1 2 3 4 5 1 2 3 4 5

2.15 24.00 0.25 4.00 2.15 24.00 0.25 4.00


CLEAR VENUE 1-2 CLEAR VENUE 1-2
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

0.950.90 0.950.90
2.15 REINF. CONCRETE GUTTER WITH 50mm THK. 2.15
CONCRETE TOPPING W/ 100mm X 100mm
G.A. 10 WELDED WIREMESH ON 4.5 kg. 0.6MM THK. PRE-PAINTED LONGSPAN RIB
TORCH APPLIED WATERPROOFING TYPE G.I. SHTS. ROOFING W/ 6MM THK.
MEMBRANE. DOUBLE-SIDED ALUM. FOIL REFLECTIVE
INSULATION.

PROPERTY LINE PROPERTY LINE


2.00

2.00

2.00

2.00
3.00

3.00

3.00

3.00
0.75
1.00

1.00

1.00

1.00
D.S. ACCU ACCU ACCU ACCU ACCU ACCU ACCU D.S. ACCU PLATFORM D.S. ACCU ACCU ACCU ACCU D.S.
A A

ACCU PLATFORM
1.45
7T-5

0.40
ANGLO ASIA OFFICE SHELVES PANTRY/ COFFEE COUNTER

4.50
(ADMIN. & FINANCE DEP'T.)

0.85
OPEN
5.00

5.00

5.00

5.00
DN

0.40
SHELVES

SHELVES ST-2 0.95


HALLWAY
8.40

2.00 0.70
ELECT'L.RM. UP
B SHELVES B
7T-2

SHELVES
STORAGE P.E.
(8 PAX.)
SECRETARY

ROOM
EXECUTIVE

ELEVATOR
OFFICE LOBBY LOBBY

1.10
15.00

15.00

15.00

15.00
7T-4
6.00

P.E.

6.00

6.00

6.00
ROOF DECK
7T-1
2.40 0.20

(8 PAX.)

1.00
ENGINEERING DEPARTMENT

1.00
SHELVES

2.65

1.150.451.50
HALLWAY 7T-3

C DN C
HALLWAY
PROPERTY LINE

PROPERTY LINE
1.35
2.15 HIGH LOW PARTITION WALL

MEETING
ROOM
4.00

4.00

4.00

4.00
1.85

2.85
CONFERENCE AREA OFFICER
10- SEATER
6.00

ROOM-1
EXECUTIVE AREA CONFERENCE ROOM
SECRET
D ROOM D
1.00
2.00

2.00

2.00

2.00
EXECUTIVE DECK
1.00

AREA = 24.88 SQ. MTR.


1.90 0.40
4.30

4.30

4.30

4.30
2.30

2.30

2.30

2.30
EDGE OF ROAD
0.40 5.80 0.45 5.65

0.35

0.6MM THK. PRE-PAINTED LONGSPAN RIB


TYPE G.I. SHTS. ROOFING W/ 6MM THK.
DOUBLE-SIDED ALUM. FOIL REFLECTIVE
INSULATION.

1.50 0.65 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

2.15 24.00 0.25 4.00 2.15 24.00 0.25 4.00


CLEAR VENUE 1-2 CLEAR VENUE 1-2

N
ANGLO ASIA OFFICE N
TOTAL FLOOR AREA= 455.94 SQ.M.
E
GD-1 7TH FLOOR PLAN TOTAL OFFICE AREA = 326.46 SQ.M. (72%) E
GD-2 ROOF PLAN
W 1:100 MTS. W 1:100 MTS.
SCALE SCALE
AR-5 TOTAL COMMON AREA = 129.48 SQ.M. (28%) AR-5
S S

LEGEND: SCHEDULE OF WALL FINISHES: SCHEDULE OF FLOOR FINISHES:

WF - 1 = PLAIN CEMENT PLASTER AND SEMI-GLOSS FF - 1 = PLAIN CEMENT FLOOR FINISH W/ 2 COATS EPOXY PAINT FF - 5 = STAMP CRETE FINISH.
PROPOSED STEEL COLUMN
PAINT WALL FINISH. (3-COATS FULL BODY)
100mm THK. C.H.B. WALL FF - 2 = PLAIN CEMENT FINISH READY TO RECEIVE TOPPING FF - 6 = 50mm THK. CONCRETE TOPPING W/ 100mm X 100mm
WF - 2 = 400mm X 400mm VIT. WALL TILES (note: ALL TOILET)
FF - 3 = 400mm X 400mm VIT. FLOOR TILES (note: ALL TOILET) G.A. 10 WELDED WIREMESH ON 4.5 kg. TORCH APPLIED
150mm THK. C.H.B. WALL WATERPROOFING MEMBRANE.
WF - 3 = 4mm THK. COMPOSITE PANEL WITH FLUOROCARBON
PAINT FINISH, CORROSION RESISTANCE WEATHERABILITY. FF - 4 = 600mm X 600mm GRANITE FLOOR TILES (note: ALL TOILET ABOVE GROUND)
150mm THK. R.C WALL

ARCHITECT REG. NO. 23257 ENGINEER REG. NO. PROJECT : OWNER : REVISION : REVISION : SHEET CONTENTS : SHEET NO.
Buenviaje & Marcelo
ARCHITECTS DESIGNERS PLANNERS
PROPOSED VENUE II ANGLO ASIA COMMODITIES AR
CRISTOBAL ST., SAMPALOC SAN MIGUEL, MANILA AS SHOWN
JOSE A. MARCELO, III
E-mail: archi_ab28@yahoo.com / ja.marcelo@yahoo.com.ph
PTR. NO. 8093686 DATE: JANUARY 22, 2019 PTR. NO. DATE:
OFFICE BUILDING CORPORATION
Contact. no.: 0919-459-9801 / 0935-148-45-44 / 734-75-86
THE COPYRIGHT OF THIS DRAWING REMAINS THE PROPERTY OF BUENVIAJE & MARCELO JAMARCELO
5
PLACE MANILA T.I.N. 301-092-824 PLACE T.I.N. LOCATION: ACTIVE STREET, SUBIC BAY INDUSTRIAL PARK, SBFZ WHOSE PERMISSION MUST BE OBTAINED BEFORE ANY USE OF IT CAN BE MADE. DRAWN BY : AABUENVIAJE CHECKED BY : DATE : APRIL 24, 2019

You might also like