No Topic
1 From soil investigation, site clearing, earth work (cut and fill) (including
equipment and plant that been used).
2 Retaining Walls (RC retaining walls, gabion and interlocking, sheet piles)
(including installation of the reinforcement bar).
3 Pad footing, stump, ground beam and ground slab, column and upper beam/
upper slab/ roof beam (including installation of the reinforcement bar).
4 Foundation, a type of common foundation is used (including installation of the
reinforcement bar).
5 From site clearing, set up platform of pilling machine, setting out pile position,
installation of reinforce concrete (RC) pile, cut of pile, starter bars, pile cap, stump,
ground beam and ground slab.
6 From soils investigation works, compare installation of RC square pile, RC spun
pile and bore pile construction.
7 Formwork system From Pile cap, stump, beam, slab, column upper beam and
upper slab/ to the roof beam.
8 Upper beam and upper slab/ roof beam (including installation of the
reinforcement bar), truss system, roof installation and types.
9 External infra (sewerage system and manhole, water piping system, road and
drainage) and internal utility services (electrical piping system, sanitary and toilet
piping system, water piping system and water tank).
10 Wall, staircase, window and door and construction joint
Reporting and submission:
1) Title and group (FIVE or SIX students) will be under the Lecturer decision.
First page
example: