IRAQ GATES CONTRACTING CO.

EARTHING SYSTEM INSTALLATION Report No.


CHECK LIST Sheet: 1 of 1

EARTHING SYSTEM INSTALLATION CHECK LIST


Drawing No: Rev: Sub-System No:

Area: Location:
Results
SL. No: Checks to be performed
ACC REJ N/A

1 Earth electrodes are located as per layout drawing.


□ □ □
2 Earth electrodes are connected properly to the main grid.
□ □ □
3 Earth bar located as per layout drawing.
□ □ □
4 Earth bar installation as per installation detail drawing.
□ □ □
5 Earth bar assembly and connections are fitted correctly.
□ □ □
All bondings to equipment are in accordance with installation
6
detail drawing. □ □ □
7 All wire lugs are properly crimped and bolted.
□ □ □
All non current carrying metal parts are bonded to earthing
8
system. □ □ □
Remarks: REQUEST FOR INSPECTION REFERENCE
RFI NO.

IGCC CONST IGCC QC BGC


Name: Name: Name:

Signature: Signature: Signature:

Date: Date: Date:

FORM No.IGCC-OPM-QUA-FMT-0095 Rev.0