Training Material: Cost Tracking 2 (Ct2) For Suppliers: © Allocation Network GMBH
Training Material: Cost Tracking 2 (Ct2) For Suppliers: © Allocation Network GMBH
This training manual gives an overview for new users of the ASTRAS solution. The supplier’s part in the Cost tracking
2 activity is detailed on the following pages.
Glossary of system-specific words that might be used in this manual:
Dashboard
The first page you see when logging in. A user can have one or more dashboards with widgets displaying information.
Widget
An item on the dashboard that allows you to perform a task or view specific information.
Activity
A collection of working steps within a production site. The joining DENSO user and external user of an activity performing a defined work
content.
Product
An entity which is equal to DENSO Part numbers, to collect data on products.
They have links to to suppliers, customer projects and activities. This data is fed in from DENSO ERP systems.
The CT2 process usually runs along another activity, e.g. an escalation. To see a cost tracking 2 activity, visit the
activities list and open the respective activity.
In the tab “Relations” you can check which other activities this cost tracking is linked to so you know which process
these costs belong to.
There is only one sheet with a cost overview available. You can check it anytime after DENSO has created the activity,
even if the overview hasn’t “officially” been submitted to you yet.
As soon as the activity reaches the status “Cost overview sent to supplier” you will be informed by e-mail.
If you reject the costs you will be asked to give a reason for the rejection.
When you save your entries (both after rejecting or accepting the costs), a window pops up and shows you the status
change after this save. The activity will be assigned to the DENSO SQE (in case of a rejection) or DENSO finance
member (in case of an acceptance).
Rejection: Acceptance:
What happens afterwards: