Professional Documents
Culture Documents
Shree Sayan Vibhag Sahakari Khand Udhyog Mandli LTD Srt65 Eia1
Shree Sayan Vibhag Sahakari Khand Udhyog Mandli LTD Srt65 Eia1
FOR
AT
PROJECT CATEGORY: B,
5(j), Sugar Industry
STUDY PERIOD:
March 2019 to May 2019
PROJECT PROPONENT:
M/s. Shree Sayan Vibhag Sahakari Khand Udyog Mandli
For
Limited
PREPARED BY:
Accreditation by
QCI / NABET Certificate No. NABET/EIA/1821/RA 0102
November, 2019
191125_RP44_1
Declaration by the Project Proponent
en-vιsι n
TABLE OF CONTENTS
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT I-1
en-vιsι n
2.10.1.2 Addition of Proposed Tertiary Treatment Plant (TTP) ............................................. 2-33
2.10.1.3 Economical & Technical Viability of the Effluent Treatment System (ETP) ........... 2-33
2.10.1.4 ETP Sludge Generation ............................................................................................. 2-34
2.10.2 Air Environment .............................................................................................................. 2-35
2.10.2.1 Flue Gas Emission ..................................................................................................... 2-35
2.10.2.2 Process Gas Emission ................................................................................................ 2-36
2.10.2.3 Fugitive Emission ...................................................................................................... 2-36
2.10.2.4 Odor Control Action Plan.......................................................................................... 2-37
2.10.3 Noise Environment .......................................................................................................... 2-37
2.10.4 Solid/ Hazardous Waste Management ............................................................................. 2-37
2.10.5 Hydro-Geological Environment ....................................................................................... 2-38
2.10.5.1 Rain Water Harvesting .............................................................................................. 2-38
2.10.6 Socio-Economic Environment ......................................................................................... 2-39
2.10.7 Ecology and Biodiversity ................................................................................................. 2-40
2.10.7.1 Greenbelt Development ............................................................................................. 2-40
2.10.7.2 Details of Existing Greenbelt .................................................................................... 2-40
2.10.7.3 Guidelines for plantation ........................................................................................... 2-44
2.11 Reuse/recycle and Cleaner Production Technologies .......................................................... 2-44
2.11.1 Cleaner Production Technologies .................................................................................... 2-44
2.11.2 Waste Minimization Methods .......................................................................................... 2-45
CHAPTER 3 DESCRITPION OF ENVIRONTMENT ...................................................................................... 3-1
3.1 Introduction............................................................................................................................ 3-1
3.1.1 Objectives of Baseline Monitoring .................................................................................... 3-1
3.1.2 Methodology for Data Collection ...................................................................................... 3-1
3.1.3 Study Area ......................................................................................................................... 3-2
3.2 Meteorological Environment ................................................................................................. 3-3
3.2.1 Climate of Study Area ....................................................................................................... 3-3
3.2.1.1 Predominant Wind Direction ....................................................................................... 3-4
3.2.1.2 Site Specific Micro-Meteorology Data ....................................................................... 3-5
3.3 Air Environment .................................................................................................................... 3-9
3.3.1 Sampling Methodology and Analysis ................................................................................ 3-9
3.3.2 Selection of Monitoring Locations .................................................................................... 3-9
3.3.3 Results and Discussion .................................................................................................... 3-12
3.4 Water Environment .............................................................................................................. 3-15
3.4.1 Sampling Methodology and Analysis .............................................................................. 3-15
3.4.2 Selection of Monitoring Location .................................................................................... 3-16
3.4.3 Results-Ground Water and Surface Water ....................................................................... 3-19
3.4.4 Discussions ...................................................................................................................... 3-27
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT I-2
en-vιsι n
3.4.4.1 Ground Water ............................................................................................................ 3-27
3.4.4.2 Surface Water ............................................................................................................ 3-27
3.5 Noise Environment .............................................................................................................. 3-28
3.5.1 Selection of Monitoring Locations and Results ............................................................... 3-29
3.5.2 Discussion of Noise Levels .............................................................................................. 3-32
3.5.3 Traffic Study .................................................................................................................... 3-32
3.5.3.1 Selection of Study Location ...................................................................................... 3-32
3.5.3.2 Methodology ............................................................................................................. 3-33
3.5.3.3 Results ....................................................................................................................... 3-33
3.5.3.4 Discussion ................................................................................................................. 3-34
3.6 Soil Environment ................................................................................................................. 3-34
3.6.1 Sampling Methodology and Analysis .............................................................................. 3-35
3.6.2 Sampling Locations and Results ...................................................................................... 3-36
3.6.3 Discussion-Soil Environment .......................................................................................... 3-40
3.7 Land Environment ............................................................................................................... 3-40
3.7.1 Methodology of Study ..................................................................................................... 3-41
3.7.1.1 Pre-Field Interpretation ............................................................................................. 3-41
3.7.1.2 Site / Ground Truthing .............................................................................................. 3-41
3.7.1.3 Post Field Work ......................................................................................................... 3-41
3.7.2 Land Use / Land Cover Map ............................................................................................ 3-41
3.7.3 Drainage Pattern of the surrounding Region.................................................................... 3-42
3.8 Hydrology and Groundwater ............................................................................................... 3-45
3.8.1 Geomorphology ............................................................................................................... 3-45
3.8.2 Topography ...................................................................................................................... 3-45
3.8.3 Drainage ........................................................................................................................... 3-45
3.8.4 Geology & Structure ........................................................................................................ 3-46
3.8.5 Seismic Zone.................................................................................................................... 3-47
3.8.6 Soil ................................................................................................................................... 3-47
3.8.6.1 Climate & Meteorology............................................................................................. 3-50
3.8.6.2 Hydrology .................................................................................................................. 3-50
3.8.6.3 Discussions on Ground Water Quality ...................................................................... 3-51
3.9 Ecology and Bio-diversity ................................................................................................... 3-57
3.9.1 Biodiversity of Terrestrial Environment .......................................................................... 3-57
3.9.2 Biological Diversity ......................................................................................................... 3-57
3.9.3 Ecological Impact Assessment......................................................................................... 3-58
3.9.4 Period of The Study and Study Area ............................................................................... 3-58
3.9.4.1 Methodology ............................................................................................................. 3-58
3.9.4.2 Presence –Absence .................................................................................................... 3-59
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT I-3
en-vιsι n
3.9.4.3 DAFOR Scale ............................................................................................................ 3-59
3.9.5 Biodiversity of Terrestrial Environment .......................................................................... 3-60
3.9.5.1 Habitats Description of the Project Site and its Immediate Surroundings ................ 3-60
3.9.5.2 Floral Diversity of the Study Area ............................................................................ 3-61
3.9.5.3 Trees .......................................................................................................................... 3-62
3.9.5.4 Shrubs ........................................................................................................................ 3-64
3.9.5.5 Herbs ......................................................................................................................... 3-64
3.9.5.6 Climbers and Twiners ............................................................................................... 3-65
3.9.5.7 Cultivated Plants in the Study Area........................................................................... 3-66
3.9.5.8 Rare and Endangered Flora in the Study Area .......................................................... 3-66
3.9.5.9 Endemic Plants of the Study Area ............................................................................. 3-66
3.9.5.10 Status of Forest and their category in the study area ................................................. 3-66
3.9.6 Faunal Diversity of Study Area ....................................................................................... 3-66
3.9.6.1 Birds of the Study Area ............................................................................................. 3-66
3.9.6.2 Butterflies from the study area .................................................................................. 3-69
3.9.6.3 Herpetofauna ............................................................................................................. 3-69
3.9.6.4 Mammals ................................................................................................................... 3-70
3.9.7 Rare and Endangered Fauna of the Study Area ............................................................... 3-70
3.9.7.1 As per Indian Wild Life (Protection) Act, 1972 ........................................................ 3-70
3.10 Socio-economic Environment .............................................................................................. 3-71
3.10.1 Major Objectives of the Study ......................................................................................... 3-71
3.10.2 Identification of Stakeholders .......................................................................................... 3-71
3.10.3 Methodology .................................................................................................................... 3-71
3.10.3.1 Primary Data Collection: Tools and Techniques....................................................... 3-72
3.10.3.2 Secondary Data Collection ........................................................................................ 3-73
3.10.3.3 Data analysis and Interpretation ................................................................................ 3-73
3.10.4 Limitations ....................................................................................................................... 3-73
3.10.5 The Project Influence Area .............................................................................................. 3-73
3.10.1 Overview of Study Area .................................................................................................. 3-77
3.11 Findings of Community Consultations ................................................................................ 3-77
3.11.1 Population ........................................................................................................................ 3-77
3.11.2 Population Density ........................................................................................................... 3-77
3.11.3 Sex Ratio .......................................................................................................................... 3-78
3.11.4 Literacy Rate .................................................................................................................... 3-78
3.11.5 Economic Profile ............................................................................................................. 3-78
3.11.6 Infrastructure Facilities .................................................................................................... 3-78
3.11.7 Educational Facility ......................................................................................................... 3-78
3.11.8 Sanitation ......................................................................................................................... 3-79
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT I-4
en-vιsι n
3.11.9 Water Supply ................................................................................................................... 3-79
3.11.10 Health Care facility .......................................................................................................... 3-79
3.11.11 Culture ............................................................................................................................. 3-79
3.11.12 Quality of life ................................................................................................................... 3-79
3.12 People’s Perception.............................................................................................................. 3-80
3.12.1 Conclusions Socio-Economic Survey .............................................................................. 3-82
CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES ....................... 4-1
4.1 Introduction............................................................................................................................ 4-1
4.1.1 Objective ............................................................................................................................ 4-1
4.1.2 Environmental Aspects ...................................................................................................... 4-1
4.1.3 Environmental Impacts ...................................................................................................... 4-1
4.1.4 Environmental Indices ....................................................................................................... 4-1
4.1.5 Environmental Impact Assessment Study.......................................................................... 4-2
4.1.5.1 Identification of Impacts.............................................................................................. 4-2
4.1.5.2 Ecological Impact Assessment Considered the Following Stages .............................. 4-2
4.1.5.3 Component Wise Environment Risk Assessment and Mitigation ............................... 4-2
4.2 Impact Identification and Assessment ................................................................................... 4-2
4.2.1 Identification Matrix .......................................................................................................... 4-2
4.2.2 Impact Assessment and Quantification .............................................................................. 4-3
4.2.2.1 Scoring the Overall Impact Severity/Consequence ..................................................... 4-4
4.2.2.2 Quantifying the Probability of Occurrence of the Impact ........................................... 4-5
4.2.2.3 Quantifying Environmental Impact Risk..................................................................... 4-6
4.2.2.4 Identifying Activities Causing Unacceptable Levels of Environmental Risk ............. 4-6
4.3 Significance of Impacts & Proposed Mitigation Measures ................................................... 4-6
4.3.1 Land Environment ............................................................................................................. 4-8
4.3.2 Soil Environment ............................................................................................................. 4-10
4.3.3 Water Environment .......................................................................................................... 4-11
4.3.4 Noise Environment .......................................................................................................... 4-12
4.3.4.1 Projection of Proposed Traffic .................................................................................. 4-14
4.3.5 Ecological Environment................................................................................................... 4-15
4.3.6 Socio Economic Environment ......................................................................................... 4-17
4.3.7 Risk & Hazard and Occupational Health & Safety.......................................................... 4-19
4.3.8 Air Environment .............................................................................................................. 4-22
4.3.9 Air Quality Modeling....................................................................................................... 4-24
4.3.9.1 AERMOD.................................................................................................................. 4-24
4.3.9.2 Methodology ............................................................................................................. 4-25
4.3.9.3 Mixing Height ........................................................................................................... 4-25
4.3.9.4 Maximum Ground Level Concentration ................................................................... 4-25
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT I-5
en-vιsι n
CHAPTER 5 ANALYSIS OF ALTERNATIVES (TECHNOLOGY AND SITE) ................................................. 5-1
5.1 Project Alternative ................................................................................................................. 5-1
5.2 Site Alternative ...................................................................................................................... 5-1
5.3 Fuel Alternative ..................................................................................................................... 5-1
5.4 Water Supply alternative........................................................................................................ 5-1
5.5 Best Available Technology .................................................................................................... 5-1
5.6 Wastewater Treatment and Use Alternative .......................................................................... 5-1
CHAPTER 6 ENVIRONMENTAL MONITORING PROGRAM ....................................................................... 6-1
6.1 Introduction............................................................................................................................ 6-1
6.2 Monitoring and Reporting Procedure .................................................................................... 6-1
6.3 Laboratory Facility ................................................................................................................ 6-4
6.4 Continuous Emission Monitoring System (Cems) ................................................................ 6-4
6.5 Work Zone Monitoring for Hazardous Chemicals ................................................................ 6-4
CHAPTER 7 ADDITIONAL STUDIES .......................................................................................................... 7-1
7.1 Public Consultation ................................................................................................................ 7-1
7.2 Social Impact Assessment and R & R Action Plan ............................................................... 7-1
7.3 Risk Assessment .................................................................................................................... 7-1
7.3.1 Objective of Risk Assessment Study ................................................................................. 7-1
7.3.2 Methodology ...................................................................................................................... 7-2
7.4 Risk And hazard study ........................................................................................................... 7-2
7.4.1 Storage of Chemicals ......................................................................................................... 7-2
7.4.2 Regulatory Permission Required For Storage of Chemicals.............................................. 7-5
7.4.2.1 PESO Permission ........................................................................................................ 7-5
7.4.2.2 Applicability of MSIHC Rules .................................................................................... 7-5
7.5 Qualitative Risk Assessment.................................................................................................. 7-5
7.5.1 Hazard Identification and Risk Assessment (HIRA) ......................................................... 7-7
7.6 Quantitative Risk Assessment.............................................................................................. 7-13
7.6.1 Consequence analysis ...................................................................................................... 7-13
7.6.2 Damage Criteria ............................................................................................................... 7-13
7.6.3 Scenarios (Vulnerability Area Identification) .................................................................. 7-15
7.6.4 Software Used for Calculations ....................................................................................... 7-16
7.6.5 Scenario of Consequence Analysis .................................................................................. 7-17
7.6.6 Summary .......................................................................................................................... 7-20
7.6.7 Recommendation against Risk ......................................................................................... 7-20
7.6.8 Fire Fighting System ........................................................................................................ 7-20
7.6.9 Do’s and Don’ts ............................................................................................................... 7-21
7.6.10 Safety Training................................................................................................................. 7-23
7.6.11 Safety Audits and Inspections .......................................................................................... 7-24
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT I-6
en-vιsι n
7.6.12 Standard Operating Procedures........................................................................................ 7-24
7.6.13 Minimization of the Manual Handling of Hazardous Substance ..................................... 7-25
7.6.14 Personal Protective Equipment ........................................................................................ 7-25
7.6.15 Medical Facilities ............................................................................................................. 7-26
7.6.16 Hazard Identification Studies ........................................................................................... 7-26
7.7 Occupational Health Surveillance Program ......................................................................... 7-26
7.7.1 Health Management within Unit ...................................................................................... 7-26
7.7.2 Occupational Health Monitoring ..................................................................................... 7-27
7.8 Disaster Management Plan .................................................................................................. 7-27
7.8.1 Statutory Provisions ......................................................................................................... 7-27
7.8.2 Onsite Emergency Plan .................................................................................................... 7-28
7.8.2.1 Communication Facilities.......................................................................................... 7-32
7.8.2.2 Sequence of Action in Emergency ............................................................................ 7-33
7.8.3 Rehearsal and Up-dation of Plan ..................................................................................... 7-41
7.8.4 Offsite Emergency Preparedness Plan ............................................................................. 7-41
7.9 Leak Detection and Repair (LDAR) program...................................................................... 7-46
7.10 Specific Safety Measures to be Taken for General Public Living in The Vicinity .............. 7-50
CHAPTER 8 ENVIRONMENTAL DAMAGE ASSESSMENT, REMEDIATION PLAN AND
NATURAL & COMMUNITY RESOURCE AUGMENTATION PLAN ................................................. 8-1
8.1 Justification For Violation ..................................................................................................... 8-1
8.2 Environmental Damage Assessment And Remediation Plan ................................................ 8-2
8.2.1 Salient Features Of The Project ......................................................................................... 8-2
8.2.2 Identification Of Damage .................................................................................................. 8-3
8.2.3 Environment Benefits Earned And Cost Of Remediation Plan And Natural & Community
Resource Augmentation Plan .................................................................................................................... 8-8
8.3 Remediation Plan ................................................................................................................... 8-9
CHAPTER 9 PROJECT BENEFITS .............................................................................................................. 9-1
9.1 Physical Infrastructure ........................................................................................................... 9-1
9.2 Social Infrastructure ............................................................................................................... 9-1
9.2.1 Corporate Environment Responsibility.............................................................................. 9-1
9.3 Employment Potential............................................................................................................ 9-3
9.4 Benefits of Industry ............................................................................................................... 9-3
9.5 Other Tangible Benefits ......................................................................................................... 9-3
CHAPTER 10 ENVITONMENTAL COST BENEFIT ANALYSIS .................................................................... 10-1
CHAPTER 11 ENVIRONMENTAL MANAGEMENT PLAN (EMP)............................................................... 11-1
11.1 Introduction.......................................................................................................................... 11-1
11.1.1 Objectives of EMP ........................................................................................................... 11-1
11.1.2 Components of EMP ........................................................................................................ 11-1
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT I-7
en-vιsι n
11.2 Environment Management Plan........................................................................................... 11-2
11.2.1 Land Environment ........................................................................................................... 11-2
11.2.2 Soil Environment ............................................................................................................. 11-4
11.2.3 Water Environment .......................................................................................................... 11-5
11.2.4 Noise Level Monitoring & Traffic Management ............................................................. 11-6
11.2.5 Ecological Environment................................................................................................... 11-8
11.2.6 Socio Economic Environment ....................................................................................... 11-10
11.2.7 Risk & Hazard and Occupational Health & Safety........................................................ 11-12
11.2.8 Air Environment ............................................................................................................ 11-14
11.3 Environmental Management Cell (EMC) .......................................................................... 11-16
11.3.1 Environment Policy and its Standard Operating Procedure ........................................... 11-17
11.3.2 Reporting System to the Directors ................................................................................. 11-17
11.4 Record Keeping and Reporting .......................................................................................... 11-17
11.5 Budget for Environment Protection ................................................................................... 11-18
CHAPTER 12 SUMMARY & CONCLUSION ................................................................................................ 12-1
12.1 Justification for Implementation of the Project.................................................................... 12-1
12.2 Conclusions.......................................................................................................................... 12-3
CHAPTER 13 DISCLOSURE OF CONSULTANTS ENGAGED ....................................................................... 13-1
13.1 Details of Consultant ........................................................................................................... 13-1
13.2 Functional Area Experts Involved in The EIA .................................................................... 13-3
13.3 Laboratory Involved For Baseline Monitoring & Other Analysis ....................................... 13-3
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT I-8
en-vιsι n
LIST OF ANNEXURES
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT I-9
en-vιsι n
LIST OF TABLES
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT I-10
en-vιsι n
Table 3-10: Noise Monitoring Methodology ................................................................................................. 3-28
Table 3-11: Ambient Noise Quality Standards for Different Areas/Zones .................................................... 3-29
Table 3-12: Noise Monitoring Locations ....................................................................................................... 3-30
Table 3-13: Noise Levels ............................................................................................................................... 3-32
Table 3-14: Noise Level due to Transportation ............................................................................................. 3-32
Table 3-15: Traffic Counts on Sayan-Kim road ............................................................................................ 3-34
Table 3-16: Existing Traffic Scenario and Level of Services ........................................................................ 3-34
Table 3-17: Level of Service .......................................................................................................................... 3-34
Table 3-18: Methodology of Testing of Soil Samples ................................................................................... 3-35
Table 3-19: Soil Sampling Location .............................................................................................................. 3-36
Table 3-20: Physicochemical Parameters of the Soil ..................................................................................... 3-38
Table 3-21: Land Use / Land Cover Statistics of the Study Area (10 km Radius) ........................................ 3-42
Table 3-22: Geological Succession ................................................................................................................ 3-46
Table 3-23: location detail of the well inventoried ........................................................................................ 3-50
Table 3-24: Water category based on range of Total Hardness value as per IS 10500:2012 ........................ 3-53
Table 3-25: Trees in the Study area ............................................................................................................... 3-63
Table 3-26: List of the Shrubs in the Study Area .......................................................................................... 3-64
Table 3-27: List of Herbaceous Species Observed in the Study Area ........................................................... 3-65
Table 3-28: List of Climbers observed in the Study Area ............................................................................. 3-65
Table 3-29: Birds of the Study Area .............................................................................................................. 3-66
Table 3-30: Butterflies in the Study Area ...................................................................................................... 3-69
Table 3-31: Reptiles observed in the study area ............................................................................................ 3-69
Table 3-32: Mammals in the Study Area ....................................................................................................... 3-70
Table 3-33: Species provided Protection as per Wild Life Protection Act, 1972 .......................................... 3-70
Table 3-34: List of Villages Where Socio-Economic Study Conducted ....................................................... 3-72
Table 3-35: List of Villages in PIA (Census 2011)........................................................................................ 3-74
Table 4-1: Environmental Impacts ................................................................................................................... 4-3
Table 4-2: Overall Impact Scoring System due to the Proposed Expansion ................................................... 4-4
Table 4-3: Impact scoring for Ecology and Biodiversity ................................................................................. 4-4
Table 4-4: Occurrence Frequency Assessment- Ecological............................................................................. 4-5
Table 4-5: Occurrence Frequency Assessment-Others .................................................................................... 4-5
Table 4-6: Environmental Impact Significance Criteria .................................................................................. 4-6
Table 4-7: Environmental Risk Categorization ............................................................................................... 4-6
Table 4-8: Ecological Risk Categorization ...................................................................................................... 4-6
Table 4-9: Assessment of Proposed Traffic Load .......................................................................................... 4-14
Table 4-10: Details of Stacks ......................................................................................................................... 4-24
Table 4-11: Maximum Ground Level Concentration (Average 24 hourly) ................................................... 4-25
Table 4-12: 24 hourly Short Term Incremental Concentrations from Source ............................................... 4-30
Table 6-1: Budget for Implementation of Environmental Monitoring Plan .................................................... 6-2
Table 7-1: Details of Storage Tank .................................................................................................................. 7-2
Table 7-2: Details of Other Chemicals ............................................................................................................ 7-3
Table 7-3: Hazardous Characteristics of of major chemicals .......................................................................... 7-4
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT I-11
en-vιsι n
Table 7-4: Threshold Storage Quantity as per MSIHC Rules.......................................................................... 7-5
Table 7-5: Risk Matrix ..................................................................................................................................... 7-6
Table 7-6: Risk Acceptability Criteria ............................................................................................................. 7-6
Table 7-7: HIRA Worksheet ............................................................................................................................ 7-7
Table 7-8: Damages to Human Life Due to Heat Radiation .......................................................................... 7-14
Table 7-9: Effects Due to Incident Radiation Intensity ................................................................................. 7-14
Table 7-10: Damage Due to Peak over Pressure............................................................................................ 7-14
Table 7-11: Possible Accident Scenario ........................................................................................................ 7-15
Table 7-12: Summary of Consequence Analysis - Fire end points ................................................................ 7-17
Table 7-13: List of Fire Hydrant points ......................................................................................................... 7-21
Table 7-14: List of Fire Extinguishers ........................................................................................................... 7-21
Table 7-15: Details of Water Storage for Fire Fighting System .................................................................... 7-21
Table 7-16: Details of Fire Water Pump Capacity ......................................................................................... 7-21
Table 7-17: List of Personal Protective Equipments...................................................................................... 7-25
Table 7-18: List of Antidotes ......................................................................................................................... 7-26
Table 7-19: Occupational Health Monitoring ................................................................................................ 7-27
Table 7-20: Types of Overall Emergencies ................................................................................................... 7-28
Table 7-21: Offsite Action Plan ..................................................................................................................... 7-45
Table 7-22: Frequency of monitoring of leaks ............................................................................................... 7-49
Table 8-1: Chronology for Project ................................................................................................................... 8-2
Table 8-2: Assessment of Environmental damage assessment & Remediation Plan and EMP
suggested ....................................................................................................................................... 8-4
Table 8-3: Environment Benefits Earned in Violation Period ......................................................................... 8-8
Table 8-4: Budgetary Allocation for Remediation plan and Natural Resource & Community
Augmentation Plan ...................................................................................................................... 8-10
Table 9-1: Corporate Environment Responsibility (CER) Plan for Five Years in Community Area .............. 9-2
Table 11-1: Roles and Responsibility of in Environmental Management Cell (EMC) ............................... 11-16
Table 11-2: Record Keeping Requirement .................................................................................................. 11-18
Table 11-3: Break-up of Capital and Recurring cost for Environment Protection Measures for
Proposed project ........................................................................................................................ 11-18
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT I-12
en-vιsι n
LIST OF FIGURES
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT I-13
en-vιsι n
Figure 4-3: Spatial Distribution of 24-Hour Average NOx Concentration from the Source (μg/m3) ............ 4-29
Figure 7-1: Threat zone of Maximum Credible Accident Scenario for Ethanol – Pool Fire ......................... 7-18
Figure 7-2: Threat zone of Worst Case Scenario for Ethanol – Pool Fire ..................................................... 7-18
Figure 7-3: Threat zone of Maximum Credible Accident Scenario for LDO – Pool Fire ............................. 7-19
Figure 7-4: Threat zone of Worst Case Scenario for LDO – Pool Fire ......................................................... 7-19
Figure 7-5: Organizational Set-up for Onsite Emergency Plan ..................................................................... 7-30
Figure 7-6: Off-Site Emergency Plan ......................................................................................................... 7-43
Figure 11-1: Environment Management Cell .............................................................................................. 11-17
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT I-14
en-vιsι n
LIST OF PHOTOGRAPHS
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT I-15
en-vιsι n
TOR COMPLIANCE
Compliance statement is prepared for Terms of Reference received wide letter no.:
SEIAA/GUJ/TOR/Violation/5(j)/927/2019 dated 19/06/2019 attached wide Annexure I.
ToR
Condition Terms of Reference Compliance Page No.
No.
1. Actual Period of violation and extent of Actual Period of violation and extent 2-1
violation with all supportive documents of violation with all supportive
including actions taken by GPCB documents including actions taken by A-121
GPCB is given in Table 2-1 and
Annexure IX
2. Ecological damage assessment with respect to Ecological damage assessment is given 8-2
air, water, land and other project & location in section 8.2 and Table 8-2 8-4
specific environment attributes, The collection
and analysis of data shall be done by an
environment laboratory duly notifies under
Environment (Protection) Act, 1986, or an
Environment laboratory duly notifies
environment laboratory accredited by NABL, or
under Environment (Protection) Act,
a laboratory of a council of Scientific and
1986, or an environment laboratory
industrial Research (CSIR) institution working 13-3
accredited by NABL was utilized and
in the field of environment.
detail is given section 13.3
3. The Environment Management plan shall Remediation plan and community & 8-9
comprise of the remediation plan and natural resource augmentation plan is
community & natural resource augmentation given in section 8.3 and Table 8-4 8-10
plan corresponding to the ecological damage
assessed and economic benefits prepared shall
be included as an independent chapter in the
EIA report.
4. The project proponent shall be required to The project peoponent will submit the --
submit a bank guarantee equivalent to the bank guarantee as and when SEAC
amount of remediation plan and nature and and regular authority will finalize the
community resource augmentation plan with the amount for the same.
GPCB prior to the grant of EC. The quantum
shall be recommended by the SEAC and
finalized by the regulatory authority. The bank
guarantee shall be released after successful
implementation of the remediation plan and
nature and community Resources Augmentation
Plan, and after recommendation by regional
office of the Ministry Followed by
recommendation of the SEAC and approval of
the regulatory authority.
5. A tabular chart for the issues raised and This ToR will be complied after --
addressed during public hearing/ consultation public hearing in final EIA report.
and commitment of the project proponent on the
same should be provided. An action plan to
address the issues raised during public hearing
and the necessary allocation of funds for the
same should be provided.
6. The project proponent shall be required to The project peoponent will submit the --
submit a bank guarantee equivalent to the bank guarantee as and when SEAC
amount of remediation plan and nature and and regular authority will finalize the
community resources augmentation plan with amount for the same.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT C-1
en-vιsι n
ToR
Condition Terms of Reference Compliance Page No.
No.
the GPCB prior to the grant of EC. The quantum
shall be recommended by the SEAC and
finalized by the regulatory authority. The bank
guarantee shall be released after successful
implementation of the remediation plan and
nature and community Resources Augmentation
Plan, and after recommendation by regional
office of the Ministry Followed by
recommendations of the SEAC and approval of
the regulatory authority.
7. Executive summary of the project-giving a Executive summary of the project is S-1to S-10
prima facie idea of the objectives of the given after ToR compliance.
proposal, use of resources, justification, etc. In
addition, it should provide a compilation of EIA
report, including EMP and the post-project
monitoring plan in brief. Project description
8. Justification for selecting the proposed product Justification for selecting the proposed 2-1
and unit size. product and unit size is given in 2-14
section 2.3 and section 2.5
9. Land requirement for the project including its Land requirement details are given in 2-10
breakup for various purposes, its availability and section 2.4.2 2-10
optimization. Land break up is given in Table 2-4
Plant layout showing land break-up 2-11
under various purposes is given in
Figure 2-7
10. Complete process flow diagram describing each Complete process flow diagram
unit, its processes and operations in production describing each unit, its processes and
of sugar, along with material and energy inputs operations in production of sugar is 2-17
and outputs (material and energy balance). given in section 2.7.1 and 2.7.2.
2-19
2-21
Energy balance is given in Figure 2-8
11. Details on requirement of raw materials, its Details on requirement of raw 2-20
source and storage at the plant. materials, its source is given in
section 2.8.1
Storage details are given in Table 7-2, 7-3,
7-1, Table 7-2 and Table 7-3 7-4
12. Details on requirement of energy and water Requirement of energy with its 2-21
along with its sources and authorization. sources and authorization is given in
section 2.9.1
13. Details on water balance including quantity of Water balance for modernization 2-25
effluent generated, recycled & reused. Effort to sugar mill is given in section 2.10.1 2-27
minimize effluent discharge and to maintain and water balance diagram is given in 2-28
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT C-2
en-vιsι n
ToR
Condition Terms of Reference Compliance Page No.
No.
quality of receiving water body. Figure 2-11 and Figure 2-12
The wastewater from modernization
activities is treated in ETP. Also
sewage will be treated in ETP along
with effluent and then treated water is
used for on land 2-33
irrigation/plantation/gardening. Refer
section 2.10.1.3
Thus, steps are proposed to be taken
to minimize wastewater final disposal
in water body.
14. Details of effluent treatment plant, inlet and Details of effluent treatment plant, 2-29
treated water quality with specific efficiency of with specific efficiency of each
each treatment unit in reduction in respect of all treatment unit is given as in section
concerned /regulated environmental parameters. 2.10.1.1
Inlet and treated water quality in
reduction in respect of all concerned
/regulated environmental parameters
2-34
is given as Table 2-19
15. Number of working days of the sugar Working days of the sugar production 2-20
production unit. unit is given in section 2.8.1
16. Details of the use of steam from the boiler. Usage of steam from the boiler is 2-23
given in Figure 2-9 and Figure 2-10 2-24
17. Information on the following is necessary: - Details of sugarcane sources are 2-20
Sugar cane sourcing, transportation and storage given in section 2.8
(Issues of traffic congestion) – Water sourcing
and use for sugarcane plantation – Land use Transportation details of sugarcane is
given in section 2.8.1 2-20
pattern and cropping, if sugarcane plantation
are owned by the mill –Bagasse quantity Details of water sourcing and use are 2-22
generated, its storage, internal use and external given in section 2.9.3
disposal- Use of Pith- Bagasse drying- Use of
fossil Fuels-Fire hazards.
3-43
Land use pattern and cropping details
are given in Figure 3-11 and Table 3-42
3-21
2-14
Details of Baggasse generation
quantity, external disposal are given
in Table 2-7
2-22
Internal use of baggasse as fossil fuel
is given in Table 2-13 2-12
Details of Baggasse storage is given
in Table 2-6
18. Details of the proposed methods of water Method of water conservation and 2-38
conservation and recharging. recharging is given in section
2.10.5.1
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT C-3
en-vιsι n
ToR
Condition Terms of Reference Compliance Page No.
No.
19. Details of proposed Source- specific pollution Details of proposed Source- specific 2-35
control schemes and equipments to meet the pollution control schemes and
national standards. equipments to meet the national 2-35
standards are given in Table 2-20 and
2-36
in section 2.10.2.1 , Table 2-21
20. Management plan for solid/hazardous waste Solid/hazardous waste generation, 2-37
generation, storage, utilization and disposal. storage, utilization and disposal are
given in section 2.10.4
21. Details regarding infrastructure facilities such as Details regarding infrastructure 2-21
sanitation, fuel storage, restroom etc. to the facilities such as sanitation, fuel
worker during construction and operation phase. storage, restroom etc. to the worker
during construction and operation
phase are given in section 2.9.2
23. Any litigation pending against the project and No litigation pending against the --
/or any direction/ order passed by any court of project and /or any direction/ order
law related to the environmental pollution and passed by any court of law related to
impacts in the last two years. if so, details the environmental pollution and
thereof. Description of the environment. impacts in the last two years
24. The study area shall be up to a distance 10 km The study area considered for baseline 2-4
from the boundary of the proposed project site. monitoring is 10 km from the
boundary of the project site is given in
Figure 2-2
25. Location of the project site and nearest habitats Location of the project site is given in
with distances from the project site to be Figure 2-1 2-3
demarcated on a toposheet (1: 50000 scale)
Distances of nearest habitats is given
in Table 2-3 2-6
Toposheet of 10 km radius study area
is given in Figure 2-3 2-5
26. Land use based on satellite imagery including Land use map and satellite imagery is 3-43
location specific sensitivities such as national given in Figure 3-11 and Figure 3-12 3-44
parks/ wildlife sanctuary, villages, industries,
etc. for the study area. Land use pattern including sensitivities
such as national parks/ wildlife
sanctuary, villages, industries, etc. for
the study area is given in Table 3-21 3-42
27. Demography details of all the villages falling Demography details of all the villages 3-74
within the study area. falling within the study area is given in
Table 3-35
28. Topography details of the project area. Topography details of the project area 3-45
is given in section 3.8.2
29. The baseline data to be collected from the study The baseline data to be collected from 3-9
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT C-4
en-vιsι n
ToR
Condition Terms of Reference Compliance Page No.
