3-Phase Capacitor Bank Pre-Installation Checklist

Customer Details
Customer name TNB account no.
Address TNB meter no.

TNB Bill & Premise Details


No. Inquiry Yes No
1 Is the TNB meter number same as in TNB bill?
2 Last 6 months power factor in TNB bill are less than 0.85?
(a) Is a capacitor bank already installed at premise? [total capacity: ………… ]
3 (b) Does the capacitor bank still function? [Skip if (a) is “no”]
(c) Does the Customer agree to install a new capacitor bank? [Skip if (a) is “no”]
Is there a space of [4ft (l) x 4ft (w) x 8ft (h) ground-mounted] or [2ft (l) x 2ft (w) x 4ft
4
(h) wall-mounted] less than 5 meters from customer’s main distribution board?
5 Is a 4X4 vehicle needed to travel to the customers premise?

Electrical Details (taken during normal premise operation)


Information from TNB Meter & Distribution Value
Board
No. Unit
L1 L2 L3

1 Voltage V
2 Current A
3 Power factor N/A
4 Real power kW
5 Main circuit breaker size (i.e. MCB, MCCB, etc.) A
Note: Inform customer that the premise electricity needs to be off for 1 hour during wiring connection
work to main distribution board.
Required Pictures Please Tick
1 Main distribution board (opened panel)
2 Main distribution board (closed panel)
3 Clear picture of main circuit breaker size (e.g. 60A, 100A, 300A, 1000A)
4 Location to install new capacitor bank

TNB Signature : Mobile no. :


Name : Date :
Required Pictures Example

1 Main distribution board (opened panel)

2 Main distribution Board (closed panel)

Clear picture of main circuit breaker


3
size (e.g. 60A, 100A, 300A, 1000A)

4 Location to install new capacitor bank

END