GALAXACT, DHA, KARACHI FEB 2021

LIST OF REQUIRED INFORMATION REGISTER


LAST Date UPDATED : 12th Febuarary 2021
ISSUE # TRADE DESIGNAVERA QUERY CLIENT REPLY Status
-
Office Areas do not have any furniture plans. For occupancy estimation
1 G open
ASHRAE 62.1 will be followed.
Kitchen, Food Court and Resturant Areas do not have any furniture
2 H open
plans. For occupancy estimation ASHRAE 62.1 will be followed.

U values for glass windows, wall partitions and roof partitions (for heat load
calculations:

Windows finished glass type and structure details such as wall thickness, dry
3 H wall partitions and slab/ceiling sections will be required. Open

At design brief stage, standard values for typical building construction shall be
taken, however the load estimates may be revised in the future. Kindly
suggest if we can proceed
Please share if any water test and soil test report is available for reserving
4 P Open
adequate space for treatment plants.
GALAXACT, DHA, KARACHI FEB 2021

ISSUE # TRADE DESIGNAVERA QUERY CLIENT REPLY Status


-
Furniture and Ceiling Plans are required for more accurate load
11 G open
estimation
Structural drawings are required for beam drop coordination and
12 G open
openings marking for mechanical services
Building program required if available at client end. Building program
should include (however not be limited to) placement of separate
13 G departments within the buildings, their working hours and occupancy. open
This will be beneficial to help develop more accurate estimates of
loads
Go ahead required for type of VRF System:
5 H a) VRF open
b) Chilled water based
If opted system is VRF, Open Space needs to be alloted for outdoor
6 H
units on every floor preferably near any available shaft
Go ahead required for type of hot water System:
7 P a) Electrical heaters open
b) Hot Water Generator (Gas based)
Go ahead required for increasing Water tanks and Septic tank sizes as
8 P open
shared
Go ahead required for
a) Bulk metering of Natural Gas
9 P open
or
b) Individual metering for each resturant/food court
10 P Go ahead required for making provision for storm water tank open
G= General, H=HVAC, P=Plumbing, D=Drainage, F=Firefighting