INSTALLATION OF CA-P TO CD-P PIPELINE

CONTRACT NO. ADOC/PI-18/SPC/CN-16


Client : ADOC (JAPAN) LTD
ABU DHABI OIL CO, LTD
NPCC-Project No. 9201

DOCUMENT NUMBER
Page 2 of 23
DOCUMENT TITLE
ADOC: MRF-EC-PL-65SPE-005 REV. : 0
NPCC: 9201-N-SP-3005 SPECIFICATION OF BARRED TEE DATE: 10-07-2019

REVISION CONTROL SHEET

REV DATE REV. SHTS. DESCRIPTION

A 20/06/2019 First Issue Issued for Review

0 10/7/2019 As Marked Issued for Design


INSTALLATION OF CA-P TO CD-P PIPELINE
CONTRACT NO. ADOC/PI-18/SPC/CN-16
Client : ADOC (JAPAN) LTD
ABU DHABI OIL CO, LTD
NPCC-Project No. 9201

DOCUMENT NUMBER
Page 3 of 23
DOCUMENT TITLE
ADOC: MRF-EC-PL-65SPE-005 REV. : 0
NPCC: 9201-N-SP-3005 SPECIFICATION OF BARRED TEE DATE: 10-07-2019

TABLE OF CONTENTS

1.0 INTRODUCTION ................................................................................................................................. 4


1.1 PROJECT OVERVIEW .......................................................................................................................... 4
1.2 PROJECT FACILITY DESCRIPTION ...................................................................................................... 4
1.3 PROJECT LOCATION............................................................................................................................ 5
2.0 PURPOSE OF THIS DOCUMENT...................................................................................................... 6
3.0 DEFINITIONS AND ABBREVIATIONS ............................................................................................. 7
4.0 REFERENCE DOCUMENTS .............................................................................................................. 8
4.1 PROJECT DOCUMENTS ....................................................................................................................... 8
4.2 INTERNATIONAL CODES AND STANDARDS ......................................................................................... 8
4.3 ORDER OF PRECEDENCE ................................................................................................................. 11
5.0 QUALITY ASSURANCE ................................................................................................................... 12
5.1 QUALITY MANAGEMENT SYSTEM ..................................................................................................... 12
5.2 QUALITY PLAN .................................................................................................................................. 12
5.3 PRE-PRODUCTION MEETING ............................................................................................................ 13
5.4 THIRD PARTY INSPECTION REQUIREMENTS..................................................................................... 13
5.5 MEASURING AND TEST EQUIPMENT ................................................................................................. 13
6.0 DESIGN AND TECHNICAL REQUIREMENTS ............................................................................... 14
6.1 BARRED TEE DESIGN AND FABRICATION ......................................................................................... 15
6.2 MANUFACTURE REQUIREMENTS ...................................................................................................... 16
6.3 BARRED TEES MATERIAL ................................................................................................................. 16
7.0 MANUFACTURE ............................................................................................................................... 18
7.1 GENERAL .......................................................................................................................................... 18
7.2 DIMENSIONAL & TOLERANCES ......................................................................................................... 18
7.3 WELDING ENDS ................................................................................................................................ 18
7.4 COATING ........................................................................................................................................... 19
7.5 TREATMENT OF DEFECTS ................................................................................................................. 19
7.6 TEST RING ........................................................................................................................................ 19
7.7 HANDLING AND STORAGE ................................................................................................................. 19
7.8 PACKING AND SHIPMENT .................................................................................................................. 19
8. INSPECTION AND TESTING ........................................................................................................... 20
8.1 INSPECTION ....................................................................................................................................... 20
8.2 TESTING ............................................................................................................................................ 20
8.3 HYDROSTATIC TESTING .................................................................................................................... 20
8.4 NDT ON WELDS................................................................................................................................ 21
8.5 IDENTIFICATION DETAILS FROM MANUFACTURER ............................................................................ 21
8.6 VENDOR DOCUMENT REQUIREMENTS .......................................................................................... 21
APPENDIX A – TYPICAL DESIGN FOR BARRED TEE ............................................................................... 22
INSTALLATION OF CA-P TO CD-P PIPELINE
CONTRACT NO. ADOC/PI-18/SPC/CN-16
Client : ADOC (JAPAN) LTD
ABU DHABI OIL CO, LTD
NPCC-Project No. 9201

DOCUMENT NUMBER
Page 4 of 23
DOCUMENT TITLE
ADOC: MRF-EC-PL-65SPE-005 REV. : 0
NPCC: 9201-N-SP-3005 SPECIFICATION OF BARRED TEE DATE: 10-07-2019

1.0 INTRODUCTION

1.1 Project Overview

Abu Dhabi Oil COMPANY (ADOC) Japan (COMPANY) produces oil from Mubarraz, AR,
GA and Hail fields. The produced oil from all fields are finally gathered on Mubarraz
Island and treated by facilities located on the Island.

