TAWARAN SEMULA CADANGAN MEMBINA DAN MENYIAPKAN HENTIAN AKHIR BANDAR (HAB) BAS DAN TEKSI

TERMASUK LALUAN PEJALAN KAKI DAN SATU (1) UNIT PENCAWANG ELEKTRIK DI ATAS SEBAHAGIAN LOT 1 & 2,
JALAN PARANG 19/18A, SEKSYEN 19, SHAH ALAM SELANGOR DARUL EHSAN.

CHECKLIST PRE CPC

A KERJA-KERJA JALAN

BIL ITEM BUTIRAN CATATAN

1 Concrete Inprint

2 Jalan Con. Kerb

3 Grease Trape

4 Stop Line

Road Marking

5 Edge Line
TAWARAN SEMULA CADANGAN MEMBINA DAN MENYIAPKAN HENTIAN AKHIR BANDAR (HAB) BAS DAN TEKSI
TERMASUK LALUAN PEJALAN KAKI DAN SATU (1) UNIT PENCAWANG ELEKTRIK DI ATAS SEBAHAGIAN LOT 1 & 2,
JALAN PARANG 19/18A, SEKSYEN 19, SHAH ALAM SELANGOR DARUL EHSAN.

6 Centre Line

7 Continuity Line

8 Road Marking Pedestrian Corssing

9 Bas Sahaja

10 Teksi Sahaja

11 Straight Arrow
TAWARAN SEMULA CADANGAN MEMBINA DAN MENYIAPKAN HENTIAN AKHIR BANDAR (HAB) BAS DAN TEKSI
TERMASUK LALUAN PEJALAN KAKI DAN SATU (1) UNIT PENCAWANG ELEKTRIK DI ATAS SEBAHAGIAN LOT 1 & 2,
JALAN PARANG 19/18A, SEKSYEN 19, SHAH ALAM SELANGOR DARUL EHSAN.

12 Left/Right Arrow

Road Marking

Straight, Left & Right


13
Arrow

14 Road Signages Berhenti

15 No Entry

Road Signages

16 Beri Laluan

Kontraktor Perunding MBSA

Tandatangan :.......................................... Tandatangan :.......................................... Tandatangan :..........................................


Nama :....................................................... Nama :....................................................... Nama :.......................................................
Tarikh :........................................................ Tarikh :........................................................ Tarikh :........................................................
CHECKLIST PRE CPC
TAWARAN SEMULA CADANGAN MEMBINA DAN MENYIAPKAN HENTIAN AKHIR BANDAR (HAB) BAS DAN TEKSI
TERMASUK LALUAN PEJALAN KAKI DAN SATU (1) UNIT PENCAWANG ELEKTRIK DI ATAS SEBAHAGIAN LOT 1 & 2,
JALAN PARANG 19/18A, SEKSYEN 19, SHAH ALAM SELANGOR DARUL EHSAN.

B KERJA-KERJA PERPARITAN

BIL ITEM BUTIRAN CATATAN

1 2.1m x 1.5m U-Shape

2 450mm BD+BS

3 Longkang Con. Slab Cover

4 Brick Sump

5 MS Grating
TAWARAN SEMULA CADANGAN MEMBINA DAN MENYIAPKAN HENTIAN AKHIR BANDAR (HAB) BAS DAN TEKSI
TERMASUK LALUAN PEJALAN KAKI DAN SATU (1) UNIT PENCAWANG ELEKTRIK DI ATAS SEBAHAGIAN LOT 1 & 2,
JALAN PARANG 19/18A, SEKSYEN 19, SHAH ALAM SELANGOR DARUL EHSAN.

6 Longkang Scupper pipe

7 600 x 600 Box Culvert

Culvert

8 Brick Sump

9 MS Grating

10 Scupper pipe

Kontraktor Perunding MBSA

Tandatangan :.......................................... Tandatangan :.......................................... Tandatangan :..........................................


Nama :....................................................... Nama :....................................................... Nama :.......................................................
Tarikh :........................................................ Tarikh :........................................................ Tarikh :........................................................
CHECKLIST PRE CPC
TAWARAN SEMULA CADANGAN MEMBINA DAN MENYIAPKAN HENTIAN AKHIR BANDAR (HAB) BAS DAN TEKSI
TERMASUK LALUAN PEJALAN KAKI DAN SATU (1) UNIT PENCAWANG ELEKTRIK DI ATAS SEBAHAGIAN LOT 1 & 2,
JALAN PARANG 19/18A, SEKSYEN 19, SHAH ALAM SELANGOR DARUL EHSAN.

C KERJA-KERJA SISTEM RETIKULASI AIR

BIL ITEM BUTIRAN CATITAN

1 150mm dia.

CLMS Pipe

2 75mm dia.

3 S Bend

S bend

4 Air Valve

5 Tapp Off Sluice Valve


TAWARAN SEMULA CADANGAN MEMBINA DAN MENYIAPKAN HENTIAN AKHIR BANDAR (HAB) BAS DAN TEKSI
TERMASUK LALUAN PEJALAN KAKI DAN SATU (1) UNIT PENCAWANG ELEKTRIK DI ATAS SEBAHAGIAN LOT 1 & 2,
JALAN PARANG 19/18A, SEKSYEN 19, SHAH ALAM SELANGOR DARUL EHSAN.

6 Hydrant

Hydrant

7 Valve

8 Meter Meter Stand

9 Meter

Kontraktor Perunding MBSA

Tandatangan :.......................................... Tandatangan :.......................................... Tandatangan :..........................................


Nama :....................................................... Nama :....................................................... Nama :.......................................................
Tarikh :........................................................ Tarikh :........................................................ Tarikh :........................................................
CHECKLIST PRE CPC
TAWARAN SEMULA CADANGAN MEMBINA DAN MENYIAPKAN HENTIAN AKHIR BANDAR (HAB) BAS DAN TEKSI
TERMASUK LALUAN PEJALAN KAKI DAN SATU (1) UNIT PENCAWANG ELEKTRIK DI ATAS SEBAHAGIAN LOT 1 & 2,
JALAN PARANG 19/18A, SEKSYEN 19, SHAH ALAM SELANGOR DARUL EHSAN.

D KERJA-KERJA SISTEM PEMBENTUNGAN (SEWERAGE WORK)

BIL ITEM BUTIRAN CATATAN

1 VCP Pipe 255mm dia.

2 1200 dia.

Manhole

3 Cover

4 Last Manhole Connection

Kontraktor Perunding MBSA

Tandatangan :.......................................... Tandatangan :.......................................... Tandatangan :..........................................


Nama :....................................................... Nama :....................................................... Nama :.......................................................
Tarikh :........................................................ Tarikh :........................................................ Tarikh :........................................................

You might also like