Untitled - Load Flow Report

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

ETAP

Project: Page: 1
12.6.0H
Location: Date: 03-31-2021
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: Bismillah Config.: Normal

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

* Bus1 20.000 100.000 0.0 1.272 -0.247 0 0 Bus6 1.272 -0.247 37.4 -98.2

* Bus3 20.000 100.000 0.0 1.435 1.055 0 0 Bus11 1.435 1.055 51.4 80.6 -2.500

Bus6 5.500 100.272 -1.5 0 0 0 0 Bus7 0.489 0.085 52.0 98.5

Bus12 0.844 0.176 90.3 97.9

Bus1 -1.268 0.281 136.0 -97.6

Bus11 -0.065 -0.542 57.1 12.0

Bus7 5.500 99.624 -2.0 0 0 0.145 0.063 Bus6 -0.487 -0.080 52.0 98.7

Bus8 0.342 0.017 36.1 99.9

Bus8 5.500 99.252 -2.4 0 0 0 0 Bus7 -0.341 -0.015 36.1 99.9

Bus10 0.341 0.015 36.1 99.9

Bus10 0.380 98.319 -4.8 0 0 0.338 0.000 Bus8 -0.338 0.000 522.8 100.0

Bus11 5.500 100.272 -1.5 0 0 0 0 Bus15 0.874 0.323 97.6 93.8

Bus18 0.245 0.065 26.5 96.6

Bus23 0.245 0.065 26.5 96.6

Bus3 -1.429 -0.995 182.3 82.1

Bus6 0.065 0.542 57.1 12.0

Bus12 5.500 99.100 -2.3 0 0 0.505 0.216 Bus6 -0.837 -0.162 90.3 98.2

Bus13 0.332 -0.054 35.7 -98.7

Bus13 5.500 98.952 -2.6 0 0 0 0 Bus12 -0.331 0.056 35.7 -98.6

Bus14 0.331 -0.056 35.7 -98.6

Bus14 0.380 98.916 -5.1 0 0 0.342 0.000 Bus13 -0.329 0.070 516.0 -97.8

Bus17 -0.014 -0.070 109.9 19.4

Bus15 5.500 98.779 -2.3 0 0 0.505 0.216 Bus11 -0.866 -0.306 97.6 94.3

Bus16 0.361 0.089 39.5 97.1

Bus16 5.500 98.239 -2.7 0 0 0 0 Bus15 -0.360 -0.087 39.5 97.2

Bus17 0.360 0.087 39.5 97.2 -2.500

Bus17 0.380 98.916 -5.1 0 0 0.342 0.000 Bus16 -0.356 -0.070 557.8 98.1

Bus14 0.014 0.070 109.9 19.4

Bus18 5.500 99.902 -1.7 0 0 0.145 0.063 Bus11 -0.244 -0.064 26.5 96.7

Bus21 0.099 0.001 10.5 100.0

Bus21 5.500 99.802 -1.8 0 0 0 0 Bus18 -0.099 0.000 10.5 100.0

Bus22 0.099 0.000 10.5 100.0

Bus22 0.380 99.579 -2.1 0 0 0.099 0.000 Bus21 -0.099 0.000 151.3 100.0

Bus23 5.500 99.902 -1.7 0 0 0.145 0.063 Bus11 -0.244 -0.064 26.5 96.7

Bus24 0.099 0.001 10.5 100.0

Bus24 5.500 99.802 -1.8 0 0 0 0 Bus23 -0.099 0.000 10.5 100.0


ETAP
Project: Page: 2
12.6.0H
Location: Date: 03-31-2021
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: Bismillah Config.: Normal

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus25 0.099 0.000 10.5 100.0

Bus25 0.380 99.579 -2.1 0 0 0.099 0.000 Bus24 -0.099 0.000 151.3 100.0

* Indicates a voltage regulated bus (voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA