PP Aaa PP1 101
PP Aaa PP1 101
SKIKDA, ALGERIA
KBR
JOB NO.: J6404
TABLE OF CONTENTS
1.0 INTRODUCTION ................................................................................................... 3
2.0 SYSTEM DESCRIPTION ...................................................................................... 5
2.1 Feed Gas Coalescer Filters .............................................................................................. 5
2.2 Feed Gas Compression.................................................................................................... 5
3.0 OPERATIONS ...................................................................................................... 6
3.1 Normal Running................................................................................................................ 6
3.1.1 Start Up Feed Gas Coalescer Filter, 01-MD03 .............................................................. 6
3.1.2 Feed Gas Coalescer Filter, 01-MD02-A/B ..................................................................... 6
3.1.3 Feed Gas Compressor K.O. Drum, 01-MD01 ............................................................... 6
3.1.4 Feed Gas Compressor, 01-MJ01 .................................................................................. 6
3.1.5 Feed Gas Compressor Aftercooler, 01-MC01 ............................................................... 7
3.1.6 Feed Gas Heater, 01-MC02 .......................................................................................... 7
3.2 Typical Operating Parameters .......................................................................................... 8
3.3 Temporary Operation ..................................................................................................... 11
3.3.1 Fuel Gas ...................................................................................................................... 11
3.3.2 Start-Up of LNG Train Liquefaction and Fractionation ................................................ 11
3.3.3 Feed Gas Heating ........................................................................................................ 11
4.0 START-UP .......................................................................................................... 12
5.0 SHUTDOWN ....................................................................................................... 14
5.1 Normal Shutdown ........................................................................................................... 14
5.2 Process Upsets and Production Loss ............................................................................ 15
6.0 SAFETY/EMERGENCY SHUTDOWN ................................................................ 16
6.1 Safety Critical Shutdown Systems ................................................................................. 16
6.1.1 I-0100 – Plant Feed Conditioning UNIT 01 ESD ......................................................... 16
6.1.2 I-0110 - 01-MJ01 Feed Gas Compressor Trip ............................................................. 16
6.1.3 I-2092 - 01-MJ01 Feed Gas Compressor Depressure ................................................ 16
6.1.4 I-1091 - Plant Feed Gas Depressure ........................................................................... 16
6.2 Pressure Safety Valve Summary ................................................................................... 16
6.3 Fire Protection Equipment .............................................................................................. 17
7.0 ATTACHMENTS ................................................................................................. 18
7.1 Attachment I: Equipment List ......................................................................................... 19
7.2 Attachment II: Utility Consumption ................................................................................ 20
KBR Page 2 of 20
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-101
OPERATING MANUAL VOLUME I, SECTION 1-1: REVISION 2
FEED GAS COMPRESSION 29 NOVEMBER 2012
1.0 INTRODUCTION
This operating manual relates to the facilities indicated on Process Flow Diagram PR-01-
PR32-002 and P&ID’s PR-01-SYPI-001A through PR-01-SYPI-006.
The natural gas feedstock for the complex comes by pipeline from the Hassi R’Mel fields.
The Feed Gas Compression System is designed to remove solid contaminants and liquids
from the feed stream, and to compress the gas to the pressure required for downstream
processing.
An 8” take-off of feed gas downstream of the Feed Gas Coalescer Filter, 01-MD02-A/B, is
provided to meet the total fuel gas demand of the LNG plant during start-up and shutdown,
and to supplement demand during normal operation. A 10” take-off of feed gas upstream of
01-MD02-A/B is provided to supply fuel gas to the flare systems and provide vacuum
protection for storage. A 6” take-off upstream of 01-MD02-A/B provides feed gas to GTG’s
for early startup. Additional take-offs upstream of 01-MD02-A/B provide feed gas to existing
facilities.