ADOC has planned an oil field development of Mubarraz Field. However, 8” gas line from
CD2-Well Jacket to CA-P has been damaged by corrosion in 2015 and has been
unavailable since then. For gas transfer from CD1-WP to CA-P, 6”oil line from CA-P to
CD-P has been temporarily substituted for unavailable 8” gas line and accordingly ADOC
has temporarily stopped the oil production from CA-P.

In order to resume oil production ADOC intends to install a new flow line from CA-P to
CD-P

1.2 Project Facility Description

The project includes the following:

 Installation of 8” New Oil Flow Line from CA-P to CD-P.


 Associated works and tie-in on CA-P Platform
 Associated works and tie-in on CD-P Platform
 Cathodic Protection for the new pipeline.
INSTALLATION OF CA-P TO CD-P PIPELINE
CONTRACT NO. ADOC/PI-18/SPC/CN-16
Client : ADOC (JAPAN) LTD
ABU DHABI OIL CO, LTD
NPCC-Project No. 9201

DOCUMENT NUMBER
Page 5 of 23
DOCUMENT TITLE
ADOC: MRF-EC-PL-65SPE-005 REV. : 0
NPCC: 9201-N-SP-3005 SPECIFICATION OF BARRED TEE DATE: 10-07-2019

FIGURE1: PIPELINE FROM CA-P TO CD-P

1.3 Project Location

The project will be executed in Mubarraz Field, which is 100 km north-west of the city of
Abu Dhabi.
INSTALLATION OF CA-P TO CD-P PIPELINE
CONTRACT NO. ADOC/PI-18/SPC/CN-16
Client : ADOC (JAPAN) LTD
ABU DHABI OIL CO, LTD
NPCC-Project No. 9201

DOCUMENT NUMBER
Page 6 of 23
DOCUMENT TITLE
ADOC: MRF-EC-PL-65SPE-005 REV. : 0
NPCC: 9201-N-SP-3005 SPECIFICATION OF BARRED TEE DATE: 10-07-2019

2.0 PURPOSE OF THIS DOCUMENT

This Specification defines the minimum requirements for the materials, manufacture,
testing and inspection of Barred Tee for the PROJECT.

Barred Tees shall meet all the requirements of this document as well as DNV-GL-ST-
F101 Section 8.2.4.
INSTALLATION OF CA-P TO CD-P PIPELINE
CONTRACT NO. ADOC/PI-18/SPC/CN-16
Client : ADOC (JAPAN) LTD
ABU DHABI OIL CO, LTD
NPCC-Project No. 9201

DOCUMENT NUMBER
Page 7 of 23
DOCUMENT TITLE
ADOC: MRF-EC-PL-65SPE-005 REV. : 0
NPCC: 9201-N-SP-3005 SPECIFICATION OF BARRED TEE DATE: 10-07-2019

3.0 DEFINITIONS AND ABBREVIATIONS


COMPANY ABU DHABI OIL CO., LTD. Japan
The party which carries out inspection,
CONTRACTOR procurement, construction, fabrication and
management of the PROJECT.
The party which manufactures and/or supplies
equipment, technical documents / drawings and
VENDOR
services to perform the duties specified by
COMPANY/CONTRACTOR.

PROJECT Installation of CA-P to CD-P pipeline

The party which carries out inspection,


SUBCONTRACTOR / procurement, installation and testing of the
SUBVENDOR systems as specified by CONTRACTOR /
VENDOR

Abbreviations
ADOC : ABU DHABI OIL CO., LTD. Japan
API : American Petroleum Institute
ASTM : American Society for Testing and Materials
ASME : American Society for Mechanical Engineers
C.E (IIW) : Carbon Equivalent (International Institute of Welding)
DNV : Det Norske Veritas
EPC : Engineering Procurement and Construction
FEED : Front End Engineering Design
ISO : International Organization for Standardization
ITP : Inspection and Test Plan
MPI : Magnetic Particle Inspection
MSS : Manufacturer Standardization Society
MPS : Manufacturing Procedure Specification
NACE : National Association for Corrosion Engineers
NDT : Non Destructive Testing
QA : Quality Assurance
QC : Quality Control
QMS : Quality Management System
VDRL : VENDOR Document Requirement List
TPA : Third Party Agency
INSTALLATION OF CA-P TO CD-P PIPELINE
CONTRACT NO. ADOC/PI-18/SPC/CN-16
Client : ADOC (JAPAN) LTD
ABU DHABI OIL CO, LTD
NPCC-Project No. 9201

