Professional Documents
Culture Documents
Boiler JSA
Boiler JSA
Name of the Contractor:- Thermax Limited, Pune Work location :- Green “Boiler Project
Prepared by:- 03.05.2010
k.k.vishwakarma
(Name & Design. of Concern Date: -
Safety Officer
HSE Officer.) -
Erection of FM Boilers: xxxxxx
Title of method statement:- JOB SAFETY ANALYSIS Description of Activity:-
Page 1 of 42
JOB SAFETY ANALYSIS
Page 2 of 42
JOB SAFETY ANALYSIS
Page 3 of 42
JOB SAFETY ANALYSIS
Page 4 of 42
JOB SAFETY ANALYSIS
Page 5 of 42
JOB SAFETY ANALYSIS
arrestor.
5.Proper storage and handling of oil.
4.Due to piano wire on
6.Ensure proper housekeeping before and after
ground trip hazard.
work.
Page 6 of 42
JOB SAFETY ANALYSIS
welding work.
person from height. 7.Ensure proper housekeeping before and after
6.Failure of scaffolding. work.
8.Ensure good quality of scaffolding material used.
1.Give HSE training about do or don’t in this work.
2.Tool box talk -discuss abut fall protection
3.Barricade the area and post safety sign
1.Fall of the object from
4.Conduct safety inspection of all tools and lifting
height. 1.Property damage, injury.
tackles/machines before starting the job.(as per
Erection of Front 2.Contact with sharp edges. 2.injury.
factory act specification).
8 Panel-Panel and Top 3.Failure of the lifting tools 3.serious Injury/fatality.
5.Ensure good and standard quality of lifting tool
header and tackles. 4.Fall of the person from
usages.
4.Failure of safety belt.(if height.
6.Use of full body harness safety belt and fall
damaged safety used).
arrestor.
7.Periodic and pre-use checks of harness.
Page 7 of 42
JOB SAFETY ANALYSIS
welding work.
person from height. 7.Ensure proper housekeeping before and after
6.Failure of scaffolding. work.
8.Ensure good quality of scaffolding material used.
1.Appropriate ventilation.
1.Exposure to welding 2.Proper earthing.
fumes. 1.Lung injury 3.Keep ready fire protective arrangement.
2.Electric shock. 2Electrocution. 4.Ensure proper use of PPE.
Front panel-Welding 3.Fire 3.Fire,explosion 5.Prepare SOP of welding work.
of panel strip 4.Projectiles,flash 4.Eye/Burn injury. 6.Safety talk-discuss abut working at height and
5.Fall of material, tools, 5.Injury, fatality. welding work.
person from height. 6.Injury, loss of property. 7.Ensure proper housekeeping before and after
6.Failure of scaffolding. work.
8.Ensure good quality of scaffolding material used.
1.Give HSE training about do or don’t in this work.
2Tool talk -discuss abut fall protection
1.Fall of the object from 3.Barricade the area and post safety sign
height. 1.Property damage, injury. 4.Conduct safety inspection of all tools and lifting
2.Contact with sharp edges. 2.injury. tackles/machines before starting the job.(as per
10 Erection of LH panel 3.Failure of the lifting tools 3.serious Injury/fatality. factory act specification).
and tackles. 4.Fall of the person from 5.Ensure good and standard quality of lifting tool
4.Failure of safety belt.(if height. usages.
damaged safety used). 6.Use of full body harness safety belt and fall
arrestor.
7.Periodic and pre-use checks of harness.
Alignment of LH 1.Fall of the object from 1.Serious injury. 1.Give HSE training about do or don’t in this work.
panel height. 2.Cut injury. 2.Barricade the area and post safety sign
2.Contact with sharp edges. 3.Fire. 3.Use of right tool for right job.
3.Improper handling of Oil. 4.Slip hazard. 4.Use of full body harness safety belt and fall
4.Due to piano wire on arrestor.
Page 8 of 42
JOB SAFETY ANALYSIS
Page 9 of 42
JOB SAFETY ANALYSIS
Page 10 of
42
JOB SAFETY ANALYSIS
work.
Page 11 of
42
JOB SAFETY ANALYSIS
work.
8.Ensure good quality of scaffolding material used.
1.Give HSE training about do or don’t in this work.
2.Tool talk -discuss abut fall protection
3.Barricade the area and post safety sign
4.Conduct safety inspection of all lifting tools and
1.Fall of the object from
lifting tackles /machines before starting the job.(as
height.
1.Property damage, injury. per factory act specification).
2.Contact with sharp edges.
2.injury. 5.Ensure good and standard quality of lifting tool
3.Failure of the lifting tools
3.serious Injury/fatality. usages.
and tackles.
4.Fall of the person from 6.Use of full body harness safety belt and fall
4.Failure of safety belt.
height. arrestor.
Erection, alignment 5.Exposure to welding
5.Lung injury 7.Periodic and pre-use checks of harness.
12 and welding of buck fumes.
6.Electrocution. 8.Welding: Appropriate ventilation.
stay 6.Electric shock.
7.Fire,explosion 9.Proper earthing.
7.Fire
8.Eye/Burn injury. 10.Keep ready fire protective arrangement.
8.Projectiles,flash
9.Injury, fatality. 11.Ensure proper use of PPE.
9.Fall of material, tools,
10.Injury, loss of 12.Prepare SOP of welding work.
person from height.
property. 13.Safety talk-discuss abut working at height and
10.Failure of scaffolding.
welding work.
14.Ensure proper housekeeping before and after
work.
15.Ensure good quality of scaffolding material
used.
Welding of bottom 1.Exposure to welding 1.Lung injury 1.Appropriate ventilation.
header fumes. 2Electrocution. 2.Proper earthing.
2.Electric shock. 3.Fire,explosion 3.Keep ready fire protective arrangement.
3.Fire 4.Eye/Burn injury. 4.Ensure proper use of PPE.
4.Projectiles,flash 5.Injury, fatality. 5.Give HSE training about do or don’t in this
Page 12 of
42
JOB SAFETY ANALYSIS
work..
6.Safety talk-discuss abut working at height and
5.Fall of material, tools,
welding work.
person from height. 6.Injury, loss of property.
7.Ensure proper housekeeping before and after
6.Failure of scaffolding.
work.
8.Ensure good quality of scaffolding material used.
1.Appropriate ventilation.
1.Exposure to welding 2.Proper earthing.
fumes. 1.Lung injury 3.Keep ready fire protective arrangement.
2.Electric shock. 2Electrocution. 4.Ensure proper use of PPE.
3.Fire 3.Fire,explosion 5.Give HSE training about do or don’t in this work.
Welding of End caps
4.Projectiles,flash 4.Eye/Burn injury. 6.Safety talk-discuss abut working at height and
5.Fall of material, tools, 5.Injury, fatality. welding work.
person from height. 6.Injury, loss of property. 7.Ensure proper housekeeping before and after
6.Failure of scaffolding. work.
8.Ensure good quality of scaffolding material used.
Pressure part 1.Fall of the object from 1.Serious injury. 1.Give HSE training about do or don’t in this work.
attachment height. 2.Cut injury. 2.Barricade the area and post safety sign
2.Contact with sharp edges. 3.Lung injury 3.Use of right tool for right job.
3.Exposure to welding 4.Electrocution,Eye/Burn 4.Use of full body harness safety belt and fall
fumes. injury. arrestor.
4.Electric shock. 5.Fire,explosion, 5.Appropriate ventilation.
5.Fire 6.Proper earthing.
7.Keep ready fire protective arrangement.
8.Ensure proper use of PPE.
9.Safety talk-discuss abut working at height and
welding work.
10.Ensure proper housekeeping before and after
work.
Page 13 of
42
JOB SAFETY ANALYSIS
13 Erection of Steam 1.Fall of the object from 1.Property damage 1.Give HSE training about do or don’t in this work.
Drum height. 2.injury. 2.Barricade the area and post safety sign
2.Contact with sharp edges. 3.serious Injury/fatality. 3.Training on-working at height, welding, gas
3.Failure of the lifting tools 4.Fall of the person from cutting and use of PPE.
and tackles. height. 4.Conduct safety inspection of all tools and lifting
4.Failure of safety belt.(if tackles /machines before starting the job. (as per
damaged safety used). factory act specification).
5.Ensure good and standard quality of lifting tool
usages.
6.Proper lubrication to the pulley.