No.
areas w.r.t. different components of the study area are given as air in section 3-15
environment viz. air, noise, water, land, and 3.3, water in section 3.4, Noise in 3-28
biology and socio-economic (please refer section 3.5, Land in section 3.7, 3-40
Section 4.4.2 for guidance for assessment of biology in section 3.9, socio-economic
3-57
baseline components and identify attributes of in section 3.10.
concern). Actual monitoring of baseline 3-71
environmental components shall be strictly
according to the parameters prescribed in the
ToR after considering the proposed coverage of
parameters by the proponents in draft ToR and
shall commence after finalization of ToR by the
compete Authority.
30. Geological features and geo-hydrological status Geological features and geo- 2-38
of the study area. hydrological status of the study area
3-46
is given in section 2.10.5, 3.8.4 and
3.8.6.2 3-50
31. Surface water quality of nearby water sources Surface water quality of nearby water
and other surface drains. sources and other surface drains are 3-27
given in section 3.4.4.2
32. Details on ground water quality. Details on ground water quality is
3-27
given in section 3.4.4.1
33. Details on water quality parameters such as
Temperature, Colour, pH, BOD, COD, Total 3-19
Details on water quality parameters
Kjeldhal Nitrogen, Phosphates, Oil & Grease,
are given in Table 3-8 and Table 3-9 3-23
Total Suspended Solids, Total Coliform bacteria
etc.
34. Details on existing ambient air quality and Details of existing ambient air quality
expected, stack and fugitive emissions for is given in section 3.3.3 3-12
PM10, PM 2.5, SO2*, NOx*, etc., and Details of stack and fugitive 2-22
evaluation of the adequacy of the proposed emissions are given in section 2.9.4, 2-35
pollution control devices to meet standards for 2.10.2.1, 2.10.2.3 2-36
point sources and to meet AAQ standards. (* -
As applicable)
Adequacy certificate is given as A-81
Annexure VII
35. The air quality contours may be plotted on a The air quality contours are given in 4-27, 4-28,
location map showing the location of project Figure 4-1, Figure 4-2, Figure 4-3 4-29,
site, habitation nearby, sensitive receptors, if
any and wind roses Wind rose is given in Figure 3-3 3-7
36. Mathematical modeling for calculating the Details of mathematical model for air 4-24
dispersion of air pollutants and ground level pollutants are given in section 4.3.9
concentration along with emissions.
Ground level concentration along with 4-25
emissions are given in section 4.3.9.4
37. Details on noise levels at sensitive/commercial Details of noise levels are given in 3-31
receptors Table 3-13, Table 3-14 and section 3-32
3.5.2 3-32
38. Site-specific micro-meteorological data Site-specific micro-meteorological 3-5
including mixing height data is given in section 3.2.1.2
Details of mixing height is given in 4-25
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT C-5
en-vιsι n
ToR
Condition Terms of Reference Compliance Page No.
No.
section 4.3.9.3
39. One season site-specific data excluding Baseline ambient air quality results 3-13
monsoon season. are given in Table 3-5
Ground water and surface water 3-19
quality results are given in Table 3-8 3-23
and Table 3-9 respectively.
Noise levels result is given in Table
3-32
3-13
Soil quality results are given in Table
3-20 3-38
40. Proposed baseline monitoring network for the Details of baseline monitoring
consideration and approval of the Competent network is given in Air monitoring 3-10
Authority. Table 3-4, Ground water and Surface 3-16
water sampling Table 3-7, Noise
3-30
monitoring Table 3-12, Soil sampling
Table 3-19 3-36
41. Ecological status (terrestrial and aquatic) of the Ecological status of the study area is 3-57
study area such as habitat type and quality, given in section 3.9
species, diversity, rarity, fragmentation,
ecological linkage, age, abundance, etc.
42. If any incompatible land use attributes fall No incompatible land use attributes --
within a 5 km radius of the project boundary, fall within a 5 km radius of the project
proponent shall describe the sensitivity boundary.
(distance, area and significance) and propose the
additional points based on significance for
review and acceptance by the EAC/SEAC.
Incompatible land use attributes include: –
Public water supply areas from rivers/surface
water bodies, from groundwater – Scenic
areas/tourism areas/hill resorts – Religious
places, pilgrim centers that attract over 10 lakh
pilgrims a year – Protected tribal settlements
(notified tribal areas where industrial activity is
not permitted); CRZ – Monuments of national
significance, World Heritage Sites – Cyclone,
Tsunami prone areas (based on last 25 years); –
Airport areas – Any other feature as specified by
the State or local government and other features
as locally applicable, including prime
agricultural lands, pastures, migratory corridors,
etc.
43. If ecologically sensitive attributes fall with in a Not applicable as no ecologically --
5 km radius of the project boundary, proponent sensitive attributes fall with in a 5 km
shall describe the sensitivity (distance, area and radius of the project boundary.
significance) and propose the additional points
based on significance for review and acceptance
by the EAC / SEAC. Ecological sensitive
attributes include: – National parks – Wild life
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT C-6
en-vιsι n
ToR
Condition Terms of Reference Compliance Page No.
No.
sanctuaries Game reserve – Tiger
reserve/elephant reserve/turtle nesting ground
Mangrove area; Areas with threatened (rare,
vulnerable, endangered) flora/fauna – Wetlands
– Reserved and Protected forests, etc. – Any
other closed/protected area under the Wild Life
(Protection) Act, 1972, any other area locally
applicable
44. If the location falls in a valley, specific issues Location does not falls in a valley, --
connected to the management of natural specific issues connected to the
resources shall be studied and presented. management of natural resources.
Anticipated environmental impacts and
mitigation measures Anticipated environmental impacts
and mitigation measures are given in
4-6
Chapter 1, section 4.3
45. Anticipated generic environmental impacts due Anticipated environmental impacts 4-6
to this project are indicated in Table 4-2, which and mitigation measures are given in
may be evaluated for significance and based on Chapter 4, section 4.3
corresponding likely impacts VECs may be
identified. Baseline studies may be conducted Baseline study for identified Valued
for all the concerned VECs and likely impacts 3-1
Environmental Components is given in
will have to be assessed for their magnitude in subsequent sections of Chapter 3
order to identify mitigation measures (please
refer Chapter 4 of the manual for guidance).
46. Tools as given in Section 4.4.3 may be referred As per tools given in section 4.4.3 of 4-6
for the appropriate assessment of environmental manual identified likely impacts and
impacts and same may be submitted in draft mitigation measures for all activities
ToR for consideration and approval by are given in section 4.3
EAC/SEAC. 5. While identifying the likely
impacts, also include the following for analysis
of significance and required mitigation
measures: – impacts due to transportation of raw
materials and end products on the surrounding
environment – impacts on surface water, soil
and groundwater – impacts due to air pollution –
impacts due to odour pollution – impacts due to
noise – impacts due to fugitive emissions –
impact on health of workers due to proposed
project activities
47. Proposed odour control measures. Odour control measures are given in 2-37
section 2.10.2.4
48. Action plan for the greenbelt development – Action plan for the greenbelt 2-40
species, width of plantations, planning schedule development is given in section
etc. in accordance to CPCB published 2.10.7.1
guidelines.
Plantations, planning schedule etc. are 2-40
given in section 2.10.7.2
49. In case of likely impact from the proposed No reserve forests fall within the --
project on the surrounding reserve forests, Plan study area.
for the conservation of wild fauna in
consultation with the State Forest Department
50. For identifying the mitigation measures, please Anticipated environmental impacts 4-6
refer Chapter III for source control and and mitigatin measures are given in
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT C-7
en-vιsι n
ToR
Condition Terms of Reference Compliance Page No.
No.
treatment. Besides typical mitigation measures section 4.3
which may also be considered are discussed in
Table 4-5. Analysis of alternative resources and Analysis of alternative resources and
technologies technologies are given in Chapter 5
5-1
51. Comparison of alternate sites considered and the Detail of alternates site is given in 5-1
reasons for selecting the proposed site. section 5.2
Conformity of the site with the prescribed
guidelines in terms of CRZ, river, highways, Conformity of the site with the
railways etc. prescribed guidelines in terms of
CRZ, rivers, highways, railways etc.
1-3
are given in Table 1-1
52. Details on improved technologies. Details of improved technologies are 5-1
Environmental monitoring program given in section 5.5
Environmental monitoring program is 6-1
given in section 6.2
53. Monitoring programme for pollution control at Monitoring program for pollution 6-1
source. control is given in section 6.2
54. Monitoring pollutants at receiving environment Monitoring pollutants at receiving 6-1
for the appropriate notified parameters – air environment for the appropriate
quality, groundwater, surface water, etc. during notified parameters are given in
operational phase of the project. section 6.2
55. Specific programme to monitor safety and Specific programme to monitor safety 7-26
health protection of workers. mention in section 7.6.16
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT C-8
en-vιsι n
ToR
Condition Terms of Reference Compliance Page No.
No.
61. Details on compensation package for the people No additional land is required to --
affected by the project, considering the socio- acquire for the modernization of sugar
economic status of the area, homestead oustees, mill, existing land i.e. 5,95,292.58
land oustees, and landless labourers. sq.mt. is sufficient for the
modernization project.
62. Points identified in the public hearing and This ToR will be complied after --
commitment of the project proponent to the public hearing in final EIA report.
same. Detailed action plan addressing the issues
raised, and the details of necessary allocation of
funds.
63. Detailed compensation package for the people No additional land is required to acquire --
affected by the project shall be prepared,
for the modernization of sugar mill,
considering the socio-economic status of the
area, homestead oustees, land oustees, and existing land i.e. 5,95,292.58 sq.mt. is
landless labourers. sufficient for the modernization project.
9-2
However, CER plan is given in Table
9-1.
64. 54. Administrative and technical organizational Administrative and technical 11-17
structure to ensure proposed post-project organizational structure is given as
monitoring programme for approved mitigation Figure 11-1
measures.
65. EMP devised to mitigate the adverse impacts of Detailed EMP devised to mitigate the 11-18
the project should be provided along with item- adverse impacts with itemwise cost is
wise cost of its implementation (capital and given in section 11.5.
recurring costs).
66. Allocation of resources and responsibilities for Details of resources and 11-16
plan implementation. responsibilities for plan
implementation are given in Table
11-1.
67. Details of the emergency preparedness plan and Details of the emergency 7-27
on-site and off-site disaster management plan. preparedness plan and on-site and off-
site disaster management plan
mention in section 7.8
68. Details with respect to justification for proposed Details of proportionate availability of 2-12
expansion: (1) To address proportionate space for production, storage, utilities
availability of space for production plant. (2) To and commond infrastructure with its
address proportionate availability of storage area impact is given in Table 2-6.
for raw materials finished goods, utilities and
goods carrier movement within premises. (3) To However, detailed Environment
address proportionate captive/common 4-6
impact and its mitigation measures is
infrastructure available to accommodate given in section 4.3.
additional load due to proposed expansion. (4)
Environment impact and its mitigation measures
for common/ captive infrastructure due to
proposed production.
69. A tabular chart for the issues raised and This ToR will be complied after --
addressed during public hearing/consultation public hearing in final EIA report.
and commitment of the project proponent on the
same should be provided. An action plan to
address the issues raised during public hearing
and the necessary allocation of funds for the
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT C-9
en-vιsι n
ToR
Condition Terms of Reference Compliance Page No.
No.
same should be provided.
70. PP shall ensure participation of people during This ToR will be complied after --
Public Hearing with equality in gender so as to public hearing in final EIA report.
encourage woman participation in Public
hearing & at the same time their issues shall also
be given weightage.
71. Proposal of online monitoring system with Online monitoring system with 6-4
reference to direction of CPCB. reference to direction of CPCB is
given in section 6.4
72. Adequacy assessment report of ETP to achieve Adequacy assessment report is given A-81
discharge norms with ETP stage wise reduction as Annexure VII
in pollutants.
73. To explore possibility of reuse of industrial Reuse of industrial effluent for 2-33
effluent for industrial purpose within premises. industrial purpose is not feasible for
sugar unit and large quantity of water
consumption required in onland
irrigation. Reuse details of treated
water is given in section 2.10.1.2
74. Adequacy assessment report of APCM to Adequacy assessment report is given A-81
achieve emission norms as Annexure VII
75. Justification of quantity of ETP sludge against Justification of quantity of ETP 2-34
treatment of industrial effluent. sludge against treatment of industrial
effluent is given in section 2.10.1.4
76. Composition of ETP sludge and its feasibility to ETP sludge and its feasibility to use it A-154
use it as manure in gardening/plantation within as manure in gardening/plantation
premises certified by government agriculture within premises certified by
university. government agriculture university is
given as Annexure XIII.
77. To provide APCM with steam boilers as per Detail of APCM with steam boilers as 2-35
prevailing GPCB guidelines. per prevailing GPCB guidelines is
given in Table 2-20
78. Validity of TOR
The ToRs prescribed for the project will Noted --
be valid for a period of three years for
submission of EIA & EMP report. ToR
will lapse after three years from the date of
issue.
The period of validity could be extended
for a maximum period of one year Noted --
provided an application is made by the
applicant to the Regulatory Authority, at
least three months the expiry of valid
period together with an updated Form-I,
based on proper justification and also
recommendation of the SEAC.
79. Further project proponent may be advised to Noted --
submit final EIA Report with EC application
within 120 days from the date of issuance of this
ToR to expedite processing of Environment
Clearance application.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT C-10
en-vιsι n
ToR
Condition Terms of Reference Compliance Page No.
No.
80. The project proponent shall have to apply for Noted --
Environmental clearance through online portal
http://environmentclearance.nic.in/ along with
final EIA report.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT C-11
en-vιsι n
EXECUTIVE SUMMARY
1 Introduction
M/s. Shree Sayan Vibhag Sahakari Khand Udyog Mandli Ltd. is a Co-operative Mandli and currently
engaged in production of sugar from sugarcane and also having 45 KLPD molasses based distillery unit
located At & Post Sayan, Taluka Olpad, District Surat - 394 130. Unit has obtained CCA to manufacture sugar
from sugarcane and Industrial alcohol/ Rectified spirit, extra neutral alcohol/Absolute alcohol/ Anhydrous
alcohol from molasses.
Existing sugar mill was based on old technology and resulting in higher operation and maintenance cost, so
management had decided and replaced existing sugar mill by installing modernized mill.
Product Detail
Capacity per Month
Sr. No. Name of Products
Existing Proposed Total
1. Crystal white sugar 19,500 MT 5700 MT 25,200 MT
2. Industrial alcohol/ Rectified spirit 1,350 KL -- 1,350 KL
Extra neutral alcohol/Absolute alcohol/
3. 1,200 KL -- 1,200 KL
Anhydrous alcohol
11.5 MW 11.5 MW
4. Bagasse based Captive Power Plant (9 MW + 2.5 -- (9 MW + 2.5
MW Standby) MW Standby)
By – Products
1. Molasses 7,500 MT 2,000 MT 9,500 MT
2. Bagasse 45,000 MT 20,000 MT 65,000 MT
3. Press mud 6,000 MT 3,000 MT 9,000 MT
The sugarcane, Lime, Sulphur, Phosphoric acid are used in sugar manufacturing unit. Whereas, Molasses,
Turkey red oil/Deformer, Rectified spirit, Potassium permanganate and Caustic soda are used in distillery unit.
Total available land area of premises is 5,95,292.58 m2, out of which 2,02,343 m2 (34.0%) area is covered
with greenbelt. Total cost of the mordenized project is Rs. 37 Crore. Total budget allocation towards
Environmental Management Facilities will be Rs. 48 lacs and recurring cost will be 1.21 Crore/annum.
Unit has submitted an application to EAC at MoEF&CC as category A, 5(j) Sugar Industry project vide
proposal no. IA/GJ/IND2/74463/2018 dated 13/04/2018 with reference to EC Violation, Notification vide
No. S.O. 804 (E) dated: 14th March, 2017.
After presentation in front of EAC Committee at MoEF&CC in 14th meeting of Expert Appraisal
Committee (Violation) held on 23.10.2018, proposal has been transferred to SEAC/SEIAA, Gujarat under
schedule 5(j), Category-B vide new proposal no. SIA/GJ/IND2/31012/2019. TOR meeting was
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT S-1
en-vιsι n
scheduled in 495th SEAC meeting held on 11.04.2019 and TOR letter granted vide letter no.
SEIAA/GUJ/TOR/Violation/5(j)/927/2019 on 19.06.2019.
The baseline details collected in 1st March to 31st May, 2019 is utilized for this project.
The environmental parameters (ambient air, water, soil, noise, flora and fauna, socio economy) selected for
study are those, which are likely to be most affected by the project. The study area is defined as an area within
10 km radius from center of the site.
The base line Ambient Air Quality (AAQ) status within 10 km study area has been assessed by conducting
monitoring at 8 AAQ sampling stations during 1st March to 31st May, 2019. Ambient Air Quality monitoring
locations were decided based on meteorology & available infrastructure facilities. The baseline Ambient Air
Quality of the study area was monitored for Particulate Matter (PM10 & PM2.5), Sulphur Dioxide (SO2),
Nitrogen Dioxide (NO2), Carbon Monoxide (CO) & Hydrocarbon (HC). The result for the same is given as
below:
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT S-2
en-vιsι n
Ambient Air Quality Status
Total water requirement for the existing mill is 5026 KLD and after modernization it is reduced to 3120 KLD,
which is sourced from Canal/Bore well.
Water Requirement
Existing Proposed Total
Sr. No. Particulars Remarks
(KLD) (KLD) (KLD)
(A) Domestic 160 0 160 --
(B) Industrial
Distillery
(B -I) 200 0 200 --
plant
(B -II) Sugar plant
Two tandem mills are replaced with
modernized closed system of one tandem
650 mill. This prevented losses of water from
(a) Process 1300 -650
(Condensate) mill which increased condensate water
recovery. Due to reuse of condensate water
fresh water requirement is reduced.
New mill required less steam consumption
213
(b) Boiler than old mill, which decreased demand of
(Condensate)
water in boiler.
1606 -756
Due to decrease in steam requirement of
(c) Cooling 637 boilers for new mill, cooling tower inlet
water reduced.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT S-3
en-vιsι n
Existing Proposed Total
Sr. No. Particulars Remarks
(KLD) (KLD) (KLD)
Others It is reduced due to reduction in water
(Humidifica requirement for boiler.
(d) tion + Spray 1260 -200 1060
pond Make
up)
200 (Fresh Dry cleaning system is adopted instead of
13+ wet cleaning system which has drastically
(e) Washing 500 -300
Condensate reduced washing water requirement.
187)
1910 Fresh + 1050 condensate water of
Total (B) 4866 -1906 2960
sugar cane crushed
2070 Fresh water + 1050 condensate water
Total (A + B) 5026 -1906 3120
of sugar cane crushed
Wastewater Generation
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT S-4
en-vιsι n
Water sampling locations
Ground Water Surface Water
Water Sample
Code Code Water Sample Location
Location
GW1 Sayan SW1 PS_ Reservoir
GW2 Siwan SW2 Canal near project site
GW3 Obhla SW3 Sayan Lake
GW4 Kareli SW4 Canal near project site
GW5 Pipodara SW5 Kareli Lake
GW6 Galundi SW6 Kakrapar Dam canal
GW7 Velanja SW7 Tapi River
GW8 Bharthana SW8 Delad Lake
In existing project, entire industrial effluent was treated in Effluent Treatment Plant (ETP) by providing
primary and secondary treatment and domestic sewage was disposed off through septic tank/soak pit system.
After modernization, in addition to existing ETP, Tertiary treatment will be provided as proposed and also
domestic sewage will be treated along with industrial effluent in ETP and subsequently treated water is/will be
reused for on land irrigation/plantation/gardening purpose within the factory premises.
The quality of ground water is good at Sayan, Siwan, Kareli, Galundi & Valenja locations and the quality of
water is poor at Obhla, Pipodara locations. The water can be used for drinking purpose after proper treatment
of hardness, TDS and bacteria removal such as filtration, RO and UV. All location total hardness result found
high compare to desirable limit but it was within the permissible limit. At Bharthana calcium and TDS found
high compare to desirable limit.
The total hardness varied in the range of 200-253 mg/L, except Tapi River at all location Total hardness is
higher than desirable limit but it was within the permissible limit. At Sayan lake and Reservoir magnesium
found higher than the desirable limit but within permissible limit.
Sugar mill has provided separate storage area for hazardous wastes having roof, impervious flooring with
leachate collection system to avoid land contamination/soil pollution.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT S-5
en-vιsι n
2.4 Land Environment
During operation activity the impact of air, water and solid & hazardous waste pollution on soil causes direct/
indirect effects on soil.
The land use for settlement is mostly confined to the ‘rural and urban settlement’. Agricultural land covers
single and double crop area (major area under single crop) including rice, sorghum (jawar), wheat, cotton,
and sugarcane.
The alluvial plains towards west merge into a dry barren sandy coastal plain fringed by marshy shore line.
The Tapi is the major river which passes through the central parts of the district and flows towards the
west. The river is perennial in nature.
As all necessary air pollution control steps are already taken to avoid adverse impact of air pollution on soil.
Green belt development consisting of air pollution tolerant tree species is already done.
To conserve water, modernized sugar mill will start installation of rain water harvesting system. Impervious
flooring is done in effluent generation and ETP area to avoid any type of leakage that can be percolated into
soil. So there is no adverse effect on land / soil due to water.
All necessary control steps are provided for handling, storage and disposal of solid/hazardous waste generated
from the mill. Thus, there will not be any significant impact of solid/hazardous waste on the soil environment.
Proper facilities with liner and bunding is provided to the raw material and product storage area to prevent soil
and ground water contamination. Spill control measures, mechanical handling is adopted to avoid chemical
spillages.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT S-6
en-vιsι n
Noise Level due to Transportation
Noise Level in dBA
Sampling Location Time
10 m from Edge of The Road 20 m From Edge of The Road
Day 53.9 50.9
Sayan - Kim Road
Night 48.2 45.2
The noise sources identified in industrial zone are vehicular traffic, industrial and commercial activities,
railway line is also near to the project site; while Project Site, Sayan railway station and Kareli village are
higher in day time and night time. At all other locations recorded Noise levels were found to be within the
standard limits.
Traffic survey was conducted to identify impact of load due to modernized mill. Traffic study reveals the LOS
(Levels of Service) as “C” Good for the Sayan Kim road, that is 2 lane road divider with capacity of >2400
PCUs; and Total PCUs per day even after modernization project is <1743. For management of traffic,
adequate parking space provided at project site. Transportation activity will be carried out during non-peak
hours only and trained driver will be appointed for transportation.
To control noise level in operation phase of modernized mill following precautions are taken:
Low noise equipments, Periodic checking and servicing of all the equipments and vehicles, Timely
lubrication of equipments, Provision of acoustic enclosures as and when required, Installation of anti-
vibration pads Personal protective equipments like ear plug and ear muff was provided to workers,
Maintenance of vehicles was maintained.
In and around the study area ground water occurs in aquifers which can broadly be demarcated into two
zones namely newer alluvium and older alluvium. Water levels are in general deeper in newer alluvium.
The alluvium occurs in the western part of the district and along the streams whereas in eastern parts
weathered and fractured basalt form aquifers.
Source of water is bore well and canal in the modernized sugar mill rain water harvesting system will be
installed and the harvested rain water will be used for various industrial activities. Annual volume of rain
water for harvesting will be about 29% of the annual fresh water requirement, thus it will be reduced in fresh
water demand.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT S-7
en-vιsι n
2.7 Socio-Economic Environment
Findings of study area based on Census 2011 and field survey:
Males: 1,04,230
Females: 90,055
Population density: 619 persons per km2
Sex ratio : 864
Average literacy rate : 80.87%
Main occupation of study area is depending on agriculture activities and animal husbandry. Main crops
were informed and observed as sugar cane, paddy and vegetables.
Health care amenities like PHC are available at Sayan and Sandhiyar near the project site, for major
illness treatment available at Surat. No major health related problem identified in village. Sayan sugar had
established Jeevan Raksha Hospital with modern technology at Siwan village.
Study area having ancient temple in Kudsad village of Ranchhod Ray and Galudi village of Shree
Swaminarayan Panchdev temple thousand of devotees are come temple.
Bore well water is use for drinking purpose and Canal water for agriculture in villages.
Village having available basic amenities like Anganwadi, School, Electricity connection, Street light,
Bank, post-office, RO water plant, door to door garbage collection, dustbin, drainage etc are available in
study area.
Impact of Project:
Various project activities will lead to upliftment of surrounding area. The project will create opportunities
for indirect employment for which skilled and unskilled manpower will be needed. Secondary jobs are
day-to-day needs and services to the work force. This will also temporarily increase the demand for
essential daily utilities in the local market. Local people will be given preference wherever found suitable
for all the jobs in the plant. Income of the area will increase in the form of various types of taxes.
CER:
The Industry will undertake CER activities. A total amount of Rs. 37 lacs would be utilized for Corporate
Environment Responsibility (CER) programme as per provision of OM no. 22-65/2017 on 01.05.2018, which
is 1.0% of proposed project cost i.e. Rs. 37 Crore as per CER guidelines. While this project is considered as
violation project of EIA Notification 2006 and its subsequent amendments, so as per guideline issued by
SEAC, Gujarat given in its TOR letter issued dated 19.06.2019 it should be doubled than actual provision. So,
total amount of Rs. 74 lacs would be allotted for CER programme for the period of five years. This
amount is proposed towards Infrastructure development, waste management, water facility, education
promotion, and healthcare activites. Also unit is abide towards spending CSR cost for the upliftment of the
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT S-8
en-vιsι n
community if project attract Companies (CSR Policy) Rules, 2014; thus improving socio-economic status of
study area.
Flora:
The trees, herbs, shrubs and major crops, observed during the biological survey conducted within
study area. During study 36 tree species belong to 17 families, 17 shrubs belong to 12 families, 17
herbaceous species belongs to 13 family, 13 species of climbers/ twiners belongs to 7 families are
enumerated from the study area.
There is no Rare and Endemic plant was observed in study area during site visit.
Cultivated plants:
The study area is dominated by the orchards of Mango and Chikko cultivation during the study
period.
The main crops of the study area are paddy, rice, sugarcane, jawar and wheat.
And fruit crops are mango, sapota and banana. The vegetables grown in the study area are, Rigan
(Solanum melongena), Val/Val papri (Lablab purpureus), Bhindi (Abelmoschus esculentus) etc. In
addition to this Very limited Bor plantation was also observed as farm land plantation.
No natural or reserved forest was observed in the study area except few scattered scrub cover in the
barren lands.
Fauna:
For the documentation of the faunal biodiversity of the study area with respect to birds, reptiles,
amphibians, and butterfly species, a baseline survey had been conducted Faunal species recorded in
the study area includes 5 types of mammals, 7 types of Reptiles, 3 types of butterflies & birds belongs
to 23 families. None of the sighted animal species can be assigned endemic species category of the
study area.
Among the birds in the study area, Pea fowl (Pavo cristatus) is included in Schedule I of Wild life
protection Act (1972), while many other birds are included in Schedule IV.
Among the reptiles, Indian Cobra (Naja naja) and Common Rat Snake (Ptyas mucosus) were
provided protection as per Schedule-II.
Total plot area of plant is 5,95,292.73 m2 out of which 2,02,343 m2 is developed as greenbelt,
consisting of air and noise pollution capturing species; which is about 34% of total plot area.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT S-9
en-vιsι n
2.9 Risk Assessment
Risk analysis and study have been carried out for identification of hazards, selection of maximum credible
scenarios, risk mitigation measures etc. All the hazardous chemicals will be stored and handled as per MSDS
guidelines.
Provision PPEs like ear plug, ear muff etc. where noise levels in excess of 80 db (A) are regularly generated.
Regular medical checkup of workers. Provision of basic infrastructure i.e. like drinking water, sanitation, first
aid etc. to workers. Use of proper PPE’s during hazardous waste handling, chemical handling etc.
4 Project Benefits
The required raw materials and skilled and unskilled laborers is utilized maximum from the local area. The
increasing industrial activity will uplift the commercial and economical status of the locality, to some extent.
This considerable employment & trade opportunities will eventually result in appreciable economic benefits to
the local people & businesses/contractors. Modernization in project will increase existing contribution to
revenue to the State exchequer in the form of taxes.
6 Conclusion
Negligible impacts will occur on air quality. However, all the necessary air pollution control measures
will be provided.
No ecological damage will occur.
No adverse impacts will occur on water environment.
Local employment opportunities will increase.
Various other environment parameters like Forest/ National Park/ Sanctuary and Religious / Historical
Places will not be affected.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT S-10
en-vιsι n
Environment Management Plan has been formulated to control all the pollutant parameters and
Environment Management Cell has been set-up to ensure that these parameters do not exceed the norms
set out by the concerned authorities.
After commissioning of the modernized project the Environmental Management Cell will take care of all
the pollution control measures.
It can be concluded that positive implementation of mitigation measures and environmental management plan
during the operational phase, there will be negligible impact on the environment.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT S-11
en-vιsι n
CHAPTER 1 CHAPTER 1 INTRODUCTION
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 1-2
en-vιsι n
21°20'14.26"N
4
72°53'54.31"E
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 1-6
en-vιsι n
Sr. Legal Instrument (Type, Ref.,
Concern Authority or Bodies Applicability
No. Year)
9. Public Liability Insurance Act, MoEF&CC, District Collector Sugar and Distillary unit
1991 amended 1992 & Public manufacturing sugar and alcohol
Liability Insurance Rules, 1991 products and more than 1000 workers
and its subsequent amendments are employed.
10. The Factories Act, 1948 Ministry of Labour, DGFASLI and Sugar and Distillary unit
Directorate of Industrial Safety and manufacturing sugar and alcohol
Health/Factories Inspectorate products and more than 1000 workers
are employed.
11. Noise Pollution (Regulation and CPCB and SPCB/UTPCC Noise generation due to various
Control) Rules, 2000 and its industrial activities.
amendments
12. The Indian Wildlife (Protection) Ministry of Environment and Not applicable
Act, 1972 and its subsequent Forests, & Climate Change
amendments (MoEF&CC), CPCB and
SPCB/UTPCC.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 1-7
en-vιsι n
Notice Details in Brief Reply
measure for the storage of excess molasses. Tank’s
details are mentioned as below:
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 1-8
en-vιsι n
Notice Details in Brief Reply
Total 1 show-cause notice, 2 closures & 2 direction notices are issued in last 5 years, the copies of notice and
reply are given as Annexure IX summary of the same is as under:
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 1-9
en-vιsι n
Notice Details in Brief Reply
EC, will immediately submit the copy of the
same to the board.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 1-10
en-vιsι n
Notice Details in Brief Reply
treatment and also filled and blocked storm water
drain with soil structure. Photographs also
submitted.
GPCB direction dated 28/04/2015: Unit has already installed and operated online
effluent monitoring system at ETP outlet for
Regarding online effluent/emission monitoring system
measuring effluent parameters like pH, BOD,
COD and TSS and online emission monitoring
system to boiler stack for measuring parameter
PM during cane crushing season. It has been
connected to GPCB/CPCB portal also.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 1-11
en-vιsι n
CHAPTER 2 PROJECT DESCIRPTION
2.3 NEED FOR THE PROJECT AND ITS IMPORTANCE TO THE COUNTRY AND/OR
REGION
Sugar mill was established in November 1972 as a Co-operative Mandli to protect the social & economic
interest of small farmers located in the region.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-1
en-vιsι n
Mandli is also trying to get good quality crops on continuous basis in order to obtain good quality sugar
production. Unit has started molasses based distillery with a capacity of 45 KLD rectified sprit from 1994 and
20 KLD absolute alcohol from March 2003.
The sugar economy in India, like many other countries, is highly regulated, starting from sugarcane to the
end‐product sugar. Even the by‐products are subject to government control. The demand for products intended
to be manufactured is increasing in domestic and global market.
M/s. Shree Sayan Vibhag Sahakari Khand Udyog Mandli Limited is able to meet the demand of various
products locally and globally. This is generated direct and indirect employment opportunity for various levels
of people including local area employment.
Existing sugar mill was based on old technology and yield of its products were reducing day by day so
management had decided to replace existing sugar mill by assemble modernized mill.
Disadvantages of old sugar mill (Old Technology):
After cane crushed, moisture content in bagasse is found high. Hence, production reduced and
calorific value of bagasse is low. Therefore, bagasse as a fuel and its consumption was increasing.
Effluent load is found with major quantity
Juice loss is also found due to spill from vessel.
Higher space was required for old mill.
Steam turbine driven.
Maintainace cost of old mill was higher than New Mill.
Manpower and power requirenment was high.
Control system for operation was tedious.
Higher lubrication consumption.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-2
en-vιsι n
2.4 LOCATION
M/s. Shree Sayan Vibhag Sahakari Khand Udhyog Mandli Ltd., is engaged in production of sugar from
sugarcane and also having 45 KLPD molasses based distillery unit with 11.5 MW (9 MW + 2.5 MW
Standby) CPP in their unit located At & Post Sayan, Taluka Olpad, District Surat - 394 130.