KBR Page 3 of 20
8 7 6 5 4 3 2 1
KBR
KBR
New LNG Train Skikda
2"
40"
M
25ºC
T0 Existing 5P/6P
24"
2"
PR-01-SYPI-001A
61-ROV01
M
20" 28" Unit 10
FEED GAS COMPRESSION
AI
10" Boil off gas header 3005A
PR-15-SYPI-001 -T
40"
NEW LNG TRAIN SKIKDA PROJECT
E 40" E
To WFH
PR-01-SYPI-003
41.20 bara
25ºC
01-BDV1093 36"
01-MC01
Page 4 of 20
PR-01-SYPI-002
40"
D 01-ESDV1012 D
FQI
3001
PR-01-SYPI-001B 68 bara
24"
01-M01-GT 68.3ºC
N
N 01-MD01 01-MJ01
01-MD02-B
01-MD02-A 01-BDV1040
36"
20"
24"
24"
01-UV1016
C C
01-LV1112
01-ESDV1000 36"
01-FV1055
WL
01-LV1110 4"
01-ESDV1036
WF
01-MC02
To WFH
OPERATING MANUAL VOLUME I, SECTION 1-1: REVISION 2
24"
B B
PDI
1092 Hot oil
DOCUMENT NO.
PP-AAA-PP1-101
PR-01-SYPI-002A
67 bara
39ºC 01-ESDV1035
29 NOVEMBER 2012
36"
To 12-MD21
FG to 15-MD05-A
A A
8 7 6 5 4 3 2 1
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-101
OPERATING MANUAL VOLUME I, SECTION 1-1: REVISION 2
FEED GAS COMPRESSION 29 NOVEMBER 2012
KBR Page 5 of 20
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-101
OPERATING MANUAL VOLUME I, SECTION 1-1: REVISION 2
FEED GAS COMPRESSION 29 NOVEMBER 2012
3.0 OPERATIONS
3.1 Normal Running
This section provides a description of the operating parameters for the Feed Gas
Compression System. Refer to Section 3.2 for a list of typical operating variables for this
system.
3.1.1 Start Up Feed Gas Coalescer Filter, 01-MD03
The Start Up Feed Gas Coalescer Filter, 01-MD03, is operated manually. The operator
should check the level and manually drain any condensate to the Warm Liquid Header as
necessary. Levels indicators 01-LI-1005A/B are displayed on the DCS, and level indicators
01-LI-1005C/D are displayed locally. There is no DCS control of the level.
The operator should check the pressure drop across the filter as indicated by 01-PDI-1004 to
determine when filter servicing is necessary. A bypass is installed around the Start Up Feed
Gas Coalescer Filter to enable the plant to operate while the filter is out of service. This filter
is normally out of service.
3.1.2 Feed Gas Coalescer Filter, 01-MD02-A/B
The condensate level in the Feed Gas Coalescer Filter, 01-MD02-A/B, is controlled by gap
type level controllers. We do not expect a level in these drums during normal operation.
When the level is high, condensate is drained to the Warm Liquid Header. When the level is
low, the drain valve closes. Level controller 01-LIC-1110 drains the first section of 01-MD02-
A/B through valve 01-LV-1110. High-select 01-LY-1110 selects which level indication, 01-LI-
1110A or 01-LI-1110B, is used for control. Level controller 01-LIC-1112 drains the second
section of 01-MD02-A/B through valve 01-LV-1112. High-select 01-LY-1112 selects which
level indication, 01-LI-1112A or 01-LI-1112B, is used for control. When one filter is taken out
of service, hand switches 01-HS-1110 and 01-HS-1112 are set to control level for the filter
that is in service.
The operator should check the pressure drop across the filter as indicated by 01-PDI-1092 to
determine when filter servicing is necessary. A bypass is installed around the Feed Gas
Coalescer Filters to enable the plant to operate while a filter is out of service.
Feed gas coalescer filter discharge flow totalizer, 01-FQI-3001, totalizes the flow of feed gas
from 01-MD02-A/B and can be used for train material balance and specific energy
calculations.
The feed gas from pipeline valve 01-ESDV-1000 can be opened by the operator with 01-HS-
1000 to establish flow of feed gas through the system or closed to stop the flow of feed.
3.1.3 Feed Gas Compressor K.O. Drum, 01-MD01
Feed gas from the Feed Gas Coalescer Filter, 01-MD02-A/B, and Feed Gas Compressor,
01-MJ01, recycle flow enters the side of the drum and then flows out the top to the suction of
01-MJ01. Condensate in the bottom is controlled by level controller 01-LIC-1049. This
controller drains condensate to the Warm Liquid Header through valve 01-LV-1049. There is
normally no flow.
3.1.4 Feed Gas Compressor, 01-MJ01
Feed gas from Feed Gas Compressor K.O. Drum, 01-MD01, flows into the Feed Gas
Compressor, 01-MJ01. The compressor is started and stopped manually from the DCS
using switch 01-HS-1032. The speed is controlled by the compressor speed controller 01-
SIC-1014 which adjusts the turbine speed to maintain the pressure set by the compressor’s
performance controller 01-PIC-1017. Since this controller is part of the compressor, the
pressure setpoint is set by the operator at the compressor panel and not at the DCS.
KBR Page 6 of 20
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-101
OPERATING MANUAL VOLUME I, SECTION 1-1: REVISION 2
FEED GAS COMPRESSION 29 NOVEMBER 2012
The compressor control system monitors the pressures, temperatures, and flow to ensure
the Compressor does not get into a surge condition, with anti-surge controller 01-UIC-1016.
This controller adjusts valve 01-UV-1016 to maintain operation a safe “distance” from the
surge line. Valve 01-UV-1016 recycles gas flow from the discharge of the Feed Gas
Compressor Aftercooler, 01-MC01, back into the Feed Gas Compressor K.O. Drum, 01-
MD01. The operator can manually open this valve from the DCS with controller 01-HIC-
1016. The anti-surge controller will override the manual setting if necessary to prevent a
surge condition.
The Feed Gas Compressor, 01-MJ01, can be isolated by the closing of 01-ESDV-1012 at
the feed to the Feed Gas Compressor K.O. Drum, 01-MD01, and 01-ESDV-1035 at the
discharge of the Feed Gas Compressor Aftercooler, 01-MC01. The Feed Gas Heater, 01-
MC02, will heat feed gas bypassing the compressor through 01-ESDV-1036.
Mechanical monitoring of the Feed Gas Compressor Gas Turbine, 01-MJ01-GT, speed,
wheel space temperatures, exhaust temperatures, and shaft vibrations will cause the
compressor and turbine to shutdown on high-high levels.
3.1.5 Feed Gas Compressor Aftercooler, 01-MC01
The Feed Gas Compressor Aftercooler, 01-MC01, is a fin-fan type cooler that cools the
discharge of the Feed Gas Compressor, 01-MJ01, before it flows to Unit 12 (Acid Gas
Removal Unit). It consists of 4 bays each containing 3 fixed speed fans. All 12 fans are
started and stopped manually by the operator to maintain a normal temperature of 39ºC. The
number of fans required to meet this cooling requirement will vary throughout the year.
Specifically, in the winter some fans can be turned off as the gas temperature measured by
01-TI-1019 falls below the target temperature.
3.1.6 Feed Gas Heater, 01-MC02
The Feed Gas Heater, 01-MC02, is a shell and tube type heater, with hot oil as the heating
medium. It heats feed gas in the event Feed Gas Compressor Turbine, 01-MJ01-GT, is not
running. If 01-MJ01-GT trips, DCS logic 01-K-1010 opens the solenoid valve in the hot oil
control valve 01-FV-1055 tubing going to the actuator. This allows the valve to be controlled
by 01-FIC-1055. The DCS logic 01-K-1010 also puts flow controller 01-FIC-1055 and
temperature controller 01-TIC-1051 in auto mode. This places the heater in operation with
the feed gas temperature controlled by master controller 01-TIC-1051, cascaded to slave
flow controller 01-FIC-1055. Flow controller 01-FIC-1055 throttles hot oil valve 01-FV-1055
to heat the feed gas to Unit 12.
When the Feed Gas Compressor, 01-MJ01, is operating normally, the operator can reset
this automatic control system with switch 01-HS-1055. DCS logic 01-K-1010 will then close
solenoid 01-FY-1055, which closes valve 01-FV-1055, and places controllers 01-FIC-1055
and 01-TIC-1051 in manual mode. Hot oil continues to flow through 01-FV-1055 bypass to
keep the exchanger hot.
KBR Page 7 of 20
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-101
OPERATING MANUAL VOLUME I, SECTION 1-1: REVISION 2
FEED GAS COMPRESSION 29 NOVEMBER 2012
KBR Page 8 of 20
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-101
OPERATING MANUAL VOLUME I, SECTION 1-1: REVISION 2
FEED GAS COMPRESSION 29 NOVEMBER 2012
KBR Page 9 of 20
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-101
OPERATING MANUAL VOLUME I, SECTION 1-1: REVISION 2
FEED GAS COMPRESSION 29 NOVEMBER 2012
KBR Page 10 of 20
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-101
OPERATING MANUAL VOLUME I, SECTION 1-1: REVISION 2
FEED GAS COMPRESSION 29 NOVEMBER 2012
KBR Page 11 of 20
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-101
OPERATING MANUAL VOLUME I, SECTION 1-1: REVISION 2
FEED GAS COMPRESSION 29 NOVEMBER 2012
4.0 START-UP
This section outlines the steps necessary to place the Feed Gas Compression System in
service. For the purpose of this section of the operating manual, it is assumed that the
following conditions exist: utilities are in service, feed gas is available, downstream units are
ready for feed gas, and system is purged and ready for start-up.
As the Feed Gas Compression System is started, feed will increase through the Acid Gas
Removal Unit (Unit 12) and other down stream systems. Unit 58 hot oil system will
temporarily provide heat to the Feed Gas Heater, 01-MC02.
1. Confirm system depressurization valves 01-BDV-1093 at Feed Gas Coalescer Filter,
01-MD02-A/B, and 01-BDV-1040 downstream of the Feed Gas Compressor After
Cooler, 01-MC01, are lined up to the warm flare header and closed.
2. Confirm Feed Gas Coalescer Filter, 01-MD02-A/B, feed isolation valve 01-ESDV-1000
and bypass are closed.
3. Confirm Feed Gas Compressor K.O. Drum, 01-MD01, feed isolation valve 01-ESDV-
1012 and bypass are closed.
4. Confirm isolation valve 01-ESDV-1035 downstream of Feed Gas Compressor
Aftercooler, 01-MC01, is closed.
5. Confirm isolation valve 01-ESDV-1036 downstream of Feed Gas Heater, 01-MC02, is
closed.
6. Place 01-MD01 level controller 01-LIC-1049 in manual and closed.
7. Line up feed gas from pipeline through the Total Feed Gas Metering System, 01-IC03,
to the Feed Gas Coalescer Filter, 01-MD02-A/B, feed isolation valve 01-ESDV-1000.
8. Line up the two 50% Feed Gas Coalescer Filters, 01-MD02-A/B.
9. Open bypass around Feed Gas Coalescer Filter, 01-MD02-A/B, feed isolation valve 01-
ESDV-1000 to pressurize the filters. When pressure has equalized open 01-ESDV-
1000 and close bypass.
10. Open bypass around Feed Gas Compressor K.O. Drum, 01-MD01, feed isolation valve
01-ESDV-1012 to pressurize the system. When pressure has equalized open 01-
ESDV-1012 and close bypass.
11. Open bypass around isolation valve 01-ESDV-1036 downstream of Feed Gas Heater,
01-MC02, to pressurize downstream equipment. When pressure has equalized open
01-ESDV-1036 and close bypass. Need to establish hot oil flow through 01-MC02
(using normally open 01-FV-1055 bypass) to warm up exchanger before placing in
service.
12. When feed gas is near desired operating temperature, place feed gas temperature
controller 01-TIC-1051 in automatic providing setpoint to Feed Gas Heater, 01-MC02,
hot oil flow controller 01-FIC-1055.
13. The Feed Gas Compressor, 01-MJ01, is bypassed and feed gas is flowing from the
Feed Gas Coalescer Filter, 01-MD02-A/B, through the Feed Gas Heater, 01-MC02, to
Unit 12.
14. As downstream systems startup and increase feed consumption, increase feed gas
flow through the Feed Gas Compressor bypass to the Acid Gas Removal Unit up to
62% rates. When additional feed gas pressure is needed, proceed to bring the Feed
Gas Compressor, 01-MJ01, online.
KBR Page 12 of 20
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-101
OPERATING MANUAL VOLUME I, SECTION 1-1: REVISION 2
FEED GAS COMPRESSION 29 NOVEMBER 2012
15. Start the Feed Gas Compressor Gas Turbine, 01-MJ01-GT, auxiliaries, including but
not limited to, mineral lube oil, lube oil heater, hydraulic oil, ventilation, air inlet filtration,
fuel gas, and seal gas systems.
