Pt. Sriwijayateknikutama: Cost Project (Budgeting)
Pt. Sriwijayateknikutama: Cost Project (Budgeting)
SriwijayaTeknikUtama
Machining, Rotating, Automotive, Fabrication, Fuel Injection Pump, Hose and Fitting Specialist, Lube and Dispensing System
ENGINEERING DIVISION
COST PROJECT ( BUDGETING )
Nama Project NDT test, Hydrotest dan Pressure test SPI 14493
Customer PT. PPA MHU QUOT NO
Quantity 7 Pcs DOC NO
Dimensi START
Estimasi Lama Pengadaan 2 Hari FINISH
Estimasi Lama Pekerjaan 6 Hari TANGGAL 25 Nopember 2019
A. Cost Material / Purchase item
Berat Harga Satuan Harga Total Luasan Cat Expedisi Realisasi
No Part Number Nama Barang Spek Jml Barang Ket
( kg ) ( Rp ) ( Rp ) m2 Espedisi Harga/kg Total Harga No. EPR No. PO Value
Sub Total Material 0 Total Berat 0 0.00 5 TOTAL COST BUDGETING 153,853,000.00
6 Cost of Contingencies ( 1 % ) 1,538,530.00
25 Nopember 2019 7 Cost of Money
Dibuat oleh, Diperiksa & Disetujui oleh, 8 Cost of Sales ( 1 % )
Dept. Engineering Head Dept. Engineering 9 Harga Re Stock -
10 Total Cost ( Nett ) 155,391,530.00
11 Harga /Pcs 22,198,790.00
12 Harga Jual
Ginanjar Mustofa Fachrudin Azis 13 Pajak Pertambahan Nilai / PPN 10% )
14 TOTAL KESELURUHAN