IRAQ GATES CONTRACTING CO.

Report No.
Inspection & Test Plan for Temporary Office Electrical Works
Sheet: 1 of 1
INSULATION RESISTANCE AND CONTINUITY TEST RECORD ELECTRICAL CABLE
Inspection & Hi-P test for MV cable (11 KV)

Area: Cable Tag: Rated Voltage: Ambient Temperature: C˚ Humidity: %


1- IR test Before Hi-Pot Test VDC: For:
L3 – others / E G
L1 – others / E G ohm L2 – others / E G ohm
ohm

2- HV Test (Ac Hi-Pot or VLF) Test Voltage: Hz: For:


L3 – others / E m
L1 – others / E m Amp L2 – others / E m Amp
Amp

3- IR Test After Hi-Pot Test VDC: For:


L3 – others / E G
L1 – others / E G ohm L2 – others / E G ohm
ohm

Test Equipment Type Make Model No Sl. No Cal Due Date

IGCC CONST IGCC QC BGC


Name: Name: Name:

Signature: Signature: Signature:

Date: Date: Date:

IGCC-OPM-QUA-FMT-0168 Rev.0