Sugar unit has assembled new modernize mill which resulted increased cane crushing capacity without
increasing other auxiliaries of the unit. No additional land was required to acquire for the modernization of
sugar mill. Existing land i.e. 5,95,292.58 sq.mt. was sufficient for the modernization project.
It is situated at 21°20'26.17"N latitude and 72°53'48.85"E longitude. An index map showing project site is
given in Figure 2-1, Google image and topography map showing 10 km Radius study area of project site is
given in Figure 2-2 & Figure 2-3 respectively.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-3
en-vιsι n
Figure 2-2: Google Image showing 10 km Radius Study area of Project Site
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-4
en-vιsι n
2.4.1 Justification of Site Selection and Key Infrastructure Features and Settlements
The modernization mill of existing unit is located in Sayan and no additional land was required to acquire for
the modernization of sugar mill; Sugar mill has basic infrastructure facilty like communication, transportation,
medical facilities, fuel, water, power, unskilled & skilled manpower, raw materials, road network, etc.
The mill is surrounded by various Pharmaceutical, Textile, Food, Electronics manufacturing units. Major
industries are located within 5-6 km radius only hence these industries are shown in Figure 2-4 and list is
given in Table 2-2.
Table 2-2: List of Nearby Industries
Distance
Tag Name of Industry Nature of Industry From Project Direction
Site (km)
A Shree Hari Industries Textile exporter 1.16 S
B Shree Gopal Ind. Estate Industrial area 1.17 SSW
C Shreeji Silk Industries Clothes and fabric manufacturer 3.95 SW
D Biogen Pharmaceutical Co. Pharmaceutical 3.37 SW
E Surka Industries Clothing manufacturer 3.01 SW
F Bandidhari Industries Elevator manufacturer 4.17 SW
G Shreya Fabrics Textile mill 4.17 SW
H Virani Impex Metal machinery supplier 4.72 SW
I Panchras Masala - Samprag Innovative Food manufacturer 4.8 SW
J Gajanad Enterprise Ice Factory Ice supplier 1.8 SE
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-5
en-vιsι n
Distance
Tag Name of Industry Nature of Industry From Project Direction
Site (km)
K Gurudev Textile Cloth manufacturer 5.9 W
L Sunrise Textile Park Textile Park 1.09 N
The mordenize sugar mill is established on existing land area so no displacement of population is take place.
There is no protected area notified under the Wild Life (Protection) Act, 1972 & Eco-sensitive area notified
under Section 3 of the Environment (Protection) Act, 1986 exists within 10 km radius areas from the project
site.
Table 2-3: Key Infrastructure Features
Nearest
Distance From
Tag Infrastructure Infrastructure Direction
Project Site (km)
Feature
A Nearest Village Shekhpur 1.44 SE
B Sayan 2.65 SSW
C Siwan 2.70 WSW
D Nearest road Sayan-Kim Road 0.30 WNW
E Nearest Railway station Sayan Railway Station 2.74 SSW
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-6
en-vιsι n
Nearest
Distance From
Tag Infrastructure Infrastructure Direction
Project Site (km)
Feature
F Nearest High Way SH-65 7.68 NNE
G SH-605 & 168 4.28 SE
H NH-8 6.79 E
I Nearest well known Shree Ranchhodrai 4.63 NE
Temple Temple, Kudsad
J River Tapi River 7.34 S
K Kim River 8.85 NE
L Domestic Airport Surat 29.60 SSW
M Nearest School Udan International 1.62 SE
School
N Nearest Hospital Jeevan Raksh Hospital 3.39 SW
O Sarthana Zoo Sarthana National Park 11.76 S
Project Site
5 km Radius area of Project Site
10 km Radius area of Project Site
Figure 2-5: Google Image Showing Locations of key Infrastructure Facilities in 10 km Radius Study Area
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-7
en-vιsι n
Figure 2-6: Google Image Showing Location of Surat Airport from Project Site
2019.05.31 2019.05.31
Main gate of project site Greenbelt in entrance
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-8
en-vιsι n
2019.05.31 2019.05.31
Greenbelt in plant area Greenbelt in Distillery area
2019.05.31 2019.05.31
New Sugar Mill New Sugar Mill
2019.05.31 2019.05.31
Distillery gate Distillery plant
Photograph 2-1: Project Site
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-9
en-vιsι n
2.4.2 Project Land and Plant Layout
The moderniation is done in existing sugar mill. The project is located in Sayan, Olpad, Surat. Total plot area
of the project is 5,95,292.73 m2 from which 2,02,343 m2 is developed as greenbelt, thus 34% of total land area
is covered with green belt. The breakup of land area after modernization is given in Table 2-4 and Table 2-5;
while plant layout showing infrastructure of existing faculties and that after modernization in Figure 2-7.
Table 2-4: Area Break-up
Area (m2)
Sr. No. Particular % of Total Area
Existing Proposed Total after modernization
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-10
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-11
en-vιsι n
Table 2-6: Space and availability for Production plant, Utilities, Storage area and common infrastructure
Space and Availability for Production plant, Utilities, Storage area and common infrastructure
As above mention, total 6 nos. of molasses storage tanks are exist which is more than sufficient to cater additional 2000
MTPM Molasses load.
2. Bagasse
Existing storage area capacity Bagasse quantity (by-product) (MT/Month)
Existing bagasse yard storage area is sufficient to store 65000 MTPM Bagasse.
3. Crystal white sugar Existing bag storage area capacity Crystal white sugar quantity (product) (MT/Month)
Existing: 19500
Total Storage area: 31785 m2
Proposed: 5700
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-12
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-13
en-vιsι n
Proposed: 0
Total after modernization: 11.5 [9 + 2.5(stand by)]
9. Press mud Press mud generation (MT/Month)
Bio compost area is 54,846 m2 which is sufficient for making bio composting from additional press mud generation.
On the basis of above data, common/captive infrastructure is having sufficient capacity to cater and additional load. So, no significant environmental impact is envisaged.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-15
en-vιsι n
The mixed juice obtained from mills is weighed and phosphoric acid is added to it. After addition of
phosphoric acid mixed juice is healed to 75 0C in multipass vertical tubular juice heaters where from it is sent
to juice sulphitor where milk of lime and SO2 gas is mixed in it and final pH is maintained to 7.0 (+ or - 0.2).
Sulphited juice is heated to 102 0C (+ or - 2) and then sent to Dorr clarifier for settling to flock formed. The
overflow of the Dorr Clarifier is clear juice and underflow is mud. The mud is filtered through vacuum filter,
mud is disposed off or used as manure and the filtrate is recycled and mixed with the mixed juice for
reprocessing. The clear juice obtained from Dorr Clarifier is concentrated to 60-650 Bx. In vapour cell and
multiple effect evaporators. The juice so concentrated i.e. Syrup is sent to Syrup Sulphitor where it is
Sulphited with SO2 and its pH is brought down to 5.0 to 5.2. Thus, Sulphited syrup is sent to pan supply tank
for further processing.
A massectuite is boiled with syrup melt and A light, Dry seed footing is taken for A massecuite boiling in
vacuum pans where sugar crystals are developed for bagging. A massecuite of 94 0Bx. And 86-88 purity is
finally dropped in the crystallizers. From crystallizer, this A massecuite is sent to centrifugal machines where
sugar crystals. A heavy molasses and A light molasses are separated, sugar is sent to graded through grass
hoppers where sugar is separated in different grains, sizes S 30 & M 30 are bagged. Bags for domestic market
and 50 Kg for export.
A light & a heavy molasses is sent to pans storage tanks. A light is used in A massecuite and a heavy is used
for boiling B massecuite. 95-96 0Bx. and 71-73 % purity. After purging B massecuite, B heavy molasses and
B sugar is obtained. B sugar is melted and sent to pans and fed to A massecuite pans. B heavy molasses is sent
to pan storage tanks and is used for boiling C massecuite of 100 0Bx. and 55-56 % purity. C massecuite is
purged in C for workers where final molasses solution of 45 0Bx. is used for lubrication, molasses obtained
from C fore centrifugals is final molasses it is weighed and is stored in five steel molasses storage tanks. ‘C’
fore cured sugar is affinated with C light molasses and sent to C after worker centrifugals where hot water is
applied and C after sugar and C light molasses is obtained. C after sugar is melted and sent to pans for A
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-17
en-vιsι n
massecuite boiling and C light molasses used for C fore magma and boiling C massecuite.
(1) Fermentation:
Alcohol is manufactured by fermentation of molasses. Molasses contains about 45% to 50% sugar. Molasses
is diluted with water as per required concentration (above 20%) & filled in a tank known as Fermentor tank.
Then alcohol generating bacteria (yeast) is added in to the Fermentor tank & allowed for fermentation. During
this process sugar in molasses is converted in to alcohol. On completion of the process, it will be a mixture of
alcohol & water, which is known as wash.
(2) Distillation:
Fermented wash contains about 5-7% of alcohol. The process for separation of alcohol from water is known
as distillation. In this process, wash is boiled in specially designed column by way of steam. The boiling
point of alcohol is lower than water. Then separated alcohol vapour is condensed in a tubular condenser &
convened in to liquid form. The liquefied alcohol is cooled in an alcohol cooler & stored in a steel tank. This
alcohol is the final product known as rectified spirit, which contains 95% ethyl alcohol.
Denatured spirit: It is known as industrial alcohol/Rectified spirit also. For the precaution & to avoid the
misuse of alcohol, government has decided to add some chemicals such as benzene, acetone, pyridine,
acetaldehyde etc. in certain proportion before sale of alcohol, but it cannot be separated from alcohol. Thus,
the alcohol is mixed with chemicals is known as denatured spirit or denatured alcohol.
The life of molecular sieve is claimed to be around 10 years. As the cycle period is very short, a fully
automated system should be adopted for changing the configuration from adsorption to regeneration and vice
versa. The valves used are totally leak proof at high temperature and pressure/vacuum conditions.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-19
en-vιsι n
The life of molecular sieve may be around ten years. However, the operating cost is considerably less
than azeotropic distillation.
2.9.2 Manpower
There is no addition in manpower requirement for the modernized mill. Existing 1200 personnel is sufficient
for this modernization mill.
Quarters of Sugar mill was allocated to workers during construction phase as construction activities are done
in off season with all the infrastructure facilities such as sanitation, fuel storage, restroom etc. Sanitation and
rest rooms are available in premises and colonies are allocated during operational phase to the workers with
all the basic facilities. Sufficient area is available for fuel storage in existing and after modernization sugar
mill.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-21
en-vιsι n
2.9.3 Water
Total water requirement for the existing mill is 5026 KLD and after modernization, it is 3120 KLD, no
additional water is required, but demand of water is reduced which is sourced from Canal/Bore well.
(Permission letter of Narmada Water Resources water supply and Kalpsar Department is given as Annexure
II Total 1530 KLD waste water is generated from the operational activities of the modernization mill. Entire
industrial effluent (1380 KLD) is treated in Effluent Treatment Plant (ETP) and also Domestic sewage (150
KLD) will be treated along with industrial effluent in ETP and subsequently treated water will be reused for
on land irrigation/plantation/gardening purpose within the factory premises.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-22
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-23
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-24
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-25
en-vιsι n
Table 2-15: Wastewater Generation
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-26
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-27
en-vιsι n
Industrial Domestic
2960 KLD 160 KLD
(1910 Fresh water + 1050 condensate
water of sugar cane crushed)
Distillery Sugar
200 KLD 2760 KLD
(1710 Fresh water + 1050 condensate
water of sugar cane crushed)
1380 KLD
ETP 150
1530 KLD KLD
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-28
en-vιsι n
Sr. No. Name of Unit Quantity (nos.) Capacity (m3) Retention Time MOC
2.5 to 3 hrs
1. Distillery Sludge Tank 10 39.2768 m3 each RCC
(Each)
2. Distillery Holding Tank 1 609.5418 m3 45 to 50 hrs RCC
Distillery Intermediate
6. 1 390.7525 m3 25 to 30 hrs RCC
Holding Tank 2
Distillery Anaerobic 30 to 35 hrs RCC
7. 4 464.49 m3 each
Digestion Tower
(each)
Distillery Intermediate 3 12 to 15 hrs RCC
8. 1 180.9356 m
Holding Tank 3
Distillery Storage
9. 1 7612.5 m3 22 to 25 days RCC
Lagoon No. 1
Methane Gas Holding
10. 1 504.866 m3 -- MS
Tank
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-30
en-vιsι n
Sr. No. Name of Unit Quantity (nos.) Capacity (m3) Retention Time MOC
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-31
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-32
en-vιsι n
2.10.1.2 Addition of Proposed Tertiary Treatment Plant (TTP)
Process Description
Existing Biological treated effluent shall be collected in Existing Intermediate tank from where it passes
through (By Propose Pumps:- One Working & One Standby) Proposed Pressure Sand Filter and Proposed
Activated Carbon Filter in series for polishing treatment for removing colour, odour, trace organics and
chlorine. Treated effluent will be stores in existing Treated Water Tank. Subsequently treated water is/will be
reused for on land irrigation/plantation/gardening purpose within the factory premises.
Table 2-17: Details of TTP Units
Sr. No. Name of unit Capacity Nos. MOC
2.10.1.3 Economical & Technical Viability of the Effluent Treatment System (ETP)
Main sources of wastewater are manufacturing process, boiler, cooling tower, washing and other activities.
Inside the sugar mill, there is an effluent treatment plant. Entire industrial effluent is being treated in Effluent
Treatment Plant (ETP) and treated water is reused for on land irrigation/plantation/gardening purpose within
the factory premises. Stream wise effluent characteristics for treatment in ETP is given in Table 2-18.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-33
en-vιsι n
2.10.1.3.1 ECONOMICAL VIABILITY OF TREATMENT SCHEME
Total wastewater generation from the project is 1530 KLD, which is subjected for treatment in in-house ETP
having primary and secondary treatment facility, and after treatment it is used for onland irrigation/gardening
purpose. In house treatment cost occurs is Rs. 80,072/- per Day. According to CPCB guideline, project
proponent are using for onland irrigation/gardening purpose after treatment in ETP and this is viable for the
project. After modernization project, effluent quantity is reduced than quantity generated from old mill.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-34
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-35
en-vιsι n
proposed APCM. In D. G. set diesel is used as fuel. Acoustic enclosure is provided with DG set. The details of
flue gas stacks are given in table below:
Table 2-21: Details of Flue Gas Stacks
Stack Air Pollution
Sr. Source of emission Type of emissions
Height Control Measures Permissible Limit
No. With Capacity i.e. Air Pollutants
(meter) (APCM)
EXISTING SCENARIO
Steam Boiler No.: 1, 2 & SPM Multicyclone
1 3* 30 SO2 Separator & Wet
(20 TPH each) NOX Scrubber
SPM
Steam Boiler No.: 4
2 40 SO2 Wet Scrubber
(40 TPH)
NOX
SPM SPM ≤150 mg/Nm3
Steam Boiler No.: 5
3 40 SO2 Wet Scrubber SO2 ≤ 100 ppm
(40 TPH)
NOX NOX ≤ 50 ppm
SPM
Steam Boiler No.: 6 Adequate Stack
4 30 SO2
(10 TPH) Height
NOX
D. G. Set- SPM
5 (625 KVA – 02 Nos. 8 SO2 Acoustic Enclosure
(Stand by) NOX
AFTER MODERNIZATION OVERALL SCENARIO
SPM Multicyclone
Steam Boiler No.: 1, & 2
1 30 SO2 Separator + Wet
(20 TPH each)
NOX Scrubber
SPM Multicyclone
Steam Boiler No.: 3*
2 30 SO2 Separator + Wet
20 TPH each
NOX Scrubber*
SPM Multicyclone
Steam Boiler No.: 4 40
3 SO2 Separator + Wet SPM ≤150 mg/Nm3
(40 TPH)
NOX Scrubber*
SO2 ≤ 100 ppm
SPM Multicyclone
4
Steam Boiler No.: 5
40 SO2 Separator + Wet NOX ≤ 50 ppm
(40 TPH)
NOX Scrubber*
SPM
Steam Boiler No.: 6 Adequate Stack
5 30 SO2
(10 TPH) Height
NOX
D. G. Set- SPM
6 (625 KVA – 02 Nos. 8 SO2 Acoustic Enclosure
(Stand by) NOX
Modernized sugar mill will install Multi Cyclone Separator + Wet Scrubber with all stacks attached to
steam boilers as mentioned above.
As per GPCB guidelines conversion of boilers/ utilities vide office order No. GPCB/ANK-C992/215695
Dated 7-6-14, ESP + Water Scrubber is required.
Note: * After modernization, Steam Boiler No.3 is separated from common stack attached to existing steam
boiler No. 1, 2 & 3 and also provided Multicyclone Separator + wet scrubber as proposed APCM.
Collection, storage,
From plant &
1 transportation &
Used oil 5.1 0.500 0 0.500
Machinery reuse/disposal by selling to
registered re-refiners.
Collection, storage,
Discarded Raw Material decontamination,
2 Container/ 33.1 0.060 6.94 7 transportation and disposal
storage area
Linears/Drums by selling to GPCB
authorized recyclers.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-38
en-vιsι n
Particular Details
Coefficient of runoff
Roof top area 0.8
Road/ Paved area 0.5
Green belt area 0.2
Open Land 0.2
Based on the above table, it can be concluded that annual volume of rain water for harvesting is about 29% of
the annual fresh water requirement.
As the harvested rain water quantity is moderate compare to water required. Total cost for the rain water
harvesting structure will be around Rs. 11 lakhs. It is not included in environmental budgetary.
The project conserves the water by harvests the rain water and recharge the well and treated industrial waste
water is utilised for on land irrigation/ plantation/ gardening purpose within the factory premises.
The Industry will undertake CER activities. A total amount of Rs. 37 lacs would be utilized for Corporate
Environment Responsibility (CER) programme as per provision of OM no. 22-65/2017 on 01.05.2018, which
is 1.0% of proposed project cost i.e. Rs. 37 Crore as per CER guidelines. While this project is considered as
violation project of EIA Notification 2006 and its subsequent amendments, so as per guideline issued by
SEAC, Gujarat given in its TOR letter issued dated 19.06.2019 it should be doubled than actual provision. So,
total amount of Rs. 74 lacs would be allotted for CER programme for the period of five years. These
activities may change after periodic discussion with local authority (Gram Sarpanch and/or District Collector).
Also unit is abide towards spending CSR cost for the upliftment of the community if project attract
Companies (CSR Policy) Rules, 2014; thus improving socio-economic status of study area. Last three years
CSR activities done by the proponent is given in below Table 2-24.
Table 2-24: Activities conducted under CSR in last three years
Sr.
Year Activities Cost (Inr) Location
No.
Agricultural, Donation in Mandirs, Jahangirpura, Sayan, Gaypagla,
1 2019-20 66,670
Social ceremonies, Kosamba, Olpad
Donation in Mandirs, Education, Social Bodhan, Sayan, Gaypagla,
fastival, community marriage ceremony, Kosamba, Olpad, Galteshwar,
2 2018-19 28,29,611
awareness, relief fund for Army, Food Sondalakhara, Talad, Surat, Kim,
donation, donation in old age home Variyav, Pulvama- J&K, Gothan,
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-39
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-40
en-vιsι n
For Absorption of Gases:
Tolerance towards pollutants in question, at concentration, that are not too high to be instantaneously
lethal
Longer duration of foliage
Freely exposed foliage
Adequate height of crown
Openness of foliage in canopy
Big leaves (long and broad laminar surface)
Large number of stomatal apertures
For Removal of Suspended Particulate Matter
Height and spread of crown.
Leaves supported on firm petiole
Abundance of surface on bark and foliage
Roughness of bark
Abundance of axillary hairs
Hairs or scales on laminar surface
Protected Stomata
2019.05.30 2019.05.30
Coconut Tree (Cocos nucifera) Neem (Azadirachta indica)
2019.05.30
Shrubs within plant premises
Figure 2-15: Greenbelt Developed within Plant Premises
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-41
en-vιsι n
Details of the plant species grown in existing greenbelt are as under:
Table 2-25: Details of Existing Plant Species in Greenbelt
No. as per Common Stomatal Mode of Sensitive/ Ecological Quantity
Latin Name Habit Flowering Season Type
Guideline Name Index Regeneration Tolerant performance
Sensitive to 222
Neem / January-March, SO2Tolerant
A44 Azadirachta indica Tree 29.2 Seeds Evergreen AGE, DC, CN
Limbado August- September to Cement
dust
C11 Cassia siamea Lam. Kasid Tree 21.2 Seeds August - May Tolerant Evergreen AGE 35
Sensitive to 06
C7 Cassia fistula Garmado Tree 20.4 Seeds, Suckers March-May Deciduous QG
cement dust
D3 Delonix regia Gulmohar Tree 14.38 Cutting, seeds April-June Sensitive Deciduous AGE, DC 38
Tolerant to 61
F1 Ficus benghalensis L. Vad Tree 21.72 Cutting, seeds April-June Evergreen AGE, DC
dust
Throughout the 42
C19 Cocos nucifera L. Narial Tree 9.31 Seeds Tolerant Evergreen -
year
Shisham By Seeds, Root 01
D2 Dalbergiasissoo Tree 18.72 March-April-June Tolerant Evergreen DC
Tree and Stem cutting
F7 Ficusreligiosa Pipal Tree Tree 18.70 Cutting, seeds January-May Tolerant Evergreen DC 71
Seeds, 17
transplanting, South India -
Sensitive to
grafting. budding, January - March
M5 Mangifera indica L. Amri/Ambo Tree 30.77 SO2Tolerant Evergreen AGE, DC, CN
air layering, root North India
to dust
cutting and February - April
marcotting
Polyalthia longifolia Sensitive to 38
P9 Asopalav Tree 22.27 Seeds April-June Evergreen AGE, DC
(Sonn.) Th. SO2
Jamrukh/Ja Cutting, seeds, 03
P20 Psidium guajava inn. Tree 28.38 - Tolerant Evergreen AGE, DC
mfal budding, grafting
Terminalia Catappa 27
T8 Badam Tree 20.9 Seeds Oct-Nov Tolerant Deciduous -
Linn
Seeds, Root 02
P16 Prosopis Cineraria Samdi Tree 18.1 Dec-Apr Tolerant Evergreen QG
suckers
-- Syzygium cumini Jamun Tree -- Seeds -- -- Evergreen AGE 30
Round the year 05
in costal
A18 Achros sapota linn Chikoo Tree 25.78 Seeds/Cutting Tolerant Evergreen QG
districts.
Sept. - Dec. tn other
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-42
en-vιsι n
No. as per Common Stomatal Mode of Sensitive/ Ecological Quantity
Latin Name Habit Flowering Season Type
Guideline Name Index Regeneration Tolerant performance
areas.
Bangali 33
A2 Acacia auticuliformis Tree 10.9 Seeds June-Jan Tolerant Evergreen QG
Babul
-- Gmelina arborea Sevan Tree -- Seeds/Cutting Feb-Apr -- Deciduous -- 08
Z1 Ziziphus mauritiana Bor Tree 12.4 Seeds April-Oct Tolerant Evergreen QG 01
P7 Pithecellobium dulce Gorasamli Tree 11.87 Seess, cutting Jan-Feb Tolerant Evergreen QG 27
C12 Casuarina equisetifolia Saru Tree -- Seeds Feb-April, Sept-Oct Evergreen QG 20
E5 Eucalyptus obliqua Nilgiri Tree 12.91 Seeds Feb-April, Oct-Dec Tolerant Evergreen QG 60
M12 Moringa oleifera Drumstick Tree 28.2 Seeds, Cutting Jan-Apr Sensitive Deciduous QG 03
Peltophorum Copper pod 564
P1 Tree 16.68 Seeds May-Sept Tolerant Evergreen DC,QG
pterocarpum tree.
M2 Madhuca longifolia Mahudo Tree 22.18 Seeds Feb-Apr Tolerant Deciduous QG 07
S6 Samanea saman Rain Tree Tree 15.64 Seeds Mar-Jun Tolerant Evergreen QG 71
T2 Tamarindus indica Aamli Tree 18.4 Seeds Apr-Oct Tolerant Evergreen QG 11
F4 Ficus racemosa Umardo Tree 19.81 Cutting, Seeds Apr-May Tolerant Evergreen QG 03
Bakam
M7 Melia azadirach Tree 23.53 Seed, stem, root Mar-May Tolernat Evergreen QG 07
Limdo
Other shrubs and ornamental species 49
Total 1462
Ecological performance:
CN –Control Noise level
AGE – Absorb Gas Emission
DC - Dust Controller
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-43
en-vιsι n
Unit will maintain existing greenbelt by
1). Rregular watering, soil enrichment work, applying manure, weeding and provide proper protection.
2). Replacement of sapling (replanting) required whenever mortality occurs in the plantation during the
growth stage.
3). Plantation requires after care for a period of minimum five years till the saplings attain matured tree stage.
4). Any damage to the developed greenbelt due to any natural or cattle activity should be redeveloped and
maintained by the unit.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-44
en-vιsι n
Storage of the finished goods and raw materials in a proper way as clearly labeled & in designated
storage areas only.
Cleanliness of roads is done regularly to prevent accumulation of dust and waste material.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 2-45
en-vιsι n
CHAPTER 3 DESCRITPION OF ENVIRONTMENT
3.1 INTRODUCTION
The baseline status of environmental quality in the vicinity of project site serves as the basis for identification,
prediction and evaluation of impacts. The baseline environmental quality is assessed through field studies
within the impact zone for various components. Baseline data generation of the following environmental
attributes is essential in EIA studies.
1. Meteorology
2. Ambient Air Quality
3. Ambient Noise Quality
4. Surface and Ground water Quality
5. Soil Quality & Geological Features
6. Land use pattern
7. Biological Information
8. Socio-economic status survey
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-2
en-vιsι n
1 Climatological normals 1981-2010, issued by office of the additional director general of meteorology (Research)
India Meteorological Department, Pune-5
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-3
en-vιsι n
3.2.1.1 Predominant Wind Direction
As per India Meteorological Department (IMD), Atlas of wind roses, 1971-2000, the annual variations in
average wind speed recorded at Surat station at 8.30 am and 5.30 pm indicates that the predominant wind
direction in from SW to NE.
Figure 3-1: Annual Wind Rose of Daily Surface Data recorded at 8:30 a.m. at Surat Station (1971-2000)
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-4
en-vιsι n
Figure 3-2: Annual Wind Rose of Daily Surface Data recorded at 5:30 p.m. at Surat Station (1971-2000)
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-5
en-vιsι n
Period: Month of Year 2019
Meteorological Parameter
March April May
Max. 89 94 89
Avg. 49.12 52.97 61.48
Min. 1 2 3
Wind Speed (km/h) Max. 32 28 32
Avg. 10.29 12.64 14.14
Wind Direction Blowing from SW to NE
Rain fall Nil
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-6
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-7
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-8
en-vιsι n
Various statistical parameters like standard deviation, geometric mean, minimum; maximum concentrations
and different percentiles have been computed from the data generated during sampling in all sampling
stations.
Sayan 21°20'26.75"N
A1 - - - Industrial Area
Sugar_PS 72°53'48.30"E
21°19'0.10"N
A2 Sayan 2.9 SW Upwind Residential
72°52'46.66"E
21°17'28.00"N
A3 Segvasyadla 7.4 SW Upwind Residential
72°50'39.00"E
21°22'12.61"N
A4 Obhla 5.1 NW Crosswind Residential
72°51'29.60"E
21°24'10.52"N
A5 Mulad 7.1 N Downwind Residential
72°54'14.86"E
21°22'34.14"N
A6 Kudsad 4.9 NNE Downwind Residential
72°55'17.08"E
21°21'30.00"N
A7 Pipodara 7.3 ENE Crosswind Residential
72°57'44.18"E
Crosswind 21°19'48.66"N
A8 Shekhpur 1.5 SE Residential
72°54'24.60"E
Project Site (A1): Machine was kept on the terrace of admin building of distillary unit. New sugar mill is
besides the dsitillary unit.
Sayan (A2): Machine was kept on the terrace of the house. House is surrounded by residential societies and
agricultutal land.
Segvasyadla (A3): Machine was kept on the terrace of Gram panchayat office. Temple is nearer to office and
Building of Sahkari mandli is besides the office.
Obhla (A4): Machine was kept on the terrace of the house. It is surrounded by agricultural area. Internal
village road is nearer to this location.
Mulad (A5): Machine was kept on the terrace of the temple. It is surrounded by Residentail area and pond.
Kudsad (A6): Machine was kept on the terrace of Gram panchayat office. Kudsad railway station is 0.53 km
in W direction. Building of Sahkari mandli is besides the office.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-10
en-vιsι n
Pipodara (A7): Machine was kept on the terrace of Gram panchayat office. It is nearer to Government
primary school and temple.
Shekhpur (A8): Machine was kept on the terrace of Gram panchayat office. It is surrounded by Residential
area.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-11
en-vιsι n
2019.03.02 2019.03.04
Sayan_PS Sayan
2019.04.08 2019.04.04
Kudsad Mulad
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-12
en-vιsι n
Detection Limit 10 10 4 6 1 1
NAAQ Standards 100 60 80 80 2 -
Min. 74 34 15 18
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-13
en-vιsι n
Particulate Matter (PM10): During the monitoring period, it has been observed that the average values of
PM10 for all the monitoring stations ranging from 57-86 µg/m3. The lowest value 57 µg/m3 was observed
Kudasd village and highest value 86 µg/m3 was observed at Pipodara village. All the results were found to be
below the NAAQS limits i.e. 100 µg/m3. PM10 at Pipodara village was 86µg/m3 because it is located near to
NH-48 (NH-8) and Pipodara GIDC.
Particulate Matter (PM2.5): During the monitoring period, it has been observed that the average values of
PM2.5 for all the monitoring stations ranging from 19-49 µg/m3. The lowest and highest values are 19 µg/m3 to
49 µg/m3 were observed at Kudsad village and Pipodara village respectively. All the results were found to be
below the NAAQS limits i.e. 60 µg/m3. PM2.5 at Pipodara village was 49 µg/m3 because it is located near to
NH-48 (NH-8) and Pipodara GIDC.
Sulphur Dioxide (SO2): During the monitoring period, it has been observed that the average values of SO2
for all the monitoring stations ranging from 9-19 µg/m3. The lowest values 9 µg/m3 was observed at Obhla
village and highest values 19 µg/m3 was observed at Pipodara village. All the results were found to be below
the NAAQS limits i.e. 80 µg/m3. SO2 at Pipodara village was 19 µg/m3 due to stack emission & flue gas
emission from the vehicles as GIDC and NH-48 is located nearer to Pipodara village.
Nitrogen Dioxide (NOx): During the monitoring period, it has been observed that the average values of NO2
for all the monitoring stations ranging from 13-28 µg/m3. The lowest and highest values are 13 to 28 µg/m3
were observed at Obhla village and Pipodara village respectively. All the results were found to be below the
NAAQS limits i.e. 80 µg/m3. NO2 at Pipodara village was 28 µg/m3 due to stack emission & flue gas emission
from the vehicles as GIDC and NH-48 is located nearer to Pipodara village.
Carbon Monoxide (CO) & Hydrocarbon (HC): The CO and HC are found below detectable limit (BDL).
From the Above results it concludes that Kudsad village is located nearer to the project site, but being
surrounded by green cover, Agricultural area and sparse residential area, low values of PM 10 & PM2.5 were
observed. Obhla village is approx 5.5-6.0 km away from the project site in NW direction, but it is surrounded
by agricultural area and few residential houses, low values of SO2 & NOx were observed. High levels of all
the parameters like PM10, PM2.5, SO2 and NOx are observed at Pipodara village from the selected villages as
NH-48 (NH-8) and Pipodara GIDC is located around it which has resulted high pollution levels due to stack
emission & flue gas emission from the vehicles.
All locations were observed Below Detectable Limit (BDL) for the parameter of Carbon monoxide (CO) and
Hydrocarbon (HC).
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-14
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-15
en-vιsι n
3.4.2 Selection of Monitoring Location
To identify Ground Water availability and type of structure used in study area Census-2011 was used.
Surface water locations were identified using topo map (Figure 2-3). It was observed that untreated tap water
is available in whole study area for drinking purpose; ground water is used as secondary source of drinking
water and for irrigation purpose. List of sampling locations are mentioned in Table 3-7 while sampling
locations are shown in Figure 3-6 and Figure 3-7.
Table 3-7: Sampling Locations for Ground Water and Surface Water
Availability of Tap
Water Sample Distance GPS
Code Source Direction water as per Census-
Location (km) Coordinates
2011
21°19'1.00"N Untreated tap water
GW1 Sayan Borewell 2.9 SSW
72°52'45.00"E
21°19'56.00"N Untreated tap water
GW2 Siwan Borewell 2.6 WSW
72°52'13.00"E
21°22'8.10"N Untreated tap water
GW3 Obhla Borewell 5.0 NW
72°51'28.06"E
21°21'55.63"N Treated Tap Water
GW4 Kareli Borewell 3.0 N
72°53'39.20"E
21°21'30.00"N Untreated tap water
GW5 Pipodara Borewell 7.3 ENE
72°57'45.00"E
21°20'21.00"N Untreated tap water
GW6 Galundi Borewell 3.0 E
72°55'26.00"E
21°18'25.08"N Treated Tap Water
GW7 Velanja Borewell 4.1 SSE
72°54'56.72"E
21°16'5.47"N
GW8 Bharthana Borewell 8.2 SSW -
72°52'11.39"E
21°20'28.58"N
SW1 PS_ Reservoir - 0.4 NE -
72°53'51.89"E
21°20'1.00"N
SW3 Sayan Lake - 0.63 SW -
72°53'31.00"E
21°21'53.65"N
SW5 Kareli Lake - 2.9 N -
72°53'37.45"E
Kakrapar 21°20'7.72"N
SW6 - 3.3 E -
Dam canal 72°55'38.33"E
21°18'53.88"N
SW7 Tapi River - 8.1 ESE -
72°58'10.66"E
21°18'39.75"N
SW8 Delad Lake - 4.0 SW -
72°52'9.51"E
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-16
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-17
en-vιsι n
2019.05.22 2019.05.22
Sayan Lake Delad
2019.05.22 2019.05.22
Siwan Bharthana
Photograph 3-2: Ground water and Surface water Sampling
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-18
en-vιsι n
3.4.3 Results-Ground Water and Surface Water
Parameters were selected based on Guidelines for Water Quality Monitoring by Central Pollution Control Board, Parivesh Bhawan, East Arjun Nagar, Delhi-32
published in December 2007. Analysis results for Ground and Surface water are given in Table 3-8 & Table 3-9. The results of Ground and Surface water samples
results were compared with The Indian standard specification for drinking water IS: 10500.
