Control Chart Akurasi (Pengukuran Sampel CRM Cod)

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

CONTROL

CONTROL CHART AKURASI


CHART AKURASI (PENGUKURAN
(PENGUKURAN NH3)
SAMPEL CRM COD)
135.00

130.00 130.70
115.00

125.00
111.4
110.00
120.00 119.60 UWL
UWL
LWL
115.00 105.65 LWL
105.00
% RECOVERY

UAL
110.00 UAL
101.85 108.70
% RECOVERY

LAL
106.20 105.50
105.00 99.9 100.00 LAL
98.75 RATA-RATA
102.10
100.00 RATA-RATA
PENGUKURAN
95.00 SAMPEL
95.00 95.10 93.5 PENGUKURAN
SAMPEL

90.00 90.00
86.60
85.00
2/1/2018 3/2/2018 7/3/2018 8/4/2018 10/5/2018 11/6/2018 13/7/2018 14/8/2018
85.00
2/1/2018 3/1/2018 WAKTU PENGUKURAN 5/1/2018
4/1/2018 6/1/2018 11/6/2018
WAKTU PENGUKURAN
CONTROL CHART PRESISI (ANALISA KADAR NO2 DALAM SAMPEL AIR
SUMUR)
12
11.32

10

UWL
8
LWL

6 UAL
% RPD

LAL

4 RATA-RATA

PENGUKURAN
SAMPEL
2

0.60 0.66 0.63


0.42
0
2-Jan-18 3-Jan-18 4-Jan-18 5-Jan-18 6-Jan-18

-2
WAKTU PENGUKURAN