Process Sheet: Express Luck Egypt Company
Process Sheet: Express Luck Egypt Company
Process Sheet: Express Luck Egypt Company
Description:
Quality is basically responsible For Provide Good Quality Products to customer to achieve Customer satisfaction , including Making Sure that
Good Quality of incoming material (Local & foreign ) ,also Good Quality of material in line .
Purpose:
1- keep our product in Good Quality to satisfy Customer .
2- reduce Customer Complain of Quality of the Products.
Objectives:
Improve Quality of Products.
Change History
Issue Change summary By
1 issue first process sheet Eng. Nesma Elwany
Process Approach:
Inputs Activities Outputs Document Used
1- Mo report
2- Approved Art work
3- SPECIFICATIONS SHEET MO Approval 1- Approved MO (signed)
4- Model Specs.
5- Carton box dimension
1- Production Plan
2- inspection Table Good Glass To Assembled in
Glass Inspection
3- main board & data cable . Main Line
4- Vacuum
1- Finish Devices.
2- Device Standard .
3- Inspection Cables (VGA & HDMI
& AV & RF )
4- PC & Receiver .
5- Digital power Meter .
6-Coloer analyser CA-210 QA Sample inspection Approved Sample
7-Voltage/Insulation Tester
8-Digital video signal generator
(VG-859C)
9-Yamaha sound av receiver AX-
V379.
1- device Sample.
2- Software QA Software Inspection Approved Software
1- Software .
Mainboard with Updated
2- Main Boards Software Update
Software
3- Plan of Production
1- Device Standard .
2- Defect Target
3- Defect Types and Codes
4- Inspection Cables (VGA & HDMI
QC inspection Devices with Good Quality
& AV & RF )
5- PC & Receiver
6- Dark Room .
7- High Boot inspection device .
1- No . Of Stacks
2- Packing condition According to
SOP
3- Devices Serial matched with
Good Packing Condition For
Carton Packing Inspection
Devices
4- Packing Check list .
5- Local Material inspection
Standard .
6- QC Pass Stamp .
1- Finish Devices.
2- Device Standard .
3- Inspection Cables (VGA & HDMI
QA Inspection Devices with Good Quality
& AV & RF )
4- PC & Receiver .
1- Sales department
1- Mo report
2- OEM (from Sales)& contex 1- Mo report
2- Approved Art work
(last Approved Art work- 2- Approved Art work
Eng. Abdelaziz Hussein 3- SPECIFICATIONS SHEET
(quality) 3- SPECIFICATIONS SHEET MO Approval 1- Approved MO (signed) Sales Department
Eng. Nesma elwany 4- Model Specs.
3- HQ 4- Model Specs.
5- Carton box dimension
4- Last Approved 5- Carton box dimension
6- MO Follow Up
dimension(Quality)
1- Finish Devices.
2- Device Standard .
3- Inspection Cables (VGA & HDMI &
AV & RF )
4- PC & Receiver .
1- Purchasing . 5- Digital power Meter .
2- HQ . 6-Coloer analyser CA-210 QA Sample inspection Approved Sample Production Tarek monaem Sample Inspection Sheet
3- Production . 7-Voltage/Insulation Tester
8-Digital video signal generator (VG-
859C)
9-Yamaha sound av receiver AX-
V379.
1- device Sample.
HQ 2- Software QA Software Inspection Approved Software Production Tarek monaem Software Inspection Sheet
1- HQ 1- Software .
Mainboard with Updated
2- Warehouse 2- Main Boards Software Update Main Line Amr Ahmed Production Plan
Software
3- Planning 3- Plan of Production
1- SOP . Devices Assembled According
HQ Line Audit Customer Moamen Mostafa KPI's Sheet
2- 5S Knowledge . to SOP
1- Device Standard .
2- Defect Target 1- Quality needs Consumption .
3- Defect Types and Codes 2- Defect Analysis Pareto & Summary
1- Purchasing . 4- Inspection Cables (VGA & HDMI & of defect QTY .
QC inspection Devices with Good Quality Customer QC Team
2- HQ . AV & RF ) 3- Daily defect Report .
5- PC & Receiver 4- Symptoms Codes .
6- Dark Room . 5- defect List report (In dark room )
7- High Boot inspection device .
1- No . Of Stacks
2- Packing condition According to
SOP
3- Devices Serial matched with
Good Packing Condition For
1- HQ . Carton Packing Inspection Warehouse Hany 1- Packing Checklist.
Devices
4- Packing Check list .
5- Local Material inspection Standard
.
6- QC Pass Stamp .
1- Finish Devices.
2- Device Standard .
1- Purchasing . 3- Inspection Cables (VGA & HDMI &
QA Inspection Devices with Good Quality Customer Tarek monaem & Ahmed EID QA Samples Sheet
2- HQ . AV & RF )
4- PC & Receiver .
1- Ding talk App. Replace the defects and report 1- Return Follow Up .
Production 2- camera Return Material to supplier defects related to PMC Raham Mohamed 2- Return reports .
him 3- Retune permission form .
Documents of support
1- Mo report
2- Approved Art work
3- SPECIFICATIONS SHEET
4- Model Specs.
5- Carton box dimension
6- MO Follow Up
Container report
1- Production Plan
2- Return Glass report
Production Plan
KPI's Sheet
1- Packing Checklist.
QA Samples Sheet
1- Return Follow Up .
2- Return reports .
3- Retune permission form .
Department
WHAT? WHO?
(Material/equipment/facility/necessary spare parts, etc.) ((Responsibility/skill matrix/qualification training/special training))
INPUTS
(External & internal customer opinions )
OUTPUTS
INPUTS
Quality OUTPUTS
(Procedures & major points internal & external customers expec
1- MO Process
2- Local Material Quality Standard Process 1- Good Materials for using.
3- Incoming Materials (Local - imported
4- TV Quality inspection Standard. 2- SW without issues
5- Production TVs 3- Goods purchased by the order
5- All models specifications 4- QA certificate
6- Customer Needed 5- Inspection reports for goods purchased.
6- customer satisfy about product
HOW? Measure?
(Approach/special environment requirement/procedure/work (Performance of process target)
specification/list/format) SUPPORT PROCESS
Prepared by Eng. Abdelaziz Hussein Reviewed by Eng. Nesma Elwany Approved by Eng. Essam
Designation Designation Designation
Date 15/4/2021 Date 15/4/2021 Date 15/4/2021
Quality
WHO?
((Responsibility/skill matrix/qualification training/special training))
OUTPUTS
(Procedures & major points internal & external customers expect )
Measure?
(Performance of process target)
Eng. Essam
15/4/2021
FO-QA-01 Issue# (1 ) Rev # ( 0) dated 15/4/2021
start
Receive MO
from Sales
Team
MO form
Model &
1 Review MO Specs & Review the Specs and Design of User manual , Black Sticker
User Quality Engineer and carton design .
manual
design &
No Black
Modify MO Approval sticker
design
Yes
Confirm MO
Send SW Requirement to HQ
Receive SW from HQ
SW
Review SW Check
List (F06)
Yes
Receiving
Incoming
Material
2 Inspect MO &
Inspect Local
Quality
Foreign Incoming
Standard
Incoming
Make sure that all material and Sop is Right and available with
Review BOM in Good condition and First sample (New Batch is accepted From
Model Change Quality Supervisor
line & SOP & QA )
Checklist
local material if Not stop line and escalate to Top management
)F05(
QC DR (F10)
QC DWR
(F11,F12,F13,F1 In process and
4) Final Inspection
3
Work 1-Inspect 100% devices and defects recorded and send to
No Quality workers & maintenance to repair
Inspect TV Instruction ST
Supervisor & engineer 2-report of defects (pareto, summary & countermeasure)
3- inspect packing process
Yes
Send Defect PCs to
Repair
Next Step
QA Inspection
QA Lap take sample from
and Result
PLto inspect
(F15,F16)
No Work
Inspect TV Instruction ST
QA inspector 1- Inspect 10% of total Accepted devices .
Yes
Send Defect PCs to
Repair
End
Note:
if any non -conformity of any inspection ,some times top management accept to pass but with consission from them.
Receive MO
from Sales
Team
MO form
Model &
Review MO Specs & Review the Specs and Design of User manual , Black Sticker
User and carton design .
manual
design &
No Black
Modify MO Approval sticker Quality Engineer
design
Yes
1 Confirm MO
Send SW Requirement to HQ
Review the sources and all applications and TV performance of
this SW
Receive SW from HQ
SW
Review SW Check
List (F06)
Approved SW
QA Leader
No
Yes
Upgrade main board with SW Quality Member Upgrade all order main board
End
Note:
if any NON -conformity of any inspection ,some times Top management Accept to Pass But with Consission from them.
Receiving
Incoming
Material
MO &
Inspect Inspect Local
Quality
Foreign Incoming Material Receiving inspect Condition of Packing From China and report if any NG
Standard
Incoming inspector condition Found
Report Local
Report Local
Incoming
Incoming
2
End
Note:
if any NON -conformity of any inspection ,some times Top management Accept to Pass But with Consission from them.
Inspection Procedure
Express luck Egypt
Company Procedure #:
Model
Change at
PL Make sure that all material and Sop is Right and available with
Good condition and First sample (New Batch is accepted From
Quality Supervisor QA )
if Not stop line and escalate to Top management
Review BOM in
Model Change
line & SOP &
Checklist
local material
)F05(
3
QC DR (F10)
QC DWR
(F11,F12,F13,F1 In process and
4) Final Inspection
NO Work
Inspect TV Instruction ST Quality workers & 1-Inspect 100% devices and defects recorded and send to
Supervisor & engineer maintenance to repair
2-report of defects (pareto, summary & countermeasure)
3- inspect packing process
Send Defect PCs to Yes
Repair
Next Step
QA Inspection
and Result QA Lap take sample from
PLto inspect
(F15,F16)
Loading Report
Loading Form F17 Material Receiving inspect devices before packed to delivery Car and also inspect
inspection inspector Delivery car conditions
End
Note:
if any NON -conformity of any inspection ,some times Top management Accept to Pass But with Consission from them.
3
4
7
7
10
11
12
13
14
15
16
17
18
19
20
General Container Report FO-QC-01
8
9
10
11
12
13
14
15
16
17
18
19
20
22
Container Report FO-QC-02
Status Comment
Incoming Report FO-QC-03 Issue No (1) Rev# (0)
Jan-20
Feb-20
Mar-20
Apr-20
May-20
Jun-20
Jul-20
Aug-20
Sep-20
Oct-20
Nov-20
Dec-20
Jan-20
Feb-20
Mar-20
Apr-20
May-20
Jun-20
Jul-20
Aug-20
Sep-20
Oct-20
Nov-20
Dec-20
Jan-20
Feb-20
Mar-20
Apr-20
May-20
Jun-20
Jul-20
Aug-20
Sep-20
Oct-20
Nov-20
Dec-20
Defect Rate
Date
Jan-20
Feb-20
Mar-20
Apr-20
May-20
Jun-20
Jul-20
Aug-20
Sep-20
Oct-20
Nov-20
Dec-20
Monthly Evaluation FO-QC-04 Issue No (1) Rev# (0)
A (0% - 0.5%)
Defect rate B(0.6%-1%)
NG QTY 不合格数量 target
不良比率 C (1% - 6%)
D (more than 6%)
1200%
1000%
800%
600%
400%
200%
0%
Jan-20 Feb-20 M
A (0% - 0.5%)
Defect rate B(0.6%-1%)
NG QTY 不合格数量 target
不良比率 C (1% - 6%)
D (more than 6%) 1200%
1000%
800%
600%
400%
200%
600%
400%
200%
0%
Jan-20 Feb-20 M
A (0% - 0.5%)
Defect rate B(0.6%-1%)
NG QTY 不合格数量 target
不良比率 C (1% - 6%)
D (more than 6%)
1200%
1000%
800%
600%
400%
200%
0%
Jan-20 Feb-20
t Rate
target Best Supplier
1200%
1000%
800%
600%
1000%
800%
600%
400%
200%
0%
Jan-20 Feb-20 Mar-20 Apr-20
Co
Issue No (1) Rev# (0)
Golden Back
1200%
1000%
800%
600%
400%
200%
0%
Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 D
Al baraka
1200%
1000%
800%
600%
400%
200%
600%
400%
200%
0%
Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 De
Tabarak
1200%
1000%
800%
600%
400%
200%
0%
Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 De
Note IF any Following Item not implement before Production start we will stop Line immediately
BOM (material sould arrive to line before production BY 2 Hour) SOP First Sample
Date Model Batch no. Customer all material is all material with all material with SOP hanged SOP is matched to sample assembled sample delivered to QA lap Sample inspection is Carton , user manual , waranety consission from Signature
matched to BOM Part No. Good condition to line Batch according to SOP before production by 4 hours Accepted and all accessories
Software name :
inspection Date : Model :
TV Type : Batch:
Brand:
defect
ITEMS ok NG defect description Fix or Not ITEMS ok NG Fix or Not
description
No. Item Date Week ID Model Batch No. Defect Failure Picture 1 Failure Picture 2 Part No. QTY Responsible HQ Comment
Return Glass Defect FO-QC-08
Issue No (1) Rev# (0)
NO. Date Week ID Model Batch NO. Brand Defect Defect Photo Box S/N Photo GLASS S/N Photo GLASS P.N. inspection place Responsible HQ Comment
12
13
14
15
16
17
18
19
20
No. Production Date Week ID Model Brand QTY Ordar Batch No. MPCB Serial No. PHOTO M.B. FRONT PHOTO M.B. BACK Serial 1 Serial 2 Defect Responsible HQ Comment
4
QC defects report FO-QC-10
0 0 #DIV/0! 0 0
DS01 DS02
كمية االنتاج كمية نسبة االضاءة الخلفية ال تعمل أضاءة ضعيفة
العيوب العيوب
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 0.0%
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0 0 0 0
CN02 CN03
كابل االنترنت ال يعمل- التوصيل االتصال الالسلكي ال يعمل- التوصيل
0 0
CN04 CN05
مخرج الHDMI 1 ال يعمل مخرج الHDMI 2 ال يعمل
0 0 0 0
Wrong Assemble - Wrong Assemble - Wrong Assemble - Wrong Assemble -
Missing Screw Wrong Screw Speaker Cable Speaker Gap
120
100
80
60
40
20
QC Defects summary FO-QC-12 Issue No (1) Rev# (0)
Row Labels Target Average of Defect Row Labels Target Display - Spot Sheet 0.25%
1200.00%
2019 2019 0.20%
2020 2020 0.20%
0.20% 0.20%
1000.00%
Half Year Half Year 0.20%
0.20%
0.15%
Q1 Q1 0.20%
Q2 800.00% Q2 0.20%
Q3 Q3 0.20% 0.10%
0.20%
July 600.00% July 0.20%
August August 0.20% 0.05%
Sept Sept 0.20%
400.00% 0.20%
W36&37 W36&37 0.20% 0.00%
W38 W38 0.20% 1 9 20 ar 1 Q2 Q3 ly st pt 7 8
20 20 Ye Q Ju ugu Se &3 W3
lf A 36
200.00% Ha W
0.00%
2019 2020 Half Year Q1 Q2 Q3 July August Sept W36&37 W38
1200.00%
Row Labels Target Sum of Total MainBoard 1200.00% Row Labels Target
Wrong Assemble - Adjusting
Sheet
2019 2019 1000.00%
2020 1000.00% 2020
Q1 Q1
Q2 600.00% Q2 600.00%
Q3 Q3
400.00% 400.00%
July July
August August
Sept 200.00% Sept 200.00%
W36&37 W36&37
W38 0.00% W38 0.00%
2019 2020 Half Year Q1 Q2 Q3 July August Sept W36&37 W38 19 20 ar 1 Q2 Q3 ly st pt 7 38
20 20 Ye Q Ju ugu Se &3 W
Ha
lf A 36
W
1200.0% 1200.00%
Row Labels Target Display - Light Leakage Row Labels Target
Wrong Assemble - Missing
Screw
2019 2019 1000.00%
1000.0%
2020 2020
%
9 20 ar 1 Q2 Q3 ly st t 37 38
20
1
20 Ye Q Ju ugu Sep & W
lf A 36
Ha W
20 ar 1 Q2 Q3 ly st pt 7 38
20 Ye Q Ju ugu Se &3 W
Ha
lf A 36
W
9 20 ar 1 Q2 Q3 ly
Ju ugu
st pt 37 38
20 Ye Q Se & W
lf A 36
Ha W
序
号 日期date 问题描述 -Problem Description
No
1
2
3
TOTAL Production
TOTAL Defects
Defect rate
Defect target
QC Defects Result FO-QC-13
会议纪要问题跟进表
Meeting minutes follow-up form
具体的解决措施Specific solutions
Code 不良比例
defect ratio
Root couse
#DIV/0!
FO-QC-13 Issue No (1) Rev# (0)
跟进表
low-up form
具体的解决措施Specific solutions
下周目标值 target
Date:
MODEL :-
التاكد من تقفيل الكرتونة جيدأ-1 التاكد من مطابقة سيريال العمليات مع سيريال الكرتونة-1
بالسلوتيب والشنبر اليمين واليسار
check closing catron box check matching Serial No of content with S.N..
well with tape &plastic ring of catron box Right & Left
التاكد من رص المنتجات جيدا-2 التأكد من لصق السيريال جيدا افقى (عدم وجود ميل-2 السيريال
)(عدم وجود ميل باحد المنتجات التعبئة ) بالسيريال
check storing the products in النهائية Serial
check pasting serial Number well horisontal
good conditions without any
without any slope Number
slope in products
التاكد من وضع الستريتش حول-3
المنتجات وقبل تسليمها للمخزن
check putting tape around
the products before delivery
to warehouse
توقيع فنى الجودة
issue No. : 1 of 2020 issue Date : 22/4/2020 QC Technical
signature
Prepared BY: Approved By : ENG.NESMA كمية االجهزة بالبالته
ENG. Abdelaziz Hussein ELWANY QTY Devices
MODEL :-
التاكد من تقفيل الكرتونة جيدأ-1 التاكد من مطابقة سيريال العمليات مع سيريال الكرتونة-1
بالسلوتيب والشنبر اليمين واليسار
check closing catron box check matching Serial No of content with S.N..
well with tape &plastic ring of catron box Right & Left
التاكد من رص المنتجات جيدا-2 التأكد من لصق السيريال جيدا افقى (عدم وجود ميل-2 السيريال
)(عدم وجود ميل باحد المنتجات التعبئة ) بالسيريال
check storing the products in النهائية Serial
check pasting serial Number well horisontal
good conditions without any without any slope Number
slope in products
التاكد من وضع الستريتش حول-3
المنتجات وقبل تسليمها للمخزن
check putting tape around
the products before delivery
to warehouse
توقيع فنى الجودة
issue No. : 1 of 2020 issue Date : 22/4/2020 QC Technical
signature
Prepared BY: Approved By : ENG.NESMA كمية االجهزة بالبالته
ENG. Abdelaziz Hussein ELWANY QTY Devices
QA inspection FQ-QC-15
inspector
Name:
Issue No (1) Rev#(0)
Model :
Date :
QA Lap inspection checklist
质量检查实验室检查清单
ser. QA Test SOFTWARE Critical issue Display AUDIO Connectivity RF & Satellite ASSEMBLING Print Packing Type of Issue Comments Aging Mode S.N Status Duration
TV Serial
数 质量检查 軟件 关键问题 显示 音效 连接性 射频和卫星 组装 打印 填料 发行类型 评论 老化模式序列号 状态 持续时间
1 OK OK OK OK OK OK OK OK OK OK OK OK
2 OK OK OK OK OK OK OK OK OK OK OK OK
3 OK OK OK OK OK OK OK OK OK OK OK OK
4 OK OK OK OK OK OK OK OK OK OK OK OK
5 OK OK OK OK OK OK OK OK OK OK OK OK
6 OK OK OK OK OK OK OK OK OK OK OK OK
7 OK OK OK OK OK OK OK OK OK OK OK OK
8 OK OK OK OK OK OK OK OK OK OK OK OK
9 OK OK OK OK OK OK OK OK OK OK OK