Table 3-8: Water Quality – Physico-chemical Analysis of Ground Water
Sample Code & Location Limits as per IS : 10500
Sr. Test
Unit of
No. Parameters Detection
Measurement Sayan Siwan Obhla Kareli Pipodara Galundi Velanja Bharthana Permissible
Limit Desirable
(GW1) (GW2) (GW3) (GW4) (GW5) (GW6) (GW7) (GW8)
1. No
pH - 5 - 12 7.3 7.2 7.8 7.2 7.9 7.1 7.4 7.0 6.5-8.5
Relaxation
2. Ambient to
Temperature °C
50
29 34 33 27 30 31 30 28 -- --
3. Colour Pt-Co. 5 - 500 BDL BDL BDL BDL BDL BDL BDL BDL 5 15
Quantitativ
e
4. objecti objecti objecti objectio objectiona objection objection objectionabl
Odor -- (objectiona
onable onable onable nable ble able able e
Agreeable Agreeable
ble/unobje
ctionable)
Agreeable/
5. Agreea Agreea Agreea Agreeab Agreeabl Agreeabl
Taste -- Disagreeab
ble ble ble le
Agreeable
e e
Agreeable Agreeable Agreeable
le
6. Turbidity NTU 0.1-200 1.4 2.1 2.6 2.5 2.7 2 1.9 1.3 1 5
Total
7. Suspended mg/L 4 - 1000 18 22 27 24 28 22 20 19 -- --
Solids (TSS)
8. Total
Dissolved
mg/L 4 - 2500 847 617 402 112 730 116 358 688 500 2000
3-19
.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDYOG MANDLI LTD , GUJARAT
en-vιsι n
Sample Code & Location Limits as per IS : 10500
Sr. Test
Unit of
No. Parameters Detection
Measurement Sayan Siwan Obhla Kareli Pipodara Galundi Velanja Bharthana Permissible
Limit Desirable
(GW1) (GW2) (GW3) (GW4) (GW5) (GW6) (GW7) (GW8)
Solids
(TDS)
Electrical
9. Conductivity µS/cm 1 - 5000 1186 864 563 157 1022 162 501 963 -- --
(EC)
Dissolved
10. Oxygen mg/L 0.2 - 8 6.0 5.5 4.7 5.1 5.2 5.8 6.4 5.90 -- --
(DO)
Biological
11. Oxygen
Demand
mg/L 1 -500 BDL BDL BDL BDL BDL BDL BDL BDL -- --
(BOD)
Chemical
12. Oxygen
Demand
mg/L 2.0 2.5 3.2 4.5 2.1 4.8 2.3 2.7 2.9 -- --
(COD)
Total
13. Coliform MPN/100 ml ≥1 Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent
(TC)
14. E. Coli MPN/100 ml ≥1 Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent
Total
15. Hardness (as mg/L 2 - 1000 547 318 238 243 376 472 310 435 200 600
CaCO3)
16. Calcium
Hardness
mg/L 1 - 1000 199 115 99 101 168 171 192 211 -- --
17. *Magnesium mg/L -- 348 203 139 142 208 301 118 224 -- --
3-20
.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDYOG MANDLI LTD , GUJARAT
en-vιsι n
Sample Code & Location Limits as per IS : 10500
Sr. Test
Unit of
No. Parameters Detection
Measurement Sayan Siwan Obhla Kareli Pipodara Galundi Velanja Bharthana Permissible
Limit Desirable
(GW1) (GW2) (GW3) (GW4) (GW5) (GW6) (GW7) (GW8)
Hardness
Total
18. Alkalinity mg/L 4 - 100 88.50 97.60 93.78 83.20 85.78 98.00 80.88 58.70 200 600
(as CaCO3)
19. Carbonate mg/L 4 - 500 0 0 0 0 0 0 0 0 -- --
20. Bi-
Carbonate
mg/L 4 - 500 130 119 102 112 121 132 124 116 -- --
22. Potassium
(as K)
mg/L 1 - 500 3.6 4.5 4.9 2.2 1.6 4.2 3.1 3 -- --
23. Magnesium
(as Mg)
mg/L 2 - 500 15 17.5 26 14 12 19 24 13 30 100
26. Sulphates
(as SO4)
mg/L 1 - 500 115 211 168 188.0 105 221 112 119 200 400
27. Phosphate
(as PO4)
mg/L 0.1 - 50 0.80 0.30 0.60 0.30 0.40 0.10 0.40 0.70 -- --
NO2)
32. No
Iron (as Fe) mg/L 0.1 - 10 BDL BDL 0.2 BDL 0.3 BDL BDL BDL 0.3
Relaxation
33. Manganese
(as Mn)
mg/L 0.1 - 10 BDL BDL BDL BDL BDL BDL BDL BDL 0.1 0.3
34. No
Lead (as Pb) mg/L 0.01 - 10 BDL BDL BDL BDL BDL BDL BDL BDL 0.01
Relaxation
35. Copper (as
Cu)
mg/L 0.05 - 10 BDL BDL BDL BDL BDL BDL BDL BDL 0.05 1.5
36. Zinc (as Zn) mg/L 0.05 - 10 BDL BDL BDL BDL BDL BDL BDL BDL 5 15
37. Arsenic (as
As)
mg/L 0.01 - 5 BDL BDL BDL BDL BDL BDL BDL BDL 0.01 0.05
Total
38. Chromium mg/L 0.05 - 10 BDL BDL BDL BDL BDL BDL BDL BDL -- --
as Cr
39. Phenolic
Compound
mg/L 0.01 - 10 BDL BDL BDL BDL BDL BDL BDL BDL -- --
40. Nickel as Ni mg/L 0.02 - 10 BDL BDL BDL BDL BDL BDL BDL BDL -- --
*Non NABL Parameter
3-22
.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDYOG MANDLI LTD , GUJARAT
en-vιsι n
1. No
pH - 5 - 12 7.5 7.1 7.5 7.9 8.2 6.5-8.5
Relaxation
2. Temperature °C Ambient to 50 37 33 30 34 34 -- --
3. Colour Pt-Co. 5 - 500 5.1 BDL 5.1 BDL 5.6 5 15
Quantitative
4. Odour -- (objectionable/un Agreeable Agreeable Dis Agreeable Agreeable Dis Agreeable Agreeable Agreeable
objectionable)
5. Agreeable/
*Taste --
Disagreeable
Agreeable Agreeable Dis-Agreeable Agreeable Dis-Agreeable Agreeable Agreeable
Biological
11. Oxygen mg/L 1 -500 BDL 1.1 1.7 4.4 1.2 -- --
Demand
(BOD)
Chemical
12. Oxygen mg/L 2 - 1000 2.4 2.2 2.6 20.1 2.8 -- --
Demand
(COD)
Total
13. Coliform MPN/10
0 ml
≥1 32 44 53 35 42 Absent Absent
(TC)
Fecal
14. Coliform MPN/10
0 ml
≥1 21 29 35 23 28 Absent Absent
(FC)
15. E. Coli MPN/10
0 ml
≥1 11 15 18 12 14 Absent Absent
Total
16. Hardness (as mg/L 2 - 1000 234.0 252.0 202.0 200.0 253.0 200 600
CaCO3)
3-24
.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDYOG MANDLI LTD , GUJARAT
en-vιsι n
Sample Code & Location Limits as per IS : 10500
Unit of
Sr. Test Detection
Measur
No. Parameters Limit PS_ Reservoir Sayan Lake Kareli Lake Tapi River Delad Lake
ement Desirable Permissible
(SW1) (SW3) (SW5) (SW7) (SW8)
Total
19. Alkalinity ( mg/L 4 - 100 95.20 97.50 98.20 94.0 96.7 200 600
as CaCO3)
22. Magnesium mg/L 2 - 500 31.20 32.80 27.60 28.00 28.50 30 100
(as Mg)
24. Chloride (as mg/L 1 -1000 109 117 112.5 127 105 250 1000
Cl)
25. Sulphates (as mg/L 1 - 500 55.8 61.2 63.40 59.5 67.3 200 400
SO4)
*Total
26. Phosphorous mg/L -- BDL BDL 0.30 BDL 0.4 -- --
(as P)
3-25
.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDYOG MANDLI LTD , GUJARAT
en-vιsι n
Sample Code & Location Limits as per IS : 10500
Unit of
Sr. Test Detection
Measur
No. Parameters Limit PS_ Reservoir Sayan Lake Kareli Lake Tapi River Delad Lake
ement Desirable Permissible
(SW1) (SW3) (SW5) (SW7) (SW8)
30. Fluoride (as mg/L 0.1 - 5 0.37 0.20 0.81 0.3 1 1 1.5
F)
33. Manganese mg/L 0.1 - 10 BDL BDL BDL BDL BDL 0.1 0.3
(as Mn)
35. Copper (as mg/L 0.05 - 10 BDL BDL BDL BDL BDL 0.05 1.5
Cu)
36. Zinc (as Zn) mg/L 0.05 - 10 BDL BDL BDL BDL BDL 5 15
Total
37. Chromium mg/L 0.05 - 10 BDL BDL BDL BDL BDL -- --
(as Cr)
3-26
.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDYOG MANDLI LTD , GUJARAT
en-vιsι n
3.4.4 Discussions
3-27
.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDYOG MANDLI LTD , GUJARAT
en-vιsι n
Surface water is suitable for irrigation to Semi tolerant crops based on soil type, EC, SAR, RSC, Boron and
Mg/Ca ratio as per guidelines of Department of Agriculture & Cooperation Ministry of Agriculture
Government of India New Delhi.
i=n
Leq = 10 log (10)Li/10 ti
i=1
Where,
n = Total number of sound samples,
Li = The noise level of any ith sample
ti = Time duration of ith sample,
Expressed as fraction of total sample time
Leq has gained wide spread acceptance as a scale for the measurement of long term noise exposure. Hourly
equipment noise levels in the identified impact zone are monitored for day and time separately using sound
level meter. All the values are reported in Leq and in case of equipment noise, Sound pressure level are
monitored 1.5 m away from the machine and assessed with respect to standard prescribed in factory Act.
Keeping in view of various local activities such as residential and Industrial activities 6 noise level
measurement locations were identified and the sites are depicted in the Table 3-12 & Figure 3-8 Recorded
sound levels are given in Table 3-13.
Traffic noise levels were measured in March, 2019. The equivalent noise level Leq (60 min average) measured
at a distance of 10 m and 20 m from the edge of the road are presented in Table 3-14.
3
dB (A) Leq*: denotes the time weighted average of the level of sound in decibels on scale A which is relatable to human hearing. Day Time: 6:00 AM
to 10:00 PM and Night Time: 10:00 PM to 6:00 AM
46:00 a.m. to 10:00 p.m.
510:00 p.m. to 6:00 a.m.
6Area comprising not less than 100 m around Hospitals, educational institutions, courts, religious places or any other area which is
Project 21°20'27.85"N
N1 Industrial -- --
site 72°53'44.96"E
Sayan
21°19'4.87"N
N2 Railway Commercial 2.3 SSW
72°53'25.53"E
Station
21°19'54.83"N
N3 Siwan Residential 2.6 WSW
72°52'14.82"E
21°21'27.29"N
N4 Bharundi Residential 3.8 WNW
72°51'49.71"E
21°21'58.31"N
N5 Kareli Residential 4.9 N
72°53'25.25"E
21°20'20.11"N
N6 Galundi Residential 3.0 E
72°55'27.46"E
Sayan 21°19'50.54"N
TN1 Kim Industrial 0.9 SSW
Road 72°53'28.50"E
3-30
.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDYOG MANDLI LTD , GUJARAT
en-vιsι n
2019.03.04 2019.03.07
Sayan Railway station Galundi
2019.03.03
Siwan
2019.03.06
Kareli
3-31
.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDYOG MANDLI LTD , GUJARAT
en-vιsι n
Table 3-13: Noise Levels
Day Time Night Time
Sampling Recorded Recorded
Code Date Category Limits in Limits in
Location level dB(A) level dB(A)
dB(A) Leq dB(A) Leq
Leq Leq
1-03-2019 to 2-
N1 Project site Industrial 73.4 75.0 68.1 70.0
03-2019
Sayan Railway 4-03-2019 to 5-
N2 Commercial 70.2 65.0 59.6 55.0
Station 03-2019
2-03-2019 to 3-
N3 Siwan Residential 49.7 55.0 40.7 45.0
03-2019
8-03-2019 to 9-
N4 Bharundi Residential 40.0 55.0 38.3 45.0
03-2019
6-03-2019 to 7-
N5 Kareli Residential 54.5 55.0 44.2 45.0
03-2019
7-03-2019 to 8-
N6 Galundi Residential 40.1 55 38.5 45
03-2019
3-32
.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDYOG MANDLI LTD , GUJARAT
en-vιsι n
3.5.3.2 Methodology
3.5.3.3 Results
The summary of daily traffic density in terms of PCU for the locations were monitored during the study
period is summarized below. It was observed that the cars/jeeps and trucks/buses forms the major volume of
the traffic. The overall total traffic PCU of this road is minimal.
The present level of traffic in terms of Passenger Car Units (PCU) at these locations as per the conversion
factors stipulated by Indian Road Congress (IRC) is presented below:
3-33
.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDYOG MANDLI LTD , GUJARAT
en-vιsι n
Table 3-15: Traffic Counts on Sayan-Kim road
During peak hr (Nos. of Vehicles/hr)
Type of Vehicles Sayan to kim Kim to Sayan
road road
Large Trailer 26 30
Heavy (Bus, Truck, etc) 303 320
Medium (Tractors, light
240 260
commercial vehicles etc)
Light (Car, Jeep, Pickup Van
330 305
etc.)
3 Wheeler (Rickshaw) 52 50
2 Wheeler (Scooter,
110 115
motorcycle, cycle etc)
Total 1061 1080
3.5.3.4 Discussion
The above traffic reveals the LOS (Levels of Service) as “C” Good for the Sayan-Kim road, Which are 2 lane
roads divider with capacity of >2400 PCUs; and Total PCUs per day even after expansion is <1743. For
management of traffic, adequate parking space will be provided at project site. Transportation activity will be
carried out during non-peak hours only and trained driver will be appointed for transportation.
2019.05.22 2019.05.22
3-36
.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDYOG MANDLI LTD , GUJARAT
en-vιsι n
2019.05.22
3-37
.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDYOG MANDLI LTD , GUJARAT
en-vιsι n
Table 3-20: Physicochemical Parameters of the Soil
Results
Sr. Detection
Test Parameters Unit Syadla Bharundi Kudsad Antroli Project
No. Limit Umra (S1)
segwa (S2) (S3) (S4) (S5) Site (S6)
Particle size
13.
Distribution
15. Bulk Density g/cc 1 1.6 1.35 1.48 1.39 1.71 1.8
18. Organic carbon (OC) % 0.5 0.71 0.5 0.56 0.75 0.63 0.69
28. Available Potassium mg/kg 5 23.1 81.5 45.7 70.8 56.20 60.1
3-39
.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDYOG MANDLI LTD , GUJARAT
en-vιsι n
The pH of the soil samples ranged from 6.8 to 7.9 during the study period, indicating that soils are
normal to slightly alkaline in reaction.
The EC (0.289 - 0.415dS/m) and ESP (17.4 – 32.9) were well within the safe limits of <0.80 dS/m
and 15.0 to 30.0 %, respectively. They have medium to high water holding capacity (52.7 % to 62.8
%).
Among water soluble cations predominance of Na (251.3 to 516.2 mg/kg) followed by Ca (263.4 to
324.7 mg/kg), K (71.6 to 114.8 mg/kg) and Mg (55.2 to 72.5 mg/kg). The available phosphorus was
raging from 5.6 kg/ha to 12.8 kg/ha which is low (<28 kg/ha).
Soil salinity class based on electrical conductivity is non-salinein nature (EC>1dS/m)
Interpretation of Soil Data
The analysis of physico-chemical properties of soil samples collected from the project areas indicated that
porosity ranged from 33.8 – 42.8 % and WHC varied from 52.7 – 62.8 %, while bulk density ranged from
1.35 – 1.8 g/cm3. The moderate to high porosity and water holding capacity were on account of clay loam to
clay texture of soils. The pH ranged from 6.8 – 7.9, indicating that soils are normal (pH= 6.5 to 7.80) to
slightly alkaline (pH=7.8 to 8.5). And available phosphorus (5.6 to 12.8 kg P2O5/ha) and available potassium
(45.7 to 81.5 kg K2O/ha) were in the low range.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-40
en-vιsι n
(IRS RS-2) in addition to Survey of India toposheets. Appropriate guidelines are followed while preparing the
LU / LC map for the project study area.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-41
en-vιsι n
Land use / Land cover map of the study area Figure 3-9 is integrated with village map and analyzed with the
help of GIS to get the village wise findings of the present land use of the study area, which is given
elaborately in the Table 3-21.
Table 3-21: Land Use / Land Cover Statistics of the Study Area (10 km Radius)
Sr. No. Land Use Area (km2) Area (%)
1 Built up
a. Settlement 14.792 4.3
b. Industrial area 17.544 5.1
2 Water bodies
a. Tank/ Canal/ Reservoir etc. 30.272 8.8
3 Crop Land
a. Single crop 189.544 55.1
b. Double Crop 73.616 21.4
4 Wastelands
a. Land with scrub 12.728 3.7
b. Land without scrub 5.504 1.6
Total 344 100
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-42
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-43
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-44
en-vιsι n
3.8.1 Geomorphology
The alluvial plains towards west merge into a dry barren sandy coastal plain fringed by marshy shore line. The
elevation varied between 29 m in Ghaludi and Pipodara to 14 m in Obhla. Figure 3-13 shows the Digital
Elevation Model of the study area.
3.8.2 Topography
Topography of the region is characterized by agricultural fields mainly sugarcane and eucalyptus fields, open
vegetation, Industrial area, water body, barren land & habitation.
Most of the landscape in the villages is utilized for agriculture.The area is characterized by peneplain
topography with a few mounds and knolls dotting the terrain; mostly formed by trap covered with
soil/alluvium.
Generally, control the drainage of the area and discharge the surface runoff water to Kim River and the Tapi
River, are the major rivers of the area.
3.8.3 Drainage
The Tapi is the major river which passes through the central parts of the district and flows towards the west.
The river is perennial in nature. It originates in Madhya Pradesh near Betul and has about 62,225 sq. km. of
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-45
en-vιsι n
catchment area. The average width of the river upstream of Kathor Bridge in about 500m. Downstream of the
bridge the average being about 700m. Pickup weir was constructed on the Tapi River in 1954 at Kakarapar
about 56km west of Surat. Ukai dam, constructed in 1965, is situated about 25km upstream of Kakarapar weir.
Other prominent rivers draining the district are Kim.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-46
en-vιsι n
LITHOLOGY FORMATION
3.8.6 Soil
The soils found in Surat district are as follows. The basaltic lava flows are covered by black clayey to loamy
soil. It is in general ranges in thickness up to one meter. The colour of the soil turns brown due to high iron
content at places. In the piedmont slope area the soil is shallow to moderately deep, moderate to severely
eroded and non-calcareous in nature. The texture is silt clay loam to clay loams. The clay content varies from
30 to 60%. The water holding capacity of the soil is moderate. In the midland and flood plain areas, the soil is
deep to very deep, light greyish to yellowish brown in colour. The texture is fine clay loam to sandy loam. The
clay content varies from 25 to 60%. In coastal region the soil is deep to very deep dark grey to black colour.
The texture is clay loam to silty loam. The area is affected by tide as well as leaching of salts from up land
forming saline alkali soils. The content of clay in this is high and permeability is low (mud flats).
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-47
en-vιsι n
The static water level is ranging between 6.65 m to 60.98 m from the existing ground Level. The contour map
of reduced water level was prepared.
Soil Sampling Purpose
The soil samples were collected from the study area to determine their physical properties such as grain size
analysis, moisture content, porosity, permeability and soil texture.
Permeability
Permeability is a measure of the ease in which water can flow through a soil volume. It is one of the most
important geotechnical parameters. However, it is probably the most difficult parameter to determine. In large
part, it controls the strength and deformation behavior of soils. It directly affects the following:
1. Quantity of water that will flow toward an excavation
2. Design of cutoffs beneath dams on permeable foundations
3. Design of the clay layer for a landfill liner.
For fine grained soil falling head permeability test is done, whereas constant head permeability test is done for
the coarse grained soil.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-48
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-49
en-vιsι n
3.8.6.1 Climate & Meteorology
General climate of the district is sub-tropical. The general agro-climatic zone of the study area is Arid to
Semi-Arid. In winter, there is much less rainfall than in summer. The average temperature in is 27.4 °C.
About 1086 mm of precipitation falls annually. The warmest month of the year is May, with an average
temperature of 31.7 °C. In January, the average temperature is 22.2 °C. It is the lowest average temperature of
the whole year. The difference in precipitation between the driest month and the wettest month is 413 mm.
The average temperatures vary during the year by 9.5 °C.
3.8.6.2 Hydrology
The major aquifers in the district are formed by alluvium and Deccan Trap basalt with Tertiary formations
occupying a small patch. The alluvium occurs in the western part of the district and along the streams whereas
in eastern parts weathered and fractured basalt form aquifers. Hydrogeological units:
1. Fissure Formations:
2. Porous Formation
Fissure Formations
Deccan Traps from the aquifers in north-eastern, eastern and south eastern parts of the district comprising
Mangrol, Mandvi, Vyara, Valod Mahuva, Songadh, Uchchhal and Nizar talukas. The ground water occurs in
unconfined to semi-confined conditions.
Alluvium
The western and north western parts of the district comprising Choryasi, Olpad, Kamrej, Palsana and parts of
Bardoli talukas is covered by Alluvium. This aquifer can broadly be demarcated into two zones namely newer
alluvium and older alluvium. The newer alluvium is present along the river courses and comprises fine to
coarse grained sand trap wash with cay intercalations. The sand is unconsolidated but shows some degree of
cohesion at places. Water levels are in general deeper in newer alluvium. Older alluvium is present in inter
river plains and comprises sand, clay, kankar, grave and silt. The ground water occurs mostly under
unconfined conditions but at places semi-confined conditions are also observed, probably due to presence of
clay lenses. The depths of the wells in alluvium generally range from 3.0 to 30.0 m with some of the wells
having bores down to 50 m below bottom of the wells. The maximum number of wells, about 80% is 5 to 20
m deep. Depths to water levels in the wells range from 0.5 to 15m bgl about 90% wells shows water levels
less than 10m bgl.
Water Level
Total 8 wells were inventoried in and around the study area in the month of March 2019. Water level
measurements were taken at 8 locations. The well inventoried was done around the Plant area. The
following table describes the location detail of the well inventoried.
Table 3-23: location detail of the well inventoried
Well SWL
Location Easting Northing Elevation (m) RWL (m)
no. (m)
GW-1 Sayan 72.879167 21.316944 20 22 -2
GW-2 Siwan 72.870278 21.351471 16 60.98 -44.976
GW-3 Obhla 72.857794 21.368917 14 21.22 -7.22
GW-4 Kareli 72.894222 21.365453 19 11.1 7.9
GW-5 Pipodara 72.9625 21.358333 29 16.768 12.2318
GW-6 Ghaludi 72.923889 21.339167 29 6.65 22.35
GW-7 Velenja 72.915756 21.306967 20 23.8 -3.8
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-50
en-vιsι n
Obhla
Kareli
21.36
Pipodara
21.35
21.34
Ghaludi
21.33
21.32
Sayan
21.31
Velenja
21.3
21.29
21.28
Bharthana
21.27
72.86 72.87 72.88 72.89 72.9 72.91 72.92 72.93 72.94 72.95 72.96
14 to 16
16 to 17
17 to 20
20 to 29
29 to 29.01
The maximum pH value found 7.9 at pipodara ground water sample while the minimum pH value 7.0
bharthana ground water sample. The pH value found 7.9 at Tapi river water sample, while the pH value 7.5
at project site reservoir water sample. The surface water samples fall in alkaline nature. The maximum pH
value found 8.2 at Delad lake, while the minimum pH value 7.1 at Sayan lake for surface water samples.
Fluoride (F)
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-51
en-vιsι n
Flouride having permissible limit are 1-1.5 mg/l as per IS 10500:2012.
The maximum flouride value found 1.7 mg/ltr at Bharthana ground water sample while the minimum flouride
value 0.14 PPM at obhla ground water sample. The maximum flouride value found 1mg/ltr at Delad lake
water sample, while the minimum flouride value 0.2 mg/ltr at Sayan lake water sample.
Bio Chemical Oxygen Demand (BOD)
BOD having permissible limit are ≤ 2 mg/lit as per IS 10500:2012.
The BOD value found at all ground water sample rest are falling under below detection limit. The maximum
BOD value found 4.4 mg/l at tapi river water sample, and the minimum BOD value found 1.1 mg/l at sayan
lake water sample & max value of BOD at kareli lake 1.7 mg/L while project site reservoir water sample
are below detection limit.
The Surface water samples of reservoirs are collected and analyzed for BOD, As per IS 10500:2012.
Total Coliform
Total Coliform having permissible limit are ≤ 500 MPN/100 ml as per IS 2296:1982.
The maximum total coliforms value found 53 MPN/10 ml at Kareli lake water sample, while the minimum
Total coliforms value 32 MPN/10 ml at Ps_Reservoir water sample. The maximum total coliforms value
found 35 MPN/10 ml at Tapi river .The surface water samples of reservoirs are collected and analyzed for
total coliforms, as per IS 10500:2012.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-52
en-vιsι n
Table 3-24: Water category based on range of Total Hardness value as per IS 10500:2012
Range of Hardness No. of Location in No. of Locations in Tube
Class
as CaCO3 Pond Sample well Sample
Soft 0 – 55 0 0
Slightly hard 56 – 100 2 0
Moderately 8 4
101 – 200
hard
Hard 201 – 500 2 6
Very Hard >500 0 1
The maximum total hardness value found 547 mg/l at Sayan ground water sample, while minimum value
found 238 mg/l at obhla ground water sample. The maximum total hardness value found 253 mg/l at Delad
lake water sample, while the minimum total hardness value 200 mg/l at tapi river water sample. The total
hardness value found 234 mg/l at PS_ Reservoir water sample.The surface water samples are of both
reservoirs are collected and analyzed for total hardness, as per IS 10500:2012.
Magnesium (Mg)
Permissible limit of Mg is 30-100 mg/l specified in the IS 10500:2012. The effect of having above the
desirable limit is encrustation and adverse effect on domestic use.
The maximum Magnesium (Mg) found 28 mg/l at Daheli ground water sample, while minimum value found
74 mg/l at Ground water sample. All ground water samples are analyzed as per IS 10500:2012 (Class –B
Outdoor bathing).
Chloride (Cl)
Permissible limit of Chloride is 250-1000 mg/l specified in the IS 10500:2012.
The chloride content above the desirable limit can cause the change in taste of water, corrosion and
portability. The Maximum Chloride ion concentration found 248.2 mg/l at Sayan Ground water sample
while minimum concentration found 157 mg/l at Obhla Ground water sample. The maximum Cl value found
127 mg/l at Tapi River water Sample, while the minimum Cl value 105 mg/l at Delad Lake water sample.
The Cl value found 105 mg/l at PS_ Reservoir water Sample. The Surface water samples of reservoirs are
collected and analyzed for Cl, As per IS 10500:2012.
Sulphate (SO4)
Permsible limit of Sulphate is 200-400 mg/l specified in the IS 10500:2012. Above the desirable limit causes
gastro intestinal irritation particularly when magnesium or sodium are present. The sulphate content in
ground water generally occurs as soluble salts of calcium, magnesium and sodium. The Maximum Sulphate
(SO4) value found 221 mg/l at Galudi Ground Water Sample, while minimum concentration of Sulphate
(SO4) found 105 mg/l at Pipodara Ground water sample. The maximum (SO4) value found 67.3 mg/l at
Delad Lake water Sample, while the minimum (SO4) value 55.8 mg/l at PS_ Reservoir water sample.The
Surface water samples of reservoirs are collected and analyzed for (SO4), As per IS 10500:2012
Total Alkalinity
Permissible limit of Total Alkalinity is 200-600 mg/l specified in the IS 10500:2012.
The Maximum Total Alkalinity value found 98 mg/l at Galudi Ground water sample, while minimum Total
Alkalinity found 58.7 mg/l at Bharthana Ground water sample. The maximum Total Alkalinity value found
98.2 mg/l at Kareli Lake water, while the minimum Total Alkalinity value 94 mg/l at Tapi River water
sample. The Total Alkalinity value found 95.2 mg/l at Reservoir Water Sample. The Surface water samples
of reservoirs are collected and analyzed for Total Alkalinity, As per IS 10500:2012.
Electrical Conductivity (EC)
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-53
en-vιsι n
Permissible limit of Electrical Conductivity (EC) is not specified in the IS 10500:2012.
Electrical conductivity is useful to determine its usefulness for irrigation water.
The Maximum Electrical Conductivity (EC) value found 1186 µsm/cm at Sayan Ground water sample,
while Minimum Electrical Conductivity (EC) found 116 µsm/cm at Galudi Ground water sample (not used
as drinking water source). The maximum EC value found 499 mg/l at PS_ Reservoir water Sample, while
the minimum EC value 261 mg/l at Delad Lake water sample. The Surface water samples of reservoirs are
collected and analyzed for EC, As per IS 10500:2012.
Total Suspended Solid (TSS)
Permissible limit of TSS is not specified in the IS 10500:2012.
The Maximum TSS value found 28 mg/l at Pipodara Ground water sample, while minimum TSS found 18
mg/l at Sayan Ground water sample. The maximum TSS value found 28 mg/l at Kareli Lake water Sample,
while the minimum TSS value 18 mg/l at Tapi River water sample. The maximum TSS value found 25 mg/l
at PS_ Reservoir water .The Surface water samples of reservoirs are collected and analyzed for TSS, As per
IS 10500:2012.
Nitrates
Permissible limit of Nitrates is 45 mg/l specified in the IS 10500:2012.
The Maximum Nitrates value found 6.5 mg/l at Velenja Ground Water Sample, while minimum Nitrates
found 1.8 mg/l at Galudi Ground water sample. The maximum Nitrates value found to be 2.1 mg/l at Kareli
Lake water sample while The Minimun nitrates values found to be 1 mg/l at Delad Lake. The Surface water
samples of reservoirs (1.9 mg/l) are collected and analyzed for Nitrates, As per IS 10500:2012.
Total Phosphates
Permissible limit of Total Phosphates is not specified in the IS 10500:2012.
The Maximum value 0.8 foundg/l at Sayan while minimum value found 0.1 mg/l at Galudi Gound Water
Sample. The Maximum Total Phosphates value found 0.4 mg/l at Delad Lake Water sample. The Miniimum
Total Phosphates value found 0.3 mg/l at Kareli Lake Water sample and except Rahiyad Pond water sample
rest are falling under below desirable limit.
Calcium Hardness
Permissible limit of Calcium Hardness is 75-200 mg/l specified in the IS 10500:2012.
The Maximum value found 211 mg/l at Barthana Ground water sample, while minimum found 99 mg/l at
Obhla Ground water sample. The Maximum value found 253 mg/l at Delad Lake water sample, while
minimum found 200 mg/l at Tapi River water samples. The value found 234 mg/l at PS_ Reservoir water
Sample.All the Surface water samples of reservoirs are collected and analyzed as per IS 10500:2012.
Carbonates
Permissible limit of Carbonates is not specified in the IS 10500:2012.
The value found 0 mg/l at all Ground water sample.
Bi-carbonates
Permissible limit of Bi-carbonates is not specified in the IS 10500:2012.
The Maximum value found 132 mg/l at galudi Ground water sample, while minimum found 102 mg/l at
Obhla Ground water sample.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-54
en-vιsι n
Sodium
Permissible limit of Sodium is not specified in the IS 10500:2012. The Maximum value found 212 mg/l at
Pipodara Ground water sample, while minimum found 151 mg/l at Velenja Ground water sample. The
maximum Sodium value found 68.95 mg/l at Kareli Lake water Sample, while the minimum Sodium value
41.2 mg/l at PS_ Resrvoir water sample. The Surface water samples of reservoirs are collected and analyzed
for Sodium, As per IS 10500:2012.
Potassium
The Maximum value found 4.9mg/l at Obhla Ground water sample, while minimum found 2.2 mg/l at Kareli
Ground water sample.
The maximum Potassium value found 4.7mg/l at Delad Lake water Sample, while the minimum Potassium
value 2 mg/l at Sayan Lake and Tapi River water sample. The Potassium value found 4 mg/l at PS_ Reservoir
water Sample.The Surface water samples of reservoirs are collected and analyzed for Potassium, As per IS
10500:2012.
Nickel
Permissible limit of Nickel is 0.02 mg/l specified in the IS 10500:2012 All the Ground water samples are
below minimum detection limit Observed.
Arsenic
Permissible limit of Arsenic is 0.01-0.05 mg/l in the IS 10500:2012. All the Ground water samples are
below minimum detection limit. The Arsenic value not found at all the places of Pond water Sample.
