -56
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
Appendix B XVI
Type and Width of Median
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -57
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
Appendix B XVII
Location of drain and footpath
RCC drains cum footpath shall be provided in all built-up areas listed in Schedule ‘B’ as per
provisions of 2-Lane Manual IRC SP 73:2015
From To
0.000 0.430
0.430 Both sides 1.0
Both sides 1.0
3.203 3.450
0.247
Both sides 1.0
11.650 11.925
0.275
Both sides 1.0
13.820 14.495
0.675
Both sides 1.0
20.130 21.090
0.960
Both sides 1.0
26.175 26.850
0.675
Both sides 1.0
33.170 33.980
0.810
Both sides 1.0
38.770 38.890
0.120
Both sides 1.0
40.820 41.720
0.900
Both sides 1.0
41.720 41.930
0.210
(b) Unlined Drain at Rural Area
Unlined Kacha drains shall be provided along both sides of the entire project highway except
the section where RCC Covered Drain has specified in TCS
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -58
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
Appendix B XVIII
Details of extra widening in sharp curves
Extra widening at sharp curves has to be provided as per Clause No-2.7.2 of two lane manual
IRC SP 73 2015. This shall be limited to existing land width available. If extra land is required,
it should not be done instead speed restrictions shall be provided. The details of Sharpe
covers are given in plan & Profile.
Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -59
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
SCHEDULE-C
PROJECT FACILITIES
(See Clause 2.1)
1 Project Facilities
The Concessionaire shall construct the Project Facilities described in this Annexure-I to form
part of two-lane with paved shoulder project highway. The Project Facilities shall include:
I Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -60
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
Annexure - I
(Schedule-C)
Project Facilities for Two-Laning with Paved Shoulder
1 Project Facilities
The Concessionaire shall construct the Project Facilities described in this Annexure-I to form
part of the two-Lane with Paved Shoulder Project Highway. The Project Facilities shall
include:
I Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -61
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
I Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -62
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
These shall be provided in the entire Project Highway near pedestrian crossings,
public gathering places (Educational Institutions, Hospitals, Worshipping Places,
etc.),cross roads, & median openings. The locations for these provisions shall be
finalised in consultation with IE.
(xi) Rumble strips
Rumble strips of Thermoplastic paint shall be provided at all cross-road junction as
per IRC: 99-1988.
(b) Pedestrian Facilities
The pedestrian facilities shall be as per the Schedule -B and Schedule-C and include the
provision of
Pedestrian guardrail: Provide pedestrian guardrail at each bus bay locations, byes,
near School/Hospital and at major junctions.
Pedestrian walkway: Provide pedestrian walkway as in all urban areas along foot-
path.
Pedestrian Crossings: Provide pedestrian crossing facilities at Junctions.
(c) Tree Plantation
The Concessionaire shall plant trees and shrubs of required number and type at the
appropriate locations as decided by Authority/IE within the Right of Way and in the land
earmarked by the Authority/IE for afforestation keeping in view the IRC Guidelines on
Landscaping and Tree Plantation.
Tree Plantation to the extent of number and species as decided by Environmental / Forest
authorities for the entire Project Highway. The Contractor shall provide minimum 7950 trees
along the entire Project Highway as per the Manual of Specification & Standards
(d) Truck Lay-Byes
Truck lay byes shall be provided at the following locations for a capacity of 5 bays, in
accordance with the Manuals of Specifications and Standards as referred in Schedule-D.
S.No. Design Chainage (Km) Side Village
NIL
The location of these truck lay-bys are tentative and shall be finalised by the concessionaire
in Consultation with the IE /PWD.
(e) Bus Shelters
Locations of Bus Shelters are provided in following Table.
Sr.No. Location Proposed Chainage in Km. Side
1 Kegaon 0.460 Both
2 Deshmukh vasti 3.600 Both
3 Basveshar 5.880 Both
4 Belati 8.840 Both
5 Kaute Gaon 12.040 Both
6 Dongaon 14.650 Both
7 Soregaon 21.330 Both
8 Kumthe 26.000 Both
9 Kumbhari 32.835 Both
10 Doddigaon 38.635 Both
I Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -63
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
NIL
NIL
(h) Cattle Crossing
NIL
Rain Water Harvesting System shall be provided as per relevant ministry circulars.
(j) Utility pipe ducts
Utility pipe ducts is provided as per Cl. 2.15 of IRC:SP 73-2015, R.C.C. NP-3 Pipe – 600mm @
1000.00m c/c for rural & @ 100.00m c/c for urban length of project road across road with
proper inlet and chamber for crossing service lines such as irrigation pipe lines and cables.
Note: In case of any discrepancy in number or location of any of the project
facilities mentioned in this Annexure - I, the Independent Engineer shall finalize the
number/ location of these facilities as per site requirements.
I Improvement to Ring road outside Solapur City S.H.- 205 KM 0/00 to 28/200, 29/800 to 44/600, 48/400 to
54/150 and 62/00 to 66/550, Tal- North Solapur, District Solapur in the state of Maharashtra Under Hybrid
Annuity Mode- PN-153 Page -64