DOCUMENT NUMBER
Page 8 of 23
DOCUMENT TITLE
ADOC: MRF-EC-PL-65SPE-005 REV. : 0
NPCC: 9201-N-SP-3005 SPECIFICATION OF BARRED TEE DATE: 10-07-2019

4.0 REFERENCE DOCUMENTS

4.1 Project Documents

Document No. Description

9201-N-DB-3001 Pipeline & Riser Design Basis

9201-N-SP-3001 Specification for Seamless Line Pipe

4.2 International Codes and Standards

Document No. Description

American Petroleum Institute (API)

API Specification 5L –
Specification for Line Pipe
45th Edition

API 1104 Welding of Pipelines and Relate Facilities

American Society for Mechanical Engineers (ASME)

Steel Pipe Flanges and Flanged Fittings. NPS 1/2


ASME/ANSI B16.5
through NPS 24

ASME/ANSI B16.9 Factory Made Wrought Steel Butt-Welding Fittings

ASME/ANSI B16.25 Butt-Welding Fittings

Boiler & Pressure Vessel Code, Non-Destructive


ASME SEC V
Examination

ASME B31.3 Process Piping

ASME B31.4 Pipeline Transportation Systems for Liquid

Boiler and Pressure Vessel Code, Welding and Brazing


ASME Sec IX
Qualifications.
INSTALLATION OF CA-P TO CD-P PIPELINE
CONTRACT NO. ADOC/PI-18/SPC/CN-16
Client : ADOC (JAPAN) LTD
ABU DHABI OIL CO, LTD
NPCC-Project No. 9201

DOCUMENT NUMBER
Page 9 of 23
DOCUMENT TITLE
ADOC: MRF-EC-PL-65SPE-005 REV. : 0
NPCC: 9201-N-SP-3005 SPECIFICATION OF BARRED TEE DATE: 10-07-2019

American Society for Testing and Materials (ASTM)

Standard Test Method for Vickers Hardness of Metallic


ASTM E 92
Materials.

ASTM E 94/ E 94 M Standard Guide for Radiographic Testing.

Standard Specification for Wrought High-Strength Ferritic


ASTM A 860/ A 860 M
Steel Butt-Welding Fittings.

ASTM E 165 Standard Test Method for Liquid Penetrant Examination.

Standard Specification for Piping Fittings of Wrought


ASTM A 234 Carbon Steel and Alloy Steel for Moderate and Elevated
Temperatures.

Low and Intermediate Tensile Strength Carbon Steel


ASTM A 283
Plates, Shapes and Bars.

Standard Test Methods and Definitions for Mechanical


ASTM A 370
Testing of Steel Products.
Standard Specification for Pressure Vessel Plates,
ASTM A 516 Carbon Steel, for Moderate and Low Temperature
Service.

ASTM E 709 Standard Guides for Magnetic Particle Testing.

American Society for Non-Destructive Testing(ASNT)

ASNT 2510 Guideline to Personnel Qualification and Certification


National Association for Corrosion Engineers (NACE)

NACE MR0175/ ISO Petroleum, Petrochemical and Natural Gas Industries-


15156 Materials for Use in H2S-Containing Environments in Oil
and Gas Production.
Laboratory Testing of Metals for Resistance to Sulfide
NACE TM0177 Stress Cracking and Stress Corrosion Cracking in H2S
Environments.
Evaluation of Pipeline and Pressure Vessel Steels for
NACE TM0284
Resistance to Hydrogen-Induced Cracking
INSTALLATION OF CA-P TO CD-P PIPELINE
CONTRACT NO. ADOC/PI-18/SPC/CN-16
Client : ADOC (JAPAN) LTD
ABU DHABI OIL CO, LTD
NPCC-Project No. 9201

DOCUMENT NUMBER
Page 10 of 23
DOCUMENT TITLE
ADOC: MRF-EC-PL-65SPE-005 REV. : 0
NPCC: 9201-N-SP-3005 SPECIFICATION OF BARRED TEE DATE: 10-07-2019

Det Norske Veritas (DNV)

DNVGL-ST-F101 Submarine Pipeline Systems

International Organization for Standardization (ISO)

Preparation of Steel Substrates before Application of


Paints and Related Products – Visual Assessment of
ISO 8501-1 Surface Cleanliness – Part 1: Rust Grades and reparation
Grades of Uncoated Steel Substrates and of Overall
Removal of Previous Coatings.