Total Chromium
Permissible limit of Hexavalent Chromium is not specified in the IS 10500:2012.All the Ground water
samples are below minimum detection limit of laboratory. The Total Chromium value found to be below
detection Limit at all the places of Lake, River and Reservoir water Sample.
Copper
Permissible limit of Copper is 0.05-1.5 mg/l specified in the IS 10500:2012. All the Ground water samples
are below minimum detection limit. The Copper value found to be below detection Limit at all the places of
Lake, River and Reservoir water Sample. The Surface water samples of reservoirs are collected and
analyzed for Copper, As per IS 10500:2012.
Lead
Permissible limit of Lead is 0.01 mg/l specified in the IS 10500:2012. All the Ground water samples are
below minimum detection limit. The Lead value found to be below detection Limit at all the places of Lake,
River and Reservoir water Sample. The Surface water samples of reservoirs are collected and analyzed for
Lead, As per IS 10500:2012.
Iron
Permissible limit of Iron is 0.3 mg/l specified in the IS 10500:2012. The maximum Value of iron value
found to be 0.3 at Pipodara Ground Water Sample, While Minimum iron Value found to be 0.2 at Obhla
Ground Water Sample Except this value All Ground Water Samples are below minimum detection limit.
The Iron value found to be 0.14 at Delad Lake water sample, 0.12 at Kareli Lake and rest are falling under
below detection Limit. The Surface water samples of reservoirs are collected and analyzed for Iron, As per
IS 10500:2012.
Zinc
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-55
en-vιsι n
Permissible limit of Zinc is 5-15 mg/l specified in the IS 10500:2012. All the Ground water samples are
below minimum detection limit. The Zinc value found to be below detection Limit at all the places of Lake,
River and Reservoir water Sample. The Surface water samples of reservoirs are collected and analyzed for
Zinc, As per IS 10500:2012.
Mangenese (Mn)
Permissible limit of Mangenese (Mn) is 0.1-0.3 mg/l specified in the IS 10500:2012. All the Ground water
samples are below minimum detection limit. The Mn value found to be below detection Limit at all the
places of Lake, River and Reservoir water Sample. The Surface water samples of reservoirs are collected
and analyzed for Mn, As per IS 10500:2012.
Phenolic Compoud
Permissible limit of Phenol is 0.005mg/l specified in the IS 10500:2012. All the Ground water Samples are
below minimum detection limit. The Phenol value found to be below detection Limit at all the places of
Lake, River and Reservoir water Sample.
Chemical Oxygen Demand (COD)
COD having permissible limit is not specified in the IS 10500:2012. The Maximum COD value found 6.4
mg/l at Velenja Ground Water sample, while minimum value found 2.1 mg/l at Kareli Ground water
samples. The maximum COD value found 20.1 mg/l at Tapi River water Sample, while the minimum COD
value 2.2 mg/l at Sayan Lake water sample. The maximum COD value found 2.4 mg/l at PS_Reservoir
water Sample. The Surface water samples of reservoirs are collected and analyzed for COD, As per IS
10500:2012.
Dissolved Oxygen
DO having permissible limit is ≥ 5.0 mg/lit As per IS 10500:2012. The Maximum DO value found to be 6.4
at Velenja Ground Water Sample, while Minimum DO Value found to be 4.7 mg/l at Obhla Ground Water
Sample. The Maximum DO value found 6.1 mg/l at Tapi River water surface, while minimum value found
4.2 mg/l at Kareli lake water sample.
Turbidity
Turbidity having permissible limit is 1-5 NTU As per IS 10500:2012. The Maximum turbidity value found
to be 2.7 NTU at Pipodara Ground Water Sample, while Minimum turbidity Value found to be 1.4 NTU at
Bharthana Ground Water Sample. The Maximum turbidity value found 1.5 NTU at Sayan Lake water
surface, while minimum value found 1.1 at Delad lake and PS_Reservoir water sample.
Fecal coliform:
The Maximum turbidity value found 35 MPN/10 at Kareli Lake water surface, while minimum value found
21 MPN/10 at PS_Reservoir water sample.
E- Coil
The Maximum turbidity value found 18 MPN/10 at Kareli Lake water surface, while minimum value found
11 MPN/10 at PS_Reservoir water sample.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-56
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-57
en-vιsι n
never been as great as it is today. Species extinction caused by human activities continues at an alarming rate.
Protecting biodiversity is for our self-interest and also for the future generation.
3.9.4.1 Methodology
For purpose of Environment Impact assessment (EIA) studies, the term biodiversity survey defines collection
of spatial and or temporal data about spices/ community or a habitat. The information from the survey
provides a snap shot of presence or absence and spatial distribution of important species. In EIA studies the
survey data are used to evaluate the ecological resources on a site and its immediate surroundings, which is
then assessed or evaluated. Impacts are consider in respect to this resources and assessed for significance.
The primary objective of the present survey was to describe the floristic and faunal communities within the
study area. Survey conducted for EIA studies aimed to provide information on the following.
What species and habitat occur in the project site and surroundings?
Whether any threatened flora and fauna occur in the study area? If so, where do they occur?
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-58
en-vιsι n
Extrapolation and prediction techniques were used to limit the number of sites to be assessed. The knowledge
of species habitats requirement, soil type, terrain, vegetation etc. were used to predict species occurrence.
This Extrapolation assessment Programme conducts preliminary for the assessment of biological value of
poorly known area. The biological value of an area can be characterized by the species richness, degree of
spices endemism, uniqueness of the ecosystem and magnitude of threats of extinction. This Rapid biodiversity
assessment were undertaken by identifying potentially rich sites from satellite imaginary (Google Earth) and
conducting the field survey in the potential habitats. GPS was utilized for locating field sample plots as well as
gathering positional attributes of sighted flora and faunal species.
For Floral survey, sample plots have been randomly distributed across the suitable stratum within 10 km
radius of project site. Tree species were sampled using 10mx10m or 5mx5m plots depending upon the stratum
variability on the ground and tree species occurrence. For sampling shrub species, two plots of size of 5 meter
x 5 meter at two opposite corner of tree plots or the same 5meter X 5meter plot of tree plots were taken. For
herbaceous plant five plots of 1meter x 1 meter at four corners of tree plots and one at centre
The methodology adopted for faunal survey involve; faunal habitat assessment, random intensive survey,
opportunistic observations, diurnal bird observation, active search for reptiles, active search for scats and foot
prints and review of previous studies. The aim was to set baselines in order to monitor and identify trends
after the commencement of project activity. Emphasis has been placed on presence of rare, endemic,
migratory and threatened species, if any present in the study area. Desktop literature review was conducted to
identify the representative spectrum of threatened species, population and ecological communities as listed by
IUCN, ZSI, BSI and in Indian wild Life Protection act, 1972. The threat status of individual species was
assessed using the revised IUCN category system.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-59
en-vιsι n
3.9.5 Biodiversity of Terrestrial Environment
3.9.5.1 Habitats Description of the Project Site and its Immediate Surroundings
The project of Shree Sayan Vibhag Sahkari Khand Udhyog Mandli Limited is located in an already
developed industrial plot. No rare and endangered flora and fauna observed in the project site or within the
close proximity of the project site. Existing premises is located in Sayan village area and well developed with
Trees, shrubs and vegetation within and outside of the premises.
2019.05.30
2019.05.30
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-60
en-vιsι n
2019.05.30 2019.05.30
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-61
en-vιsι n
2019.05.30
2019.05.30
3.9.5.3 Trees
The dominant trees in the study area were, Mangifera indica (Keri), Azadirachta indica (Limbado),
Tamarindus indicum (Amli), Delonix regia (Gaulmor), Cassia fistula L.(Garmalo), and various Acacia sps.
The list of tree species is enlisted in the Table 3-25. 36 species of trees belong to 17 families were enumerated
from the study area from the sampling plots.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-62
en-vιsι n
Table 3-25: Trees in the Study area
Relative abundance in
No. Family & Scientific name Vernacular name
sampling plots
1. Anacardiaceae
1.1. Mangifera indica L. Ambo D
2. Annonaceae
1.2. Polyalthia longifolia Asopalav O
1.3. Annona squamosa L. Sitaphal O
3. Arecaceae
1.4. Borassus flabellifer L. Tad F
1.5. Cocos nucifera L. Nariel F
4. Caesalpiniaceae
1.6. Delonix regia(Boj) Gulmohar O
1.7. Cassia fistula L. Garmalo R
1.8. Senna siamea Lam. Kasida O
1.9. Tamarindus indica L Amli O
5. Casuarinaceae
1.10. Casuarina equisetifolia L. Sharu F
6. Caricaceae
1.11. Carica papaya L Papaya O
7. Combretaceae
1.12. Terminalia catappa L. Badam O
8. Meliaceae
1.13. Azadirachta indica A.Juss Limbado D
1.14. Melia azedarach Bakan limdo O
9. Mimosaceae
1.15. Acacia auriculiformis L Austrialanbaval D
1.16. Acacia nilotica (L.) Del.subsp.indica (Bth.) Baval A
Brenan
1.17. Acacia leucophloea (Roxb) Hermobhaval A
1.18. Albizia lebbeck L. Siris O
1.19. Leucaena leucocephala (Lam.) De Pardesi Baval O
1.20. Prosopis cineraria (L.) Druce Khyigdo D
1.21. Prosopis juliflora (Sw.) DC Gadobaval F
1.22. Pithecellobium dulce (Roxb.) Bth. Gorasmli O
10. Moraceae
1.23. Ficus bengalensis L Vad O
1.24. Ficus racemosa L. Umaro R
1.25. Artocarpus heterophyllus Lam Fanas R
1.26. Ficus religiosa L Piplo O
11. Moringaceae
1.27. Moringa pterygosperma Gaertn., Fruct Saragvo O
12. Myrtaceae
1.28. Eucalyptus citriodora Hk. Nilgari F
1.29. Syzygium cumini ( L) Jambu O
13. Rhamnaceae
1.30. Zizyphus glabrata Heyne ex Roth Bor A
1.31. Zizyphus mauritiana Lam Bordi O
14. Sapotaceae
1.32. Manilkara zapota L Chikoo O
1.33. Madhuca longifolia (Koenig) Macbr. var. latifolia Mahudo O
15. Simaroubaceae
1.34. Ailanthus excelsa Roxb. Aurdso A
16. Verbenaceae
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-63
en-vιsι n
Relative abundance in
No. Family & Scientific name Vernacular name
sampling plots
1.35. Tectona grandis L. Sag F
17. Fabaceae ( Sub family Papiloniodeae)
1.36. Dalbergia latifolia Roxb., Corom Sisam A
Relative abundance in sampling plots DAFOR scale. : Dominant, Abundant, Frequent, Occasional,
Rare,. (David Hill etal., 2005)
3.9.5.4 Shrubs
Shrubs observed during the present survey are given in the Table 3-26 shrub species belong to 13 families
were observed in the sampling plots laid in study area. The dominant shrub community in this area was
represented by Calotropis procera (Akado), Thevetia peruviana (Pilikarean), Lawsonia inermis (Mendhi) etc.
Table 3-26: List of the Shrubs in the Study Area
Sr Vernacular Relative abundance
Family & Scientific name
No. name in sampling plots
1 Apocynaceae
1/1 Thevetia peruviana Merr. Pili karan O
1/2 Nerium indicum Mill Lalkaren O
2 Asclepiadaceae
1/3 Calotropis procera (Ait.) R.Br Akado F
3 Euphorbiaceae
1/4 Euphorbia nerifolia L Thor F
5 Lythraceae
1/5 Lawsonia inermis L Mendhi A
6 Malvaceae
1/6 Abelmoschus manihot L. Medic. Jungli Bindi O
1/7 Abelomoschus esculentus (L.) Bhindi F
1/8 Hibiscus rosa –sinensis Jasund O
1/9 Gossypium hirsutum L. Kapas O
7 Rhamnaceae
1/10 Zizyphus nummularia (Burm.f.) W. &. Chanibor F
1/11 Zizyphus glabrata Heyne ex Ro Bor F
8 Musaceae
1/12 Musa paradisiaca L. Kela O
9 Poaceae
1/13 Saccharum officinarum L. Sherdi Crop
10 Nyctaginaceae
1/14 Bougainvillea spectabilis Willd. Bougainvel O
11 Labiatae
1/15 Ocimum sanctum L. Tulsi F
12 Solanaceae
1/16 Datura metel L Daturo R
1/17 Solanum incanum L Ubhi ringan R
3.9.5.5 Herbs
The herbs observed in the sampling plots, during the survey period have been enlisted in the Table 3-27. 17
species of herbs belongs to13 families were documented from the sampling plots laid in different habitats.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-64
en-vιsι n
Most dominant herbaceous cover in the study area was Hygrophila schulli (Akaro), Xanthium strumarium
(Gokhru) and Ocimum sanctum L. (Tulsi).
Table 3-27: List of Herbaceous Species Observed in the Study Area
Sr Relative abundance in
Family & Scientific name Vernacular name
No. sampling plots
1 Family : Acanthaceae
1/1 Hygrophila schulli (Buch.-Ham.) M. R. Akaro D
2 Family : Amaranthaceae
½ Aerva lanata (L.) Juss. ex Schult., Gorakhganjo A
3 Family : Araceae
1/3 Colocasia esculenta (L.) Schott -- O
1/4 Alocasia macrorrhiza (L.) G -- F
4 Family : Asteraceae
1/5 Tridax procumbens L Pardesi Bhangro A
1/6 Xanthium strumarium L. Gokhru A
5 Family : Boraginaceae
1/7 Trichodesma indicum R. Br. Undha Fuli A
6 Family : Lamiaceae
1/8 Ocimum sanctum L. Tulsi O
1/9 O. canum Sims Ramtulsi O
7 Family : Zygophyllaceae
1/10 Tribulus terrestris L. Mithu Gokhru R
8 Family: Poaceae/geamineae
1/11 Zea mays L., Makkai O
9 Family: Nymphaeaceae
1/12 Nymphaea pubescens Wild Kamal O
10 Family:Nyctaginaceae
1/13 Bougainvillea spectabilis Willd. Bougainvel O
11 Family: Papilionaceae
1/14 Cajanus cajan (L) Tuvar O
1/15 Medicago sativa L Lachko O
12 Family: Liliaceae
1/16 Aloe barbadensis Mill. Kunvarpato O
13 Family: Gentianaceae
1/17 Nymphoides indicum (Roxb.) Kumudini R
Relative abundance in sampling plots DAFOR scale. : Dominant, Abundant, Frequent, Occasional, Rare, (David Hill
etal., 2005)
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-65
en-vιsι n
1/5 Ipomea cairica (L.) -- A
1/6 Ipomoea obscura L. Vad Fudardi A
1/7 Ipomoea hederifolia L., -- A
1/8 Ipomea aquatica Forsk. Nadanivel D
1/9 Ipomoea pes-tigrides L Vaghpadini vel A
5 Family Cucurbitaceae O
1/10 Luffa cylindrica (L.) M.J.Roem Galku R
1/11 Lagenaria siceraria Didhi R
6 Family: Cuscutaceae
1/12 Cuscuta reflexa Roxb. Amarvel O
7 Family: Oleaceae
1/13 Jasminum multiflorum (Burm.f.)Andr. Mogro F
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-66
en-vιsι n
Relative
Old Common New Common Distribution IUCN status
Scientific Name Aabundance
name Name Status Ver3.1
In study area
I ORDER: ANSERIFORMES
Family: Anatidae (Ducks and teals)
Spotbill Spot-billed Duck Anas poecilorhyncha R UC Least Concern
II ORDER: APODIFORMES
Family: Apodidae (swifts)
Common Common
Common Swift Apus apus R VC
Swift Swift
III. ORDER: FALCONIFORMES
Family: Accipitridae (vulture, Sparrow hawk, Eagle, Harrier, Kite and Vulture)
Shikra Shikra Accipiter badius R Uc Least Concern
Black-winged Black-winged
Elanus caeruleus R C Least Concern
Kite Kite
IV. ORDER: : CICONIIFORMES
Family: Ardeidae (heron, Egret, Bittern)
Cattle Egret Cattle Egret Bubulcus ibis R C Least Concern
Little Egret Little Egret Egretta garzetta R C Least Concern
Indian Pond- Least
Pond Heron Ardeola grayii R C
Heron Concern
Median or Intermediate Least
Mesophoyx intermedia R C
Smaller Egret Egret Concern
Family: Charadriidae (Plover, Stilt, Oystercatcher, Lapwing, Avocet )
Black-winged Black-winged
Himantopus himantopus R LC Least Concern
Stilt Stilt
Red-wattled Red-wattled
Vanellus indicus R LC Least Concern
Lapwing Lapwing
Family: Phalacrocoracidae ( Cormorant)
Phalacrocorax
Indian Shag Indian Cormorant R LC Least Concern
fuscicollis
Little
Little Cormorant Phalacrocorax niger R LC Least Concern
Cormorant
Family: Pteroclidae (Sandgrouse)
Indian Chestnut-bellied
Pterocles exustus R UC Least Concern
Sandgrouse sandgrouse
V. ORDER: COLUMBIFORMES
Family: Columbidae (Pigeon, Dove)
Blue Rock
Rock Pigeon Columba livia R C Least Concern
Pigeon
Eurasian
Ring Dove Streptopelia decaocto R C Least Concern
Collared-Dove
VI Order: Coraciiformes
Family: Dacelonidae (King fihers)
White
White-throated
breasted Halcyon smyrnensis R UC Least Concern
Kingfisher
Kingfisher
Family: Meropidae (Bee Eater)
Small Green Little Green Bee-
Merops orientalis R LC Least Concern
bee-eater eater
VII.ORDER: CUCULIFORMES
Family: Centropodidae (Cocucal
Crow-
Pheasant or Greater Coucal Centropus sinensis R UC Least Concern
Coucal
Family: Cuculidae (cuckoo, Koel)
Asian
Koel Koel/Wetsern Eudynamys scolopacea R UC Least Concern
Koel
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-67
en-vιsι n
Relative
Old Common New Common Distribution IUCN status
Scientific Name Aabundance
name Name Status Ver3.1
In study area
Indian
Drongo
Drongo Surniculus lugubris R C Least Concern
Cuckoo
Cuckoo
VIII ORDER: GALLIFORMES
Family: Phasianidae (Peafowl , Patridge)
Common
Indian Peafowl Pavo cristatus R LC Least Concern
Peafowl
Family: Rallidae ( Waterhen, coot, crake water cock, Moorhen, Rail,)
White-
White-breasted
breasted Amaurornis phoenicurus R LC Least Concern
Water hen
Water hen
Coot Common Coot Fulica atra R LC Least Concern
Indian Common
Gallinula chloropus R LC Least Concern
Moorhen Moorhen
Purple
Purple Swamphen Porphyrio porphyrio R LC Least Concern
Moorhen
X. ORDER: PASSERIFORMES
Family: Paridae (Tit )
Grey Tit Great Tit Parus major R LC Least Concern
Family: Corvidae
Large Cuckoo-
Large
shrike/Black Coracina
Cuckoo- R UC Least Concern
faced Cuckoo- novaehollandiae
shrike
shrike
House Crow House Crow Corvus splendens R LC Least Concern
Least Concern
Raven Common Raven Corvus corax R UC
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-68
en-vιsι n
Relative
Old Common New Common Distribution IUCN status
Scientific Name Aabundance
name Name Status Ver3.1
In study area
Family: Psittacidae (Parrot and Parakeet)
Rose-ringed Rose-ringed
Psittacula krameri R LC Least Concern
Parakeet Parakeet
Note: Distribution status: R = Widespread Resident, WM: winter migrant Ref WCMC, Check list of Indian Birds/
IUCN 2018, Bird Life International. 2018, Bird Life International. 2016.
Kumar, A., J.P. Sati and P.C. Tak (2003): Checklist of Indian Water birds. BUCEROS 8 (1): 30 pp
Relative Abundance: VC: Very common, C: Common, LC: Locally common, UC: Un Common and R; Rare.
IUCN Status: ver 3.1 (LC)Least Concern, Near Threatened
3.9.6.3 Herpetofauna
No amphibians sighted in the study area during the survey period even though the region is characterized by
many water logged region. Reptiles observed in the study area are given in the Table 3-31.
Table 3-31: Reptiles observed in the study area
Relative
IUCN status
No. Common Name Scientific name Aabundance
Ver3.1
In study area
1 Common garden lizard Calotes versicolor (Daudin) UC Least Concern
2 Common rat snake Ptyas mucosus (Linn.) UC -
3 House Gecko Hemidactylus flaviviridis UC Not evaluated
(Ruppell)
4 Fan-Throated Lizard Sitana ponticeriana ( Cuvier) LC Least Concern
5 Indian Cobra Naja naja ssp. kaouthia (Linn.) Secondary Least Concern
6 Russell’s Viper Daboia russelii (Shaw and Secondary Least Concern
Nodder)
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-69
en-vιsι n
Relative
IUCN status
No. Common Name Scientific name Aabundance
Ver3.1
In study area
7 Common Indian Krait Bungarus caeruleus(Schneider) Secondary -
= Not sighted but included as per the information provided by villagers ,during the interaction with them with pictorial
presentation.
Relative Abundance: VC: Very common, C: Common, LC: Locally common, UC: Un Common and R; Rare.
3.9.6.4 Mammals
The wild mammals observed other than domesticated ones from the study area is documented in the Table
3-32.
Table 3-32: Mammals in the Study Area
Relative
IUCN status
No Common Name Scientific name Aabundance
Ver3.1
In study area
1 Five striped Palm squirrel Funambulus pennantii C Least Concern
(Wroughton)
2 Hare Lepus sp. UC Least Concern
3 Common Mongoose/Indian Herpestes edwardsi (Geoffroy) UC Least Concern
Grey Mongoose
4 Wild Boars Sus scrofa (Linnaeus) Secondary -
5 Indian field mouse Mus booduga (Gray) UC -
= Not sighted but included as per the information provided by villagers, during the interaction with them with
pictorial presentation.
Relative Abundance: VC: Very common, C: Common, LC: Locally common, UC: Un Common and R; Rare.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-70
en-vιsι n
Schedule
Population
Nearest (Wild Life
Group Species Coordinates at the time of
village Protection
sighting
Act, 1972.)
Indian Cobra (Naja
Secondary -- --
naja),
Reptiles Schedule-II
Common rat snake
Secondary -- --
(Ptyas mucosus)
Common Mongoose
Secondary -- -- Schedule-II
(Herpestes edwardsi),
Five striped Palm
Mammals squirrel Many
-- >20 Schedule-IV
(Funambulus pennanii places
( Wroughton))
Wild Boars (Sus
Secondary -- -- Schedule-III
scrofa Linnaeus)
Sources: Wild Life Protection Act 1972 and its amendments
3.10.3 Methodology
Socio-Economic aspects report was prepared by following methodology given as under:
1. A detailed desk review of the reports and secondary data related to the socio-economic context of the
project.
2. Reviewing census records.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-71
en-vιsι n
3. Reconnaissance visits to the project site were made.
4. Screening of potential social impacts in the project influence area was carried out.
During the reconnaissance visit, Public Consultations, Focused Group Discussion (FGD) and Personal
Interview were conducted to gather feedback from the local people on the proposed development and
perceived socio-economic impacts.
Table 3-34: List of Villages Where Socio-Economic Study Conducted
Sr. From the Project Site
Villages Sub-District District Wind Direction
No. Distance Direction
1 Kareli 2.92 N Crosswind
2 Bharundi 3.92 WNW Crosswind
3 Siwan Olpad 2.73 WSW Upwind
4 Kudsad Surat 4.65 NNE Downwind
5 Sayan (CT) 2.71 SSW Upwind
6 Shekhpur 1.29 SE Crosswind
Kamrej
7 Ghaludi 2.64 E Crosswind
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-72
en-vιsι n
3.10.4 Limitations
Study is limited to the 10 km radius with purposive random sampling from the proposed project site.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-73
en-vιsι n
Table 3-35: List of Villages in PIA (Census 2011)
Census Population 2011 Projecte
District
District
Population Literates Total Worker d
Sub
Sr. Total
Village Area Non- Populati
No. HH SC ST
(ha) Total Male Female Male Female Male Female on for
worker
20217
1 Anita 705.81 247 1110 561 549 90 465 399 352 361 199 550 1746
2 Bolav 645.36 267 1223 620 603 2 653 465 420 386 206 631 1923
3 Kimamli 446.36 226 1067 535 532 36 550 344 326 315 173 579 1678
4 Kathodra 349.47 773 3628 1940 1688 243 638 1473 1022 1158 291 2179 5706
5 Simalthu 357.29 166 820 406 414 0 452 244 222 257 132 431 1290
6 Pardi Bhadoly 489.25 172 676 343 333 113 314 246 205 215 136 325 1063
7 Kanbhi 308.92 150 658 320 338 46 371 233 227 224 131 303 1035
8 Erthan 510.46 311 1436 736 700 119 637 538 467 503 240 693 2258
9 Morthan 592.64 206 948 484 464 154 500 313 261 309 237 402 1491
10 Vihara 357.46 221 1023 528 495 75 418 396 326 361 178 484 1609
11 Kachhab 359.48 83 385 197 188 12 253 164 154 123 49 213 605
Olpad
12 Syadla 505.24 326 1415 715 700 26 964 477 352 473 280 662 2225
Surat
13 Mulad 923.62 841 3755 1944 1811 268 1166 1436 1183 1255 565 1935 5905
14 Kudsad 1687.7 2150 9407 5516 3891 173 1299 4127 2291 3640 771 4996 14794
15 Kareli 801.11 250 1152 577 575 108 598 414 361 351 182 619 1812
16 Bharundi 550.41 219 1031 514 517 0 690 288 249 364 241 426 1621
17 Obhla 391.44 84 430 214 216 84 276 133 118 135 78 217 676
18 Kanthraj 261.86 162 681 349 332 33 312 258 229 233 144 304 1071
19 Sithan 313 230 1144 588 556 2 671 385 323 392 212 540 1799
20 Achharan 420.78 231 1025 518 507 74 521 313 251 363 206 456 1612
21 Sandhiyer 1352.09 693 3207 1646 1561 164 1327 1282 1067 1054 301 1852 5043
22 Khalipor 174.77 86 421 223 198 0 158 170 143 135 66 220 662
23 Madhar 296.25 143 607 315 292 95 369 220 176 186 28 393 955
24 Paria 917.22 554 2506 1302 1204 99 890 963 808 843 375 1288 3941
7 Projected population was considered on the basis of growth rate of respective Taluka
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-74
en-vιsι n
Census Population 2011 Projecte
District
District
Population Literates Total Worker d
Sub
Sr. Total
Village Area Non- Populati
No. HH SC ST
(ha) Total Male Female Male Female Male Female on for
worker
20217
25 Siwan 562.07 491 2134 1118 1016 86 509 897 698 705 165 1264 3356
26 Kanyasi 424.62 288 1387 710 677 180 559 477 430 489 231 667 2181
27 Umra 423.58 476 2233 1120 1113 104 1319 806 716 701 409 1123 3512
28 Delad 290.19 863 4028 2060 1968 269 1623 1513 1294 1248 396 2384 6335
29 Gothan 635.27 642 3035 1515 1520 156 960 1188 1018 938 419 1678 4773
30 Vaswari 299.55 172 949 494 455 112 465 345 301 292 106 551 1492
31 Segwasyadla 234.4 159 805 407 398 4 472 243 205 263 156 386 1266
32 Kim (CT) 229 4205 18638 9969 8669 1259 1875 8124 6451 5760 1165 11713 29311
33 Sayan (CT) 702 3337 15324 8539 6785 1050 1857 6755 4729 5338 987 8999 24099
Total Olpad (A) 17518.67 19424 88288 47023 41265 5236 24131 35629 27375 29370 9455 49463 138844
34 Siyalaj 677.71 348 1699 893 806 142 389 666 518 551 209 939 4282
35 Mota Borsara 627.44 1397 5680 3933 1747 298 1315 3230 1048 3092 259 2329 14315
36 Kothva 354.96 4476
Mangrol
45 Navi Paradi 815.69 1061 4474 2440 2034 393 1696 1928 1385 1483 566 2425 9589
46 Akhakhol 305.5 128 590 310 280 0 557 161 122 161 24 405 1265
47 Dhoran Paradi 1052.53 431 1939 988 951 9 689 739 614 554 170 1215 4156
48 Velanja 621.6 568 2550 1327 1223 170 975 966 802 822 352 1376 5465
49 Kathor 1107 2848 13783 6986 6797 721 1791 5550 5025 3831 1141 8811 29541
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-75
en-vιsι n
Census Population 2011 Projecte
District
District
Population Literates Total Worker d
Sub
Sr. Total
Village Area Non- Populati
No. HH SC ST
(ha) Total Male Female Male Female Male Female on for
worker
20217
50 Choryasi 226 223 1153 619 534 2 198 447 300 345 53 755 2471
51 Bhairav 410.17 203 961 491 470 79 307 373 357 334 133 494 2060
52 Kamrej 1065.91 3269 16078 8327 7751 879 2927 6306 5051 4749 1379 9950 34459
53 Kholvad 763.62 3186 15535 8310 7225 725 2593 6189 4579 4840 842 9853 33296
54 Bhada 458.51 371 1770 889 881 71 764 579 506 557 100 1113 3794
55 Abrama 1032.28 603 2682 1365 1317 124 1356 930 787 850 480 1352 5748
56 Valak 331.39 450 2153 1105 1048 24 392 780 690 651 139 1363 4614
57 Amboli (CT) 375 1317 6137 3274 2863 402 619 2388 1813 1959 423 3755 13153
Total Kamrej (C) 10245.19 15420 73376 38252 35124 3713 16223 28666 23160 22231 6312 44833 157264
Bharthana
Chorasi
58 431 1169 5679 2935 2744 49 601 1863 1272 1643 435 3601 19367
Kosad (CT)
Total Chorasi (D) 431 1169 5679 2935 2744 49 601 1863 1272 1643 435 3601 19367
TOTAL A+B+C+D 31816.21 42099 194285 104230 90055 10042 45198 78479 58417 64003 17382 112900 383377
Sources: Census 2011, District Surat
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-76
3.10.1 Overview of Study Area
Surat city situated on the left bank of river "Tapi" once one of western India's major ports and trading
towns. Surat is second largest city in Gujarat and ninth largest in India. Surat is famous for its textile and
diamond businesses. Three-quarters of the world's diamonds are cut and polished in Surat. Surat has
highest number of flyovers bridges in Gujarat state. Economy of Surat district in Gujarat is concentrated in
the diamond processing, textiles and chemical and petrochemical industries. Surat is also a major
production centre for synthetic textiles in India. Agriculture is the main occupation of the rural folk of the
district and they grow jowar, cotton, rice, groundnut, sugarcane, wheat, fruits and vegetables as the
principal crops. Surat district has 10 talukas like Umarpada, Olpad, Kamrej, Chorasi, Palsana, Bardoli,
Mahuva, Mangrol, Mandvi, Surat City
Sayan is one of the nearest towns of Surat City it is situated at around 13 km radial distance away from
Surat. Sayan is famous for its Sugar Factory. Sayan is having Railway station and bus station. Sayan sugar
is near to National Highway-8 (48). Now Sayan is home for many textile industries nearby Sayan Sugar
industry. Many residential projects come in Sayan.
3.11.1 Population
Project Influence Area does consist one districts viz. Surat while Olpad, Mangrol, Kamrej, Chorasi
indicated as Sub-district.
In 2011 Census, Surat had population of 60,81,322 from which male and female were 34,02,224 and
26,79,098 respectively. In 2001 census, Surat had a population of 42,75,540 from which males were
23,62,072 and remaining 19,13,468 were females. There was change of 42.24 percent in the population
compared to population as per 2001. In the previous census of India 2001, Surat district recorded increase
of 54.30 percent to its population compared to 1991.
Demographical data of the study area are shown in Table 3-35. Populations in villages of study area
located in Olpad, Mangrol, Kamrej, Chorasi talukas of Surat district were 88,288; 26,942; 73,376 and
5,679 respectively as per census 2011. Total population in the study area was 1,94,285 as per the Census
2011 from which 1,04,230 are males and 90,055 are females. 10,042 Schedule Caste population and
45,198 were Schedule Tribes population in the study area as per census 2011.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-77
3.11.3 Sex Ratio
As per 2011census data of Surat district, sex ratio Surat was stood at 787 per 1000 male in 2011 census
compared to 2001 census figure of 810. Child sex ratio is 835 girls per 1000 boys in 2011 census
compared to figure of 859 girls per 1000 boys of 2001 census data. The average national sex ratio in India
was 940 as per latest reports of Census 2011. Sex ratio of the study area as per census 2011 was 864
female population per 1000 male population.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-78
3.11.8 Sanitation
During the assessment, it was observed that in the study area, some
area of villages having proper sanitation facility like door to door
garbage collection, dustbin, drainage, clean and adequate water is
available in study area while tribal area of village having improper
sanitation like open defection (Government scheme Swachchh
Bharat Mission under provide latrines but they are not habituated),
2019.05.31
lack of drainage and the reason for this less education and lower
economic condition. There is need for proper management of solid Dustbin
waste in the villages of the study area.
3.11.11 Culture
Study area having ancient temple in Kudsad village which is approx 250 year old temple of Ranchhod Ray
as informed by the local people. It’s well known as ‘Mini Dakor’. Local people believe that, nobody knows
who and when established this idol at Kudsad temple but said by old people that Vanzara community
(migrating community) brought this idol from Dakor some 400-500 years ago to protect it from attack of
thieves (source: http://kudsadranchhodrai.weebly.com/). Galudi village is also having famous temple and it
is well known as ‘Mini sarangpur’. No significant changes in culture are expected due to this project as
existing sugar unit is running for several years.
2019.05.31
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-80
As per census 2011 village population was 2,650. According to Consultation with sarpanch
Sarpanch, presently village population is approx 3,500. Agriculture and animal husbandry is main
occupation of village. Main crops of village are Sugarcane and vegetables. Educational facility available in
village from anganwadi to till 5th standard, while further educational facilities are available at Sayan, Kim
and Surat. New generation are getting graduation and post-graduation degree in various fields. Primary
healthcare Centre (PHC) is available in Sandhiyar and Sayan village. Bore well water is use for drinking
purpose and for agricultural activity purpose water is available from Ukai canal. Drainage facility is
available in village and its water is disposed in near ‘Koyli khadi’.
Date: 31/05/2019 Village: Bharundi
Different caste population lives in the village together like SC, ST,
OBC and other castes population. Agriculture and animal
husbandry are main income sources for villagers. Sugarcane, paddy
and vegetables are main agriculture crops of village. Local people
get education degree in various fields. Anganwadi and primary
school facilities are available in village. Education scenario is good
in study area. New generation are getting higher education and
prefer agriculture activity. Sayan sugar provides employment to 2019.05.31
local people as per their educational qualification. Door to door Group Discussion
garbage collection, dustbin, drainage, road, electricity connection, transportation, community hall, fertilizer
co-operative society, irrigation society, etc are available in the study area. Some of villagers received fund
for construction of house and latrine facility under various government schemes.
Date: 31/05/2019 Village: Kareli
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-81
Date: 31/05/2019 Village: Shekhpur
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 3-82
CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS AND
MITIGATION MEASURES
4.1 INTRODUCTION
The baseline data are going to be extrapolated to identify the impacts of the proposed modernization
activities on the various aspects of environmental components. Any developmental activity has an impact
on the surrounding environment of its activities, which can be either positive or negative. The negative
impacts are being mitigated with the help of adequate measures so that the environment is not being
damaged and conserved to the maximum extent possible.
4.1.1 Objective
To identify project activities that could beneficially or adversely impact the environment
Predict and assess the environmental impacts of such activities
Examine each environmental aspect-impact relationship in detail and identify its degree of significance
Identify possible mitigation measures for these project activities and select the most appropriate
mitigation measure, based on the reduction in significance achieved and practicality in
implementation.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-1
environment, soil, ecology and bio diversity, socio economics, occupational health, community health and
safety.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-2
Table 4-1: Environmental Impacts
Potential Environmental Impacts on Environment
S.
Project Activity LU/
No. S W NV EB SE RH OH AQ
LC
1 Construction Phase
1.1 Land Acquirement No land acquisition involved, proposed project is within premises.
1.2 Site Clearing ● ● ● o ● ●
1.3 Vehicle movement for
transportation of materials ● ● o● ● ●
and equipment
1.4
Civil Construction ● ● ● ● ● o ● ●
1.5 Heavy fabrication work
including metal cutting ● ● o ● ● ●
(Gas cutting, welding)
1.6 Usage of Water ●
1.7 Usage of fuel, electricity
● ● ●
and resources
1.8 Construction material
● ● ● ● ●
storage and disposal
1.9 Domestic Waste
● ●
generation and disposal
2 Operation Phase
2.1 Storage and Handling of
●
Sugarcane
2.2 Storage and Handling of
bagasse , molasses and raw ● ● ● ● ●
materials
2.3 Transportation of Raw
● o● ●
Materials and Products
2.4 Manufacturing Process ● ● o ● ●
2.5 Usage of water ● ● ●
2.6 Effluent/Sewage
● ● ● ● ● ●
management
2.7 Storage, handling and
disposal of solid/hazardous ● ● ● ● ●
waste
2.8 Usage of Fuel for
Operation of Boiler & DG ● ● o● ● ●o
set and APCM operation
2.9 Landscaping and greenbelt
area development o o o o o o
3 Decommissioning Phase
3.1 Dismantling of structures
of the project components ● ● ● ● ●
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-4
Consequence
Magnitude Ranking
Category
Site specific loss of habitats of common species of fauna; but it will not result in
permanent loss of habitat.
Short /long term impact likely to adversely affect habitat character/ habitat
ecology/ ecosystem function.
Impact on agro-ecosystem when pollution load increases but can be mitigated.
Site specific impact on threatened species and impacted species are widely
distributed in study area.
Short term impacts may lead to loss of large quantity of species or area covered
by species; but it will not lead to loss of local population.
Major ±4
Short term impacts may lead to loss of local population.
Site specific loss of fauna listed in IUCN, WCMC, bird life international, or any
other secondary information.
Impact on habitat/ecosystem of international importance.
Impact and/or loss of threatened species listed as endemic/ Schedule-I in IWPA-
1972, BSI, red book data, ZSI, or literature published by any State Government
Institute/university/ collage etc.
Catastrophic Impact on genetic diversity ±5
Impact on ecosystem i.e. river, forest, wetland etc.
Impact on WLS / ESZ /NP/ RF
After identifying the consequence severity, the probability of occurrence also needs to be estimated to
arrive at a complete picture of environmental impact risk. Table 4-4 &
Table 4-5 provides probability/likelihood ratings on a scale of 1 to 5. These ratings are used for estimating
the likelihood of each occurrence.
Table 4-4: Occurrence Frequency Assessment- Ecological
Category Ranking Occurrence frequency
Regular 5 Continuous occurrence/each day
Frequent 4 Occur several times each year
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-5
4.2.2.3 Quantifying Environmental Impact Risk
The level of environmental impact risk is calculated by multiplying the consequence score and the
probability of occurrence together. Thus
Significance of Impact = Consequence Score × Probability of Occurrence
The final score is in relative point score, rather than actual impact. Table 4-6 below as signs significance
criteria, based on the scale of 1-15, used for prioritizing mitigation measures for reducing the
environmental impact risks and thereafter, formulating and implementing. Environmental Management
Plans (EMPs).
To do this, environmental impact risk levels are first scored and identified as mentioned earlier and then
evaluated on the evaluation scale that follows in Table 4-6.
Table 4-6: Environmental Impact Significance Criteria
Consequence (Risk)
Probability
Insignificant (1) Minor (2) Moderate (3) Major (4) Catastrophic (5)
Rare (1) 1 2 3 4 5
Possible (2) 2 4 6 8 10
Likely (3) 3 6 9 12 15
Often (4) 4 8 12 16 20
Certain (5) 5 10 15 20 25
Ecological risk is categorized in to 3 levels from less, moderate and high ecological risk This is
summarized in Table 4-8.
Table 4-8: Ecological Risk Categorization
Score Significance Action Required
Activity/aspect should be eliminated or activity should be modified to
>20 High
include remedial planning.
11-20 Medium Operation subject to management by operational control
1-10 Low Operation subject to periodic monitoring/surveillance
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-6
For various activities at different stages of industrial setup impacts identified are listed in Table 4-1. While
the nature and extent of impacts is mentioned in Section 4.2.2. The mitigation measures are proposed for
these activities are given in subsequent sections:
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-7
en-vιsι n
4.3.1 Land Environment
Impact Scoring
S.
Activity Aspect /Impact Consequence Probability Significance Mitigation Measures Proposed
No. CxP
(C) (P)
Construction Phase
1 Site Clearing and minor Land use change in result of vegetation -4 1 -4 Medium No trees were cut down during site cleaning activity
excavation removal due to cleaning and excavation and 34% of total premises area was developed as a
of site. It must have increased sun greenbelt.
heating.
2 Civil Construction- Land use of the area was already -4 1 -4 Medium
construction for shed industrial but it was converted from open
to shed.It must have increased sun
heating.
3 Construction material There may have been changes in LU-LC -4 1 -4 Medium Proper dumping and leveling of construction waste
storage and disposal of land where construction material has shall be ensured.
been disposed.
Operation Phase
1 Usage of water Source of water is bore well and canal -3 5 -15 High Maximum optimization of water usage is followed by
water. It would have an impact on water utilizing treated water.
body and its competitive users. Rainwater harvesting system will be installed.
2 Storage, handling and Storage and handling of bagasse changes -3 4 -12 High The Bagasse is Stored in Bagasse yard within the
disposal of solid/ hazardous land use and land cover of the site. premises and regular care is taken not to spread it.
waste
ETP sludge of this project uses as manure 3 5 15 Positive
in composting that helps in greenery of
land area.
3 Effluent management Effluent generation from the unit and is 3 5 15 Positive Treatment of effluent will be ensured to achieve
being treated and treated effluent uses for desired quality for on land irrigation.
on land irrigation purpose.
It helps in improving green area of the
land and maintaining water body by
reduction of fresh water requirement.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-8
en-vιsι n
Impact Scoring
S.
Activity Aspect /Impact Consequence Probability Significance Mitigation Measures Proposed
No. CxP
(C) (P)
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-9
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-10
en-vιsι n
4.3.3 Water Environment
Impact Scoring
S.
Activity Aspect/Impact Consequence Probability Significance Mitigation Measures Proposed
No. CxP
(C) (P)
Construction Phase
1 Civil construction activity Water consumption in construction as -2 4 -8 High Due care was taken to avoid water wastage.
well as domestic activities would have Rain water harvesting system will be installed to
been lead to resource depletion. It could recharge the ground water level.
have been affect on competitive users
and their lifestyle.
2 Water usage Water requirement for the construction -2 4 -8 High
activities, it would have been affect on
competitive users and their lifestyle like;
flora, fauna, people, and soil quality of
the area.
Operation Phase
1 Usage of water Water consumption in various activities -3 4 -12 High Unit will installed rain water harvesting system
such as domestic, production, utilities within premises to collect and reuse rainwater.
may lead to resource depletion and its Effluent generated from the production is being
impact on other ecosystem. treated in ETP and treated water reuses for on land
irrigation purpose.
Conclusion: the impact scoring results shows that activity comes under High significance however with suggested mitigation measures, impacts can be lowered down. To check the efficiency of mitigation
measures Environment Management Plan is proposed.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-11
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-12
en-vιsι n
Impact Scoring
S. No. Activity Aspect/Impact Consequence Probability Significance Mitigation Measures Proposed
CxP
(C) (P)
4 Usage of Fuel for operation Noise from operation of boiler, antivibration pad for equipment with high vibration
of boiler & DG set DG set, etc is provided.
All the vibrating parts are checked periodically and
serviced to reduce the noise generation.
5 Landscaping and greenbelt Reduction in Noise and air 5 3 15 Positive Impact About 2,02,343 m2 of area has been developed as
area development pollution levels due to development Green belt with noise capturing species.
of noise capturing plants in the
vicinity of the project site
Decommissioning Phase
1 Dismantling of structures of Noise due to operation of heavy -2 1 -2 Low Maintenance of vehicles and equipment, restriction
the project components machineries for dismantling of this of dismantling activity only for day time with proper
project. planning will reduce noise levels.
Conclusion: The impact scoring results shows that activity comes under Low to High significance with one positive activity/impact, however with suggested mitigation measures, impacts can be
lowered down. To check the efficiency of mitigation measures Environment Management Plan is proposed.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-13
4.3.4.1 Projection of Proposed Traffic
Activities:
Vehicular movement for raw material, products, wastes, and fuel transportation
Mitigation:
Traffic survey was conducted at Sayan to Kim road. Based on the traffic survey hourly vehicular traffic has
been calculated. Passenger Car Unit (PCU) has been calculated by applying PCU factor. Increase in load of
trucks due to the movement of raw materials, fuel and products have been calculated. A design capacity of
road has been taken from the Indian Road Code. Assessment of existing and after modernization traffic
load due to the proposed activities is given in Table 4-9.
Table 4-9: Assessment of Proposed Traffic Load
Two Lane without divider (One way)
PCU Factor as
Type of Vehicles Average Vehicles per Indian Road
Equivalent PCU
during Peak Code
per day
hr./day
Large Trailer 26 78 3
Heavy (Bus, Truck, etc) 302 906 3
Medium (Tractors, light
242 242 1
commercial vehicles etc)
Light (Car, Jeep, Pickup
313 313 1
Van etc.)
3 Wheeler (Rickshaw) 47 47 1
2 Wheeler (Scooter,
104 52 0.5
motorcycle, cycle etc)
Total PCU/hr 1638
From the table, it can be concluded that even for considering the worst case; there is minor increase in
vehicular load due to the modernization project. However, the total traffic load due to after modernization
project activity is very low compare to the design capacity of roads. Adequate parking arrangements are
provided within the industrial premises.
As no major increase in traffic due after modernization project, there is less chance in increase in vehicular
pollution. However, unit is taking adequate measures such as transporters is instructed to use only PUC
certified trucks/vehicles and carrying out regular service and maintenance of them.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-14
en-vιsι n
4.3.5 Ecological Environment
Impact Scoring
S.
Activity Aspect Consequence Probability Significance Mitigation Measures Proposed
No. CxP
(C) (P)
Construction Phase
1 Site Clearing Existing vegetation may have been lost and -2 1 -2 Low Tree cutting activity was not carriedout during site
disturbed the fauna preparation. Total 34 % of greenbelt was developed
within premises.
2 Vehicle movement for Spillage of construction material could have -2 2 -4 Low Waste materials were stored and disposed properly.
transportation of been disturbed the fauna & the growth of the Soil characteristics were restored with time hence
materials and equipment flora. this was reversible impact.
3 Transportation and Construction work leads -3 2 -6 Low Vehicular movement and construction activity was
Civil Construction & to dust emissions which could have been restricted only for daytime.
disposal of construction affect the faunal species of the premises.
material Existing soil characteristic may have been
4 Heavy fabrication work lost and it leads to disturbance to growth of -1 2 -2 Low
including metal cutting flora species.
(Gas cutting, welding) High noise may generate due to operation of
heavy machinery for demolition,
construction and fabrication works which
would have been disturbed the faunal
species of the area.
Operation Phase
1 Storage and Handling of Penetration of leachate & Spillage of waste -4 1 -4 Low Molasses and Chemicals are stored in designated
Bagasse, molasses and can cause adverse impact on local flora & area with spillage collection system.
haz. waste fauna in nearby vicinity area. Bagasse is storage in bagasse yards.
ETP sludge is properly utilized as manure for
composting to develop soil quality of the premises.
2 Effluent/Sewage Due to leakage or spillage of effluent can -1 1 -1 Low Effluent generated from the production is treated in
management cause site specific short term disturbance of ETP and treated water reuses for on land irrigation
subsoil fauna. purpose.
3 Manufacturing Activity Noise generation due to process activity -1 2 -2 Low Timly lubrication of machinaries
PPE’s are provided to worker.
Heavy noise generating equipmrnts are installed with
acuastic enclousers.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-15
en-vιsι n
Impact Scoring
S.
Activity Aspect Consequence Probability Significance Mitigation Measures Proposed
No. CxP
(C) (P)
3 Usage of Fuel for Emission of fluegas due to operation of -2 5 -10 Low Proper APCD is provided to Boiler, D. G. Set.
operation of boiler, boiler and D. G.Set. APCM is required to the bagasse, methane gas and
D.G.set & operation of Furnace oil based boiler. Multicyclone Separator
Air Pollution Control with Wet Scrubber is provided with 4 nos. of
Measures System boilers and adequate stack height is provided with
1 no. of boiler.
Adequate noise control measures such as
antivibration pad for equipment with high vibration
is provided. The equipment, which generates
excessive noise (e.g. DG set), is provided with
enclosures etc.
6 Landscaping and Development of greenbelt area is lead to 4 4 16 Positive About 2,02,343 m2 of area has been developed as
greenbelt area restoration of local flora, fauna and affected impact Green belt with noise capturing species.
development habitats
7. Dismantling of structures Noise due to operation of heavy machineries -2 -4 -8 Low The equipment, which generates excessive noise
of the project for dismantling of project may affect local (e.g. DG set), shall be provided with enclosures.
components flora, fauna and affected habitats. Dismantling activity will be restricted for only day
time.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-16
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-17
en-vιsι n
Impact Scoring
S.
Activity Aspect/ Impact Consequence Significance Mitigation Measures Proposed
No. Probability (P) CxP
(C)
3 Operation of Air This will help to reduce flue gas emissions 4 5 20 Positive To control flue gas and fugitive emission adequate
Pollution Control within premises as well as study area and pollution control measures will be installed &
Measures System thus reducing impacts on various receptors. followed.
Health care activities should be carried out for
4 Landscaping and Plantation will be carried out in villages 4 4 16 Positive community.
greenbelt area within 10 km radius with major focus in Healthcare activities for worker due to bagasse.
development core zone under CER/CSR activities. Village developmental activities shall be done.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-18
en-vιsι n
5 Usage of fuel, electricity Fire due to fuel storage/handling if -2 5 -10 High Earthing was provided
and resources ignition available Fire hydrant/Fire extinguishers was available
Electrocution due to Electric shock, First aid box is available
burns, damaged cable, no earthing
6 Construction material Injuries/cuts due to improper storage, -2 4 -8 High Avoided manual handling
Handling, storage and excessive weight lifting Proper stacking or storage of construction material
disposal Preventive maintenance of crane of lifting machine
Operation Phase
1 Storage and Handling of Injury/cuts due to Fall from height, -3 2 -6 Medium Using proper PPEs
Bagasse and molasses Accident due to moving part Closed conveyor belt is provide
Bagassosis due to long term
Bagasse dust exposure Nip guard/Fixed guard provide
Spillage/leakage from molasses tank Preventive maintenance
Pull code switch is provide
Spillage/leak attend properly
Regular medical checkup of employees was carried
out. Same practice is continuing.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-19
en-vιsι n
Impact Scoring
S.
Activity Aspect/Impact Consequence Probability Significance Mitigation Measures Proposed
No. CxP
(C) (P)
2 Manufacturing Process Mechanical hazards e.g. pressure release, -3 1 -3 Low Feed quantity controlled either volumetrically or
leaks, equipment or utility failure gravimetrically.
Electrical hazard Process control devices like sensors, alarms, trips and
Noise/Vibration other control systems
Heat Stress due to improper ventilation
High Temperature indicator valve and alarm system
Auto cut off system after reaching of predetermined
maximum safe temperature.
Pressure gauge and Safety Control valve
Skilled workers
Mechanical seal in all pumps and reactors
Proper Insulation
Adequate Illumination and Ventilation
3 Effluent Management Injuries/Cutting due to moving -3 2 -6 Medium Trained and Experience Staff
part/machinery, Fall, Slip, struck with Good Practices is follow
object
Biological hazard due to direct exposure Use proper PPEs
with untreated effluent Proper disposal of ETP sludge
Spillage/leakage of effluent Provided impervious/pucca flooring near ETP area
4 Storage, handling and Release of toxic vapor due to spillage/ -3 2 -6 Medium Adequate level of natural or artificial lighting and
disposal of hazardous leakage of drum. Adequate Ventilation
chemical and waste Injuries/Cuts due to collapse of Proper Raw material stacking.
containers.
Spillage/ leakage of chemicals during Avoid manual handling.
transportation, loading, unloading, Provided Fire Extinguishers/fire hydrant
charging. Operators/Workers are trained for Safe Work
Practices.
Spillage is cleaned or neutralized with suitable
media.
Use of Suitable protective clothing, gloves, boots
shall be used
5 Usage of Fuel for Flue gas emission from vehicles, boiler, -3 1 -3 Low To control process gas, flue gas and fugitive emission
operation of boiler, CPP DG set. adequate pollution control measures are installed.
& DG set Hearing loss due to noise of operation of -3 2 -6 Medium Use proper PPEs
boiler, CPP & DG set Preventive -maintenance and lubricating to reduce
noise.
Plantation
The details for additional requirements are given in
Table 7-7.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-20
en-vιsι n
Impact Scoring
S.
Activity Aspect/Impact Consequence Probability Significance Mitigation Measures Proposed
No. CxP
(C) (P)
Operation of APCM will reduce 2 5 10 Positive --
emissions.
8 Landscaping and greenbelt The greenbelt consisting of air & noise 2 5 10 Positive --
area development pollutant tolerant will help to reduce
pollution load and thus improving health
of workers
Decommissioning Phase
1 Dismantling of structures Workers will be susceptible fugitive -3 1 -3 Low Site will be covered properly to reduce effect of
of the project components emission, flue gas emission, excessive fugitive emission from civil and site clearing
noise & occupational injuries etc. during activities on nearby community due to dismantling of
dismantling of structures of the project this project.
components. Workers were provided with PPE’s.
Conclusion: the impact scoring results shows that activity comes under Low to High significance with one positive activity/impact, however with suggested mitigation measures, impacts can be lowered
down. To check the efficiency of mitigation measures Environment Management Plan is proposed.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-21
en-vιsι n
4.3.8 Air Environment
Impact Scoring
S.
Activity Aspect Probability Significance Mitigation Measures Proposed
No. Consequence (C) CxP
(P)
Construction Phase
1 Site clearing, Vehicle Fugitive emissions may have occurred -3 4 -12 High Construction materials were transported in covered
movement for due to construction activities. trucks. Water sprinkling was carried out on site.
transportation of materials Flue gas emissions may have ocuured Minimum stock of materials were maintained and
and equipment due to vehicular movement; DG set covered with sheet.
Civil Construction operation. Proper maintenance of transportation of vehicles was
Constuction material VOC during painting could have carried out to reduce flue gas emission.
storage and disposal affected on health of workers. VOC may affected workers hence PPE’s was
Usage of fuel, electricity mandatory while Painting.
and resouces
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-22
en-vιsι n
Impact Scoring
S.
Activity Aspect Probability Significance Mitigation Measures Proposed
No. Consequence (C) CxP
(P)
waste.
Following measures are proposed to control
fugitive emissions during existing and after
modernization activities:
Good housekeeping is maintained in the plant.
The open area is covered with either greenbelt of
paved surface to avoid dust during transportation
within plant.
Wetting of roadways to reduce traffic dust and re-
entrained particles
Fly ash is mixed with ETP sludge and used in
factory farm or sell to brick manufacturer
Flue Gas emission and APCM
APCM is required to the bagasse, methane gas and
Furnace oil based boiler. Multicyclone Separator
with Wet Scrubber is provided with 4 nos. of
boilers and adequate stack height is provided with
1nos. of boiler.
APCM is required to DG set; Acoustic Enclosure is
provided.
There is no process gas emission from existing and
after modernization project.
8 Landscaping and The greenbelt area consists of air 3 4 12 Positive --
greenbelt area pollutant tolerant species which helps impact
development to reduce pollution load.
Decommissioning Phase
1 Dismantling of structures Fugitive emission due to dismantling -2 1 -2 Low Site will be covered to avoid fugitive emission.
of the project components of project structures. Dismantled construction waste will be transported in
covered trucks.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-23
en-vιsι n
4.3.9 Air Quality Modeling
During operation phase the emission of flue gas is take place. Although required APCM will be provided,
based on modeling required modification will be suggested after impact quantification. The details of flue gas
stack considered for study and input data for model area given in Table 4-10. Primary meteorological data
(refer Table 3-1) have been used for AERMOD.
Table 4-10: Details of Stacks
Exit Stack
Stack Stack Exit Gas Emission
Stack Gas Expected
Stack Attached to Diameter Height Temperature Rate
No. Velocity Pollutant
(m) (m) (K) (g/s)
(m/s)
Steam Boiler No.: 1, PM 2.265
1 2 & 3* 3.2 30 2.8 438 SO2 0.036
(20 TPH each) NOx 0.059
PM 1.464
Steam Boiler No.: 4
2 2.85 40 3 433 SO2 0.034
(40 TPH)
NOx 0.046
PM 1.464
Steam Boiler No.: 5
3 2.85 40 3 433 SO2 0.034
(40 TPH)
NOx 0.046
PM 0.222
Steam Boiler No.: 6
4 2 30 0.75 433 SO2 0.003
(10 TPH)
NOx 0.005
After Modernization (After seperation of Boiler No. 3 from common stack No. 1)
PM 11.716
Steam Boiler No.:
1 3.2 30 14 438 SO2 20.446
1, 2 (20 TPH each)
NOx 7.348
Steam Boiler No.: PM 4.902
2 3 2.06 30 14 433 SO2 8.554
(20 TPH) NOx 3.074
PM 8.184
Steam Boiler No.:
3 3 40 11 433 SO2 14.282
4 (40 TPH)
NOx 5.133
PM 8.184
Steam Boiler No.:
4 3 40 11 433 SO2 14.282
5 (40 TPH)
NOx 5.133
PM 2.976
Steam Boiler No.:
5 2 30 9 433 SO2 5.193
6 (10 TPH)
NOx 1.866
4.3.9.1 AERMOD
The dispersion of pollutants in the atmosphere is a function of several meteorological parameters viz.
temperature, wind speed and direction, mixing depths, inversion level, etc. A number of models have been
developed for the prediction of pollutant concentration at any point from an emitting source.
Atmospheric Dispersion Modeling System (AERMOD) is a steady-state plume model that incorporates air
dispersion based on planetary boundary layer turbulence structure and scaling concepts, including treatment of
both surface and elevated sources, and both simple and complex terrain.
In the stable boundary layer (SBL), it assumes the concentration distribution to be Gaussian in both the
vertical and horizontal. In the convective boundary layer (CBL), the horizontal distribution is also assumed to
be Gaussian, but the vertical distribution is described with a bi-Gaussian probability density function (pdf).
This behavior of the concentration distributions in the CBL was demonstrated by Willis and Deardorff (1981)
and Briggs (1993).
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-24
en-vιsι n
Additionally, in the CBL, AERMOD treats “plume lofting,” whereby a portion of plume mass, released from
a buoyant source, rises to and remains near the top of the boundary layer before becoming mixed into the
CBL. AERMOD also tracks any plume mass that penetrates into the elevated stable layer, and then allows it
to re-enter the boundary layer when and if appropriate. For sources in both the CBL and the SBL AERMOD
treats the enhancement of lateral dispersion resulting from plume meander.
There are two input data processors that are regulatory components of the AERMOD modeling
system: AERMET, a meteorological data preprocessor that incorporates air dispersion based on planetary
boundary layer turbulence structure and scaling concepts, and RAMMET, a powerful meteorological pre-
processor which allows you to convert raw meteorological data to the format required by the U.S. EPA
AERMOD model.
4.3.9.2 Methodology
Meteorology is the fluid mechanics applied to the atmosphere. Meteorological conditions play an important
role in determining proposed air quality and environmental conditions. The essential relationship between
meteorology and atmospheric dispersion involves the wind in the broadest sense of the term. Wind
fluctuations over a very wide range of time and space scales accomplish dispersion and strongly influence
other processes associated with them. The characterization of the proposed meteorological conditions near a
source of pollutants is, therefore, a critical aspect for assessing air quality in the ambient environment. For the
rapid air quality impact assessment meteorological data for the desired season/period over the project region
are used for air quality modeling. The following subsections describe the prime meteorological parameters
during the observation period which govern the dispersion of pollutants.
PM10 3.33
SO2 1010.10 1010.10 0.07 1.74 NE
NOX 0.001
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-25
en-vιsι n
While the predicted 24 hourly short term incremental Concentrations from at the monitoring locations are
given in Table 4-12.
The spatial distribution of ground level incremental concentrations of PM10, SO2 and NOx, due to modernized
plant operation on the study area of 10 km around the site is shown in Figure 4-1, Figure 4-2 and Figure 4-3.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-26
en-vιsι n
Figure 4-1: Spatial Distribution of 24-Hour Average PM10 Concentration from the Source (μg/m3)
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-27
en-vιsι n
Figure 4-2: Spatial Distribution of 24-Hour Average SO2 Concentration from the Source (μg/m3)
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-28
en-vιsι n
Figure 4-3: Spatial Distribution of 24-Hour Average NOx Concentration from the Source (μg/m3)
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-29
en-vιsι n
Table 4-12: 24 hourly Short Term Incremental Concentrations from Source
Co-ordinates Existing
monitored 24 Hourly
Monitoring Resultant
Pollutant maximum Incremental
Stations X Y (µg/m3)
concentration (µg/m3)
(µg/m3)
Project PM10 83.7 0.00 83.7
Site_Sayan 0 0 SO2 18.2 0.00 18.2
Sugar (A1) NOx 26.30 0.00 26.3
PM10 82.11 0.28 82.39
Sayan (A2) -1812.05 -2641.67 SO2 18.71 0.00 18.71
NOx 22.73 0.00 22.73
PM10 67.11 0.25 67.36
Segvasyadla
-5530.40 -5424.55 SO2 14.63 0.00 14.63
(A3)
NOx 19.27 0.00 19.27
PM10 68.91 0.23 69.14
Obhla (A4) -3952.54 3310.07 SO2 14.12 0.00 14.12
NOx 18.87 0.00 18.87
PM10 73.1 0.91 74.01
Mulad (A5) 857.27 6872.50 SO2 16.86 0.01 16.87
NOx 20.53 0.02 20.55
PM10 65.43 0.89 66.32
Kudsad (A6) 6822.52 1855.80 SO2 15.73 0.01 15.74
NOx 19.84 0.02 19.86
PM10 86.24 0.63 86.87
Pipodara (A7) 1030.41 -1185.52 SO2 19.34 0.01 19.35
NOx 28.27 0.01 28.28
PM10 73.64 0.09 73.73
Shekhpur
2610.50 3884.40 SO2 17.14 0.00 17.14
(A8)
NOx 22.18 0.00 22.18
Predication of incremental values of CO and HC are not done as there were not detected in baseline
monitoring.
4.3.9.4.1 CONCLUSION
After establishment of proposed modernized project, these concentrations are found to be well below the
permissible NAAQs norms for rural/residential zone and Industrial zone. Therefore, the proposed
modernization activity will not have any significant adverse impact on the air environment.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 4-30
en-vιsι n
CHAPTER 5 ANALYSIS OF ALTERNATIVES (TECHNOLOGY AND
SITE)
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 5-1
en-vιsι n
CHAPTER 6 ENVIRONMENTAL MONITORING PROGRAM
6.1 INTRODUCTION
Environmental monitoring describes the processes and activities that need to take place to characterise and
monitor the quality of the environment. It checks efficiency of mitigation measures and changes in
environment over period of time.
The objectives of environmental monitoring program are;
To verify the results of the impact assessment study in particular with regard to new development;
To follow the trend of parameters which have been identified as critical;
To check or assess the efficiency of the pollution control measures;
To ensure that new parameters, other than those identified in the impact assessment study, do not
become critical through the commissioning of new installations;
To check assumption made with regard to the development and to detect deviations in order to initiate
necessary measures; and
To establish a database for future Impact Assessment Studies for new projects.
Regular monitoring of important and crucial environmental parameters is very important to assess the status of
environment during operational phase. With the knowledge of baseline conditions, the monitoring program
can serve as an indicator for any deterioration in environmental conditions due to operational phase and
suitable mitigation steps could be taken in time to safeguard the environment. Monitoring is as important as
that of control of pollution since the efficiency of control measures can only be determined by monitoring.
Proposed environment monitoring plan is given in Table 6-1.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 6-1
en-vιsι n
Table 6-1: Budget for Implementation of Environmental Monitoring Plan
Work shall be assigned Total
Attribute Aspect Locations Monitoring Frequency Parameters/ Records
to Budget (INR)8
Air Stacks Monitoring All flue gas stacks except DG Twice in a year or as per PM10, SO2, NOx, CO & HC NABL/ MoEF &CC 5000/stack
stack – as DG is for emergency EC and CCA accredited lab
only
Ambient Air Quality Minimum 2 location within the PM2.5,PM10, SO2, NOx NABL/ MoEF &CC 4500/station
Monitoring premises accredited lab
Work area monitoring 3 to 5 Twice in a year or as per As identified by auditor. NABL/ MoEF &CC 5500/location
locations EC and CCA accredited lab
Water Quantity of water & Process, utilities, ETP, Daily to monitor water Records of water EHS department --
wastewater domestic, garden usage & to monitor ETP consumption and
load wastewater generation
Monitoring of wastewater ETP inlet and various treatment Daily to check efficiency pH, COD, NH3-N, TDS, In house laboratory Onsite by Party
stages of treatment system TSS
ETP outlet Monthly or as per EC and Other parameters as pH meter & flow meter is 2500 for 15
CCA mentioned in CCA. installed at ETP outlet. parameters/ sample
Fresh water source Intake water source Twice in a year or as per Parameters specified in IS: Other parameters by 4000 for 25
EC and CCA 10500 NABL/ MoEF &CC parameters / sample
accredited lab
Ground water quality Two piezometer well are Twice in a year or as per 4000 for 25
proposed EC and CCA parameters / sample
Noise Ambient noise monitoring Main gate, Production area, Twice in a year or as per Noise Level for Day & NABL/ MoEF &CC 200/ location
utility, ETP area EC and CCA Night time or specified in accredited lab
CCA/ EC
Soil Soil quality One inside premises and one At least once in a year in General parameters as NABL/ MoEF &CC 5000/ sample
outside premises pre-monsoon or as per considered in baseline (EC, accredited lab
consent of PCB pH, ESP,OC, Available P &
Available K)
Solid & Solid / hazardous waste Process, ETP etc. Twice in a year or as per General parameters as per NABL/ MoEF &CC 2500/ sample
Hazardous quality EC and CCA audit scheme by Honorable accredited lab
Waste high court of Gujarat
Quantity of Solid / As per EC/ CCA Daily Quantity of solid waste EHS department --
Hazardous Wastes generation
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 6-3
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 6-4
en-vιsι n
CHAPTER 7 ADDITIONAL STUDIES
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-1
en-vιsι n
7.3.2 Methodology
The steps involved in risk assessment methodology are as follows:
Hazard identification by studying the information of plant location, layout of the equipment & process condition;
Hazard assessment by qualitative risk assessment and quantitative risk assessment.