7.Use of full body harness safety belt and fall
arrestor.
8.Periodic and pre-use checks of harness.
9.Life line for anchoring the safety belt.
10.Tool box talk & JSA -discuss about fall
protection.
11.Made Critical Lift Plan.
12.Ensure Heavy lift permits.
13.Informed to HO and Client about drum erection.
14.Check Crane condition its load chart and all
parts visually with erection Engineer and eye test
should be there of Crane and Hydra Operators.
15.Check whether and soil condition and power
should be off during its erection.
16.Check all welding of structure before drum
erection.
17.Don’t go inside the erection and barricading
area.
Page 14 of
42
JOB SAFETY ANALYSIS
14 Erection of convection 1.Fall of the object from 1.Property damage 1.Give HSE training about do or don’t in this work.
bank module height. 2.injury. 2.Barricade the area and post safety sign
2.Contact with sharp edges. 3.serious Injury/fatality. 3.Training on-working at height, welding, gas
3.Failure of the lifting tools 4.Fall of the person from cutting and use of PPE.
and tackles. height. 4.Conduct safety inspection of all tools and lifting
4.Failure of safety belt.(if tackles/machines before starting the job.(as per
damaged safety used). factory act specification).
5.Ensure good and standard quality of lifting tool
usages.
6.Proper lubrication to the pulley.
7.Use of full body harness safety belt and fall
arrestor.
Page 15 of
42
JOB SAFETY ANALYSIS
Page 16 of
42
JOB SAFETY ANALYSIS
Alignment and 1.Exposure to welding 1.Lung injury 1.Appropriate ventilation, Appropriate respirators.
welding of SH coils fumes. 2Electrocution. 2.Ensure good quality of cables; Proper earthing
2.Electric shock. 3.Fire,explosion arrangement.
3.Fire 4.Eye/Burn injury. 3.Remove all combustible materials and fire
4.Projectiles,flash 5.Injury, fatality. hazards from welding area; Keep ready fire
Page 17 of
42
JOB SAFETY ANALYSIS
protective arrangement.
4.Ensure proper use of PPE.
5.Give HSE training about do or don’t in this work.
6.Safety talk-discuss abut working at height and
welding work.
7.Use of full body harness safety belt and fall
5.Fall of material, tools,
arrestor.
person from height. 6.Injury, loss of property.
8.Periodic and pre -use checks of harness.
6.Failure of scaffolding.
9.Life line for anchoring the safety belt.
10.Ensure proper housekeeping before and after
work.
11. Barricade the area and post safety sign.
12.Ensure good quality of scaffolding material
used.
1.Give HSE training about do or don’t in this work.
2.Barricade the area and post safety sign.
3.Training on-working at height, welding, gas
cutting and use of PPE.
1.Fall of the object from 4.Conduct safety inspection of all tools and lifting
height. 1.Property damage tackles/machines before starting the job.(as per
2.Contact with sharp edges. 2.injury. factory act specification).
Erection of SH
17 3.Failure of the lifting tools 3.serious Injury/fatality. 5.Ensure good and standard quality of lifting tool
secondary coils
and tackles. 4.Fall of the person from usages.
4.Failure of safety belt (if height. 6.Proper lubrication to the pulley.
damaged safety used). 7.Use of full body harness safety belt and fall
arrestor.
8.Periodic and pre-use checks of harness.
9.Life line for anchoring the safety belt.
10.Tool box talk -discuss about fall protection.
Page 18 of
42
JOB SAFETY ANALYSIS
Page 19 of
42
JOB SAFETY ANALYSIS
Page 20 of
42
JOB SAFETY ANALYSIS
usages.
5.Use of full body harness safety belt.
6.Tool box talk -discuss about fall protection.
1.Appropriate ventilation, Appropriate respirators.
2.Ensure good quality of cables; Proper earthing
arrangement.
3.Remove all combustible materials and fire
hazards from welding area; Keep ready fire
protective arrangement.
1.Exposure to welding
4.Ensure proper use of PPE.
fumes. 1.Lung injury
5.Prepare SOP of welding work.
2.Electric shock. 2Electrocution.
6.Safety talk-discuss abut working at height and
Welding of sat. steam 3.Fire 3.Fire,explosion
welding work.
supply pipes 4.Projectiles,flash 4.Eye/Burn injury.
7.Use of full body harness safety belt and fall
5.Fall of material, tools, 5.Injury, fatality.
arrestor.
person from height. 6.Injury, loss of property.
8.Periodic and pr-use checks of harness.
6.Failure of scaffolding.
9.Life line for anchoring the safety belt.
10.Ensure proper housekeeping before and after
work.
11. Barricade the area and post safety sign.
12.Ensure good quality of scaffolding material
used.
20 Erection of down 1.Fall of the object from 1.Property damage 1.Give HSE training about do or don’t in this work.
comers height. 2.injury. 2.Barricade the area and post safety sign.
2.Contact with sharp edges. 3.serious Injury/fatality. 3.Training on-working at height, welding, gas
3.Failure of the lifting tools 4.Fall of the person from cutting and use of PPE.
and tackles. height. 4.Conduct safety inspection of all tools and lifting
4.Failure of safety belt (if tackles/machines before starting the job.(as per
damaged safety used). factory act specification).
Page 21 of
42
JOB SAFETY ANALYSIS
Page 22 of
42
JOB SAFETY ANALYSIS
Page 23 of
42
JOB SAFETY ANALYSIS
arrangement.
3.Remove all combustible materials and fire
hazards from welding area; Keep ready fire
protective arrangement.
2.Electric shock. 4.Ensure proper use of PPE.
3.Fire 3.Fire,explosion 5.Prepare SOP of welding work of In bed
4.Projectiles,flash 4.Eye/Burn injury. evaporator coil header to header.
header to header
5.Fall of material, tools, 5.Injury, fatality. 6.Safety talk-discuss abut working at height and
person from height. welding work.
7.Use of full body harness safety belt and fall
arrestor.
8.Periodic and pr-use checks of harness.
9.Ensure proper housekeeping before and after
work..
Welding of RH panel 1.Exposure to welding 1.Lung injury 1.Appropriate ventilation, Appropriate respirators.
tube with header stub fumes. 2Electrocution. 2.Ensure good quality of cables; Proper earthing
2.Electric shock. 3.Fire,explosion arrangement.
3.Fire 4.Eye/Burn injury. 3.Remove all combustible materials and fire
4.Projectiles,flash 5.Injury, fatality. hazards from welding area; Keep ready fire
5.Fall of material, tools, protective arrangement.
person from height. 4.Ensure proper use of PPE.
5.Prepare SOP of welding work of RH Panel tube
with header stub.
6.Safety talk-discuss abut working at height and
welding work.
7.Use of full body harness safety belt and fall
arrestor.
8.Periodic and pr-use checks of harness.
9.Ensure proper housekeeping before and after
Page 24 of
42
JOB SAFETY ANALYSIS
work.
10. Barricade the area and post safety sign.
Page 25 of
42
JOB SAFETY ANALYSIS
usages.
damaged safety used). 5.Use of full body harness safety belt.
6.Tool box talk -discuss about fall protection.
1.Appropriate ventilation, Appropriate respirators.
2.Ensure good quality of cables; Proper earthing
arrangement.
3.Remove all combustible materials and fire
1.Exposure to welding hazards from welding area; Keep ready fire
fumes. 1.Lung injury protective arrangement.
2.Electric shock. 2Electrocution. 4.Ensure proper use of PPE.
Alignment and 3.Fire 3.Fire,explosion 5.Prepare SOP of welding work.
welding of In bed SH 4.Projectiles,flash 4.Eye/Burn injury. 6.Use of full body harness safety belt and fall
5.Fall of material, tools, 5.Injury, fatality. arrestor.
person from height. 6.Injury, loss of property. 7.Periodic and pr-use checks of harness.
6.Failure of scaffolding. 8.Ensure proper housekeeping before and after
work.
9. Barricade the area and post safety sign.
10.Ensure good quality of scaffolding material
used.
24 Erection, fit-up and 1.Fall of the object from 1.Property damage, injury. 1.Give HSE training about do or don’t in this work.
welding of SH height. 2.injury. 2.Tool box talk -discuss abut fall protection
interconnecting 2.Contact with sharp edges. 3.serious Injury/fatality. 3.Barricade the area and post safety sign
piping 3.Failure of the lifting tools 4.Fall of the person from 4.Conduct safety inspection of all lifting tools and
and tackles. height. lifting tackles /machines before starting the job.(as
4.Failure of safety belt. 5.Lung injury per factory act specification).
