Professional Documents
Culture Documents
Final Bs IV Submission Notice
Final Bs IV Submission Notice
4 Assignment 3 Market Survey for Active Fire Protection System ( Group) Final: A2 size portfolio
5 Assignment 4. Passive Fire protection System. ( Group) Final: A2 size portfolio
6 Assignment 5. Site Visit Analysis of Active Fire Protection System and Passive Final: A2 size portfolio
Fire protection System
Type of building: Residential Building or commercial or Industrial
(with detail plan, section, views showing fire protection system).
Analysis to be done As per NBC Norms ( Group)
7 Assignment 6 Show Fire fighting Services for Current Design Project for. Ex. Final: A2 size portfolio
Hotel, Provision of (Active and Passive Fire Protection System as per
NBC Norms. For basement and Floor plans with section.
1. Show Escape Route 2.Basement Sprinkler system calculation,
Fire Staircase, Fire Lift Fire Door, Water Storage Tank.
ACOUSTICS
8. Assignment 7. Market Survey on Types of Materials used as: Sound Absorbers, Final: A2 size portfolio
Sound Diffusers, Diffusers, Barriers & Vibration Control,
isolators and their application as per NRC AND STC
9 Assignment 8. Market Survey on Sound Amplification System their types with Final: A2 size portfolio
specification.
10 Assignment 9 Site Visit: CASE OF AN AUDITORIUM as per given check list. Final: A2 size portfolio
11 Assignment Acoustical Layout Design For A Seminar Hall Final: A2 size portfolio
10. Specify the acoustical material and calculate the RT.
Group of 6
12 Assignment Journal Writing as per Given Questionnaire with neat sketches. Journal
11.
Note: 1.1.If student fail to submit the above submission as per given schedule, it will affect their internal marking.