ISO 9000 Quality Management Systems – Fundamentals and


Vocabulary.
ISO 9001 Quality Management Systems - Requirements

ISO 9712 Non-destructive Testing - Qualification and Certification of


NDT Personnel.

ISO 15590-2 Petroleum and Natural Gas Industries Induction Bends,


Fittings and Flanges for Pipeline Transportation Systems.

ISO 10474 Steel and Steel Products, Inspection Documents.

Welded steel tubes for pressure purposes-ultrasonic testing


ISO 12094 for the detection of laminar imperfections in strips/plates
used in the manufacture tubes.

Manufactures Standardization Society (MSS)

MSS SP 25 Standard Marking System for Valves, Fittings, Flanges

MSS SP 75 Specification for High Test Wrought Butt-Welding Fittings

MSS SP 6 Standard Finishes for Contact Faces of Pipes,Flanges and


Connecting End Flanges of Valves and Fittings
INSTALLATION OF CA-P TO CD-P PIPELINE
CONTRACT NO. ADOC/PI-18/SPC/CN-16
Client : ADOC (JAPAN) LTD
ABU DHABI OIL CO, LTD
NPCC-Project No. 9201

DOCUMENT NUMBER
Page 11 of 23
DOCUMENT TITLE
ADOC: MRF-EC-PL-65SPE-005 REV. : 0
NPCC: 9201-N-SP-3005 SPECIFICATION OF BARRED TEE DATE: 10-07-2019

4.3 Order of Precedence

The MANUFACTURER shall notify the COMPANY of any conflict between this
specification, the related data sheets, the Codes and Standards and any other
specifications noted herein. Resolution and/or interpretation precedence shall be obtained
from COMPANY in writing before proceeding with the design or manufacture. COMPANY
interpretation shall be final and binding on MANUFACTURER.

In case of conflict, the order of precedence shall be:

• The laws, standards and regulations of the United Arab Emirates


• PROJECT Specifications and Standards
• Industry Codes and Standards
INSTALLATION OF CA-P TO CD-P PIPELINE
CONTRACT NO. ADOC/PI-18/SPC/CN-16
Client : ADOC (JAPAN) LTD
ABU DHABI OIL CO, LTD
NPCC-Project No. 9201

DOCUMENT NUMBER
Page 12 of 23
DOCUMENT TITLE
ADOC: MRF-EC-PL-65SPE-005 REV. : 0
NPCC: 9201-N-SP-3005 SPECIFICATION OF BARRED TEE DATE: 10-07-2019

5.0 QUALITY ASSURANCE

5.1 Quality Management System

The Manufacturer shall operate a Quality Management System (QMS) within his
organization, which ensures that the requirements of this specification are fully achieved.
The Manufacturer's Quality Management System shall be based on the latest issue of
ISO 9001 (or an equivalent) and accredited by a reputable certifying agency. The
Manufacturer's Quality Manual shall provide details for the preparation of a Quality Plan,
which shall include provisions for the QA/QC of all raw materials, Barred Tee
Manufacturing, testing and final inspection. Where an approved Manufacturer revises
their Quality Management System that effect any changes to COMPANY approved
Quality plan/ Inspection & Test Plan, then the revised Quality plan / Inspection & Test
Plan shall be submitted for COMPANY approval before initiating any manufacturing
process.

The effectiveness of this Quality System may be subject to monitoring by the COMPANY
or its representative and, may be audited following an agreed period of notice.

The Manufacturer shall maintain sufficient Inspection and Quality Assurance staff,
independent of his production management, to ensure that the Quality Plan is correctly
implemented and that all related documentation is available.

5.2 Quality Plan

The successful bidder shall submit project specific Quality Plan as well as Inspection and
Test Plan (ITP) to the COMPANY within one week after the award of Purchase Order.
Evidence shall be included in the plan to prove that the quality section is independent of
production management.

