3-Phase Capacitor Bank Pre-Installation
3-Phase Capacitor Bank Pre-Installation
Customer Details
Customer name TNB account no.
Address TNB meter no.
1 Voltage V
2 Current A
3 Power factor N/A
4 Real power kW
5 Main circuit breaker size (i.e. MCB, MCCB, etc.) A
Note: Inform customer that the premise electricity needs to be off for 1 hour during wiring connection
work to main distribution board.
Required Pictures Please Tick
1 Main distribution board (opened panel)
2 Main distribution board (closed panel)
3 Clear picture of main circuit breaker size (e.g. 60A, 100A, 300A, 1000A)
4 Location to install new capacitor bank
END