5.Exposure to welding 6.Electrocution. 5.Ensure good and standard quality of lifting tool
fumes. 7.Fire,explosion usages.
6.Electric shock. 8.Eye/Burn injury. 6.Use of full body harness safety belt and fall
7.Fire 9.Injury, fatality. arrestor.
Page 26 of
42
JOB SAFETY ANALYSIS
Page 27 of
42
JOB SAFETY ANALYSIS
usages.
6.Use of full body harness safety belt and fall
arrestor.
7.Periodic and pre-use checks of harness.
fumes. 8.Welding: Appropriate ventilation.
6.Electric shock. 9.Proper earthing.
7.Fire,explosion
7.Fire 10.Keep ready fire protective arrangement.
8.Eye/Burn injury.
8.Projectiles,flash 11.Ensure proper use of PPE.
9.Injury, fatality.
9.Fall of material, tools, 12.Prepare SOP of welding work of risers.
10.Injury, loss of
person from height. 13.Ensure proper housekeeping before and after
property.
10.Failure of scaffolding. work.
14.Ensure good quality of scaffolding material
used.
Page 28 of
42
JOB SAFETY ANALYSIS
Page 29 of
42
JOB SAFETY ANALYSIS
Page 30 of
42
JOB SAFETY ANALYSIS
arrestor.
7.Periodic and pre-use checks of harness.
8.Welding: Appropriate ventilation.
9.Proper earthing.
7.Fire
10.Keep ready fire protective arrangement.
8.Projectiles,flash
9.Injury, fatality. 11.Ensure proper use of PPE.
9.Fall of material, tools,
10.Injury, loss of 12.Prepare SOP of welding work of Integral piping.
person from height.
property. 13.Safety talk-discuss abut working at height and
10.Failure of scaffolding.
welding work.
14.Ensure proper housekeeping before and after
work.
15.Ensure good quality of scaffolding material
used.
29 Erection and welding 1.Fall of the object from 1.Property damage, injury. 1.Give HSE training about do or don’t in this
of Motorized & safety height. 2.injury. work..
valves 2.Contact with sharp edges. 3.serious Injury/fatality. 2.Tool box talk -discuss abut fall protection
3.Failure of the lifting tools 4.Fall of the person from 3.Barricade the area and post safety sign
and tackles. height. 4.Conduct safety inspection of all lifting tools and
4.Failure of safety belt. 5.Lung injury lifting tackles/machines before starting the job.(as
5.Exposure to welding 6.Electrocution. per factory act specification).
fumes. 7.Fire,explosion 5.Ensure good and standard quality of lifting tool
6.Electric shock. 8.Eye/Burn injury. usages.
7.Fire 9.Injury, fatality. 6.Use of full body harness safety belt and fall
8.Projectiles,flash 10.Injury, loss of arrestor.
9.Fall of material, tools, property. 7.Periodic and pre-use checks of harness.
person from height. 8.Welding: Appropriate ventilation.
10.Failure of scaffolding. 9.Proper earthing.
10.Keep ready fire protective arrangement.
11.Ensure proper use of PPE.
Page 31 of
42
JOB SAFETY ANALYSIS
Page 32 of
42
JOB SAFETY ANALYSIS
used.
1.Give HSE training about do or don’t in this work.
2.Tool box talk -discuss abut fall protection
1.Fall of the object from 1.Property damage, injury.
3.Barricade the area and post safety sign
height. 2.injury.
Air Preheated (APH)- 2.Contact with sharp edges. 4.Ensure good and standard quality of lifting tool
3.serious Injury/fatality.
31 Tube sheet insertion usages.
3.Fall of material, tools, 4.Fall of the person,
and expansion 5.Ensure proper use of PPE.
from height. material from height.
6.Ensure proper housekeeping before and after
4.Failure of scaffolding.
work.
7.Ensure good quality of scaffolding material used.
1.Give HSE training about do or don’t in this work.
