IRAQ GATES CONTRACTING CO.

Inspection & Test Plan for Temporary Office


Report No.
Electrical Works

FLOODLIGHT, ROAD AND COLUMN MOUNTED LIGHTING INSTALLATION AND TEST RECORD
Tag No: Location: Sub-System No:
DB No: Circuit No: Lighting Type:
Light Fixture Ex. Protection Type: Gas Group: Temp. Class: IP Rating:
Jn. Boxes Ex. Protection Type: Gas Group: Temp. Class: IP Rating:
Lighting Layout Drawing No: Dist. Drawing/Schedule No:
Haz. Area Classification Drawing No: Haz. Area Class:

Sl No: Checks to be Performed Result


1 Foundation released from Civil QC (If required).
2 Where applicable, Vertical alignment checked and adjusted.
3 Location, elevation and orientation as per layout drawing.
4 Fixture and support stability good.
5 Assembly as per manufacturer's instructions.
6 Circuit Installed and Identified according to approved drawings and specifications.
7 Equipment is appropriate to the hazardous area classification requirements of the location.
8 All fittings solidly and correctly mounted and not obstructed by other services.
9 Nameplate securely attached, readable and not obscured.
10 All equipment undamaged and clean.
Verify cable termination and glanding at each junction box and lighting fitting to ensure
11
compliance with drawing/specification.
12 All identification labels are correct.
13 Earth connection and earth continuity in accordance with specification.
14 Verify warning labels are fitted, where necessary.

IR& Continuity test/termination of internal cables prior to lifting the pole (MΩ)

Pole.No: 1 2 3 4 5 6 7 8 9 10 11 12

P-N

P-E

N-E
15
Continuity

Termination

IGCC CONST IGCC QC BGC


Name: Name: Name:

Signature: Signature: Signature:

Date: Date: Date:

FLOODLIGHT, ROAD AND COLUMN MOUNTED LIGHTING INSTALLATION AND TEST RECORD

Form No: IGCC-OPM-QUA-FMT-0105 Rev. 0


Page 1 of 2
IRAQ GATES CONTRACTING CO.

Inspection & Test Plan for Temporary Office


Report No.
Electrical Works

Tag No: Location: Sub-System No:


DB No: Circuit No: Lighting Type:
Light Fixture Ex. Protection Type: Gas Group: Temp. Class: IP Rating:
Jn. Boxes Ex. Protection Type: Gas Group: Temp. Class: IP Rating:
Lighting Layout Drawing No: Dist. Drawing/Schedule No:
Haz. Area Classification Drawing No: Haz. Area Class:

Phase – Neutral: MΩ

Insulation resistance and continuity test of complete Neutral-Earth: MΩ


circuit: (Ensure to disconnect lighting fixtures during Phase – Earth: MΩ
16 IR test.)
Test Voltage: VDC for 1min. Continuity:

Record number of lighting fittings and junction Light Fittings:


17 boxes in a circuit. Jn. Boxes:
18 Lamp rating, type and position are correct.
19 Unused cable entries are blanked off with correct type of plugs.
20 No unauthorized modifications on electrical enclosures.
21 Enclosure glass parts and glass to metal sealing gasket and/or compounds are satisfactory.
22 Enclosure flange faces are clean and undamaged and gaskets, if any, any are satisfactory.
23 Enclosure flange gap dimensions are within maximal values permitted.
24 Obstructions adjacent to flame proof flanged joints are within minimum distance stipulated
for specific gas group (IIA=10mm, IIB=30mm, IIC=40mm)
25 Breathing and draining devices are satisfactory.
26 Equipment is adequately protected against corrosion, weather, vibration and other adverse
factors.
27 No undue accumulation of dust and dirt.
28 Where applicable, sealing of trunking, ducts, pipes, and /or conduit are satisfactory.
29 Enclosure lids are satisfactory with suitable gasket (where applicable) and fixing screws / bolts
tightened and IP rating is maintained.
30 Installation complies with hazardous area classification requirements.
Test Equipment Type Make Model Sl. No Cal Due Date

Remarks:

IGCC CONST IGCC QC BGC


Name: Name: Name:

Signature: Signature: Signature:

Date: Date: Date:

Form No: IGCC-OPM-QUA-FMT-0105 Rev. 0


Page 2 of 2