Quantification of Hazard involves selection of most credible scenario or worst case scenario;
Estimate consequences scenarios in the plant such as fire, explosion and toxic effect;
Estimate frequency of occurrence of any incident is to be found out by reliability analysis;
Prioritize and Reduce Risk by providing control / mitigation measures;
Preparing disaster management plan to face any accident and disaster caused by the project operations;
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-2
en-vιsι n
Table 7-2: Details of Other Chemicals
Type of MOC of Storage Nos. of Max. Storage
No. Material Name State
Storage Storage Capacity of unit storage unit (MT or KL)
Existing
1. Lime Solid Bags PP woven 50 Kg 1345 67 MT
2. Sulphur Solid Bags PP woven 20 Kg 942 19 MT
3. Phosphoric Acid Liquid Tank MS 5 KL 3 15 KL
4. Potassium Solid Bags PP woven 5 Kg 81 0.40 MT
Permanganate
5. Caustic soda Solid Bags PP woven 50 Kg 3230 162 MT
After Modernization
1. Lime Solid Bags PP woven 50 Kg 808 40 MT
2. Sulphur Solid Bags PP woven 20 Kg 808 16 MT
3. Caustic soda Solid Bags PP woven 50 Kg 54 3 MT
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-3
en-vιsι n
Table 7-3: Hazardous Characteristics of of major chemicals
Vapour Flammability Limit Odour
S. Name of Phase Sp. Gravity Flash Point Boiling Melting TLV (Mg/m³ LD50 LC50, NFPA IDLH
CAS NO Density Threshold
No Chemical (G/L/S) (Water = 1) (°C) Point (oC) Point (oC) LEL% UEL% or ppm) (Mg/kg) (Mg/m3/h) Rating (ppm)
(Air = 1) (ppm)
2 mg/m3
10
2. Lime 1310-73-2 Solid 2.13 NA N.A. 1388 323 N.A. N.A. from NA NA 3-0-1 NA
mg/m3
ACGIH
1400
3. Sulphur 7704-34-9 Solid 2.07 NA 207.2 444.6 119 35 g/m3 5 ppm NA NA 2-1-0 NA NA
g/m3
Potassium
Decompos 1090
4. permangan 7722-64-7 Solid 2.7 NA N.A. NA N.A. N.A. 5 ppm NA 1-1-0 NA NA
es mg/kg
ate
2 mg/m3
Caustic 1310-73-2 Solid 2.13 NA N.A. 1388 323 N.A. N.A. from NA NA 3-0-1 NA N.A.
5.
soda
ACGIH
7060 20000 3300
6. Ethanol 64-17-5 Liquid 0.79 1.59 16.6 78 -114 3.3 19 1000 ppm 2-3-0 NA
mg/kg ppm/10H ppm
7500
7. Furnace Oil 68334-30-5 Liquid 0.8-0.88 4.5 > = 40 150 - 371 -39 0.7 6 850 ppm NA 1-2-0 NA NA
mg/kg
5 g/M3/4
8. Diesel 8052-41-6 Liquid 0.81-0.91 3-5 32 215-376 18-46 0.6 6 800 ppm 5 g/kg 1-2-0 NA NA
hr
NA Not available TLV Threshold Limit Value UEL Upper Exposure Limit FP Flash point ACGIH American Conference of Governmental Industrial Hygienists
N.A. Not applicable TWA time-weighted average LEL Lower Exposure Limit CC Close Cup OSHA Occupational Safety and Health Administration
NG Not Given STEL short-term exposure limits BP Boiling Point OC Open Cup NFPA National Fire Protection Association
ND Not determined
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-4
en-vιsι n
7.4.2 Regulatory Permission Required For Storage of Chemicals
Qualitative Risk Assessment has been carried out for the following areas:
Hazard involving during Construction Phase;
Storage and Handling of Acids;
Storage and Handling of Flammable Chemicals;
Storage and Handling of Toxic Chemicals;
Storage and Handling of other Solid Chemicals;
In Qualitative Risk Assessment, risk has been analyzed using methodology called HIRA-Hazards
Identification & Risk Assessment. In HIRA, major manual activities carried out by plant personnel as well as
contract labors have been considered. The Risk Matrix is presented in Table 7-5, Risk acceptability criteria
given in Table 7-6 and HIRA worksheet presented in Table 7-7.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-5
en-vιsι n
Table 7-5: Risk Matrix
Severity
Minor Moderate
Major Catastrophic
Insignificant (First Aid (Medical
(Hospitable/ (Death/Mass
Likelihood (No injuries/Min. treatment/Med Treatment/
Large Financial ive Financial
financial loss) ium Financial High financial
Loss) Loss)
Loss) loss)
1 2 3 4 5
5 Almost Certain (often
5 10 15 20 25
occurs)
4 Likely (could easily
4 8 12 16 20
happen)
3 Possible (could happen
3 6 9 12 15
or known it to happen)
2 Unlikely (hasn't
2 4 6 8 10
happened yet but could)
1 Impossible (conceivable
but only on extreme 1 2 3 4 5
circumstances)
Reference: Fine Kinney Method
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-6
en-vιsι n
7.5.1 Hazard Identification and Risk Assessment (HIRA)
Table 7-7: HIRA Worksheet
Sr. Process / Hazards Associated Initial Risk Residual Risk
Effect Control/Mitigation Measures
No. Activity with /Cause Likelihood Severity Risk Likelihood Severity Risk
A. Construction Phase
1. Vehicle Accident Injury 3 2 6 Regular Maintenance of Vehicles 2 1 2
movement for Speed control of the vehicles
transportation Proper Road provided
of material
2. Site Clearing Fall from height, Injuries 2 2 4 Barricaded construction area 1 1 1
and Civil Collapse of scaffold Safety net provided
Construction Proper PPE’s provided to
workers
3. Heavy Fire due to welding Injury/cuts 3 3 9 Trained person 3 1 3
fabrication Fall from height Burns Good House Keeping
work include Struck with objects Proper illumination and Adequate
metal cutting Noise/Vibration ventilation
(Gas welding) Use PPE
B. Operation Phase
1. Transportation, Loading-Unloading , Transferring on Conveyor belt
1.1 Unloading of Fall load from height Injury/cuts 3 2 6 Inspected & tested lifting tool, 2 1 2
sugar cane on Over turn of OHT due Material loss tackle
Conveyor belt to heavy load Trained person/operator
by OHT lift Improper maintenance/ Work permit system with lock
operation out/tag out (LOTO)
Preventive maintenance
1.2 Operation of Accident due to Injury/cuts 3 2 6 Trained person & supervision 2 1 2
Conveyor belt moving part/machinery Nip guard/Fixed guard provide
Proper signage & labeling
Preventive maintenance
Pull code switch provided
1.3 Loading of Fall of load from Bagassosis due to 3 3 9 Use proper PPEs 2 1 2
Bagasse on height long term Nip guard/Fixed guard provide
Conveyor belt Bagasse dust exposure exposure of Proper signage & labeling
to Boiler area Accident due to Bagasse dust Preventive maintenance
moving part Injury/cuts Pull code switch provide
2. Sugarcane Milling, Sugarcane Juice Clarification, Concentration and Evaporation
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-7
en-vιsι n
Sr. Process / Hazards Associated Initial Risk Residual Risk
Effect Control/Mitigation Measures
No. Activity with /Cause Likelihood Severity Risk Likelihood Severity Risk
2.1 Sugar cane Accident due to Injury/cuts 3 3 9 Trained person & supervision 3 1 3
milling moving part/machinery Electrical Burns Nip guard/Fixed guard provide
Electrical Shock Use proper PPEs
Preventive maintenance
Proper Earthing.
Adequate Illumination
Good Housekeeping
2.2 Clarification, Mechanical hazards Burns 3 4 12 Feed quantity controlled either 3 1 3
Crystallizer, e.g. pressure release, Injuries volumetrically or gravimetrically.
Evaporation leaks, noise, Damage to Process control devices like
equipment or utility Equipments sensors, alarms, trips and other
failure Property loss control systems
Hazards due to failure Asphyxiation High Temperature indicator valve
of control and alarm system
Electrical hazard Auto cut off system after
Noise hazard reaching of predetermined
Heat Stress maximum safe temperature.
Pressure gauge and Safety
Control valve
Skilled workers
Mechanical seal in all pumps and
reactors
Proper Insulation
Adequate Illumination and
Ventilation
Juice heaters with necessary
valves, venting and condensate
extraction device with collection
tanks and safety for steam use.
Guards on stirrer and gear drives
and centrifugal machines.
2.3 Distillation Fire Hazard Burns/Death 3 4 12 Automatic control system 2 1 2
Unit Mechanical hazard Loss of material Fire extinguisher/Fire hydrant
Damage property system provision
Earthing bonding for static
charge
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-8
en-vιsι n
Sr. Process / Hazards Associated Initial Risk Residual Risk
Effect Control/Mitigation Measures
No. Activity with /Cause Likelihood Severity Risk Likelihood Severity Risk
Temperature gauge
Pressure gauge
Level Indicator
Personal protective device
Adequate local exhaust
ventilation
Good Housekeeping
Proper lighting and illumination
Machine Guarding & Fencing
Trained person & supervision
3. Storage, Handling of Hazardous Chemical/Acid/Alkalis, Molasses, Industrial Alcohol/Rectified Spirit
3.1 Handling of Fire due to Injury/cuts 3 3 9 Impervious floor 2 1 2
Hazardous Spillage/Leakage Burns/Death Adequate level of natural or
Chemical/Aci Release of toxic vapor Asphyxiation artificial lighting
d/Alkalis Reaction of Skin irritation Adequate Ventilation
incompatible chemical Loss of material/ Proper Raw material stacking.
Collapse of containers property Avoid manual handling.
Provide Fire Extinguishers/fire
fighting system.
Operators/Workers to be trained
for Safe Work Practices.
Regular Inspection
Spillage will be cleaned or
neutralized with suitable media.
Chemical handling bags to be
labeled properly.
Use of Suitable protective
clothing, gloves, boots shall be
used
SOP should be follow for
handling hazardous chemical
3.2 Storage and Health Hazard Injury/illness 2 2 4 Proper preventive maintenance 1 1 1
Handling of Spillage/leakage Containment loss schedule
Molasses in Catastrophic failure of Loss of tank Operators/Workers to be trained
Tank tank for Safe Work Practices.
Spillage/leak attended properly
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-9
en-vιsι n
Sr. Process / Hazards Associated Initial Risk Residual Risk
Effect Control/Mitigation Measures
No. Activity with /Cause Likelihood Severity Risk Likelihood Severity Risk
SOP should be follow
3.3 Storage and Fire due to Glands/seal Injuries 3 4 12 Fire hydrant system installed. 2 1 2
Handling of leaks in valves, pumps Burns/Death Flame proof Electrical fittings
Industrial Fire during loading Loss of provided
Alcohol/Rectif and unloading process containment Proper selection of MOC for
ied Spirit in if nearby ignition Property damage chemicals storage tank.
Tank sources Earthing/bonding provided for
Unloading road tanker static charges.
hose rupture. Flame arrestor provided on
flammable material storage tank
vent.
Level gauge and level
measurement instrument
provided on material storage
tank.
Safety permit system should be
follow
Fencing, caution note, hazardous
identification board provided
Authorized person permitted in
storage tank area
SOP should be follow.
Dyke wall should be providing.
4. Utility plant
4.1 Operation of Explosion due to Hit of Fragments 2 4 8 Water level indicator & controller 2 1 2
Boiler Failure of Controls or of boilers or inter lock
poor Maintenance Building Air to full ratio control
Hot water splash Flame failure control device
Burns and Injury Fire Extinguisher/Fire Hydrant
Loss of provided.
Equipment Temperature indicator
&controller
Regular inspection /cleaning
Testing of Boiler
4.2 Diesel Fire/Explosion Burns 2 3 6 Good Housekeeping maintained 1 1 1
Generator Generator Spillage/leak attended
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-10
en-vιsι n
Sr. Process / Hazards Associated Initial Risk Residual Risk
Effect Control/Mitigation Measures
No. Activity with /Cause Likelihood Severity Risk Likelihood Severity Risk
House & LDO damage Level indicator on LDO tank in
tank Damage property DG Room
No smoking in area
4.3 Electricity Fire due to lose contact Electric Burns 3 3 9 Regular inspection of electrical 2 1 2
of wires Damage Property fitting, flame proof fitting
Weak earthing provided in flammable area,
Short Circuit proper earthing.
Improper Insulation Regular measurement of earth pit
resistance.
4.4 Cooling Electrical Shock Burns 2 3 6 Trained Electrician 1 1 1
Tower Health Hazard due to Illness Use proper Personal Protective
Legionella bacteria Equipments
Good practice
4.5 Pipeline Fire/Explosion Burns 2 4 8 Regular inspection of pipelines 2 1 2
Network Toxic dispersion if Injuries and tanks. The damaged pipes &
leakage Damage flanges to be replaced, regular
Corrosion Equipment painting of pipelines.
Property loss Proper preventive maintenance
Color coding on pipeline
5. Captive Power Plant
5.1 Turbine and Fire/Explosion Burns 2 3 6 Regular inspection, maintenance 1 2 2
Generator Mechanical Hazard Injuries Proper storage, isolation from the
High Noise Damage ignition sources
Cooling system failure Equipment Ear plug, ear muff should
Short Circuits Property loss provided.
5.2 Power Fire/Explosion Burns 2 3 6 All electrical fittings and cables 1 2 2
Transformer Transformer oil Injuries are provided as per the specified
leakage/ Spill Short Damage standards.
circuit in Transformer Equipment Ensure that all electrical cabling
Overheating of Property loss in the area are properly insulated
Transformer & fire and covered.
Foam/CO2/dry powder type fire
extinguishers are to be provided.
6. ETP Area
6.1 ETP operation Moving Injuries/Cuts 3 3 9 Avoid manual handling 2 1 2
and part/machinery Asphyxiation Trained and Experience Staff
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-11
en-vιsι n
Sr. Process / Hazards Associated Initial Risk Residual Risk
Effect Control/Mitigation Measures
No. Activity with /Cause Likelihood Severity Risk Likelihood Severity Risk
Maintenance Fall, Slip, struck with Illness Good Practices to be follow
object Use proper PPEs
Biological hazard due Proper disposal of ETP sludge
to direct exposure with Provide impervious/pucca
untreated effluent flooring near ETP area
7. Electrical-Mechanical Preventive Maintenance Work
7.1 Operation & Person fall at height Burns 3 3 9 Use proper PPEs 2 1 2
Maintenance while working at Injuries LOTO system should follow
of Electrical height Asphyxiation Trained and Experience Staff
Appliances Exposure of Live Good Practices to be follow
Wires Work Permit System should
Falling of material/ follow
accessories
Fire in Waste Oil
Fire due to welding
Struck with objects
Conclusion
It can be concluded from the above table that, after providing mitigation measure in different Operations/activities, risk probability will change from almost
certain to possible as well as its residual risk will change from medium to low.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-12
en-vιsι n
The consequences of the release of Hazardous substances by failures or catastrophes and the damage to the
surrounding area can be determined by means of models. Models help to calculate the physical effects
resulting from the release of hazardous substances and to translate the physical effects in terms of injuries
and damage to exposed population and environment. To assess the damage level caused by the various
accidental events, it is essential to firm up the damage criteria with respect to different types of accidents
e.g. thermal radiation, toxicity, explosion overpressure etc.
Consequence analysis involves the application of mathematical, analytical and computer models for
calculation of effects and damages subsequent to a hydrocarbon release accident. Consequence models are
used to predict the physical behaviour of the hazardous incidents. The techniques used to model the
consequences of hydrocarbon and other hazardous material releases cover the following:
The information normally required for consequence analysis includes meteorological conditions, failure
data of equipment and components, ignition sources, population characteristics within and outside the
plant, acceptable levels of risk etc.
A. Heat Radiation
The consequence caused by exposure to heat radiation is a function of:
The radiation energy onto the human body [kW/m2];
The exposure duration [sec];
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-13
en-vιsι n
The protection of the skin tissue (clothed or naked body).
The limits for 1% of the exposed people to be killed due to heat radiation, and for second-degree burns
are given in the table below:
Table 7-8: Damages to Human Life Due to Heat Radiation
Exposure Radiation for 1% Radiation for 2nd degree Radiation for first degree
Duration lethality (kW/m2) burns (kW/m2) burns, (kW/m2)
10 Sec 21.2 16 12.5
30 Sec 9.3 7.0 4.0
Since in practical situations, only the employees will be exposed to heat radiation in case of a fire, it is
reasonable to assume the protection by clothing. It can be assumed that people would be able to find a
cover or a shield against thermal radiation in 10 sec. time. Furthermore, 100% lethality may be assumed
for all people suffering from direct contact with flames, such as the pool fire, a flash fire or a jet flame. The
effects due to relatively lesser incident radiation intensity are given below:
Table 7-9: Effects Due to Incident Radiation Intensity
Incident Radiation in kw/m2 Type of Damage
0.7 Equivalent to Solar Radiation
1.6 No discomfort for long exposure
4.0 Sufficient to cause pain within 20 sec. Blistering of skin (first degree burns are
likely)
9.5 Pain threshold reached after 8 sec. second degree burns after 20 sec.
12.5 Minimum energy required for piloted ignition of wood, melting plastic tubing etc.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-14
en-vιsι n
1/3
1-1 50% Ear drum rupture - -
Source: Marshall, V.C. (1977)' Howlethal are explosives and toxic escapes'.
LEGEND
1 2 3
PROBABILITY: SEVERITY: RISK RATING:
1 – HIGHLY UNLIKELY 1 – EXTREMELY MILD PROBABILITY x SEVERITY
2 – UNLIKELY 2 – MILD
3 – SOMEWHAT LIKELY 3 – MODERATE
4 – LIKELY 4 – SEVERE
5 – VERY LIKELY 5 – MOST SEVERE
There are fire risk scenario, on the operational and storage of chemicals.
The worst case scenario is also well within the reach of fire protection/mitigation measures, planned
for installation.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-15
en-vιsι n
Fire protection/control/mitigation measures are incorporated.
Hence, proposed project setup can be categorized as a medium hazard industry who can manage their risks
through invoking on-site emergency plan. The scope for Off-site emergency is visualized as a remote
possibility.
During the navigation of above sequence of activities, it is drawn to the understanding that the storage &
handling are to be closely associated with the Threshold Planned quantities (TPQ) of hazardous
chemicals. This will ensure, the associated preventive / mitigating facilities planned and installed for
managing the projected risk scenarios will be serving the desired objectives.
The in-house regulatory measures for implanting safety shall be appropriate to the risks, and to be handled
by trained persons for the purpose. SOPs are to be documented and identified people are to be trained.
Regular mock drills shall be planned and will be executed, as a preparation/ precaution for dealing with
emergency operations.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-16
en-vιsι n
B. Considerations for Maximum Credible Accident Scenario (MCA)
Pool Fire due leakage from tank
Internal Temperature: 32° C
Circular Opening Diameter: 1inch
The chemical escaped as a liquid and formed a burning puddle.
C. Chemical Properties
Chemical properties of each hazardous chemical stored within premises are given in Table 7-3.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-17
en-vιsι n
Figure 7-1: Threat zone of Maximum Credible Accident Scenario for Ethanol – Pool Fire
Figure 7-2: Threat zone of Worst Case Scenario for Ethanol – Pool Fire
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-18
en-vιsι n
Figure 7-3: Threat zone of Maximum Credible Accident Scenario for LDO – Pool Fire
Figure 7-4: Threat zone of Worst Case Scenario for LDO – Pool Fire
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-19
en-vιsι n
7.6.6 Summary
For purpose of consequence analysis, Distillery unit Maximum Credible Accident Scenario and Worst
Case Scenarios for the Tank storage have been considered.
The risk assessment study shows that existing setup of the unit has potential for damage to those inside
because of storage and handling of Ethanol.
As per the Consequence analysis in case of worst case scenario due to catastrophic failure of,
- Ethanol storage tank for pool fire the maximum hazardous distance is observed within 29 meter.
- Hence, it will pose threat to within 29 meter of storage area.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-20
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-21
en-vιsι n
Do’s Don’ts
end of the batch / job. required till the end of the batch / job
Check for proper manpower available till the entire Don’t work without enough and proper man
operation in over. power.
Time schedule should prepare for material flow on Don’t use the equipments which are not in
basis of the process. operable condition.
Monitor the temperature and pressure if possible Don’t use the materials for process without
during the process. verify the test certificates.
Use pumps for transferring the liquids to the reactor Don’t use the material without Prepare time
tank. schedule of material flow on basis of the process.
Familiarize the worker about what is the job on Don’t perform without Monitoring the
hand. temperature and pressure during process.
The worker or operator should have sufficient Don’t handle chemicals with open hands where
knowledge of the materials handling. manual handling is a must.
Visual instructions should properly display for Don’t keep the workers under wraps about what
characteristics of the chemicals. is the job on hand.
Ensure proper training of personnel. Don’t let the worker / operator do the work
Ensure sufficient numbers of safety devices are having lack of sufficient knowledge of the
available. materials handled.
In view of the chemicals handled, whether required Don’t use the chemical with unknown
or not, please ensure availability of SCBA characteristics or having unreadable label.
apparatus near every use and storage area of Don’t let the personnel do the work without
chemical. giving proper training.
Ensure the workers wear proper PPE of adequate Don’t work without sufficient numbers of safety
grade. devices.
Demarcation of the chemical storage area for Don’t let the workers do work without wearing
chemical in test. proper PPE of adequate grade.
Ensure removal of used containers from Don’t use material that is under testing for
workspaces. production.
Prepare and follow the safe work instruction. Don’t store used containers at workspaces.
Record every incident that led to an accident Don’t breach the safe work instruction.
irrespective of the seriousness of the accident and Don’t try to conceal information regarding
analyze the same to improvise the system missed accidents or small injuries. Remember
continuously. every and any mishap can be fatal if not for
Always check the fire water tank to be filled up to yourself for others.
the brim to ensure availability of fire water in After any shutdown never start operation without
sufficient quantity at all times. The design of other having ensured the fire water tank filled up.
water to be used shall be from the overflow of the Don’t work bare foot or without safety shoes.
fire water tank to ensure this system. Don’t use mobile phones in work zones.
Never work bare foot or without safety shoes. Do not use PPEs which are not relevant to the
Never use mobile phones in work zones. operational aspect that has been identified.
Use only proper grade PPEs and use them properly. Don’t open or use containers on which
Open or use containers only on written instruction. instruction are not written.
Verify the label with the instruction before use. Don’t work without Verifying the label with the
Participate wholeheartedly in all safety related instruction before use.
exercises an keep yourself updated. Don’t ever even thinking of evading safety
instructions.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-22
en-vιsι n
a. Induction Training
This training covers the overview of organization, company policies and departments, basic rules and
system called induction Training.
The induction Training will be imparted to every new employee as well as visitors. It will be extended to
Driver/ Contract employees on later stage.
b. On the Job & Class Room Training
Class Room training is provided to all employees on various subjects by concerned internal and external
faculty as per the Schedule prepared by HRD.
On the job Training is imparted to all new joiners by the concerned HOD or his/her designee related to the
area of operation. This Training program includes the Training related to the specific aspects of an
employees’s role including use of equipment, unit operations, and safety norms to be followed.
If any employee is transferred from one area of operation to other area of operation within the department,
Training on related SOPs is imparted to the employees.
c. Refresher Safety Training
All employees is undergo refresher Training on the procedures of their respective functions and related or
cross functional department processes, whenever needs identified.
Refresher Training is carried out as per ongoing calendar, and whenever there is a procedural change or
revision in the SOP.
External Training
Persons from another sites, locations and persons from outside of organizations will be called to give
training as and when required for specialized subjects.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-23
en-vιsι n
The external Safety training will be conducted for Mandatory safety training as required under Section
111-A ii of the Factories Act 1948 to all employees and contract employees through DISH Approved
Safety Training Institute.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-24
en-vιsι n
7.6.13 Minimization of the Manual Handling of Hazardous Substance
Employers and employees should examine their workplaces to detect any unsafe or unhealthful conditions,
practices, or equipment and take corrective action. Minimize lifting of raw materials, heavy loads by using
appropriate platforms, trolleys etc. Manual material handling only the causes of musculo-sketal disorders
(MSD), backache, pain in minor and major joints, fatigue etc. following measure have been taken to avoid
mentioned ill health effect to workers.
Below 25 Kg weight will be handling by a worker if required to do so.
Material handling lorry-cart, drum handling trolley, fork lift, stacker, etc. will be used for material handling.
Training will be carried out for Manual material handling.
Avoid the moving, manual handling of hazardous material.
Care of PPE’s
Visual check for personal protective equipment is carried out by the user for its integrity before its use
and, if any defects are observed, the concerned supervisor is informed promptly and the defects corrected
or PPE replaced.
Self contained breathing apparatus will be inspected and details of the inspection and maintenance will be
recorded.
All employees are familiarized themselves with different types of PPEs available in the company.
When not in use, PPE is carefully stored in a designated place.
PPE’s is keeping in a safe place well covered, away from sunlight and dust.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-25
en-vιsι n
7.6.15 Medical Facilities
Medical facilities are needed to provide immediate medical attention to people who may be exposed to certain
health risks during an accident. The factory is covered under ESI. All the injured persons will be sent to
nearby Hospital for treatment after giving first aid. A general agreement for immediate treatment is made
between the nearest hospital and the plant.
The First Aid boxes are kept in the Security Office, Production Plant, QC, and Safety Office. The First Aid
Boxes are checked from time to time and the first aid material is replenished immediately.
Industry has appointed a full-time medical officer and also external medical officer. Occupational Health
Centre (OHC) is located at HR Department which contains safety shower, eye wash centre and oxygen-
administering facility, etc. The contact numbers of all nearby hospitals and medical facilities are put up on a
board in the First Aid Centre. An emergency guide is provided to each employee, which gives guidance to
him or her during an emergency.
Antidotes are available in Occupational Health Centre (OHC) as well as in the area where chemical exposure
is likely. The list of antidotes is as under:
Table 7-18: List of Antidotes
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-26
en-vιsι n
7.7.2 Occupational Health Monitoring
Occupational health surveillance of the workers (Pre-Employment, Periodic Check up and Post -checkup) is
carried out on a regular basis as per section-41-C of the Factories Act and Rule-68-T of Gujarat Factories
Rules and records are maintained in form 30 & 32. Full time internal medical officer is available at project
site.
In Sugar and distillery industry main Health hazards is;
Bagassosis due to bagasse dust in Sugar plant
Noise and Vibration due to heavy machineries
Working at height, Falling objects, Struck with Objects
Cutting, Injuries etc.
Heat Stress
Table 7-19: Occupational Health Monitoring
Sr. Check up
No. Medical Test
Pre employment Periodical Post employment
1. Vision ✔ ✔ ✔
2. Audiometry ✔ ✖ ✔
3. Spirometry ✔ ✔ ✔
4. X-Ray ✔ ✔ ✔
5. Urine ✔ ✔ ✔
6. RBCs ✔ ✔ ✔
7. PFTs ✔ ✖ ✔
All precautions would be taken to avoid foreseeable accident like spillage, fire and explosion hazards and to
minimize the effect of any such accident and to combat the emergency at site level in case of emergency. Risk
control preventive & mitigative measures are discussed in previous section. Medical checkup is conducted
regularly. Medical records of employees are given as Annexure VI.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-27
en-vιsι n
Rule 13, 14 and Schedule II & 12 of the Manufacture; Storage and Import of Hazardous Chemicals Rules,
1989 and Rule 5,7,9 and 10 of the Chemical ' Accidents (Emergency Planning, Preparedness and Response)
Rules, 1996 also provide for on-site and off-site emergency plans.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-29
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-30
en-vιsι n
Members of above teams will be available during all shifts and holidays. Protective equipment, lifting gears,
fire control points etc.; will be provided in sufficient numbers and their locations will be well informed.
Necessary vehicles will be kept ready to shift persons in case of emergency.
Details of Antidotes, PPE’s, Medical facilities and Fire fighting system are provided. Minimum two persons
qualified as Incident Controller must be present anytime during plant operation. If this condition is not met,
temporary suspension of chemical operations must be initiated.
A. Emergency Control Centre
The Security office near the factory main gate has been earmarked as an emergency Control Centre. All the
operations to handle and control emergency are coordinated from the emergency control centre. The
emergency Control Centre is always in close liaison with HSE, Medical Operation & HR Dept. in-side the
factory. The emergency Control Centre is manned all the time by a security guard. The Security Guards have
been trained on various actions to be taken in case of emergency. They are made aware about the emergency
communication facilities, first aid, basic fire fighting etc. All employees who come for duty and while going
back make necessary record into the Emergency Control Centre. Moreover visitors are also not allowed to
enter inside the factory premises without taking necessary gate pass from the emergency control centre. This
helps to know the exact number of employees and visitors at a time available in the factory / Head Count.
B. Chain of Command during Emergency
1. Incident Controller
A person eligible for Incident Controller status must hold a minimum position of “Shift In-Charge”.
Furthermore, training must be given to the concerned and exams must be passed 6 monthly to retain the status.
At the time of emergency the highest ranking – and qualified – person present in the company will put in
charge of Incident Controller and second highest ranking qualified person is put in charge of Incident Deputy
Controller. Qualified personnel in ranking order are listed. Any higher ranking personnel arrives in the
company premises on emergency call automatically takes over the Incident Controller or Deputy Incident
Controller charge after debriefing.
2. Site Controller
Site Controller and Site Deputy Controller status is held by Chief Executive Officer (CEO) and any deputy
ordered by CEO. If Site (Deputy) Controller is present at company premises, he takes charge of Incident
(Deputy) Controller automatically.
3. In case of Off-Site Emergency
If Off-Site Emergency is declared by Site Controller Government Authorities automatically take charge of
main controller status. All company employees are required to act as per the instructions of District
Emergency Commander.
C. Fire Fighting Team
Any employee of company can become a Fire Fighting Team member on instruction of his superior. Training
must be given to the concerned Fire Fighting Team members play a major role in in-house tackling of fire
incidents. They are required to operate fire fighting equipment in front-line, help other employees into safe
place and take any fire-control measure on order of Incident Controller. It is always ensured that minimum 3
Fire Fighting Team Members are present in the premises. Fire Fighting Team commander is Site Deputy
Controller under normal operation and Incident Controller during emergency.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-31
en-vιsι n
D. First Aider
First aid training time to time provide by approved agency& at lease minimum first aider available in all shift.
E. Assembly Points
Assembly point is the place, where the non-emergency employees are assembled for a head count. Later they
are kept at the same place OR shifted to a safer place on the advice of IC. Two assembly points are provided.
Assembly point will be located inside the site of the plant. Normally assembly points are away from the bulk
storage locations, near to the plant main security gate, and located in upward side of the predominant wind
direction. The wind sock will be installed on the top of the plant building for instantly knowing the current
wind direction and is clearly seen from the assembly points.
All employees of the factory should know the above codification, so that he can take appropriate action as
deem fit at the time of emergency.
B. Mobile Phones
To communicate with the concern key persons in emergency, the facility of mobiles has been provided to
concern dept. head / key personnel.
It is strictly prohibited to use mobile phones in and near areas where chemical spillage is happening!
To communicate the verbal or written messages in emergency, a facility for runner is devised; people are also
identified for the same who can go and communicate the required message / information.
C. Evacuation Plan
Graphical evacuation plan is prepared by Maintenance Dept. Display boards marking fire exits and assembly
points are prepared and placed accordingly. Revision is done yearly.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-32
en-vιsι n
7.8.2.2 Sequence of Action in Emergency
A. In case of Fire, Explosion
Any person noticing fire or explosion should attract attention of nearby persons by shouting Aag…
Help… Aag…….. Help…. Aag.......Help…
He will try to start combating the fire with available resources.
Types of extinguishing media to be used:
Do not use water to extinguish solvent fire! Use water monitor with foam!
Do not use water to extinguish electrical fires!
He will inform the Incident Controller via Security Office or any other means.
After receiving information Incident Controller and Incident Deputy Controller immediately take their
charge and start action.
Incident Controller rushes to the site and stays there until emergency is over; instructs all personnel,
especially Fire Fighting Team members on combating fire and all other actions.
Incident Controller takes decision on evacuation, orders First Aider to give first aid and instructs Incident
Deputy Controller to call Ambulance if necessary.
Incident Controller evaluates seriousness of the situation; and if it cannot be handled with own resources
he orders Incident Deputy Controller to contact District Emergency Control Centre (VECC) and Fire
Brigade
Incident Deputy Controller rushes to Emergency Control Centre, immediately starts informing Key
Personnel
Brief description of Incident
Materials concerned
Status and seriousness of situation
Whether human life is in danger
Action taken
Immediate assistance required
Incident Deputy Controller immediately contacts District Emergency Control Centre, Fire Brigade and
Ambulance on instruction of Incident Controller.
Information to be given to emergency services
Brief description of Incident
Materials concerned
Status and seriousness of situation
Whether human life is in danger
Self-identification
Incident Deputy Controller starts head count as soon as possible to ensure that no employee in need is left
unattended.
Incident Controller and Incident Deputy Controller are to guide the outside emergency services and
cooperate with them.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-33
en-vιsι n
Incident Controller and Incident Deputy Controller are responsible of cordoning the site off and to prevent
any unauthorized persons – especially media and news – entering the premises.
Incident Controller and Incident Deputy Controller are to immediately brief any qualified higher ranking
person – especially the Site (Deputy) Controller – arriving at company premises and hand over the charge.
Site (Deputy) Controller – after reaching the site – re-evaluates the situation and reviews actions taken / to
be taken.
If Site (Deputy) Controller feels that the situation is not controlled by available resources within the
factory premises, he will assess the situation and declare the emergency as Off Site Emergency.
Site (Deputy) Controller will immediately inform to the COLLECTOR, District, Sr. Inspector of Factories
and brief them regarding the incident and ask for additional help if required.
Site (Deputy) Controller will continue to do his job by using available resources to control and contain the
emergency until the outside authorities and aids reach to the site.
As soon as District Authorities reaches to the site of incident Site (Deputy) Controller will narrate the
following things.