1.Fall of the object from 1.Property damage, injury. 2.Tool box talk -discuss abut fall protection
height. 2.injury. 3.Ensure good and standard quality of lifting tool
2.Contact with sharp edges. 3.serious Injury/fatality. usages.
Fit -up of APH casing
3.Fall of material, tools, 4.Fall of the person, 4.Ensure proper use of PPE.
from height. material from height. 5.Ensure proper housekeeping before and after
4.Failure of scaffolding. work.
6.Ensure good quality of scaffolding material used.
32 Erection & welding of 1.Fall of the object from 1.Property damage, injury. 1.Give HSE training about do or don’t in this work.
staircase and ladders, height. 2.injury. 2.Tool box talk / JSA -discuss abut welding,
grills and hand railing 2.Contact with sharp edges. 3.serious Injury/fatality. material handling safety and fall protection
3.Failure of the lifting tools 4.Fall of the person from 3.Barricade the area and post safety sign
and tackles. height. 4.Ensure good and standard quality of lifting tool
4.Failure of safety belt. 5.Lung injury usages.
5.Exposure to welding 6.Electrocution. 5.Use of full body harness safety belt and fall
fumes. 7.Fire,explosion arrestor.
6.Electric shock. 8.Eye/Burn injury. 6.Periodic and pre-use checks of harness.
7.Fire 9.Injury, fatality. 7.Welding: Appropriate ventilation.
8.Projectiles, flash 8.Proper earthing.
Page 33 of
42
JOB SAFETY ANALYSIS
34 Erection of Bunker 1.Fall of the object from 1.Property damage, injury. 1.Give HSE training about do or don’t in this work.
platform beam and height. 2.injury. 2.Tool box talk / JSA -discuss abut welding,
chequer plats 2.Contact with sharp edges. 3.serious Injury/fatality. material handling safety and fall protection
3.Fall of material, tools, 4.Fall of the person from 3.Barricade the area and post safety sign
from height. height 4.Ensure good and standard quality of lifting tool
4. Failing of lifting tools 5.Injury, fatality usages.
and tackles 5.Use of full body harness safety belt and fall
arrestor.
6.Periodic and pre-use checks of harness.
Page 34 of
42
JOB SAFETY ANALYSIS
Page 35 of
42
JOB SAFETY ANALYSIS
Page 36 of
42
JOB SAFETY ANALYSIS
Page 37 of
42
JOB SAFETY ANALYSIS
Page 38 of
42
JOB SAFETY ANALYSIS
Page 39 of
42
JOB SAFETY ANALYSIS
44 Pre Commissioning 1.Serious accidents due to 1.Fetal accidents 1.Proper work permit must be obtained ensuring
and commissioning inhalation of dust inside the 2.Heavy lose to property. power logout / men on work at panels, before
activities boiler furnace and drums Fetal Accidents entering in to confined spaces.
(confined spaces) during 2.Use of PPEs must be ensured before entering
Boiler GD test. insdie the confined spaces.
2.Hazards associated with 3.Before entering inside the confined spaces ensure
electrical instrumentation, that there is no dust passing through Boiilers. This
Page 40 of
42
JOB SAFETY ANALYSIS
mechanical works i.e. entry running the Fans.till stack is clean visually before
in confined spaces (narrow entering inside the confined spaces of BOILERS.
are inside the Boilers) non- 4.Proper communication tools must be used while
availability of inter locking conduction GD test.
system & improper 5.Always responsible authorized person must be
communication for the work available near, outside Boilers confined spaces
activity. while conduction GD test.
3.Serious accident due to Proper work permits.
poor illumination inside the 6.Sufficient illumination 24V / 100W lamps are to
confined spaces. be provided. Minimum two lamps must be provide
4.Chanches of explosions per group out of this one must be used as stand by.
inside the confined Spaces 7.Install Co analyzer.
i.e. due to CO accumulation 8. Arrest false air leakage inside the Boilers
inside the confined spaces confined spaces.
carry over of un-controlled
un burned inside the
confined spaces. Improper
sequence of plant start up or
shut down – all resulting
into Boilers internal
damages Boilers parts
damages / fetal accidents /
heavy loses to property.
Page 41 of
42
JOB SAFETY ANALYSIS
k.k.vishwakarma
safety coordinator
Page 42 of
42