Estimate For Factory Building: SI No Description Unit Quantity Rate Amount

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Estimate for Factory Building

SI No Description Unit Quantity Rate Amount


1 Excavation Cum 331.24 124.86 41359
2 Levelling Course (M15 Grade) Cum 43.74 6643.65 290623
3 Reinforced Concrete (M25 Grade) Cum 32.26 9945.50 320845
4 Column Cum 23.71 9945.50 235820
5 RCC Beam Cum 70.38 9945.50 699975
6 RCC Slab Cum 81.26 9945.50 808192
7 Brick Works Cum 84.97 8517.43 723703
8 Earth fill Cum 571.64 1000.00 571638
9 HYSD Bar kg 26318.16 80.68 2123349
10 Plastering Sqm 934.15 310.62 290167
11 Painting Sqm 934.15 272.08 254165
Civil Work Cost = 6,359,836
Shuttering costs = 953,975
Electrical cost= 381,590.17
Plumbing Cost= 508,786.89
Design & Dwg = 63,598.36
Other Cost= 317,991.81
Over Heads = 127,196.72
Total Cost = 8,712,975
SI No. Description Nos L B D QTY
1 Excavation 331.24
Footing 16 1.50 1.50 1.60 57.60
Footing 8 2.00 2.00 1.60 51.20
Strap Beam 1 173.78 0.80 1.60 222.44

2 Levelling Course (M15 Grade) 43.74


Footing 16 1.70 1.70 0.1 4.62
Footing 8 1.20 1.20 0.1 1.15
Strap Beam 1 173.78 0.5 0.1 8.69
Below Ground Slab 1 21.341 13.72 0.1 29.28

3 Reinforced Concrete (M25 Grade) 32.26


Footing 16 1.5 1.5 0.2 7.20
Footing 8 1 1 0.2 1.60
Strap Beam 8 13.72 0.45 0.3 14.82
Strap Beam 3 21.341 0.45 0.3 8.64

4 Column 23.71
Below Ground 24 0.3 0.45 1.75 5.67
Above Ground 24 0.3 0.45 5.57 18.04

5 RCC Beam 70.38


Plinth Beam 8 13.72 0.45 0.3 14.82
Plinth Beam 3 21.341 0.45 0.3 8.64
Intermediate Beam 8 13.72 0.45 0.3 14.82
Intermediate Beam 3 21.341 0.45 0.3 8.64
Ground Floor Beam 8 13.72 0.45 0.3 14.82
Ground Floor Beam 3 21.341 0.45 0.3 8.64

6 RCC Slab 81.26


Ground Slab 1 13.72 21.341 0.13 36.60
Roof Slab 1 21.341 13.72 0.15 43.92
Lintel Slab 10 1.2195 0.6098 0.1 0.74

7 Brick Works 84.97


Basement Level 1 70.122 1 0.23 16.13
Ground Floor 1 70.122 4.2683 0.23 68.84

8 Earth fill 571.64


Below Ground Level 1 278.84
For Basement Fill 1 13.72 21.341 1 292.79
9 HYSD Bar 26318
Footing Kg 8.80 0.80% 7850 552.64
Column Kg 23.71 2.50% 7850 4653.3
Beam Kg 93.84 2% 7850 14733
Slab Kg 81.26 1% 7850 6379.1

10 Plastering 934.15
Inner and Outter 2 70.122 4.5732 641.36
Slab 1 13.72 21.341 1 292.79