Handing Over Checklist
Handing Over Checklist
Handing Over Checklist
TERMASUK LALUAN PEJALAN KAKI DAN SATU (1) UNIT PENCAWANG ELEKTRIK DI ATAS SEBAHAGIAN LOT 1 & 2,
JALAN PARANG 19/18A, SEKSYEN 19, SHAH ALAM SELANGOR DARUL EHSAN.
A KERJA-KERJA JALAN
1 Concrete Inprint
3 Grease Trape
4 Stop Line
Road Marking
5 Edge Line
TAWARAN SEMULA CADANGAN MEMBINA DAN MENYIAPKAN HENTIAN AKHIR BANDAR (HAB) BAS DAN TEKSI
TERMASUK LALUAN PEJALAN KAKI DAN SATU (1) UNIT PENCAWANG ELEKTRIK DI ATAS SEBAHAGIAN LOT 1 & 2,
JALAN PARANG 19/18A, SEKSYEN 19, SHAH ALAM SELANGOR DARUL EHSAN.
6 Centre Line
7 Continuity Line
9 Bas Sahaja
10 Teksi Sahaja
11 Straight Arrow
TAWARAN SEMULA CADANGAN MEMBINA DAN MENYIAPKAN HENTIAN AKHIR BANDAR (HAB) BAS DAN TEKSI
TERMASUK LALUAN PEJALAN KAKI DAN SATU (1) UNIT PENCAWANG ELEKTRIK DI ATAS SEBAHAGIAN LOT 1 & 2,
JALAN PARANG 19/18A, SEKSYEN 19, SHAH ALAM SELANGOR DARUL EHSAN.
12 Left/Right Arrow
Road Marking
15 No Entry
Road Signages
16 Beri Laluan
B KERJA-KERJA PERPARITAN
2 450mm BD+BS
4 Brick Sump
5 MS Grating
TAWARAN SEMULA CADANGAN MEMBINA DAN MENYIAPKAN HENTIAN AKHIR BANDAR (HAB) BAS DAN TEKSI
TERMASUK LALUAN PEJALAN KAKI DAN SATU (1) UNIT PENCAWANG ELEKTRIK DI ATAS SEBAHAGIAN LOT 1 & 2,
JALAN PARANG 19/18A, SEKSYEN 19, SHAH ALAM SELANGOR DARUL EHSAN.
Culvert
8 Brick Sump
9 MS Grating
10 Scupper pipe
1 150mm dia.
CLMS Pipe
2 75mm dia.
3 S Bend
S bend
4 Air Valve
6 Hydrant
Hydrant
7 Valve
9 Meter
2 1200 dia.
Manhole
3 Cover