16. Begin turbine shaft rotation, start turbine firing, and bring turbine speed above minimum
completing start sequence.
17. Establish minimum flow from the Feed Gas Compressor After Cooler, 01-MC01, to the
Feed Gas Compressor K.O. Drum, 01-MD01, through anti-surge valve 01-UV-1016.
18. Place 01-MD01 level controller 01-LIC-1049 in automatic to drain any liquids collected
to the warm liquid header.
19. Place compressor performance controller 01-PIC-1017 in automatic providing the
setpoint to speed controller 01-SIC-1014.
20. As the Feed Gas Compressor discharge increases, open isolation valve 01-ESDV-1035
downstream of Feed Gas Compressor Aftercooler, 01-MC01, to allow compressor
discharge to flow to Unit 12. The flow of feed gas bypassing the compressor through
01-ESDV-1036 will discontinue as compressor discharge pressure increases.
KBR Page 13 of 20
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-101
OPERATING MANUAL VOLUME I, SECTION 1-1: REVISION 2
FEED GAS COMPRESSION 29 NOVEMBER 2012
5.0 SHUTDOWN
5.1 Normal Shutdown
The following steps are based on a planned shutdown of the Feed Gas Compression
System.
The Feed Gas Compression System is done in conjunction with downstream units.
1. Reduce LNG production to minimum allowing feed gas compressor controls to reduce
compressor speed.
2. When LNG rate is reduced to minimum, block in MCHE, molecular sieve dryers,
mercury removal, and AGRU. Refrigeration machines can remain on line, if desired.
3. Shutdown and isolate the Feed Gas Compressor, 01-MJ01.
4. Close Feed Gas Compressor K.O. Drum, 01-MD01, feed isolation valve 01-ESDV-
1012.
5. Open 01-BDV-1040 and vent gas from compressor system to the warm flare header
and close 01-BDV-1040 after the system has completed depressurizing.
6. When ready to discontinue all feed gas to downstream equipment, close isolation valve
01-ESDV-1036 downstream of the Feed Gas Heater, 01-MC02.
7. Feed gas can continue to supply fuel gas to 15-MD05-A through the Feed Gas
Coalescer Filters, 01-MD02-A/B, while isolation valve 01-ESDV-1000 remains open.
When ready to discontinue flow of feed gas through the Feed Gas Coalescer Filters,
close feed isolation valve 01-ESDV-1000.
Note: The feed gas isolation valve 01-ESDV-1000 remains open when the Plant ESD
Interlock I-0000 is initiated. Isolation valve 01-ESDV-1000 is only closed by operator action.
8. Open 01-BDV-1093 and vent gas from the filters to the warm flare header and close
01-BDV-1093 after the system has completed depressurizing.
KBR Page 14 of 20
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-101
OPERATING MANUAL VOLUME I, SECTION 1-1: REVISION 2
FEED GAS COMPRESSION 29 NOVEMBER 2012
KBR Page 15 of 20
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-101
OPERATING MANUAL VOLUME I, SECTION 1-1: REVISION 2
FEED GAS COMPRESSION 29 NOVEMBER 2012
Set Pressure
Valve Number Description/Location (barg)
KBR Page 16 of 20
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-101
OPERATING MANUAL VOLUME I, SECTION 1-1: REVISION 2
FEED GAS COMPRESSION 29 NOVEMBER 2012
Set Pressure
Valve Number Description/Location (barg)
Description Quantity
KBR Page 17 of 20
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-101
OPERATING MANUAL VOLUME I, SECTION 1-1: REVISION 2
FEED GAS COMPRESSION 29 NOVEMBER 2012
7.0 ATTACHMENTS
The following attachments are included in this section of the Operating Manual:
7.1 Attachment I: Equipment List
7.2 Attachment II: Utility Consumption
KBR Page 18 of 20
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-101
OPERATING MANUAL VOLUME I, SECTION 1-1: REVISION 2
FEED GAS COMPRESSION 29 NOVEMBER 2012
Design Design
Equipment Pressure Temp
No. Description (barg) (ºC)
KBR Page 19 of 20
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-101
OPERATING MANUAL VOLUME I, SECTION 1-1: REVISION 2
FEED GAS COMPRESSION 29 NOVEMBER 2012
Available
Motor Load
Equipment No. Description (kW)
KBR Page 20 of 20