Barred Tee Manufacturer shall also submit the mills operating procedures such as the
Manufacturing Procedure Specification (MPS), Inspection, NDT, Hydrostatic testing,
Handling, Storage etc. for review by the COMPANY. The documents submitted shall be
reviewed by the COMPANY and any queries resolved during preproduction meetings.
For the first order of each grade and/or size of barred tee, the Manufacturer shall submit a
Manufacturing Procedure Specification (MPS) along with his offer for review/approval by
the COMPANY.
INSTALLATION OF CA-P TO CD-P PIPELINE
CONTRACT NO. ADOC/PI-18/SPC/CN-16
Client : ADOC (JAPAN) LTD
ABU DHABI OIL CO, LTD
NPCC-Project No. 9201

DOCUMENT NUMBER
Page 13 of 23
DOCUMENT TITLE
ADOC: MRF-EC-PL-65SPE-005 REV. : 0
NPCC: 9201-N-SP-3005 SPECIFICATION OF BARRED TEE DATE: 10-07-2019

For subsequent order / supply of the same barred tee as indicated above, reference shall
be made to the previously approved MPS as an alternative to submitting the document
with the offer.

5.3 Pre-Production Meeting

Pre-production meetings shall be held between the COMPANY and/or its representatives
and the Manufacturer, to clarify and resolve any technical issues.
The first pre-production meeting shall be conducted within 14 days after the award of
Purchase Order.

5.4 Third Party Inspection Requirements

ITP and all inspection procedures shall have prior approval of COMPANY. All qualification
tests shall be witnessed by COMPANY approved Third Party.
Barred Tees shall have a type 3.2 certificate as per BS EN 10204.

5.5 Measuring and Test Equipment

The accuracy of all measuring and test equipment shall be periodically verified and
recorded as per Manufacturer's Quality Management System and demonstrated to the
COMPANY or its representative throughout manufacturing.
INSTALLATION OF CA-P TO CD-P PIPELINE
CONTRACT NO. ADOC/PI-18/SPC/CN-16
Client : ADOC (JAPAN) LTD
ABU DHABI OIL CO, LTD
NPCC-Project No. 9201

DOCUMENT NUMBER
Page 14 of 23
DOCUMENT TITLE
ADOC: MRF-EC-PL-65SPE-005 REV. : 0
NPCC: 9201-N-SP-3005 SPECIFICATION OF BARRED TEE DATE: 10-07-2019

6.0 DESIGN AND TECHNICAL REQUIREMENTS

The technical requirements stipulated in this specification are based on API Specification
5L, 45th edition. These requirements are applicable to COMPANY.

The numbering of the following items corresponds to the paragraph numbering in API
Specification 5L and reflects additions, modifications, and deletions by the COMPANY
indicated in the heading. All provisions of API Specification 5L that are not revised remain
in force.

The end thickness of the Barred Tee branch shall be same as the connecting line pipe,
mentioned in Table A. The pipe connecting to the branch of the Tee may be of different
diameter to the main line. Where this occurs, the Barred Tee branch shall be designed to
suit the same.

The Barred tees corrosion allowance and internal diameter shall be the same values as
the adjoin pipeline. Pipeline data presented in the Table A has been extracted from
Pipeline Design Basis.

Table A : Pipeline Design Data

Description Unit Parameters

Nominal Pipe Size (Outside Inches 8"


Diameter – Pipeline/Riser) (mm)
(219.1)

Approximate Pipeline Total Length km 4.8

Type of Service - Oil pipeline (Sour)

Material Grade (API 5L) - API 5L Gr. X46NO/X46QO,


PSL 2 (NACE MR 0175)
Minimum pipeline wall mm 12.7
thickness (For Zone 1 and
Minimum wall thickness of the mm 14.27
Zone 2)pipe for induction bending
mother

Internal Corrosion Allowance mm 6


INSTALLATION OF CA-P TO CD-P PIPELINE
CONTRACT NO. ADOC/PI-18/SPC/CN-16
Client : ADOC (JAPAN) LTD
ABU DHABI OIL CO, LTD
NPCC-Project No. 9201

DOCUMENT NUMBER
Page 15 of 23
DOCUMENT TITLE
ADOC: MRF-EC-PL-65SPE-005 REV. : 0
NPCC: 9201-N-SP-3005 SPECIFICATION OF BARRED TEE DATE: 10-07-2019

Wall Thickness Fabrication Tolerance % +12.5% of wall thickness

Out-of-roundness Tolerance, % % 1.5% D for pipe except at ends;


1% D at ends.

Minimum Induction Bend Radius mm 1095.4 (5D)

6.1 Barred Tee Design and Fabrication

The design & fabrication and testing & inspection of Barred Tees shall be fully compatible
with DNV-GL-ST-F101 Section 5.6.3 and Section 8.2.4. Barred Tees shall be designed to
provide unhindered passage of bi-directional pigs and intelligent pigs. It shall have an
internal diameter equal to that of the connecting line pipe system and shall meet the same
tolerance requirements.

