Percentage Reinforcement Calculation For Miscellaneous RCC Works BBP
Percentage Reinforcement Calculation For Miscellaneous RCC Works BBP
Quantity in
RCC Member Size of reinforcement required
No kg/m3
1 Column footings 75 10mm or 12mm
12mm, 16mm – 85%
2 Grade beams 100
Stirrups – 6mm or 8mm– 15%
8mm diameter – 85%,
3 Plinth beams 125
Stirrups 6mm – 15%
16mm, 20mm and 25mm – 90%
4 Columns 225
Ties – 6mm or 8mm – 10%
12mm, 16mm dia – 85%
5 Lintel beam 125
Stirrups – 6 mm or 8mm – 15%
8mm dia – 75%
6 Sunshades 60
Distributer – 6mm – 25%
10mm dia – 80%
Canopy slab upto 2.0 m
7 125 Distributor bars – 6mm or 8mm –
span
20%
12 or 16mm dia – 80%
8 Staircase waist slab 150
Distributor 8mm dia – 15%
9 Roof slab
8mm dia – 70%
(a) One way slab 80
Distributor – 6mm – 30%
(b) Two way slab 100 8mm dia – 100%
(c) Square slab – 4m to
150 10 – 12mm dia – 100%
6m size
20mm, 16mm, 12mm – 80 – 85%
10 Main beams above 6m 250
Stirrups – 8mm – 15 – 20%