PERMIT TO WORK SYSTEM
GENERAL PROCEDURE (SERVICING OF PUMPS)
Operator in-charge shall
relieve the line / vessel
pressure before
dismantling valves and
flanges.
Safety Staff must check
Electrical and Valve
Isolation Certificate.
Before leaving the area,
everything must be
checked and cleaned.
5S area before permit
termination.
PERFORMING GAS ANALYSIS PRIOR TO CONFINED SPACE ENTRY