10 OK OK OK OK OK OK OK OK OK OK OK
11 OK OK OK OK OK OK OK OK OK OK OK
12 OK OK OK OK OK OK OK OK OK OK OK
13 OK OK OK OK OK OK OK OK OK OK OK
14 OK OK OK OK OK OK OK OK OK OK OK
15 OK OK OK OK OK OK OK OK OK OK OK
16 OK OK OK OK OK OK OK OK OK OK OK
17 OK OK OK OK OK OK OK OK OK OK OK
18 OK OK OK OK OK OK OK OK OK OK OK
19 OK OK OK OK OK OK OK OK OK OK OK
20 OK OK OK OK OK OK OK OK OK OK OK
21 OK OK OK OK OK OK OK OK OK OK OK
22 OK OK OK OK OK OK OK OK OK OK OK
23 OK OK OK OK OK OK OK OK OK OK OK
24 OK OK OK OK OK OK OK OK OK OK OK
25 OK OK OK OK OK OK OK OK OK OK OK
26 OK OK OK OK OK OK OK OK OK OK OK
27 OK OK OK OK OK OK OK OK OK OK OK
28 OK OK OK OK OK OK OK OK OK OK OK
29 OK OK OK OK OK OK OK OK OK OK OK
30 OK OK OK OK OK OK OK OK OK OK OK
31 OK OK OK OK OK OK OK OK OK OK OK
32 OK OK OK OK OK OK OK OK OK OK OK
33 OK OK OK OK OK OK OK OK OK OK OK
34 OK OK OK OK OK OK OK OK OK OK OK
35 OK OK OK OK OK OK OK OK OK OK OK
36 OK OK OK OK OK OK OK OK OK OK OK
37 OK OK OK OK OK OK OK OK OK OK OK
38 OK OK OK OK OK OK OK OK OK OK OK
39 OK OK OK OK OK OK OK OK OK OK OK
40 OK OK OK OK OK OK OK OK OK OK OK
41 OK OK OK OK OK OK OK OK OK OK OK
42 OK OK OK OK OK OK OK OK OK OK OK
43 OK OK OK OK OK OK OK OK OK OK OK
44 OK OK OK OK OK OK OK OK OK OK OK
45 OK OK OK OK OK OK OK OK OK OK OK
46 OK OK OK OK OK OK OK OK OK OK OK
47 OK OK OK OK OK OK OK OK OK OK OK
48 OK OK OK OK OK OK OK OK OK OK OK
49 OK OK OK OK OK OK OK OK OK OK OK
50 OK OK OK OK OK OK OK OK OK OK OK
DATE
4/5/2020
5/5/2020
TOTAL
QA inspection
0.04
0.036363636363636
0.035
0.03
0.025
0.02
0.015 0.013157894736842
0.01
0.005
0
43955 43956 0
Date
dd/mm/y
QA Inspection Result
TOTAL Production
555
400
955
QA inspection
0 0 0
Serial
FQ-QC-16 issue No (1) Rev#(0)
131 128 3 2% 0%
0.1376
0.1373
0.1372
0.1371
0.137
0.1369
0.1368
0.1367
0.1366
43955 43956 0 0 0
Issue Image
No out going sound وت
- وجد صـ
الـ ي ـ
o (1) Rev#(0)
Note
12
10
8
6
4
2
0
es 76 55 1
pl 13
m
L sa
O TA
T
12
10
0 8
6
QA Respond
2
6
1-
2- 4
0
1 2 3 4 5 6 7 8 9 10 11
QA inspection
1 ue )ال
13 Iss ي)و)ج
د
)و)ص
-ت
d
oun
gs
in
t go
ou
No
Chart Title
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
ال)
ي
)و)ج
8 29 30 31
Loading Report
C
Good Packing in car
Brand Model QTY تعبئة صحيحة بداخل عربية
التحميل
No (1) Rev# (0)
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
#DIV/0! 0%
concession
Defects QTY Photo Photo Defect Rate
التنازل
Defect Target Comment
100.00%
90.00%
80.00%
70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%
12
12
10
0
loading defect rate