The Barred Tees shall be of the integral (non-welded) reinforcement type. Outlets shall be
extruded and the main branch shall not be welded.
All calculations needed in the performance of the works shall be submitted to COMPANY
for review.

The end thickness of the header and branch of barred tee shall match the connecting line
pipe thickness to which they will be welded. The pipe connecting to the branch of the Tee
may be of different diameter to the main line. Where this occurs, the Barred Tee branch
shall be designed to suit the same.
All tees shall be designated to dimensional requirement of MSS SP 75. Moreover, the
Tees shall also conform to the applicable pipeline code or standard (B31.4; DNV-GL-ST-
F101).

The Barred tees corrosion allowance and internal diameter shall be the same values as
the adjoining pipeline.
INSTALLATION OF CA-P TO CD-P PIPELINE
CONTRACT NO. ADOC/PI-18/SPC/CN-16
Client : ADOC (JAPAN) LTD
ABU DHABI OIL CO, LTD
NPCC-Project No. 9201

DOCUMENT NUMBER
Page 16 of 23
DOCUMENT TITLE
ADOC: MRF-EC-PL-65SPE-005 REV. : 0
NPCC: 9201-N-SP-3005 SPECIFICATION OF BARRED TEE DATE: 10-07-2019

Barred Tees shall meet all the requirements of DNV-GL-ST-F101. VENDOR shall perform
the following calculations:-

 Reinforcement calculations as per ASME B 31.4. 404.3.5 “Reinforcement of Single


Openings”
 The flexibility stress calculation as per ASME B 31.3 para 319.4.4 to ensure the
Tee will accommodate the external moments. Otherwise the finite elements
analysis shall be provided as per DNV-GL-ST-F101.

6.2 Manufacture Requirements

The Manufacture requirements of Barred Tees shall be full compliance with ISO 15590-2,
Class ‘CS’ for sour service. VENDOR shall follow the additional requirements to ISO
15590-2 and as defined in DNV-GL-ST-F101Section 8.2.4.
Bars of barred tees and wyes shall not be welded directly to the high stress areas around
the extrusion neck. It is recommended that the bars transverse to the flow direction are
welded to a pup piece, and that the bars parallel to the flow direction are welded to the
transverse bars only. If this is impractical, alternative designs shall be considered in order
to avoid peak stresses at the bar ends.

6.3 Barred Tees Material

All materials for manufacture of the Barred Tees shall be provided by the VENDOR. The
Material for Barred Tees shall be full compliance with ASTM A860 WPHY 46 or higher
based on the connecting line pipe. The Barred Tee materials shall be in compliance with
sour service requirements for well fluid as stated in the Barred Tee data sheet. Barred
Tee for sour services shall comply with the requirements of project specification. The
chemical composition for barred tees material and the maximum carbon equivalent (C.E)
shall be Pcm ≤ 0.22, CE (IIW) ≤ 0.36) in compliance with “Specification for Seamless Line
Pipe” Document No: - 9201-N-SP-3001.

Connecting Pipes to which the barred tees will be welded are manufactured in
accordance with API 5L and “Specification for Seamless Line Pipe” Document No: -
9201-N-SP-3001.
INSTALLATION OF CA-P TO CD-P PIPELINE
CONTRACT NO. ADOC/PI-18/SPC/CN-16
Client : ADOC (JAPAN) LTD
ABU DHABI OIL CO, LTD
NPCC-Project No. 9201

DOCUMENT NUMBER
Page 17 of 23
DOCUMENT TITLE
ADOC: MRF-EC-PL-65SPE-005 REV. : 0
NPCC: 9201-N-SP-3005 SPECIFICATION OF BARRED TEE DATE: 10-07-2019

The scrapper guides (bars) have to be adapted to the internal shape of the branch; the
inner guides shall follow the internal contours of the runs. Bars shall be full penetration
welded into the outlet neck of the straight tees as shown in Appendix-A. Bars shall be
manufactured from ASTM A516 Gr. 46 or higher steel quality or approved alternative. In
no case the welded bars shall protrude inside the header.

All material shall comply with NACE MR 01 75 / ISO 15156.


