Professional Documents
Culture Documents
Risk Assessment For Harmonic Measurement Study Procedure
Risk Assessment For Harmonic Measurement Study Procedure
1
Base Risk Ranking Residual Risk Ranking Person
CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Responsible
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk
L S L S
Score Rating Score Rating
2
1
3
Base Risk Ranking Residual Risk Ranking Person
CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Responsible
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk
L S L S
Score Rating Score Rating
4
5
Base Risk Ranking Residual Risk Ranking Person
CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Responsible
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk
L S L S
Score Rating Score Rating
6
15) Ensure the transformer is proper ground
connections
7
Base Risk Ranking Residual Risk Ranking Person
CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Responsible
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk
L S L S
Score Rating Score Rating
8
the device/cable under test to avoid sparks.
25). Identify and avoid electrical hazards
26). Ensure that sufficient spacing is maintained
with test equipment/device-cable under test with
other nearby conductive materials
27). Both in service and abandoned cables must be
positively identify through existing records and
authorized tests
2 Working on Work at height Operatives/Staff/ 3 4 12 Med 1) Only trained and authorised personnel to 1 4 4 Low Supervisors
Mobile tower for Visitors carry out the task. Foreman,
Harmonic Fall form height Others 2) Ensure the PTW in place. Site Eng.
measurement 3) Ensure proper working platform with Scaffolding
activity Falling objects complete fall protection Inspector
4) Ensure Full body harness and 100% Tie off
Over loading 5) Ensure the scaffold platform is properly
Fragile surface erected with "Safe to use" tag.
6) Ensure castor wheels are locked and out
Access & egress rigger in place.
7) Hand tools must be secured/tethered
8)Work materials strictly not allowed to be
stored on platform except for working tools
9) Always comply with the WLL & man loading
capacity
10) Ensure unauthorised person not allowed
to modify the scaffolding and if needed to any
changes then must be modified by trained
and certified scaffolder.
11) Must clean the work area after
9
Base Risk Ranking Residual Risk Ranking Person
CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Responsible
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk
L S L S
Score Rating Score Rating
10
completion the job.
12)Ensure safe access to the working
platform
13)Scaffold access must be free from
obstruction
14) During installation and connection activity
ensure that nobody will enter in side Duct for
resting or keeping any food item and no debris will
remain inside.
15) Work area must barricade with signage and
watchman must monitor no unauthorised person
will enter inside exclusion zone
16) Ensure sufficient illumination in work area.
17) Work area should clean and remove all the
debris end of shift.
18) Ensure that working near fragile surface special
care of body and eye protection with necessary
PPE.
3 Use of Ladder Falling from height Operatives/ 3 4 12 Medium Ladder is not to use daily basis but in certain 1 4 4 Low Commissioni
Staff/ cases where there is very narrow place and ng Eng.
Working on Uneven even podium ladder not possible to fix in that Sup
ground cases Ladder can use if permission granted Foreman
from McLaren Safety
Falling objects 1) Only light work, off short duration and
work in which the operative can maintain
secure hand and foot hold can be undertaken
form a ladder
2) Never try to overreach with any ladders
11
Base Risk Ranking Residual Risk Ranking Person
CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Responsible
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk
L S L S
Score Rating Score Rating
12
3) Check the ladder is of suitable quality for
industrial use and is in good condition
4) Maintain a minimum of 3 points of contact
with stepladders at all times
(feet/thighs/hands)
If possible, avoid the use of stepladders at a
working height of 2 meters and more.
5) Check the ladder legs (and stays) are fully
deployed or locked (depending on type) to
maintain maximum base dimensions and the
step ladder is orientated to provide maximum
stability.
6) Stepladders/ladders has to be used on
leveled ground/firm base
7) Ensure that during using ladder from the
top 2 steps is blocked to avoid climb on that.
8) The ladder securely fixed to prevent
slipping outwards or sideways or securely
footed at all times.
9) Person must hold the ladder while another
operative working on it
8) Materials should not be placed above the
thread of ladders/step ladders
9) Do not carry any materials in one hand
while climbing or getting down from ladder
10) Ensure the area under the ladder is
barricaded especially if it is being used in a
13
Base Risk Ranking Residual Risk Ranking Person
CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Responsible
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk
L S L S
Score Rating Score Rating
14
public area.
11) Ensure the ladder is electrical insulated
podium type if working in live services
15
Base Risk Ranking Residual Risk Ranking Person
CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Responsible
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk
L S L S
Score Rating Score Rating
16
2) Proper lighting system should be in place
3) Ensure proper Communication /
Coordination and close supervision
4) Industrial safe torches to be available for
illumination emergency situations
Foreman
Lone worker 5) High visibility Traffic Vest for personnel’s in
night shift
6) Avoid lone working and always ensure
buddy system while working at night
7) Employees to be trained and understand
McLaren Crises plan.
6 COVID-19 Cough All employees 4 4 16 High 1) Every 7 days operatives must have Covid 19 1 4 4 Low Supervisor
Sneezing Negative Report. Construction
Fever (fever as body 2) Operatives musts try to perform their duties Operatives
maintaining some at least 2meter distance
temperature higher
from each other wherever possible.
than 38°C
3) Appropriate personal hygiene posters to be
Headache displayed on notice boards at workplace.
Nasal Discharge 4) Maintain high standards of hygiene.
5) Intensive routine sanitation/disinfection of
Offices, desks, chairs, laptop/desktop
keyboards, dining tables, drinking water
stations, toilets, door handles, pantry, visitor
PPE’s. meeting tables to be disinfect after
each use.
6) Disinfection of site offices, Welfare areas and
work areas to be carried out
7) Temperature monitoring of
employees/visitors on site arrival by using
17
Base Risk Ranking Residual Risk Ranking Person
CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Responsible
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk
L S L S
Score Rating Score Rating
18
infrared thermometer, person with above 38O
temperature will refuse to access site or
offices.
8) Avoid close contact with anyone showing
symptoms of respiratory illness, maintain
social distance on 2meter.
9) Wash hands often with soap and water for at
least 20 seconds, follow the displayed poster
at washbasins.
10) Use hand sanitizer if soap and water are not
available, sanitizer dispensers installed at AKS
site: Security post, operatives dining area and
Office reception, Sub Contractors room and
meeting room.
11) Cover your mouth and nose with a tissue or
your sleeve (not your hands) when coughing
or sneezing. Put used tissues in the bin
immediately.
12) Avoid touching your eyes, nose or mouth
without washing your hands
13) Take enough rest and take a large amount of
fluids.
If you have Cough, Shortness
14) If you have Cough, Shortness Breath, Fever,
Sore Throat, headache seek medical care early
and stay at home.
15) Avoid spiting at workplace/site.
16) Do not travel while sick.
17) In the event that any medical support or
inquiry is required, please contact:
19
Base Risk Ranking Residual Risk Ranking Person
CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Responsible
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk
L S L S
Score Rating Score Rating
20
a. “Estijaba" service at the operation center –
Department of Health at 8001717
b. Ministry of Health & Prevention at 80011111
c. SEHA 80050
d. Abu Dhabi COVID Emergency helpline
+971563713090
McLaren Incident reporting protocol to be
followed
2
3
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Base Risk Ranking Residual Risk Ranking Person
CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Responsible
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk
L S L S
Score Rating Score Rating
22
21 Approved By: Name Vishnu Mohan Position _PM________ Signature _ ________ ___________