Lifting Plan

Site / Project Site: - Huntsman Assets Dismantling Date:-


Phase-2 (b)
Lift Location:- MSRA References No. :-

Load Details / Crane Details


Job ID : Crane configuration/model:
Design boom Length:
Maximum Height :

Maximum Length : Maximum boom Lenght:

Maximum Width :

Max. hook weight :

Accessories weight: Maximum Radius: Wind (knots): N / A

Actual Job weight :

Other information:
Gross weight : SWL at this radius:
Signal Man Name:

SAFETY MEASURES TO BE CONSIDERED


Weight verified Lifting equipment/accessories equipment checks
certificates
Crane mode verified Crane stability Dynamic factors involved

Competent and sufficient personnel Packing protection load/lifting


equipment/assets Suitable adequate supervision

Loose objects removed from load Correct PPE Tag lines required
Working space adequate and Accessories/equipment fit for
Toolbox talk required unobstructed purpose/SWL

Emergency/rescue plans Environment: visibility/wind speed/other Trained/competent personnel


Soft barricade should be arranged
Signal man deployed for this activity Communications (If specify)
before commencing the activity

Step-by-step details of lifting operation (Responsible)


 Crane Position and Out Rigger Position – Driver/Operator and Helper
 Hard/soft Barricade for the activity – Helper
 lifting activity – Supervisor
 Boom lift position – Operator and Supervisor
 Riggers Competency – EHS
 Signals and Communication – Signal Man
Lifting Plan

TOOLS & TACKLES:

Diameter of
Sr. Condition
Type of Tools Identification Wire HITCH TYPE
No SWL TPI (OK/NOT Remarks
& Tackles Number Rope/Width of vertical/choker/basket
. OK)
Lifting Belt

Lifting Material Sketch:

Contractor’s PM/Site in charge Contractor’s EHS Representative PMC Site in charge/ EHS
Name & Sign. Name & Sign. Name & Sign.