INSTALLATION OF CA-P TO CD-P PIPELINE
CONTRACT NO. ADOC/PI-18/SPC/CN-16
Client : ADOC (JAPAN) LTD
ABU DHABI OIL CO, LTD
NPCC-Project No. 9201

DOCUMENT NUMBER
Page 18 of 23
DOCUMENT TITLE
ADOC: MRF-EC-PL-65SPE-005 REV. : 0
NPCC: 9201-N-SP-3005 SPECIFICATION OF BARRED TEE DATE: 10-07-2019

7.0 MANUFACTURE

7.1 General

The Barred Tee shall be manufactured in accordance with ISO 15590-2, Class ‘CS’ for
sour service. VENDOR shall follow the additional requirements to ISO 15590-2 are
defined in DNV-GL-ST-F101 Section 8.2.4.
Materials shall be in the normalized, quenched and tempered (Q&T) or precipitation heat
treatment condition in order to meet the strength requirements in accordance with DNV-
GL-ST-F101 Section 8.2.4. The stress shall be relived according to MSS SP 75.
The sizing plates shall be fabricated from material which will avoid gauging or scratching
of the inside surface of the tee with the exception that copper or copper alloy (brass,
bronze) shall not be used. The diameter of the sizing plate shall be 95% of nominal inner
diameter.
The design of gauging plate shall be approved by COMPANY prior to commencement of
inspection. No production shall commence without COMPANY written approval of
VENDOR’s manufacturing procedure. VENDOR shall provide a copy of mill certificates of
the Material for the Tees to COMPANY for Acceptance / Approval prior to the
commencement of production.

7.2 Dimensional & Tolerances

Dimension and Tolerance of Barred Tees shall meet the requirements of ISO-15590-2.
The minimum internal diameter of the completed Barred Tees shall be confirmed for pig
clearance by passing an internal gauge through full length of the bore(s). The gauge for
Barred Tees shall consist of at least one gauging plate with the dimensions defined in
section 7.1.

7.3 Welding Ends

Welding ends shall be machine beveled after the completion of hydrostatic testing to the
requirements of DNV-GL-ST-F101.
The welding ends shall be prepared to match “Specification for Seamless Line Pipe”
Document No: - 9201-N-SP-3001. The bevel end angle shall be according to API 5L.
INSTALLATION OF CA-P TO CD-P PIPELINE
CONTRACT NO. ADOC/PI-18/SPC/CN-16
Client : ADOC (JAPAN) LTD
ABU DHABI OIL CO, LTD
NPCC-Project No. 9201

DOCUMENT NUMBER
Page 19 of 23
DOCUMENT TITLE
ADOC: MRF-EC-PL-65SPE-005 REV. : 0
NPCC: 9201-N-SP-3005 SPECIFICATION OF BARRED TEE DATE: 10-07-2019

7.4 Coating

Protection of weld ends sensitive to corrosion must have an application of corrosion


inhibitor and wrapping of neutral paper, then waterproof fabric and end sealed with wax.
VENDOR shall submit the painting proposal Barred Tee to COMPANY for approval.

7.5 Treatment of Defects

The treatment of defects shall be according to ISO 15590-2; Repair by welding is not
permitted. Any other repairs shall be brought to the notice of COMPANY.

7.6 Test Ring

VENDOR shall provide weld test rings for each grade, heat, size and wall thickness of the
barred tee as quantified in the Purchase Order for COMPANY to allow weld procedure
qualification to be performed. Test rings shall be supplied as pipe with wall thickness
specified in the purchase order and shall match the representative barred tee weld end
preparation. Overall length of each test ring to be a minimum of 500mm.

Supplied weld test rings shall be subject to heat treatment identical to the barred tee
represented by the rings.

7.7 Handling and Storage

All handling, loading and unloading shall be done in such a manner as to minimize
mechanical damage and corrosion. Fitting ends shall be protected with suitable end
protectors. The type of protector shall be submitted for COMPANY approval.

7.8 Packing and Shipment

Packaging shall be provided to adequately protect the Tees and prevent damage during
transportation and storage, including application of package wraps, cushioning, and
complete identification markings. The Tees shall be placed in exterior shipping containers
or other media, including necessary blocking, bracing, cushioning, weatherproofing, and
exterior strapping, and marking prior to shipment.
INSTALLATION OF CA-P TO CD-P PIPELINE
CONTRACT NO. ADOC/PI-18/SPC/CN-16
Client : ADOC (JAPAN) LTD
ABU DHABI OIL CO, LTD
NPCC-Project No. 9201

DOCUMENT NUMBER
Page 20 of 23
DOCUMENT TITLE
ADOC: MRF-EC-PL-65SPE-005 REV. : 0
NPCC: 9201-N-SP-3005 SPECIFICATION OF BARRED TEE DATE: 10-07-2019

8. INSPECTION AND TESTING

8.1 Inspection

The Barred Tee shall be inspected as per DNV-GL-ST-F101 Section 8.2.4 and
COMPANY approved ITP. COMPANY Representative/ TPA shall be given free access to
all places of manufacture. In addition, they shall be authorized to attend all tests and
inspect all phases of manufacturing and to receive a copy of all conformity certificates
and test sheets, ensuring that the finished product conforms to this specification.

VENDOR’s inspectors and equipment shall be subjected to the approval of COMPANY.


VENDOR shall notify COMPANY in writing at least fourteen (14) days prior to start of
procedures/tests to enable inspection arrangements to be made.

COMPANY or TPA will be the sole judge of the acceptability of materials and/or work
done. COMPANY shall carry out inspection as indicated in the approved ITP.

This inspection does not relieve VENDOR from the responsibility to perform inspection
activities required to ensure the quality of the product.

8.2 Testing

All material shall comply with NACE MR 0175 / ISO 15156.

All testing requirements shall comply with section 8.5.1 of DNV-GL-ST-F101

As a minimum, Acceptance criteria for all testing shall be in line with “Specification for
Seamless Line Pipe” Document No: - 9201-N-SP-3001.

8.3 Hydrostatic Testing

VENDOR shall provide COMPANY with details of hydrostatic testing procedures for
approval.

Hydrostatic pressure testing of the Barred Tee is required based on DNV-GL-ST-F101.


VENDOR shall certify in writing to the COMPANY that Barred tee is capable of
withstanding, without leaks, ruptures or unacceptable deformation, the pipeline field
hydrostatic test pressure as specified provided by DNV-GL-ST-F101.

Duration of the test shall be 60 minutes minimum COMPANY reserves the right to
witness the pressure test. After the completion of Barred Tee testing and acceptance,
INSTALLATION OF CA-P TO CD-P PIPELINE
CONTRACT NO. ADOC/PI-18/SPC/CN-16
Client : ADOC (JAPAN) LTD
ABU DHABI OIL CO, LTD
NPCC-Project No. 9201

DOCUMENT NUMBER
Page 21 of 23
DOCUMENT TITLE
ADOC: MRF-EC-PL-65SPE-005 REV. : 0
NPCC: 9201-N-SP-3005 SPECIFICATION OF BARRED TEE DATE: 10-07-2019

closure shall be cut off and the ends prepared in accordance with ISO 15590-2, such that
the tee run end to end and the center line to branch and dimensions are not less than the
dimensions specified in ISO 15590-2.

8.4 NDT on Welds

VENDOR shall carry out NDT on all welds, bar attachment welds shall be subjected to
100% MPI.

Ultrasonic testing shall be carried out for the base metal.

All bevel ends and 100 mm back from bevel shall be subjected to 100 % MPI.

NDT shall be in compliance to DNV GL-ST-F101.

8.5 Identification Details from Manufacturer

The following data shall be painted in white in 25 mm high or larger letters externally on
each Barred Tees as a minimum. Hard stamping is not permitted.
1. Tag Number
2. Purchase Order number
3. Purchase Order Item number
4. Material Grade
5. Tee minimum wall thickness, Size in millimetres and material grade
6. VENDOR’s Name and Date of Manufacture
7. COMPANY name
8. Weight in Kilograms
9. Design and Hydrostatic Test pressures in “X” barg at “Y” °C
10. Heat Number

8.6 VENDOR Document Requirements

The VENDOR shall submit to COMPANY documents as listed in VDRL attached to the
requisition.
INSTALLATION OF CA-P TO CD-P PIPELINE
CONTRACT NO. ADOC/PI-18/SPC/CN-16
Client : ADOC (JAPAN) LTD
ABU DHABI OIL CO, LTD
NPCC-Project No. 9201

DOCUMENT NUMBER
Page 22 of 23
DOCUMENT TITLE
ADOC: MRF-EC-PL-65SPE-005 REV. : 0
NPCC: 9201-N-SP-3005 SPECIFICATION OF BARRED TEE DATE: 10-07-2019

APPENDIX A – TYPICAL DESIGN FOR BARRED TEE


INSTALLATION OF CA-P TO CD-P PIPELINE
CONTRACT NO. ADOC/PI-18/SPC/CN-16
Client : ADOC (JAPAN) LTD
ABU DHABI OIL CO, LTD
NPCC-Project No. 9201

DOCUMENT NUMBER
Page 23 of 23
DOCUMENT TITLE
ADOC: MRF-EC-PL-65SPE-005 REV. : 0
NPCC: 9201-N-SP-3005 SPECIFICATION OF BARRED TEE DATE: 10-07-2019