Type and Exact location of incident
Equipments, Chemicals, and people likely involved
Measures taken to tackle the emergency situation
Additional aid required to mitigate the emergency situation.
After arrival of the District Authorities to the site of incident he will give all the necessary help, assistance
and information as and when needed.
Site (Deputy) Controller is the only authorized person to call off the on-site emergency after evaluation of
the situation.
Site (Deputy) Controller is the only authorized person to make any statement or give any interview to
media.
B. Guidelines for Fire Fighters
If a jet of fire is shooting out of any flanges / valves / pipelines / pumps of flammable material i.e.
Leaking liquid is on fire, in such case cut of the supply of liquid / gas to the leaking section or equipment
by closing the appropriate valve in the incoming line.
Do not attempt to extinguish fire unless flow of material can be stopped.
Flood the area with fine water spray; do not scatter spilled material with high-pressure water streams.
Apply water from a protective location or from a safe distance.
Stay upwind and keep out of low areas so that you will be protected from flame / radiant heat and
inhalation of material or combustion by-product.
Move containers from fire area, if it can be done without risk.
Cool Container with water spray until well after the fire is out.
Stay away from the ends of the tanks as heat will build pressure and rupture closed storage containers.
Keep unnecessary people away.
Isolate Hazard area and deny entry.
C. Guidelines for Employees in Case of Fire
Do not panic. Think before acting.
Attract attention of nearby persons by shouting.
Operate the nearest fire alarm point by breaking the glass.
Inform the Incident Controller via Security Office or any other means.
Brief description of Incident
Materials concerned
Status and seriousness of situation
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-34
en-vιsι n
Whether human life is in danger
Action taken
Try to handle the situation with own resources.
Start combating the fire.
Try to save human life in danger.
Remove flammable materials from incident place.
Do not take and give away uncontrolled information. Do not spread panic.
Listen to and follow the instructions of superiors.
Evacuate the place only via emergency exits if instructed.
Reach to assembly point if instructed and wait for further instruction.
Do not enter danger area if instructed not to do so.
Start emergency shutdown procedure if instructed.
D. In Case of Toxic Spillage / Leakage
Any person noticing serious leakage of chemical from pipelines, vessel or other equipments should attract
attention of nearby persons by shouting
Help…….Help……Help……
If the leakage is small and knows to control / contain it, then will start working for containing and
stopping the leakage.
He will immediately inform to the concerned plant / area in charge
He will inform the Incident Controller via Security Office or any other means.
After receiving information Incident Controller and Incident Deputy Controller immediately take their
charge and start action.
Incident Controller rushes to the site and stays there until emergency is over; instructs all personnel on all
actions including:
Instruct stopping discharge of effluent through storm / drain.
Check area clear of people and organize emergency shutdown. Put barricade. Stop all Hot work /
Vessel entry related activity
Ascertain nature of material and keep MSDS ready
Follow the standard laid down spill control procedure and emergency shutdown of plant.
Incident Controller takes decision on evacuation, orders First Aider to give first aid and instructs Incident
Deputy Controller to call Ambulance if necessary.
Incident Controller evaluates seriousness of the situation; and if it cannot be handled with own resources
he orders Incident Deputy Controller to contact District Emergency Control Centre.
Incident Deputy Controller rushes to Emergency Control Centre, immediately starts informing Key
Personnel.
Information to be given to Key Personnel:
Brief description of Incident
Materials concerned
Status and seriousness of situation
Whether human life is in danger
Action taken
Immediate assistance required
Incident Deputy Controller immediately contacts District Emergency Control Centre and Ambulance on
instruction of Incident Controller.
Information to be given to emergency services
Brief description of Incident
Materials concerned
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-35
en-vιsι n
Status and seriousness of situation
Whether human life is in danger
Self-identification
Incident Deputy Controller starts head count as soon as possible to ensure that no employee in need is left
unattended.
Incident Controller and Incident Deputy Controller are to guide the outside emergency services and
cooperate with them.
Incident Controller and Incident Deputy Controller are responsible of cordoning the site off and to prevent
any unauthorized persons – especially media and news – entering the premises.
Incident Controller and Incident Deputy Controller are to immediately brief any qualified higher ranking
person – especially the Site (Deputy) Controller – arriving at company premises and hand over the charge.
Site (Deputy) Controller – after reaching the site – re-evaluates the situation and reviews actions taken / to
be taken.
If Site (Deputy) Controller feels that the situation is not controlled by available resources within the
factory premises, he will assess the situation and declare the emergency as Off Site Emergency.
Site (Deputy) Controller will immediately inform to the COLLECTOR, District, Sr. Inspector of Factories
and brief them regarding the incident and ask for additional help if required.
Site (Deputy) Controller will continue to do his job by using available resources to control and contain the
emergency until the outside authorities and aids reach to the site.
As soon as District Authorities reaches to the site of incident Site (Deputy) Controller will narrate the
following things.
Type and Exact location of incident
Equipments, Chemicals, and people likely involved
Measures taken to tackle the emergency situation
Additional aid required to mitigate the emergency situation.
After arrival of the District Authorities to the site of incident he will give all the necessary help, assistance
and information as and when needed.
Site (Deputy) Controller is the only authorized person to call off on-site emergency after evaluation of the
situation.
Site (Deputy) Controller is the only authorized person to make any statement or give any interview to
media.
E. In Case of Accident / Injury
If any person is injured or notices that some worker is injured should attract the attention of nearby
persons by shouting Help….Help…Help….
Other workman at the site will help the injured person to go out of the place i.e. Into open area and
arrange for first aid
Inform to the shift in-charge / Production Officer / Area in charge to take help of the First Aid team.
The first Aider and the Shift in charge / Production Officer / Area in charge will immediately rush to the
site of incidence. They will assess the situation and if required they will arrange to call the ambulance or
another vehicle and send the injured person to nearby hospital, after giving necessary first aid.
He will depute a responsible man to accompany the injured person at hospital / dispensary.
He will ensure that the injured person reached to the hospital and receives required medical aid.
EHS Manager takes decision; if the injury is loss time accident / reportable, then he will immediately
inform to Sr. Inspector of Factories, Tapi on telephone or by sending a letter or by any other means
depending on the severity.
Site Controller – after reaching to the site – depending on severity, will immediately inform to the police /
inspector of factories.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-36
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-39
en-vιsι n
Rescue and Relief Team – Responsibilities
On receiving information from SMS emergency rushes to accident site and coordinates activities with
ASC.
Group the team members and inform all non-emergency personnel to assemble at assembly points
(Assembly points are located near main security gate).
Subdivide the group and perform intensive search operation at all location to find out the injured.
Make arrangements to transport to injure on stretcher to the medical team stationed at medical center.
Search for the missing person given in the list by LH. Give periodic feedback to ASC.
On Declaration of Real Emergency
Soon after hearing the emergency siren or SMS - emergency, Rescue and Relief Team Head rushes to accident
site.
Associates with the accident site controller wherever he demands help in controlling the emergency.
Makes arrangements to search employees, contract persons and visitors missing in the HEAD COUNT.
Search teams go all around the plant to search for the missing persons in the head count.
Fire Team – Responsibilities
Fire Team head is nominated from Safety Department.
Fire Team consists of Key emergency personnel from safety Department, First aid centre, process
department and security departments.
He ensures all electrical systems are isolated except emergency lighting systems.
He ensures all the fuel /heating systems are isolated from both the ends of flow.
He ensures required numbers of fire mitigation equipment are fully operational.
He ensures all fire fighting persons are performing the operations safe.
He ensures all external help required is informed to ASC in time.
He ensures the water resources are fully operational.
He ensures smooth co-ordination with external Fire Mitigation Agencies.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-40
en-vιsι n
He ensures gate security team protects all inside plant persons. Records the in time of key emergency
personnel.
Stops all persons/ vehicular movements as soon as Emergency Call is received.
Allows DDMA vehicles, emergency service vehicles and guides them properly.
He ensures all instructions given by Liaison Head are strictly followed.
On Declaration of Real Emergency
a. Soon after hearing the emergency call OR SMS-emergency, Security Team Head rushes and takes
Instructions from LH.
b. He plans his persons for various operations and assigns a security supervisor for the same.
c. He takes note of wind direction and guides the persons to Assembly point/s.
d. He controls the gate operations and records the movement of vehicles and persons after the
declaration of emergency.
e. He interacts with LH and performs his instructions.
Medical Team – Responsibilities
Medical Team head is nominated from OHS Department.
He ensures the ambulance and one male nurse is kept in the accident site.
Ensures CPR is given to unconscious persons in the accident site.
Depending on the requirement requests LH for additional ambulance.
He ensures proper prearrangements are done at nearby hospitals for treatment of injured.
Keeps records of injured persons and monitor the progress of injured regularly.
On Declaration of Real Emergency
a. Soon after hearing the emergency call OR SMS - emergency, Medical Team Head rushes and takes
Instructions from LH.
b. He will be stationed in OHS centre and monitor the medical needs of the injured.
c. He will ensure the required medicine, fire blankets, first aid boxes, and other essentials are kept ready
for the injured persons.
d. One additional ambulance will always be kept at OHC depending on the emergency conditions.
e. He will have constant interactions with LH on the medical treatment to injured persons
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-41
en-vιsι n
The roles of the various parties who is directly involved in the implementation of an offsite plan are described
below. Depending on local arrangements, the responsibility for the offsite plan would either rest with the plant
management or with the local authority.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-42
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-43
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-45
en-vιsι n
Responsible Action Required to be taken to
Equipment/Material Facilities Required
Agencies for Mitigate Disaster by Aid giving
at Site to Mitigate Emergency
Taking action agency
department Arrange emergency shifting of affected persons and shifting vehicles at site and stock of
non Affected person to specified area fuel for vehicles.
Arrange diesel/ petrol for needed vehicles
Meteorological Give all information related to meteorological aspects Provide wind direction and velocity
Department for safe handling of affected area for living beings instruments with temperature
measurements
Forecast important weather changes, if any Mobile van for meteorological
parameter measurements
Local Crises Representatives of all departments are in the local crisis Must have all resources at hand,
Group group; therefore they are expected to render services especially disaster management plan
available with them. Since it is a group of experts with and its implementation method.
authority, the mitigating measures can be implemented All relevant information related to
speedily. The representatives’ from locals are also there hazardous industry shall available with
so that communication with local people is easy and crisis group News paper editor shall be
quick. a part of the group so that right and
The district emergency or timely media release can be done.
Disaster control officer/collector shall be the president
and he shall do mock drill etc. so that action can be
taken in right direction in time
District Crisis Collector shall be the president of District Crisis Group All necessary facilities
Group therefore all district infrastructure facilities are available at district can be made
diverted to affected zone available at affected zone
All other functions as mentioned For local crisis group Control of law and order situation
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-46
en-vιsι n
Elements of an LDAR Program:
Identifying Components
Leak Definition
Monitoring Components
Repairing Components
Recordkeeping
Sources of Leakages & VOC Generation:
Connectors are components such as flanges and fittings used to join piping and process equipment
together. Gaskets and blinds are usually installed between flanges.
Sampling connections are utilized to obtain samples from within a process.
Compressors are designed to increase the pressure of a fluid and provide motive force. They can
have rotary or reciprocating designs.
Pressure relief devices are safety devices designed to protect equipment from exceeding the
maximum allowable working pressure. Pressure relief valves and rupture disks are examples of
pressure relief devices.
Leaks from pumps typically occur at the seal.
Leaks from valves usually occur at the stem or gland area of the valve body and are commonly
caused by a failure of the valve packing or O-ring.
Leaks from connectors are commonly caused from gasket failure and improper bolts on flanges.
Leaks from sampling connections usually occur at the outlet of the sampling valve when the
sampling line is purged to obtain the sample.
Leaks from compressors most often occur from the seals.
Leaks from pressure relief valves can occur if the valve is not seated properly, operating too close to
the set point, or if the seal is worn or damaged. Leaks from rupture disks can occur around the disk
gasket if not properly installed.
Leaks from open-ended lines occur at the point of the line open to the atmosphere and are usually
controlled by using caps, plugs, and flanges. Leaks can also be caused by the in correct
implementation of the block and bleed procedure.
To Prevent Losses in Atmosphere
Leak Free Pumps for transfer like Magnetic coupled pumps
MSW (Metal Slice Wreath) Gaskets in pipelines to prevent leakage from flanges.
Condenser and Reactor with cooling arrangement.
Diagram of Tanker Loading/Unloading
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-47
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-48
en-vιsι n
LDAR Activities
1. Monitoring of Losses
Workplace VOC monitoring through VOC meter - photo ionization detection (PID) sensor
technology) or flame ionization detector (FID)
Periodic Leakage Audit at Plant
2. Preventive Maintenance to prevent Leakages
In order to prevent leakage from Pump, Seals, Valves etc preventive maintenance is carried out
periodically as per plan. In case of any recurring problem, action plan shall be prepared or frequency shall
be revised.
Table 7-22: Frequency of monitoring of leaks
S. No. Component Frequency of Monitoring Repair Schedule
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-49
en-vιsι n
7.10 SPECIFIC SAFETY MEASURES TO BE TAKEN FOR GENERAL PUBLIC LIVING IN THE
VICINITY
Safety Policy as per Rule 12-C and Rule 68-P of Gujarat Factories Rule 1963 is prepared & displayed / given
to all interested parties. Safety Manual is prepared in line with requirement of the Rule 68-P & 68-J of Gujarat
Factories Rule 1963consisting of list of Hazardous Chemicals, its hazards and precautions taken and in case of
Emergency situation what actions to be taken by General Public is be prepared in Local language and given to
all Stake holders.
Detailed On-Site Emergency Plan is prepared and further it will be modified as per Schedule 8-A of Sub rule
68-J-(12) (1) of Gujarat Factories Rule – 1963. The plan will rehearsed on regular basis at stipulated
frequency. Unit has taken PLI policy as per applicability. PLI policy is given as Annexure XIV
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 7-50
en-vιsι n
CHAPTER 8 ENVIRONMENTAL DAMAGE ASSESSMENT,
REMEDIATION PLAN AND NATURAL & COMMUNITY
RESOURCE AUGMENTATION PLAN
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 8-2
en-vιsι n
Water demand for the construction work was fulfilled from existing water supply sources i.e. canal water and
ground water. The area is considered safe in terms of availability of water. It is sufficient to cater the demand
of all users in the project region. During the construction phase, majorly wastewater generation was domestic
sewage which was disposed off in existing soak pit/ septic tank.
While in operation phase, water requirement and waste water generation from the modernized mill was
reduced from consented quantity. Water requirement were met from existing source of water, i.e. canal water
and ground water. Waste water generation was treated in existing ETP and reused as on-land irrigation/
plantation/ gardening.
Construction of modernization project carried out on vacant land within the premises so there was no
demolition work involved. Due to that construction, wastes were generated that was disposed off as per
existing practice. While construction debris was utilized as filling material up to plinth level and other
materials were sold as scrap to the dealers. During operation of the project, waste generated was disposed off
as per existing consent by GPCB.
Noise generation expected due to construction work but those construction activities were carried out during
the day time and thick greenbelt within the site so its impact was reduced to the environment. As construction
activity was carried out within existing premises so noise might limited to within project site. During the
operation, comparing to old unit this new unit has reduced noise generation due to single and enclosed tandem
system.
Thick greenbelt to the site is already developed, 34% of project site area is developed as a greenbelt further,
and no tree was cut during the construction of the project. Hence, no additional greenbelt is proposed and
positive impact has been considered for this ecological damage assessment.
During the construction and operation phase, required water was met from surface water through canal and
ground water through borewell during interval of 15 days as canal water is sufficiently available for 15 days.
Around 1500 KL water was tapped for construction activities. That has impacted on competitive users so it
needs to be recharged in ground water through rain water harvesting.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 8-3
en-vιsι n
The collection and analysis of data with respect to air, water, land, noise and other environment attributes was carried out by NABL accredited laboratory and details
are presented in Chapter 3 of this EIA report. Assessment of environmental damage assessment with respect to air, water, noise, soil/land, flora & fauna and other
environmental attributes are presented in Error! Not a valid bookmark self-reference.:
Table 8-2: Assessment of Environmental damage assessment & Remediation Plan and EMP suggested
Environmental
Sr. Estimated Cost of Damage/
Parameter/ Activities Damage Remediation /EMP
No. Remediation
Attribute
1 Water Surface and ground water Fresh water quantity As the area falls under safe category so
Consumption consumed is around 10.8 KLD reduction for recharging of rainwater is not the best
for domestic purpose and 7 competent users. solution. So it is decided to contribute in
KLD construction purpose development of sewerage network of the
during construction phase and area that will prevent percolation of waste
Total cost of Rs. 7 Lacs considered
max 651 KLD during operation water.
under remediation plan for
phase.
During operation phase, water consumption development of sewerage network
is reduced from its permitted quantity that is and treatment in local community.
positive impact.
In addition to this, allocation of Rs.
2 Waste Water Domestic waste water generated Disposal of domestic During construction phase, generated 7.5 lacs towards 5 nos. of safe
Generation is 8.64 KLD during construction waste water through domestic waste water was disposed off drinking water facility like RO/UV in
period. While during operation septic tank, increase through septic tank as per existing practice. nearby villages.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 8-4
en-vιsι n
Environmental
Sr. Estimated Cost of Damage/
Parameter/ Activities Damage Remediation /EMP
No. Remediation
Attribute
3 Air Pollution Construction of shed for mill, Dust generation and During construction phase, water sprinkling To overcome air pollution in the
transportation of materials for pollution increase due was done to suppress dust emission. While community, plantation and
construction purpose. to exhaust from in operation phase of modernization project, Healthcare activities are proposed in
vehicles. Resulting multi cyclone with wet scrubber are remediation plan for the same Rs. 2
increase the level of proposed to control air emission. Moreover, lacs and Rs. 3.75 lacs are allocated
PM, SO, NOx and CO. Plantation in nearby villages and payment of respectively.
hospital bills and development of facilities in
Jeevan Raksha Hospital.
4 Solid Hazardous Waste generation due to Illegal dumping of Construction work was carried out on vacant Cleaning of road side plastic waste in
Waste construction and operation wastes may lead to land within the premises so no demolition the area as per CPCB guidelines 2017
activities pollution in land use, work was carried out. No demolition waste & utilization in road construction and
surface water bodies, generated. Construction debris was utilized in cement industry. Rs. 10 lacs are
air, etc. in levelling. allotted towards this activity, as per
guideline these wastes should be
During operation phase, wastes were
collected and shredded and sent to
generated and those managed as per existing
prescribed users (in road making or
practise as per regulations. These have not
cement industry, etc).
created significant impact.
5 Noise & vibration Use of heavy machineries for Noise generation in Construction activities were done during day To remediate this impact plantation
construction activities, noise location which affect time and it was within the existing premises. to be in nearby villages for this Rs. 2
generation in operation phase. on ecology and human Project is having thick greenbelt which lacs allotted.
beings. control noise to travel outside of premises. It
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 8-5
en-vιsι n
Environmental
Sr. Estimated Cost of Damage/
Parameter/ Activities Damage Remediation /EMP
No. Remediation
Attribute
was ensured from contractors to use PUC
certified vehicles for transportation of
materials. During operation phase, noise
generation was low comparing to old mill.
6 Greenbelt Tree cut for construction Imbalance in ecological This construction activity done on open land To remediate this impact plantation
activities. system of the location. within the premises and no tree was cut. to be in nearby villages for this Rs. 2
Moreover, unit is having 34% of greenbelt lacs allotted and Healthcare activities
area. are proposed in remediation plan for
the same Rs. 3.75 lacs are allocated.
7 Hydro-Geology Ground water utilization for Ground water utilized for construction and Total cost of Rs. 7 Lacs considered
construction and operation operational activities with interval of 15 under remediation plan for
Reduction in ground
phase. days as a secondary source when surface development of sewerage network
water table that can be
water not available. To optimise this, rain and treatment in local community.
impacted on competent
water harvesting cannot be best option due
users.
to safe category and maximum area
available for percolation. So sewerage
network and treatment is planned for
domestic wastewater in the area.
8 Risk Hazards/ Various construction activities Impact on health of All required safety measures were taken Rs. 4 lacs are allotted towards
Occupational and operation activities workers during construction phase and operation financial aid in educational support to
Health & Safety phase. Though to overcome this impact, youth of the local area and Rs. 3.75
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 8-6
en-vιsι n
Environmental
Sr. Estimated Cost of Damage/
Parameter/ Activities Damage Remediation /EMP
No. Remediation
Attribute
provisions are made in remediation plan for lacs are allotted towards healthcare
financial aid in education and healthcare activities.
activities.
9 Soil Conservation Excavation during construction Loss of top soil To optimise this impact, plantation in local For plantation activities in local area
activities. area and contribution towards development Rs. 2 lacs area allotted and Rs. 2.75
in Sayan village gas connection lacs allotted for contribution towards
establishment are considered in remediation gas connection establishment in
plan. Sayan villages. This is for approx 68
houses and that can be distributed
amount all remaining houses.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 8-7
en-vιsι n
8.2.3 Environment Benefits Earned And Cost Of Remediation Plan And Natural & Community
Resource Augmentation Plan
Ecological damage and remediation plan estimated/ calculated as per the guideline given in TOR letter is as
under:
Cost of remediation plan and natural & community resource augmentation plan:
Total of recurring cost = Rs 516 per day x Number of days violation (192 days of construction out of
total 498 days of violation) = Rs. 99,072/-
Total EMP cost = Annual Recurring + Non recurring cost = Rs. 7,50,872/-..........(I)
Profit earned due to the activity = 10 % of profit earned due to the activity = Rs. 50,616/-..........(II)
Cost of remediation plan and natural & community resource augmentation plan = Total EMP cost (I)
+ 10 % of Profit earned (II) = Total Rs. (III) Rs. 8,01,488/-..........(III).
Cost of remediation plan and natural & community resource Rs. 8,01,488/-
augmentation plan as per indicative guideline
Ecological damage assessed and economic benefits derived due to violation, total amount of Rs. 8,01,488/- is
assessed. But as per guideline given in TOR letter, amount to be considered as calculated as per damage
assessment or equivalent to the CER amount as per OM dated 01/05/2018, whichever is higher. So
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 8-9
en-vιsι n
Remediation Plan and Natural & Community Augmentation Plan to be prepared for Rs. 37,00,000/- for 5
years.
Hence, project proponent assures to submit bank guarantee of Rs. 37 lacs for the cost towards Remediation
Plan and Natural and Community Augmentation Plan. The detail of activities to be carried out and break-up of
the budget allotted is as under:
Table 8-4: Budgetary Allocation for Remediation plan and Natural Resource & Community Augmentation Plan
Cost (Rs. In Lacs) Total
No. Remediation Plan (Rs. In
1st Year 2nd Year 3rd Year 4th Year 5th Year Lacs)
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 8-10
en-vιsι n
CHAPTER 9 PROJECT BENEFITS
The modernization project will have benefits in the form of infrastructural development, socio-economic
development, indirect employment generation, etc due to this project of as described below under respective
points.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 9-1
en-vιsι n
Table 9-1: Corporate Environment Responsibility (CER) Plan for Five Years in Community Area
Year wise budget (INR in Lakhs) for CER Activities
Sr.
Area CER –Proposed Planned Activities Village
No. Grand
1st Years 2nd Years 3rd Years 4th Year 5th Year
Total
Sayan, Siwan, Kudsad,
Provide school kit like bag, books, sports Bharundi, Kareli, Shekhpur,
1 Education 1 1 1 1 0.6 4.6
equipment etc to students. Galundi and other nearest
villages
Contribution in constructing of four tract
road and divider, From Delad to Sayan Sayan 4.8 4.5 4.5 0 0 13.8
and east bridge to Jhatkadevi temple.
Sayan, Siwan, Kudsad,
Bharundi, Kareli, Shekhpur,
Clean and repair to drainage creek/canal. 2.2 2.1 2.1 2.1 2.1 10.6
Galundi and other nearest
villages
2 Infrastructure
Contribution to Construct community hall. Sayan - - 2.6 2.6 2.8 8
Contribution to construct Veterinary
Sayan - 6.0 6.0 - - 12
Hospital.
Contribution with government scheme and
Siwan, Bharundi, Kareli,
construct sanitation and houses for tribal 2.1 2.1 2.1 2.1 2 10.4
Shekhpur, Galundi
community.
Contribution to repair water tank. Sayan - 1.2 1.2 - 1.2 3.6
Contribution in developing Jeevan Raksha
Hospital and organization of awareness Sayan, Kudsad, Siwan,
3 Health camp regarding social evils alcohol, etc. Bharundi, Kareli, Shekhpur, 1 1 1 1 1 5
organize free medical checkup camp Galundi, Kudsad
especially in tribal area of village.
Contribution in agriculture development
Sayan, Siwan, Bharundi,
for new technology or providing
4 Agriculture Kareli, Shekhpur, Galundi, 2 1 1 1 1 6
equipments and/or seeds and fertilizer in
Kudsad
community area.
Year wise Total (INR in Lakhs) 13.1 18.9 21.5 9.8 10.7 74
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 9-2
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 9-3
en-vιsι n
CHAPTER 10 ENVITONMENTAL COST BENEFIT ANALYSIS
As per EIA notification, 2006, Environmental cost benefit analysis is applicable only when recommended at
the scoping stage. However as per the ToR points issued by SEIAA, Gandhinagar, Gujarat vide letter No.
SEIAA/GUJ/TOR/Violation/5(j)/927/2019 dated, 19th June, 2019 (given as Annexure I) Environmental cost
benefit analysis is not recommended at the scoping stage, and has therefore not been carried out.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 10-1
en-vιsι n
CHAPTER 11 ENVIRONMENTAL MANAGEMENT PLAN (EMP)
11.1 INTRODUCTION
To formulate and monitor Environmental Protection measures during and after commissioning of project,
preparation of Environmental Management Plan (EMP) is required.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 11-1
en-vιsι n
Concern Change in land use pattern and effect of pollution on sensitive receptor of study area
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 11-2
en-vιsι n
Impacting Implementation and Management
Mitigation Measures and Rationale Remarks
Activities Location Timing Responsibility Monitoring Records
followed by utilizing treated water. quality for meter on reuse
Rainwater harvesting is done. general line and analysis
parameters are reports of same.
as per
requirement
Storage, handling and Bagasse is storage on open land area of the Within premises Minimum EHS Analysis of Analysis reports -
disposal of premises and regular care is taken not to once in a waste received
solid/hazardous spread it. month
waste. Checks by
security staff at -
entry gate
(industry as well
as TSDF site)
Effluents/Sewage Treatment of effluent will be ensured to Within premises Minimum ETP Operator Checks by ETP Maintaining -
management achieve desired quality for on land once in a Supervisor record of
irrigation. month effluent quality
Landscaping and Developments of flue gas capturing species Within premises Once in a EHS and Regular Plant species -
greenbelt area will help to reduce air pollution within year maintenance monitoring register
development premises. department within
project site
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 11-3
en-vιsι n
Wastewater generation, Pucca flooring is done in ETP area to At and near the All times EHS and Monitoring of Records of flow Using of
treatment and disposal avoid any type of leakage that can be ETP area maintenance waste water meters. proper PPE
percolated into soil. department quality. Analysis results by workers
Wastewater of waste water.
regeneration
records.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 11-4
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 11-5
en-vιsι n
11.2.4 Noise Level Monitoring & Traffic Management
Probable noise sources are boilers and D.G set. DG set will be standby source of electricity hence noise will be minimal.
Objective To reduce noise due to after modernization unit. To ensure smooth traffic within & outside industry.
Concern Increase in Noise level due to existing and after modernization unit. Traffic movement outside and within site.
Benefits of EMP Control over increase in noise in surrounding area. Smooth and congestion free operation.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 11-6
en-vιsι n
Implementation and Management
Impacting Activities Mitigation Measures and Rationale Remarks
Location Timing Responsibility Monitoring Records
Effluent Management and Proper and timely lubrication, At and near the At all time ETP operator/ Periodic Records of noise Use of proper
Usage of Fuel for operation oiling and maintenance of all ETP area and EHS and monitoring of levels. PPE by
plant and machineries. within site maintenance noise levels Equipment workers at
Adequate noise control measures department service records. areas
such as antivibration pad for generating
equipment with high vibration. noise.
Check all the vibrating parts
periodically and service to reduce
the noise generation.
Landscaping and greenbelt About 2, 02,343 m2 of area has Within Once in a year EHS and Regular Regular -
area development been developed as Green belt premises maintenance monitoring monitoring
with noise capturing species. department within within
project site project site
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 11-7
en-vιsι n
11.2.5 Ecological Environment
Greenbelt developed within premises will help in restoration of fauna as well as increase aesthetic view of surrounding area.
Objective To ensure reduction in air pollution, noise pollution, restoration of flora and fauna disturbed due to project activity.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 11-9
en-vιsι n
Concern Health & Safety of community and workers; socio-economic status of study area
Benefits of EMP Minimize the impact of the project on health of community & workers and on environment
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 11-10
en-vιsι n
Implementation and Management
Impacting Activities Mitigation Measures and Rationale Remarks
Location Timing Responsibility Monitoring Records
Fuel for operation of boiler economic level of engaged people. raised by different
& DG sets divisions
Operation of APCM, Utilization of treated water and Within & outside At all time EHS/ Security Daily - -
Landscaping and greenbelt recharging of rainwater. premises
development Adequate pollution control measures
will be installed and followed.
Healthcare activities should be carried - CER/CSR team
out for community and worker.
Social developmental activities
should be done.
Plantation within community area will
reduce air and noise pollution.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 11-11
en-vιsι n
11.2.7 Risk & Hazard and Occupational Health & Safety
Objective To ensure health & Safety of workers against air pollution, noise pollution, solid and hazardous waste handling, handling of solvents.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 11-13
en-vιsι n
11.2.8 Air Environment
In the modernization project, main source of air pollution is flue gas emission. Main sources of flue gas emission are bagasse, methane gas and Furnace oil based boiler.
Multicyclone Separator with wet scrubber will be provided with 4 nos. of boilers as an APCM and adequate stack height is provided with 1 no. of boiler.
Objective To ensure that air emissions due to the construction activities and operation phase will be minimum
Concern Construction of building, installation of new plant and machinery and operation phase can deteriorate air quality
Benefits of EMP Reduced air pollution and protection of health of workers and local community
Operation Phase
Ensuring that vehicles have a Along the At all time Safety Checks by PUC certificate -
Vehicle movement for
Pollution Under Control (PUC) vehicle department of security staff
transportation of materials certificate movement track industry at entry gate
and equipment Materials are transported in At site During EHS department Periodic Type of chemicals, Proper PPE to
covered trucks. transportation operating be worn by
conditions of workers at all
chemicals times
transported
Odour generation from Properly management and At site At all time, EHS department Periodic Logbook of ETP is --
effluent, if it is not treatment in ETP during maintained.
disposed properly. operation
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 11-14
en-vιsι n
Implementation and Management
Impacting Activities Mitigation Measures and Rationale Remarks
Location Timing Responsibility Monitoring Records
Fugitive emission due to Good housekeeping is At site At all time, EHS and Periodic Stack monitoring Using proper
operation of DG and Boiler maintained in the plant. during maintenance records and Results PPE
Proper water sprinkling should operation department of work zone
be done for dust suppression. monitoring and
ambient air quality
monitoring.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 11-15
en-vιsι n
Additionally the Environmental Management Cell collects data about health of workers, green belt
development, etc. Organogram of the Environmental Management Cell is presented in the following Figure
11-1.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 11-16
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 11-17
en-vιsι n
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 11-18
en-vιsι n
CHAPTER 12 SUMMARY & CONCLUSION
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 12-2
en-vιsι n
Activity and Potential Negative
Attributes Mitigation Measures
Impact
Traffic Improper & uncontrolled Controlled vehicular movement with adequate supervision.
movement of vehicles can Vehicle entry and exit scheduling so that traffic congestion
result in traffic congestion is not created on nearby public road.
within & immediate outside
the industry.
Socio- Flue gas and dust emission Vehicles with PUC shall be allowed to control flue gas
Economic deteriorate and air and that emissions.
may affect the health of driver Healthcare activities are organized.
and people living near the Utilization of treated water and rainwater recharging.
route due to transportation of Adequate pollution control measures installed to control
materials. flue gas and fugitive emission.
Pollution level of the industry Plantation activities are carried out.
such as water pollution and air
pollution will create negative
impact on health of
community.
Occupational Various activities affecting health To control flue gas and fugitive emission adequate pollution
Health and of workers via physical contact; control measures are installed.
Safety inhalation; noise etc. are as under: Use of proper PPE’s during hazardous waste handling,
Flue gas emission from chemical handling etc.
various activities such as Basic infrastructure i.e. facilities like drinking water,
transportation activities, sanitation, first aid etc. are delivered to workers.
operation of boiler, DG sets. Regular medical check-up of workers.
Fugitive emission from Ambient and source noise are regularly monitored within
various activities such as the plant.
loading & unloading of All workmen are provided with required set of PPE’s like
chemicals. ear plug, ear muff etc. where noise levels in excess of 80 dB
Handling hazardous waste; (A) are regularly generated.
toxic and flammable
chemicals.
Operation of utilities &
production activities.
12.2 CONCLUSIONS
The modernized sugar mill has certain level of marginal impacts on the local environment. However,
development of this project has beneficial impact/effects on large scale in terms of providing the vital
products, high conversion rate from raw material to product comparing to old mill, less pollution generation
and the same is creating a positive impact during operational phase of the project.
Thus, it is conclude that with the judicious and proper implementation of the pollution control and mitigation
measures, the modernization project is beneficial to the society and is contributing to the economic
development of the region in particular and country in general.
M/S. SHREE SAYAN VIBHAG SAHAKARI KHAND UDHYOG MANDLI LTD., SAYAN, SURAT GUJARAT 12-3